Loading...
HomeMy WebLinkAbout20171188 Ver 1_More Info Received_20170920 (12)Homewood, Sue From: Brad Luckey <bluckey@pilotenviro.com> Sent: Wednesday, September 20, 2017 3:49 PM To: Williams, Andrew E CIV USARMY CESAW (US); Homewood, Sue Subject: RE: First Christian Church PCN - Electronic Copy (UNCLASSIFIED) Attachments: C1.pdf, C2.1.pdf Updated overall and plan sheet showing perennial location. Thanks. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com bluckeykpilotenviro.com From: Brad Luckey Sent: Wednesday, September 20, 2017 2:59 PM To: 'Williams, Andrew E CIV USARMY CESAW (US)' <Andrew.E.Williams2@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: First Christian Church PCN - Electronic Copy (UNCLASSIFIED) Updated JD map attached. Kent at Landmark is updating the PCN project boundary to match the JD boundary (i.e. removal of parcel west of JD area). I did not include this parcel in the PCN or JD request, but it is shown on the overall impact drawing, so I think it's a good idea to update the overall so it's all consistent. Additionally, Kent will update overall to show the stream as being perennial beginning at flag SA 18, as determined today in the field by Sue. I will send it over when I get it. I think that should get everything covered, but if not then let me know. Thanks. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com bluckeykpilotenviro.com From: Williams, Andrew E CIV USARMY CESAW (US) [mailto:Andrew.E.Williams2gusace.4rmy.mil] Sent: Wednesday, September 20, 2017 2:37 PM To: Homewood, Sue <sue.homewoodgncdenr.gov> Cc: Brad Luckey <bluckeygpilotenviro.com> Subject: RE: First Christian Church PCN - Electronic Copy (UNCLASSIFIED) CLASSIFICATION: UNCLASSIFIED Sue, Thanks for taking a look at this. I will wait to get the revised plans/drawings. Andrew Williams Regulatory Project Manager US Army Corps of Engineers Wilmington District, Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 919-554-4884 ext. 26 From: Homewood, Sue[mailto:sue.homewoodgncdenr.gov] Sent: Wednesday, September 20, 2017 2:34 PM To: Williams, Andrew E CIV USARMY CESAW (US) <Andrew.E.Williams2gusace.ann mil> Cc: Brad Luckey <bluckeygpilotenviro.com> Subject: [EXTERNAL] RE: First Christian Church PCN - Electronic Copy Andy, I went out to see this site with Brad and Mike this afternoon. It's pretty standard, the wetland limits are topographical so there's no question on that. The stream going through the wetland has been silted in, but it still has ordinary high water mark present throughout most of the wetland. We identified a point where the stream becomes perennial and Brad is going to update the map and send it to both of us. Also, the drawings supplied by Landmark with the PCN show a property that is larger than the property in the delineation documents done by Pilot. There's a stream channel on the far western side of the project, outside of the delineation limits but within the drawings sent by Landmark. Brad is going to get that resolved and send us updated drawings so that they are consistent. Mike indicated it was clearly an incised perennial stream and may end up not being within the project limits so I didn't verify it today. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewooda-ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Brad Luckey[mailto:bluckeygpilotenviro.com] Sent: Tuesday, September 19, 2017 2:27 PM To: andrew.e.williams2gusace.army.mil Cc: Homewood, Sue <sue.homewood@ncdenr.gov>; Gibby, Jean B CIV USARMY CESAW (US) <Jean.B.Gibbygusace.ann mil>; Heather LaGamba <hla amba gpilotenviro.com> Subject: FW: First Christian Church PCN - Electronic Copy Andy, As discussed today in the field, PCN and verification information is attached. We are visiting the site tomorrow with Sue about 1:00, but if you need to set up something separate, then please let me know. Also, USPS says that the PCN has not been delivered to your office yet. We had the same problem on one with Jean a couple months back. Nonetheless, please provide me an actual received date for my records. Thanks Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com bluckeykpilotenviro.com From: Brad Luckey Sent: Thursday, September 14, 2017 8:53 PM To: 'Gibby, Jean B CIV USARMY CESAW (US)' <Jean.B.Gibbygusace.army.mil>; 'Homewood, Sue' <sue.homewoodgncdenr. gov> Subject: First Christian Church PCN - Electronic Copy Jean/Sue, We have whiffed a few times on doing JD on this one. Nonetheless, electronic copy of PCN is attached and will be mailed to each agency tomorrow. I also included JD package/request so it's all in one place for y'all. Let me know if either of you want to go visit or not. Thanks. And Jean .... I keep hearing tales that you are down in the Virgin Islands on hurricane assignment. Be safe and come back in one piece. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com bluckeykpilotenviro.com CLASSIFICATION: UNCLASSIFIED EX. H❑US j v IIIIi I,5ED 1. `.ING ��� &RO R.J ac INTERSTATE 40 - 15'rFASS 40 EX. STREAM PUBLIC R/H VARIES —] IMPACT SITE INFORM' AT I ON: N 4 r LPECANLANE 00 SITE o= ��Oo°o�P L _ 0- Lo to a _ J Q°N w Q r- ?8W = ❑ - () ° cn Lel y° °a 0 oo�Z 000000004-4 PEC,4N LANE \ 60' RM PUBLIC IMPACT FIRST CHR15TIAN CHURCH MINI5TRIE5 WATERSHED DATA: 1130 N MAIN 5TREET WATERSHED: NOT IN A REGULATED HATER5HED KERNER5VILLE, NG 27254 PERCENT BUA: 3.4/27.36 = 12.4% (LOH DENSITY) ((oO%MAX) TOTAL AREA: 27.36 ACRES BUILDING HEI CHT: ±35' (40' MAX) PIN #6574-05-6426 BUILDING 51 ZE: ±33,350 5F ZONING: R5 -a SCALE: P=200' C7 z J 3 1 DATE. q/bAl 1 1REVISE D. q/20A-7 1 LIMITS OF DIS -- \-- ` 6T�J1 T bF �' NNIAL STREAM`.\ \ — 1I-- 1 45LTE ERQ510N'-- — -' "T L AREA \E --__ -_ \ \ _ 940 � 1 0000 CONCRETE HEADWALL ` EX. WETLAND (.33 AC) !� s N N700000 tid, oo° P L Oo �N,- = N z8 N —oLI� c a° �„ N 0) CD a j �0% Y &d0 oo�`V`\�\\ /moi O 000000000 M J STREAM PERMANENT DIST. (I,Q20 SF) (.044 AC) WETLAND PERMANENT DIST. (2,840 SF) (.065 AC) STREAM TEMPORARY DIST. (1,200 SF) (FOR TEMPORARY PUMP AROUND) TOTAL DIST. = 1,200 SF (.027 AC) TEMPORARY STREAM IMPACT (PUMP AROUND): 25 LF TOTAL IMPACT: 25 LF umTEMPORARY HETLAND IMPACT/PUMP AROUND: 400 SF TOTAL IMPACT: 400 SF PERMANENT STREAM IMPAGT/GUL\/ERT: 80 LF PERMANENT STREAM IMPAGT/RIP RAP: 25 LF TOTAL IMPACT: 105 LF Q z Ju H � 9 G REVISED. 9/20/1-1 JOB NO: