HomeMy WebLinkAbout20140005 Ver 1_Certification of Completion_20170918eMCKIM&CREED
September 18, 2017 M&C 01082-0028 (40)
Division of Water Resources
401 and Buffer Permitting Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
RE: Craven County Potable Water Supply and Treatment Facilities
401 Water Quality Certification
DWR# 14-0005 Craven County
To Whom It May Concern:
Enclosed please find the Engineer's Final Certification for the Craven County
Potable Water Supply and Treatment Facilities 401 Water Quality Certifiation, as
required by the Approval of Buffer Impacts issued under DWR# 14-0005.
If you have any questions or concerns in regards to the enclosed documents,
please do not hesitate to contact the Engineer's office.
Sincerely,
McKIM & CREED, INC.
K. Jaso
Construction Administrator
cc. Rusty Hayes
Dyk Luben, PE
Chuck D. Riley, PE
Enclosures
Certification of Com lep tion
DWR Project No: 14-0005
Applicant: Craven County
County: Craven
Project Name: Craven County Potable Water Supply and Treatment Facilities
Date of Issuance of Permits: 29 January 2014
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR
401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Agent's Certification
Date:
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I, K. Jason Savage, PE, as a duly registered Professional Engineer in the State of North Carolina, having
been authorized to observe periodically the construction of the project, for the Permittee hereby state
that, to the best of my abilities, due care and diligence was used in the observation of the construction
such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature:
Date: 18 September 2017