HomeMy WebLinkAbout20081784 Ver 1_Triage Check List_20081216Triage Check List
Date: Project Name:
To: ARO Roger Edwards
FRO Ken Averitte
? MRO Alan Johnson
? RRO Laur n Witherspoon
From: ?... ?- 1 L
? WaRO Kyle Barnes
? WiRO Joanne Steenhuis/Chad Coburn
? WSRO Sue Homewood
Telephone : (919) ? I ?_d 6-? l
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
? Stream length impacted
Stream determination
? Wetland determination and distance to blue-line surface waters on USFW topo maps
? Minimization/avoidance issues
? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
? Pond fill
? Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
? Is the application consistent with pre-application meetings?
? Cumulative impact concern
Comments: