Hey Ryan,
I have finalized my review of the Maple View Year 1 Monitoring Report. Comments are provided below:
Maple View — Monitoring Year 1 Report DWR Comments
The Division of Water Resources has reviewed the Year 1 Monitoring Report received September 15, 2017 and has the
following comments:
1. Encroachment within 0.23 acres (10,018.8 ft2) along the easement boundary in the "Replant Area" —
Despite the Figure 5 (see attached) noting only the marker poles were missing, the pictures suggest mowing of
the area as well. When comparing the photos taken this Spring of the "replant area" with those taken during
monitoring, it appears that the trees that were planted in Spring 2017 were mowed and their heights greatly
affected by the encroachment. Poles appear to be missing as well. EBX is not proposing a replant of this area.
Action Item 1: Add two rectangular transects to the mowed area identified as "Replant Area" on Figure
5 and submit vegetation data for each transect. Length and size of the transects are up to the discretion
of EBX, but they must be placed in the encroached area along the boundary as shown. Only the
quantity, species type and heights of planted woody stems in the transect need to be presented. This
data shall be provided to DWR as a response to this report review. Additionally, these two transects will
need to stay in place and be presented with the Year 2 Monitoring Report in addition to the other plot
data.
Action Item 2: EBX proposes replacing marking poles. However, DWR is unclear of what "poles"
implies. Due to the nature of the encroachment and the location being along the edge of the easement
boundary, it would be best if EBX invests in poles or wire fencing/T-posts as a means of more permanent
marking. This would help ensure the boundary is clearly marked.
2. Encroachment within 0.10 acres (4,356 ft2) near Plot 7—
Action
—
Action Item 3: EBX is proposing replanting the area in 2018. DWR supports this action.
Action Item 4: Due to the nature and location of the encroachment it would be best if EBX invests in
poles or wire fencing/T-posts as a means of more permanent marking. This would help ensure the
boundary is clearly marked and any replanting that is performed is less likely to be hindered in the
future.
As a result of the monitoring report review, DWR will hold the next credit release until the Action Items 1, 2 and 4 are
implemented and EBX submits proof of work in writing to DWR.
Thank you for your attention to this matter,
Katie
Katie Merritt
Nutrient Offset & Buffer Banking Coordinator
401 & Buffer Permitting Unit
North Carolina Department of Environmental Quality
Work: 919-807-6371
Website: http://portal.ncdenr.org/web/wq/401bufferpermitting
512 N. Salisbury Street, Raleigh, NC 27620
1617 Mail Service Center, Raleigh, NC 27699-1617
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.