Loading...
HomeMy WebLinkAboutNCDOT STIP U-3431 Proposed SR 1763 (Miller Boulevard) and NC 101 (Fontana Boulevard) Widening REVISED Start of StudyStrickland, Bev From: Emily Robinson <erobinson@HNTB.com> Sent: Wednesday, September 13, 2017 9:44 AM Cc: Kenneth Gilland; James Byrd; Beauregard, Rachelle L Subject: NCDOT STIP U-3431, Proposed SR 1763 (Miller Boulevard) and NC 101 (Fontana Boulevard) Widening: REVISED Start of Study Attachments: U-3431 Start of Study Letter (Agencies).pdf My apologies, please disregard my last email and see the revised Start of Study letter attached. Thank you and sorry for the inconvenience. Good morning, The North Carolina Department of Transportation (NCDOT) — Division 2 is beginning the project development, planning, and engineering studies for State Transportation Improvement Program (STIP) Project Number U-3431, the widening of SR 1763 (Miller Boulevard) and NC 101 (Fontana Boulevard) from SR 1756 (Lake Road) to Outer Banks Drive in Havelock, Craven County. Attached are the Start of Study letter and the project data sheets, which include a project vicinity map and an environmental features map. We respectfully request any comments you may have on the subject project by Tuesday, September 26, 2017. If you have any questions regarding the project please contact Rachelle Beauregard, Project Manager, by email rlbeaure�ard@ncdot.�ov or phone, (919) 239-7168. Thank you for your time and assistance in this project. Regards, Emily Robinson, EI Transportation Planning Engineer Tel (919) 424-0447 Cell (919) 219-5656 HNTB North Carolina, P.C. 343 E. Six Forks Road Suite 200, Raleigh, NC 27609 � www.hntb.com � 100+ YEARS OF INFRASTRUCTURE SOLUTIONS This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are NOT the intended recipient and receive this communication, please delete this message and any attachments. Thank you.