Loading...
HomeMy WebLinkAbout20171091 Ver 1_Stormwater Info_20170809i� GI FI EI J CI 0 12 10 7,9 / 7 \ 2810j/z/ / / i j/�/ \ \ \ CONTRACTOR SHALL CONVERT \ \ - TD #1 TO ITS PERMANENT /j v v v v STATE AND MAT WITH NORTH /// / \ \ v AMERICAN GREEN S75 OR - // 28 PROPOSED / / v v v APPROVED EQUIVALENT - / / / // z/� / \ \ \ \ � _ - - 2 HDPE @ 1.82% \ \ / // // �✓ / PROPOSED PERMANENT DITCH vv ---- - PD #1 @ 2% - - - - - - - - MINIMUM SLOPE _28 Ln �/ / / \\ // / °z°// \ (SEE DETAIL) - _00 / / / / / /2// 288 / / / / / / �- 5 STORMWATER -NOTE- NO STORMWATER PERMIT IS REQUIRED PER NCDEQ STORMWATER PERMITTING INTRACIIVE MAP WEBSITE. TTHROAATEPROPOSDNLETEA2 - 1 TOP. 2878.00 r' _ INV.: 2875.00 �- \ - //' (STRUCTURE SHALL NOT BE / ���� j /,,'%�// _ - - EXISTING SEWER / INSTALLED UNTIL SEDIMENT / / , / / / \ _ \ (TYP.) j ///' TRAP IS REMOVED) A =� / / / \ v v a°o V \ v /� / / �� PROPOSED EXISTING BUILDING _ 45LF - 15" FFE: 2875.20 ® A \ V A \ / HDPE @ 8.89% v � L V i / EXISTING /i // / /// / - _ - S`� _ S EXISTING PROPOSED A4 EXISTING GUARD HOUSE / \ 18" CMP 28 \ \ \ 0 3 SITE INFORMATION: ADDRESS: 1 PARI DRIVE PIN#: 8545-30-6278 DEED BOOK/PG: 442/749 PLAT BOOK/PG: NA TOTAL ACREAGE (COMBINED) ±204 ACRES ±8,886,240 SF TRANSYLVANIA COUNTY ZONING: NA LEGEND STORM DRAINAGE PIPE EXISTING CONTOURS PROPOSED CONTOURS PROPOSED RIP -RAP APRON PROPOSED WA TER BAR PROPOSED STORM INLET PERMANENT DITCH • 0 Know what's below. Call before you dig. GUARD -_-_ _ _ _ �� - L= - - // / j / �� (YARD INLET) _ / / /j / / / i, - - - - \ S\ 71 \ \�S\ \ \ SHACK _ - - _ _ _- - _ -- - - - PROPOSED OPEN ./ / / / // // ✓� TOP: 2873.50 - a / / / /r - \ \\� \ \ \ \ - - -_ THROAT INLET A3 //// / j/ / j/ ------ _\ \\\�S i / / INV.: 2871.50 / - - - - - - - TOP: 2880.00 / �i / / / W w \ - - - - - _- - - - -_- / / / i, 2874 \ \ �\W\` ----- ,==T- INV.: 2876.00 j / PROPOSED 7LF (STRUCTURE SHALL NOT ___--- BE INSTALLED UNTIL / i / / - 15" HDPE @ SEDIMENT TRAP IS��� f - �3 7.14% W W- REMOVED) i 28 / / PROPOSED CURB CONCRETE STEPS - / INLET Al N 2872 // TOP: 2875.20 / EXISTING GRATE / / / INV.: 2871.00 // / / / i INLET AO f / ---- TOP: UNADJUSTED INV.: 2838.00 PROPOSED EXISTING \ \ / / 43LF - 15" / / / /� / WET POND \ \ / // HDPE @ 6.98% \ �/ / / / i - STORMWATER N \ I / EXISTING WATER PROPOSED / 0 ` / / / EXISTING CONTROL / MEASURE _- (TYP.) CURB INLET B4 / 24" CMP �, / TOP: 2869.00 INV.: 2866.00 - I / / / / 2868 // , // / / �/ EXISTING r 24" CMP i APPROXIMATE EXISTING BUILDING - _ / % / / /' ILOCATION OF EXISTING RISER PROPOSED / / - !4 /// I STRUCTURE 32'F - 15" _ - - - - - - \ 2 6� // PROPOSED OPEN HDPE @ 3.13% - - 8\ / THROAT INLET B5 / / /� a -- \ V A �- _ TOP: 2863.50 PROPOSED ° - ° \ / INV.: 2861.00 73LF 15" V EXISTING / HDPE @ 0.50% / GO 1 � 18" RCP \ - \ \a ' -28d5 ° ° EXISTING BUILDING J PROPOSED ), / / / / / ° a FFE: 2870.35 PROPOSED w -- A 113LF - 15" = CURB INLET B3 \ HDPE @ 3.81% c - / / TOP: 2868.0041- PROPOSED PIPE i \ 865 OUTLET EO INV.: 2865.00 j v -; 2 PROPOSED INV.: 2859.64 tz / % / / - ' ---- / 20LF - 15 - � - HDPE @ 4.00% \ / a 2 �q _ 0c 0 z JOE HOUSE RD. ONVRGN ��� R M���ooN�P -o D. / 28 N s SITE US6 4 HWY VICINITY MAP (NOT TO SCALE) - W �� n ` - - - - --- - W ■ �/ \ 2 28 PROPOSED OUTLET \ \ / PROPOSED I ° s2 6� STRUCTUREE1 E1 2861.20 / / i / / / / 2865 - --- - ---- -- - - .--- - 57LF 15 9 / / / W / ii - ---__ / - \ a EXISTING BUILDING INV.: 2860.00 / ,� / _ �- \ > / , HDPE @ 0.88% STRUCTURE SHALL NOT / N EXISTING � � 2g ( PROPOSED BUILDING - - - -�+- - 48" CMP 286 6� BE INSTALLED UNTIL FINAL FFE: 2870.35 ///iii////ii / %ago% \ \ �- i, EXISTING STORM a _ / -_ - -_ -_ 2� CONVERSION TO DETENTION DRAINAGE (TYP.) -: ----�_ 86A/ POND BEGINS 2855 ) N ° ° ° a EXISTING FENCE - - - t \ \ _ / PROPOSED I \ ° < ° \� ° °�� °� %/ \ - -cw- (TYP.) _ �/� ° �%\ \ EXISTING 30LF 15" a j !/ / =s 285\/ \ 12" HDPE , EXISTING / % HDPE @ 3.67%2868 d 18 l - i CMP\w6, /// // // / / \/ \ 2 3 N �a ♦ cP / J PROPOSED OPEN 86 - 1 ♦ ♦ �\ 2�s, \ /// /�i ii / / - - - - - a - -=�� / - - - = EXISTING A -- / THROAT INLET B2 �, ♦ \ / / / "` - -_- _ -- - - ' - - - - - _ / TOP: 2863.00 2�� / r - - - - -= - - - - - - 18" RCP / INV.: 2860.70 \ 2860 - ///// � j !_ - 1.1 1 / ♦♦� / � l / 2863 // / - - - - / d/ / / / \ \� / PROPOSED OPEN / // NA \\\I THROAT INLET 131 TOP: 2863.50 INV.: 2860.20 PROPOSED SEGMENTAL BLOCK RETAINING WALL. PEDESTRIAN SAFE HANDRAIL SHALL BE ADDED TO TOP OF WALL WHEREVER HEIGHT OF WALL EXCEEDS 30" (COORDINATE TYPE & STYLE WITH ARCHITECT) (DESIGN BY OTHERS)(TYP.) J / I / / ?8e� PROPOSED � ��-_ �_ - _--___- �_-- - ----------- / / / / /// /% / j PROPOSED / - , %/i \ \ \ 96LF - 15" _ -zeas -� - / / /// // /// / / / / / / 15LF - 18" / - - �-PD� \ / HDPE @ 3.96% �/� / / _ - �\ \ - - - HDPE @ 0.67% I - EXISTING GRAVEL °����'�// ° ° ROAD (TYP.) �k PROPOSED CURB INLET D2 - - - - / / / TOP: 2868.00 PROPOSED PIPE / \ \ // / - - - - _ / / / OUTLET BO / \ // / / - - - - - - PROPOSED / / /// INV.: 2865.00 INV.: 2860.10 - / / / / / - - - - - ` - - PERMANENT DITCH // 7 PROPOSED WET/DRY POND // --_-- - - - - - / �/ / %/ // / / / / // \ MINIMUM SLOPE - - - - - - - / /� // / / FOREBAY STORMWATER CONTROL (SEE DETAIL) PROPOSED OPEN - - - - - / MEASURE SEE DETAIL CONTRACTOR THROAT INLET D1 EXISTING PAVED ( )( / \ / ROAD (TYP.) \ SHALL CONVERT BASIN TO FINAL / PROPOSED CONDITION SEDIMENT TRAP 49LF - 12" TOP: 2864.20 HASBEENREMOVED)HDPE @ 0.61% CONTRACTOR SHALL CONVERT INV.: 2861.20 TD #1 TO ITS PERMANENT STATE AND MAT WITH NORTH PROPOSED OPEN AMERICAN GREEN S75 OR PROPOSED PIPE THROAT INLET C1 APPROVED EQUIVALENT OUTLET DO . TOP: 286200 INV.: 2860.10 30' STREAM/ INV.: 2860.40 PROPOSED PIPE BUFFER / OUTLET CO INV.: 2860.10 12 11 10 9 7 0 5 0 3 NORTH CAROLINA FIRM NUMBER C-2849 MICHAEL LOVOY, P.E. 34 BIG BEAR TRAIL ASHEVILLE, NC 28805 (828) STORMWATER PLAN GRAPHIC SCALE 30 0 15 30 60 120 ( IN FEET ) 1 inch = 30 ft. 2 \I 119 Brookstown Ave. Suite 100 Winston-Salem NC 27101 p. 336-724-1503 www.cjmw.com PERMIT SET FOR CONSTRUCTION 1►11111111��0 ` O p,RCHl1'F�. �Vip O�F�iSSI�p�LH9�jjii/� �? CERT. NOG�o = ALf U 50356 = 38 ASTON -SALEM' Version Issue Name I pate 1 RESPONSE TO 06.08-17 NCDEQ COMMENTS 06-13.2017 sheet z Z Copyright 2016 CJMW Architecture, P.A. STORMWATER PLAN C4.1 date: 5126/2017 commission: 17-0050 drawn bv: UAG PROJECT TEAM INFORMATION OWNER/DEVELOPER: PISGAH ASTRONOMICAL RESEARCH INSTITUTE 1 PARI DRIVE ROSMAN, NC 28772 CONTACT: DONALD CLINE (828)862-5554 CIVIL ENGINEER: ADVANTAGE CIVIL ENGINEERING 34 BIG BEAR TRAIL ASHEVILLE, NC 28805 CONTACT: MIKE LOVOY, P.E. (828)545-5393 GENERAL CONTRACTOR: FRANK L. BLUM CONSTRUCTION CO. PO BOX 4153 WINSTON SALEM, NC 27115 CONTACT: CHRIS WHITE (336)724-5528 SURVEYOR: KEE MAPPING AND SURVEYING PO BOX 2566 ASHEVILLE, NC 28802 CONTACT: BRAD KEE (828)575-9021 NOTES 1 . ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE NCDENR AND BUNCOMBE COUNTY STANDARDS AND SPECIFICATIONS. 2. ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH NCDENR AND BUNCOMBE COUNTY STANDARDS AND SPECIFICATIONS. 3. SINGLE PHASE CONSTRUCTION. 4. ALL WORK SHALL BE PERFORMED BY A NORTH CAROLINA LICENSED UTILITY CONTRACTOR. 5. CONTRACTOR TO COORDINATE EXACT LOCATION OF PROPOSED AND EXISTING UTILITIES. 6. EROSION CONTROL IS FIELD PERFORMANCE BASED AND ADDITIONAL SILT FENCES, TEMPORARY SEDIMENT BASINS, AND ALL OTHER MEASURES MAY NEED TO BE ADDED IN ADDITION TO THE APPROVED PLAN AS NECESSARY. MEASURES SHOWN CAN AND SHOULD BE ADJUSTED TO ASSURE MAXIMUM PROTECTION ON SITE. 7. CONTRACTOR IS RESPONSIBLE FOR INSTALLING, MAINTAINING, AND REMOVING ALL NECESSARY EROSION AND SEDIMENTATION MEASURES. 8. CONTRACTOR TO FIELD VERIFY ALL PIPES AND DEPTHS PRIOR TO ORDERING MATERIALS AND CONSTRUCTION. 9. ADD MEASURES AS NEEDED IN ENVIRONMENTALLY SENSITIVE AREAS. 10. PROJECT LIES OUTSIDE 1 00 -YEAR FLOOD PLAIN. 1 1 . CONTRACTOR RESPONSIBLE FOR KEEPING ACCURATE LOG OF SITE CONDITIONS IN ACCORDANCE WITH NPDES PERMIT. 12, SOIL TYPE "A" (UDORTHENTS) 13. ALL DISTURBED AREAS TO BE SEEDED WITHIN 14 WORKING DAYS OF COMPLETION PER NCDENR AND BUNCOMBE COUNTY STANDARDS AND SPECS 14. ALL RETAINING WALL ELEVATIONS SHOWN ARE FROM TOP OF WALL TO FINISH GRADE ELEVATION. CONTRACTOR TO ACCOUNT FOR FOOTER/COVER OVER FOOTER. 1 S. CONTRACTOR IS RESPONSIBLE FOR OBTAINING GRADING AND EROSION CONTROL PERMIT FOR WASTE OR BORROW SITES. 16. ALL STORM OUTFALLS SHALL HAVE ONLY CLASS II LARGE RIP -RAP FOR ALL APRONS UNLESS OTHERWISE SPECIFIED. 17. ALL AREAS TO BE GRADED TO DRAIN TO SEDIMENT BASIN OR LOW ELEVATION AREAS. 18. BIO -RETENTION CELLS AND AREAS AROUND CONCRETE FLUMES TO INCLUDE BLUEGRASS SOD. 19. STORM DRAINAGE BOXES SHALL BE A STANDARD 3'X 3' (I.D.) PRECAST STRUCTURE UNLESS OTHERWISE NOTED. - W �� n ` - - - - --- - W ■ �/ \ 2 28 PROPOSED OUTLET \ \ / PROPOSED I ° s2 6� STRUCTUREE1 E1 2861.20 / / i / / / / 2865 - --- - ---- -- - - .--- - 57LF 15 9 / / / W / ii - ---__ / - \ a EXISTING BUILDING INV.: 2860.00 / ,� / _ �- \ > / , HDPE @ 0.88% STRUCTURE SHALL NOT / N EXISTING � � 2g ( PROPOSED BUILDING - - - -�+- - 48" CMP 286 6� BE INSTALLED UNTIL FINAL FFE: 2870.35 ///iii////ii / %ago% \ \ �- i, EXISTING STORM a _ / -_ - -_ -_ 2� CONVERSION TO DETENTION DRAINAGE (TYP.) -: ----�_ 86A/ POND BEGINS 2855 ) N ° ° ° a EXISTING FENCE - - - t \ \ _ / PROPOSED I \ ° < ° \� ° °�� °� %/ \ - -cw- (TYP.) _ �/� ° �%\ \ EXISTING 30LF 15" a j !/ / =s 285\/ \ 12" HDPE , EXISTING / % HDPE @ 3.67%2868 d 18 l - i CMP\w6, /// // // / / \/ \ 2 3 N �a ♦ cP / J PROPOSED OPEN 86 - 1 ♦ ♦ �\ 2�s, \ /// /�i ii / / - - - - - a - -=�� / - - - = EXISTING A -- / THROAT INLET B2 �, ♦ \ / / / "` - -_- _ -- - - ' - - - - - _ / TOP: 2863.00 2�� / r - - - - -= - - - - - - 18" RCP / INV.: 2860.70 \ 2860 - ///// � j !_ - 1.1 1 / ♦♦� / � l / 2863 // / - - - - / d/ / / / \ \� / PROPOSED OPEN / // NA \\\I THROAT INLET 131 TOP: 2863.50 INV.: 2860.20 PROPOSED SEGMENTAL BLOCK RETAINING WALL. PEDESTRIAN SAFE HANDRAIL SHALL BE ADDED TO TOP OF WALL WHEREVER HEIGHT OF WALL EXCEEDS 30" (COORDINATE TYPE & STYLE WITH ARCHITECT) (DESIGN BY OTHERS)(TYP.) J / I / / ?8e� PROPOSED � ��-_ �_ - _--___- �_-- - ----------- / / / / /// /% / j PROPOSED / - , %/i \ \ \ 96LF - 15" _ -zeas -� - / / /// // /// / / / / / / 15LF - 18" / - - �-PD� \ / HDPE @ 3.96% �/� / / _ - �\ \ - - - HDPE @ 0.67% I - EXISTING GRAVEL °����'�// ° ° ROAD (TYP.) �k PROPOSED CURB INLET D2 - - - - / / / TOP: 2868.00 PROPOSED PIPE / \ \ // / - - - - _ / / / OUTLET BO / \ // / / - - - - - - PROPOSED / / /// INV.: 2865.00 INV.: 2860.10 - / / / / / - - - - - ` - - PERMANENT DITCH // 7 PROPOSED WET/DRY POND // --_-- - - - - - / �/ / %/ // / / / / // \ MINIMUM SLOPE - - - - - - - / /� // / / FOREBAY STORMWATER CONTROL (SEE DETAIL) PROPOSED OPEN - - - - - / MEASURE SEE DETAIL CONTRACTOR THROAT INLET D1 EXISTING PAVED ( )( / \ / ROAD (TYP.) \ SHALL CONVERT BASIN TO FINAL / PROPOSED CONDITION SEDIMENT TRAP 49LF - 12" TOP: 2864.20 HASBEENREMOVED)HDPE @ 0.61% CONTRACTOR SHALL CONVERT INV.: 2861.20 TD #1 TO ITS PERMANENT STATE AND MAT WITH NORTH PROPOSED OPEN AMERICAN GREEN S75 OR PROPOSED PIPE THROAT INLET C1 APPROVED EQUIVALENT OUTLET DO . TOP: 286200 INV.: 2860.10 30' STREAM/ INV.: 2860.40 PROPOSED PIPE BUFFER / OUTLET CO INV.: 2860.10 12 11 10 9 7 0 5 0 3 NORTH CAROLINA FIRM NUMBER C-2849 MICHAEL LOVOY, P.E. 34 BIG BEAR TRAIL ASHEVILLE, NC 28805 (828) STORMWATER PLAN GRAPHIC SCALE 30 0 15 30 60 120 ( IN FEET ) 1 inch = 30 ft. 2 \I 119 Brookstown Ave. Suite 100 Winston-Salem NC 27101 p. 336-724-1503 www.cjmw.com PERMIT SET FOR CONSTRUCTION 1►11111111��0 ` O p,RCHl1'F�. �Vip O�F�iSSI�p�LH9�jjii/� �? CERT. NOG�o = ALf U 50356 = 38 ASTON -SALEM' Version Issue Name I pate 1 RESPONSE TO 06.08-17 NCDEQ COMMENTS 06-13.2017 sheet z Z Copyright 2016 CJMW Architecture, P.A. STORMWATER PLAN C4.1 date: 5126/2017 commission: 17-0050 drawn bv: UAG