Loading...
HomeMy WebLinkAbout20140005 Ver 1_Certification of Completion_20170918eMCKIM&CREED September 18, 2017 M&C 01082-0028 (40) Division of Water Resources 401 and Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 RE: Craven County Potable Water Supply and Treatment Facilities 401 Water Quality Certification DWR# 14-0005 Craven County To Whom It May Concern: Enclosed please find the Engineer's Final Certification for the Craven County Potable Water Supply and Treatment Facilities 401 Water Quality Certifiation, as required by the Approval of Buffer Impacts issued under DWR# 14-0005. If you have any questions or concerns in regards to the enclosed documents, please do not hesitate to contact the Engineer's office. Sincerely, McKIM & CREED, INC. K. Jaso Construction Administrator cc. Rusty Hayes Dyk Luben, PE Chuck D. Riley, PE Enclosures Certification of Com lep tion DWR Project No: 14-0005 Applicant: Craven County County: Craven Project Name: Craven County Potable Water Supply and Treatment Facilities Date of Issuance of Permits: 29 January 2014 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, K. Jason Savage, PE, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe periodically the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: 18 September 2017 CARO 00,SEAL 037492 j S