September 28, 3017
Rowan County
NCDWR Prqject No. 20171172
Bridge 186 on SR 2488
WBS Project No. 17BP.9. R.41
APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS
Ms. Amv Euliss, Environmen[al Of}lcer
NCDOT, Division 9
+75 Silas Qeek Parkway
Winston Salem, NC 27127
Dear Ms. Euliss:
You have our approval, in accordance wi[h the conditiuns listed below, for [he followin, impacts for the purpose of
replacing Bridge l86 wi[h a new bridge over UT ro Dutch Buffalo Creek on Rimertown Road in Rowan County:
Stream Im ac[s
Temporary Fill in
Perennial Stream
Si�e linear ft
Dewater 5[abilization
I 10 -
Totals 10 -
in the Yadkin Pee Dee River B
Permanent Fill in Pcrennial
Stream
Ilinear ftl
Bank Stabilization
Total Stream Impact for Projec[: 59 linear feet
'I'otal Stream
Impact
(linear ft)
59
Stream
Impacts
Requiring
Mitiga[ion
The project shall be consh'uc[ed in accordance with your application dated September 13, 2017. After reviewing
your application, we have decided that these impacts are covered by General Water Quality Certification Number
4055. This certitication corresponds to Nationwide Pennit 3 issued by the Corps of Engineers. In addition, you
should acquire any other federal, state or bcal pennits befure you proceed with your project includine (but not
limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval
will ezpire with die accompanying 404 pennit.
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your projec[ diange, you mus[ notify the NCDW R and submit a new application. If the property is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the conditions. If [o[aI wetland fills for this project (now or in Ihe future) exceed one acre, or of to[al
impacts to streams (now or in the future) exceed 300 linear f'eet, compensatory mitigation may be required as
described in liA NCAC 2H A�06 Qi) (6) and (7). For this approval [o remain valid, you must adhere to the
conditions listed io the attached cenification(s) and any additional conditions listed below.
State o( North Camlina I Enuimnmen[al Quality
I fil7 Mail Service Cenler I Raleigh, North Carolina 2 7699-1 6 1 7
Condition(s) of Certification:
Project Specitic Conditions
1. As a condition of this 401 Water Quality Certification, the bridge demolition and construction must be
accomplished in strict compliance with the most recent version of NCDOT's Best Management Practices for
Construction and Maintenance Activities. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)]
2. The post-construction removal of any temporary bridge structures must return the project site to its
preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native
species. [15A NCAC 02H .0506(b)(2)]
3. NCDOT shall use Design Standards in Sensitive Watersheds (15A NCAC 4B.0124[a]-[e]) in areas draining to
Water Supply II (WS) and High Quality Waters (HQW) including all pertinent conditions listed in NCDOT's
NPDES Permit NCS000250, including applicable requirements of NCGO10000.
4. Bridge deck drains shall not discharge directly into the stream. [15A NCAC 02H .0506(b)(2)]
5. For the 10 linear feet of stream being impacted due to site dewatering activities, the site shall be graded to its
preconstruction contours and revegetated with appropriate native species. [15A NCAC 02H.0506(b)(2)]
6. The 50 feet buffer requirement in Condition 20 of the above referenced General Water Quality Certification
(Number 4085) will be waived per request of the permittee. However, measures shall be undertaken to prevent
surface water contamination by equipment fuel, lubricants and oils if it is necessary to conduct equipment
maintenance within 50 feet of surface waters. [15A NCAC 02H.0506]
General Conditions
1. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and
streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater
than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow
low flow passage of water and aquatic life. Design and placement of culverts and other structures including
temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of
wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant
is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWR. If
this condition is unable to be met due to bedrock or other limiting features encountered during construction,
please contact NCDWR for guidance on how to proceed and to determine whether or not a permit modification
will be required. [15A NCAC 02H.0506(b)(2)]
2. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between
curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged
to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC
02B.0200]
3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S.,
or protected riparian buffers. [15A NCAC 02H.0506(b)(2)]
4. The dimension, pattern and profile of the stream above and below the crossing shall not be modified.
Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC
02H.0506(b)(2)]
5. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage.
[15A NCAC 02H.0506(b)(2)]
6. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approval. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
7. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from
the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock
berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A
NCAC 02H.0506(b)(3) and (c)(3)]
8. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)]
9. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC
02H.0506(b)(3)] .
10. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certification. [15A NCAC 02H.0506(li)(3)]
11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters
is prohibited. [15A NCAC 02H.0506(b)(3)] ,
12. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any
other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws
are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being
violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify
this certification. [15A NCAC 02B.0200]
13. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise
authorized by this certification. [ISA NCAC 02H.0506(b)(2)]
14. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the
Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer
and the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
15. The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing or flagging prior to any land disturbing
activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A
NCAC 02H.0501 and .0502]
16. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management, rules, soil erosion and
sedimentation control requirements, etc.
17. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours
of discovery. [15A NCAC 02B.0506(b)(2)]
18. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division
Engineer (or appointee) shall complete and return the enclosed "Certification of Completion Form" to notify the
NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(fl]
19. Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project
by the end of the growing season following completion of construction. [15A NCAC 02B.0506(3)]
20. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites,
be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road
construction activities. [15A NCAC 02H.0506(b)(3) and (c)(3)] �
21. Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect surface
waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]):
a. The erosion and sediment conhol measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North CaroJina Sediment and Erosron Contro!
Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sedimen[ and erosion control measures must be
such that they equal, or exceed, the requiremenu specified in the most recent version of the North Carolina
Sediment and Erosron Contro! Manual. The devices shall be maintained on all consWction sites, borrow
sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the
project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requiremenu of the Sedimentation Pollution Control Act.
22. Sediment and erosion conhol measures shall not be placed in wetlands or waters unless otherwise approved by
this Certification. [15A NCAC 02H.0506(bx3) and (cx3)]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition fortn from the office of Administrative heazings. You must file the perition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepu filings Monday through Friday behveen the hours of 8:OOam and S:OOpm, except
for official state holidays. The original and one (1) copy ofthe petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Heazings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone:(919)431-3000, Facsimile:(919)431-3100
A copy of the petition must also be served on DEQ as follows:
Mc Sam M. Hayes, General Counsel
Department of Environmental Quality
1601 Mail Service Center
T'his letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you
have any questions, please contact Dave Wanucha at (336)776-9703 or Dave. Wanucha@ncdenr.gov.
Sincerely,
/`°� �(�
� S. Jay Zimmerman, Director
Division of Water Resources
Electronic copy only distribution:
James Lastinger, US Army Corps of Engineers, Raleigh Field Office
Marella Buncick, US Fish and Wildlife Service
Marla Chambers, NC Wildlife Resources Commission
File Copy
Environrnenrnl
Qualiry
NCDWR Project No.:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
County:
ROY COOPER
c;,,�,-,,�t,�
MICHAEL S. REGAN
�<<,�<��������
S. JAY ZIMMERMAN
nrr,cu,r
Certifica[e of Completion
Upon completion of all work approved wi[hin Ihe 401 Water Quality Certifica[ion or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return [his certiticate to ihe 401 Transponation Permitting
Unit, North Carolina Division of Water Resources. 1617 Mail Service Centec Raleiah, NC, 27699-1 6 1 7. This form
may be retumed to NCDWR by the applicant, the applicant's authorized a�ent, or the p%ject engineec It is no[
necessary to send certificates from all of these.
Applicmal'.s Certiftcatinn
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Qualiry Certitication and 6uffer RWes, the approved plans and
specitications, and o[her supportin_ materials.
Signa[ure: _ Date:
AgeiiPs Cerdflcalio�i
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be 6uilt within substantial
compliance and intent ofthe 401 Water Quality Certitication and Buffer Rules, the approved plans and
specitica[ions, and other supportin� materials.
Sienature:
Engineer's Certifiealion
Partial Final
I, , as a duly registered Professional Engineer in [he Stare of North
Carolina, having been authorized [o observe (periodically, weekly, full time) the construc[ion o([he project for the
Permittee hereby state that, to [he best of my abilities, due care and dilieence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.