Loading...
HomeMy WebLinkAbout20080398 Ver 1_More Info Received_20081218Peddler's Square 401 Wet Detension Basin Supplement Form Subject: Peddler's Square 401 Wet Detension Basin Supplement Form From: "Kevin Alford" <alfordkl@bellsouth.net> Date: Thu, 18 Dec 2008 01:00:27 -0500 To: <Annette. Lucas@ncmai Lnet> Annette, Here is the filled out Wet Detention Basin Supplement Form as per your request. This should be the last required information you need to approve the wet detention pond design for the Peddler's Square project. The original will be Fed-Ex to you tomorrow. Enjoy your vacation time for Christmas. If you have any further questions, please feel free to call me at 828-506-3411(cell) or 828-926-8341 (office). Kevin R Alford, PE Alford Engineering, RLLP Peddler's Square SW401-WetPond-Rev.2.xls Content-Type: application/vnd.ms-excel Content-Encoding: base64 1 of 1 12/18/2008 1:18 PM Permit No. (to be provided by DWQ) PW ,UF W A TFq W NCDENR y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 01) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Peddler's Square Contact person Kevin R Alford, PE Phone number 828-506-3411 Date 12/18/2008 Drainage area number 11. DESIGN INFORMATION Site Characteristics Drainage area 255,697 ft2 Impervious area 118,048 ft2 % impervious 46.16714314 % Design rainfall depth 1.0 in Storage Volume: Non-SR Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? N (Y or N) 1-yr, 24-hr rainfall depth in Rational C, pre-development (unitless) Rational C, post-development (unitless) Rainfall intensity: 1-yr, 24-hr storm in/hr Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3/sec Basin Elevations Basin bottom elevation 2936.00 ft Sediment cleanout elevation 2937.00 ft Permanent pool elevation 2940.00 It Temporary pool elevation 2941.00 ft Volume and Surface Area Calculations SA/DA ratio 2.30 (unitless) Permanent pool, surface area required 5,881 ft2 Permanent pool, surface area provided 5,894 ft2 Permanent pool volume 9,801 ft3 Average depth for SAIDA tables 1.662877503 ft Forebay volume 1,960 ft3 Forebay % of permanent pool volume 20 % Temporary pool, surface area provided 1,229 ft2 OK Minimum of 3 It required, Increase depth OK Form SW401-Wet Detention Basin-Rev.2 Parts I. & II. Design Summary, Page 1 of 2 Permit No (to be provided by DWQ) II. DESIGN INFORMATION -? Drawdown Calculations Treatment volume drawdown time 4.3 days OK Treatment volume discharge rate 0.03 ft3/s Pre-development 1-yr, 24-hr discharge 26.11 ft3/s OK Post-development 1-yr, 24-hr discharge 23.92 ft3/s OK Additional Information Diameter of orifice 1.00 in Design TSS removal 90 % Basin side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 3 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1 ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies :mergency Spillway Form SW401-Wet Detention Basin-Rev.2 Parts I. & II. Design Summary, Page 2 of 2