Pipe Replacement NC 118 Pitt County
Erosion Control Schedule
• Install erosion/sediment control measures according to plans.
• Grading of slopes; 1.5: 1= stabilize with Class B riprap
• Seed all disturbed areas as soon as final grading is completed.
• Clean out and/or rework all temporary sediment control measures after
significant rainfall event (or as otherwise needed). These measures should be
maintained until a permanent vegetative cover is established,and project is
complete
081841
Pipe Installation Schedule
• Install erosion/sediment control devices per plans.
• Remove material while limiting, as much as possible, material and sediment
from entering the stream and/or escaping from the project.
• Prepare pipe foundation while taking care to limit material and sediment from
entering the stream and/or escaping from the project. 'Where possible new
grade should be below the existing streambed. Bedding material will be washed
stone.
• Place new pipe and compact fill.
• Install slope protection on outlet and inlet ends of pipe (Class B Granite riprap)
• Establish permanent vegetation as soon as possible
• Remove sediment control devices after project has stabilized and permanent
vegetative cover is established.
MICHAEL F EASLEY
Guy I RNOR
September 15, 2008
COUNTY Pitt
MEMORANDUM TO Mi John Rouse, PE
Division Maintenance Engineer
LYNDO TIPPETT
SI-CRErARN
FROM R A Boyd, PE ?- K%
Regional Hydraulics Engineer
SUBJECT Emergency Structure Recommendations on NC-118 located
+/- 0 3 mi west of SR-1917 (Cannon Price Road)
Pursuant to the requested by Mr Mike Rogers of your staff on` September 4, 2008,
a review of the subject location has been ma e and the following is offered
-'t' r h kjw
D A = ? sq mi Existing structure is 1@ 72" CMP
Recommended Pipe Size is I@ 10' CAAP w/Headwalls
If turther assistance can be piovided, please contact this office
RAB/sr
Cc Mr Woody Jarvis jlftw# Mr Mike Rogers
DEC X 9
In8?TERQ, UAG
MAILING ADDRESS
NC DEPARTMENT OF TRANSPORTATION
HYDRAULICS UNIT
1590 MAIL SERVICE CENTER
RALEIGH NC 27699-1590
TELEPHONE 919-250-4100
FAX 919 250-4108
WEBSITE WWW DOH DOT STATE NC US
LOCATION
CENTURY CENTER COMPLEX
BUILDING B
1020 BIRCH RIDGE DRIVE
RALEIGH NC
Office Use Only' Fonn Version March 05
2 0 0 8 1 8 4 1
USACE Action ID No. DWQ No.
(It any particular item is not applicable to uns project, please enter toot Appricaote_ or tviti
Courtesy Copy No Fee
Processing
Check all of the approval(s) requested for this project
? Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
? 401 Water Quality Certification ? Express 401 Water Quality Certification
2 Nationwide, Regional or General Permit Number(s) Requested N/A
If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here
4 If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts,,attach the acceptance letter from NCEEP, complete section VIII,
and check here ?
If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here ?
I. Applicant Information
Owner/Applicant Information
Name'North Carolina Department of Transportation
Mailing Address
P.O. Box 1587
Greenville NC 27835-1587
Telephone Number 252-830-3490
E-mail Address
Fax Number 252-830-3341
2 Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant )
Name Jay B Johnson
Company Affiliation Division 2 Environmental Officer
Mailing Address
P.O. Box 1587
Greenville NC 27835-1587
Telephone Number 252-830-3490 Fax Number 252-830-3341
E-mail Address jbiohnson(a)ncdot.gov
Undated 111112005
Page 5 of 13
H. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties Both the vicinity map
and site plan must include a scale and north arrow The specific footprints of all buildings,
impervious surfaces, or other facilities must be included If possible, the maps and plans should
include the appropriate, USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined Plan drawings, or other maps may be-included at the applicant's discretion,
so long as the property is clearly defined For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format,
however, DWQ may accept paperwork of any size DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided
1 Name of project NC 118 Pipe Replacement
2 T I P Project Number or State Project Number (NCDOT Only) 2CR.10741.6
3 Property Identification Number (Tax PIN)
4 Location
County Pitt Nearest Town Grifton
Subdivision name (include phase/lot number)
Directions to site (include road numbers/names, landmarks, etc )
From Grifton, take,NC 118 East 5 Miles.
5, Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody )
Decimal Degrees (6 digits minimum) 35.363608 ON 77.352403 °W
6 Property size (acres) N/A
7 Name of nearest receiving body of water Grinnel Creek
8 River Basin Neuse Middle Neuse 03020202
(Note - this must be one of North Carolina's seventeen designated mayor river basins The
River Basin map is available at hap Hh2o enr state nc us/admtnlmapsl )
9 Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application Woodlands, Residential, and Agricultural
Updated 11/1/2005
Page 6 of 13
10 Describe the overall project in detail, including the type of equipment to be used
Pipe Replacement on NC 118 Pipe to Pipe Replacement Typical Bridge and Roadwav
Construction Equipment
11 Explain the purpose of the proposed work Pipe Replacement
III. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn Provide photocopies of previously issued permits,
certifications or other useful information Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable) If this is a NCDOT project,
list and describe permits issued for prior segments of the same T I P project, along with
construction schedules. None
IV. Future Protect Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application
No Additional Permit Requests are Anticipated in the Near Future
V. Proposed Impacts,to Waters of the United States/Waters of the State
It is the applicant's ?(or agent's) responsibility to deternnne, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project Each impact must be
listed separately in the tables below (e g , culvert installation should be listed separately from
riprap dissipater pads) Be sure to indicate if an impact is temporary All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems
Wetland and stream evaluation and delineation forms should be included as appropriate
Photographs may be included at the applicant's discretion If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below If additional
space is needed for listing or description, please attach a separate sheet
I Provide a written description of the proposed impacts
updated 11/1/2005
Page 7 of 13
2 Individually list wetland impacts Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc For dams,
se aratel list impacts due to both structure and flooding
Wetland Impact
Site Number
(indicate on map)
Type of Impact 'iypc of Wetland
(e g , forested, marsh,
herbaceous, bog, etc) Located within
year
100-
Floo oodplain
(yes/no) Distance to
Nearest
Strewn
(linear feet) Area of
Impact
(acres)
Area 1 0 Acres
Area 2 0 Acres
Area 3 0 Acres
Area 4 0 Acres
'Total Wetland Impact (acres) 0 Acres
3 List the total acreage (estimated) of all existing wetlands on the property N/A
4 Individually list all intermittent and perennial stream impacts Be sure to identify temporary
impacts Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e g , cement walls, rip-rap, crib
walls, gabions, etc ), excavation, ditching/straightening, etc If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included To calculate acreage, multiply length X width, then divide by 43,560
Stream Impact
Number
(indicate on map)
Stream Name
Type of Impact Perennial or
Intermittent`? Average
Stream Width
Before Impact Impact
Length
(linear feet) Area of
Impact
(acres)
Total Stream Impact (by length and acreage) 0 0
5 Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U S ) Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc
Open Water Impact
Site Number
(indicate on ma) Name
applicable) Waterbody
(if ap
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay,
ocean, etc) Area of
Impact
(acres)
0 SF
Total Open Water Impact (acres) 0,00 Ac
Updated 11/1!2005
Page 8 of B
6 List the cumulative impact to all Waters of the U S resulting from the project
Stream Impact (acres) 0
Wetland Impact (acres) 0
Open Water Impact (acres) 0
Total Impact to Waters of the U S (acres) 0
Total Stream Impact (linear feet) 0
7 IsolatedWaters
Do any isolated waters exist on the property? ? Yes ® No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet) Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE
None
8 Pond Creation None
if construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections Also, the proposed pond should
be described here and illustrated on any maps included with this application
Pond to be created in (check all that apply) ? uplands ? stream ? wetlands
Describe the method of construction (e g, dam/embankment, excavation, installation of
draw-down valve or spillway, etc )
Proposed use or purpose of pond (e g, livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc )
Current land use in the vicinity of the pond
Size of watershed draining to pond Expected pond surface area
VI. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid, the proposed impacts It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible Also discuss how impacts
were minimized once the desired site plan was developed If applicable, discuss construction
techniques to be followed during= construction ,to reduce impacts
No 404 Wetlands are Filled Slopes will be Vegetated and Rip Rap Installed for
Slope Stabilization in the Stream Buffer Zone at the Proposed Pipe Location.
VII. Mitigation None
DWQ - In accordance with 15A NCAC 2H 0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams
Updated 11/1/2005
Page 9 of 13
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed Examples of mitigation that may be appropriate and practicable include,
but are not limited to reducing the size of the project, establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams, and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina (see DWQ websrte for most current
version )
Provide a brief description of the proposed mitigation plan The description should provide
as much information as possible, including, but not limited to site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e g , deed restrictions, conservation easement, etc), and a
description of the current site conditions and proposed method of construction Please attach
a separate sheet if more space is needed
2 Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP) Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must,be attached to this form For
additional information regarding the application process for the NCEEP, check the NCEEP
websrte at http //www nceep net/pageshnlieurepl ace htm If use of the NCEEP is proposed,
please check the appropriate box on page five and provide the following information
Amount of stream mitigation requested (linear feet)
Amount of buffer mitigation requested (square feet)
Amount of Riparian wetland mitigation requested (acres) _
Amount of Non-riparian wetland mitigation requested (acres)
Amount of Coastal wetland mitigation requested (acres)
Updated 11/1/2005
Page 10 of 13
VIII. Environmental Documentation (required by DWQ)
1 Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ?
2 If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation
Yes ? No
3 If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter Yes ? No
IX. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project The applicant must also provide
justification for these impacts in Section VII above All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan All buffers must be shown on a
map, whether or not impacts are proposed to the buffers Correspondence from the DWQ
Regional Office may be included as appropriate Photographs may also be included at the
applicant's discretion
1 Will the project impact protected riparian buffers identified within 15A NCAC 2B 0233
(Meuse), 15A NCAC 2B 0259 (Tar-Pamlico), 15A NCAC,02B 0243 (Catawba) 15A NCAC
2B 0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ® No ?
2 If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers
Zone* ( Impact Required
ice,,,, - I Multi
f o+? pher I >,1a,+,,..,f,,,.,
I I 0 SF I 3 (2 for Catawba) N/A
2 0 SF 15 NIA
Total I 0 SF I ( N/A
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel, Zone 2 extends an
additional 20 feet from the edge of Zone I
3 If buffer mitigation is required, please discuss what type of mitigation is, proposed (i e ,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund) Please attach all appropriate information as identified
within 15A NCAC 2B 0242 or 0244, or 0260 Pipe to Pipe Replacement
Impacts are under the 40 Linear Foot Threshhold
Updated 11/1/2005
Page 1 l of 13
X. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site Discuss
stormwater controls proposed in order to protect surface waters and wetlands downsti cam from
the property If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. The Proiect will be de-watered by use of
Aqua Bags located to the North and South of the Proposed Pine. Water Flow will be
diverted into ,a Double Barrel Box Culvert located on-site. The work area will be pumped
dry and the water will be pumped into silt bags located on the banks.
XI. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility
N/A
XU. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (I 5A NCAC 2H 0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XM. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http //h2o enr state nc us/ncwetlands If no, please provide a short narrative description
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e g, draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control)
Updated 11/1/2005
Page 12 of 13
I a).
/Applicant/A
(Agent's signature is
Updated 11/1/2005
XSignature Date
d only if an authonza on letter from the applicant is provided )
Page 13 of 13
?ftm
PV -WUNTY, MORTH CAI
, ti? a°> d ou
NC 118
_W
PIPE REPLACEMENT WBS ELEMENT NUMBER 2CR 107416
l »
FORT BARNWELL, USGS QUAD MAP AND j
1 ?
SHEET NUMBER 82-A OF THE PITT COUNTY SOIL SURVEY j
EXISTING 72" CMP TO BE
REPLACED WITH A 10' CARP
NOVEMBER 25, 2008
,Ty r
,
N-1
PROJECT fiz
Y= 59133
X= 2491180.2891 ?`"' r3 {
N35^-21'-49" ?l
W 77^ 2I ! 09'? f - - -
k
N35.363608 DEGREES
W 77352403 DEGREES
frFn ? _ ? ER bpi .. ? V
r =
0 850 1,700 3,400 5,100 6,800
Feet ?r
n
S b.
co 0
koL
co
N
O7
-=z
? ¢ a,
5~ui I
I
o =? W
x
0
o?
?o
00
V ti N II
p oz° Zo
P4
A
A O
p x _ °- -? '" Ba
06
F ?` gym.
o °W
? yo ? -? - Io J
xL
W
is
I? I
0
O
z
al m /
u
z
g t
0
0
----- --------- ?.
1V ZC
?\ N
-Z zo
I` t r- REEK
00
St JOHN 5?
o?-??R.r?r-? •" ? ? I m zo LL
zzd - --?za_ - - V zI sO Q
W V I I 03
l a Q Q
S LL- D m
t W
j
a?
O -
?
?- W O I ? I J W ? Q p
a I
° cq -j W
m $
Nm
0
wW L
?Z
Qo? -? - 03
I a
W
KZ ?
F-
J Z
F
0 :so-
zoom
D- 0
wX?c
h
Q?m
J
r0z? mZY mc? Q z
J m z (D
V
O yQ
Z a ? LLJ (r)
z
moa
Wm
V) U
I
LL
I
LL?W I
. I
Ll
l
tJw~ Z
:t .
Z
~
z 4 O
Ct ?
_ 0
5om V) o- --o-
I
------------------------------------------------------ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - J
IATE OF NORTH CAROLINA SUBJECT 11 I•,10-1' - /1C- 14,j, T fig PROJECT
ARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS COUNTY
HI
GHWAY BUILDING PREPARED BY DATE 10-02-08 STATION
P O BOX 25207
RALEIGH NORTH CAROLINA 27877 CHECKED BY DATE STR NO SHEET_I_ OF
yr
F
olk
., SNOB -7 "o..
c.cr, } Ovru
-0 ?
D cAo nw.4 R4c..,c.
T%jL QA
tZO"? 14r 0"
?D-(o
^I D V taw - ?.J GT t Ou-r "
'zo ¢ 8 -z<< 3 x t
CoK.iuLAT 7 IQ (.Um..J?«.
15' I'tac To ac = 49 =g .
?ACtuz7Cg CA- Zia?o4
Fu co, JC4T94 b*.,FJs
" A-12 Z - t 'u tvc rc..r
36-8 6p5?a
F4. w-,j