Loading...
HomeMy WebLinkAbout20171091 Ver 1_More Info Received_20170920Strickland, Bev From: M Barksdale <mbarksdale@aceasheville.com> Sent: Tuesday, September 19, 2017 9:29 PM To: Mitchell, Robert K Cc: Brown, David W CIV USARMY CESAW (US); Leslie, Andrea J; King, Melissa; Aiken, Stan E; Mike Lovoy Subject: RE: Request for Additional Information PARI Parking Improvements DWR-17-1091- Transylvania Attachments: 1684 PARI - PCN Application Page 4 REV 09-19-2017.pdf, 1684 -Wet Basin Pre & Post Develop Routing REV 09-19-2017.pdf, 1684 -Steam Pipe Storm Drainage Calcs REV 09-19-2017.pdf Robert, Please see my responses below in red text to your review comments, along with associated attachments. The revised stream buffer variance request and revised land disturbance permit application documents will be delivered to Stan Aiken and Melissa King on Wednesday morning, September 20, 2017. Please contact me if you have any questions or additional comments. Thank you. R. Marcus Barksdale, PE Advantage Civil Engineering, PA 50 S. French Broad Ave., Suite 152 Asheville, North Carolina 28801 828-771-6396 (mobile) From: Mitchell, Robert K [mailto:kevin.mitchell@ncdenr.gov] Sent: Friday, September 08, 2017 4:37 PM To: M Barksdale <mbarksdale@aceasheville.com> Cc: Brown, David W CIV USARMY CESAW (US) <David.W.Brown@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; King, Melissa <Melissa.King@ncdenr.gov>; Aiken, Stan E <stan.aiken@ncdenr.gov> Subject: Request for Additional Information PARI Parking Improvements DWR-17-1091- Transylvania Marcus, Thanks for meeting with us yesterday to discuss the subject project. I have some additional questions after further review of the project. On August 22, 2017, the Division of Water Resources (Division) received your application dated July 28, 2017, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on hold until all of the following items are addressed: [15A NCAC 02H .0507 (c)] 1. As we discussed in our meeting on September 7, 2017, please provide a typical or construction sequence showing how the proposed work will meet Condition 9 of Water Quality Certification 4092, which states that "all work in or adjacent to streams shall be conducted so that the flowing stream does not come in contact with the disturbed area." [15A NCAC 02H .0506(b)(3)] The typical construction sequence for the proposed stormwater pipe in the stream is described as follows: 1. Install erosion control devices, consisting of: a. silt fence b. temporary pump -around systems, including discharge apron and dewater filter c. temporary dike in the stream. 2. Dewater the construction zone. 3. Remove existing vegetation and unsuitable soil from the construction zone. 4. Place and compact soil as required to prepare a foundation for the pipe, endwall and junction box. 5. Place and compact bedding stone for the pipe, endwall and junction box. 6. Install the pipe, endwall and junction box. 7. Place and compact backfill material to a depth that the pipe is stable. 8. Install the two (2) temporary sediment traps, flanking the stream pipe, in a position to allow as much of the constructed fill slope to be constructed as possible. Adjust silt fence as required. 9. Remove existing vegetation from the remainder of the fill zone. 10. Place and compact soil fill material. Install and adjust temporary ditches as required to direct any runoff to the temporary sediment traps. 11. Adjust the temporary sediment traps as required. Install stormwater catch basins, connecting stormwater pipes Install inlet protection as systems are installed. 12. Remove the temporary sediment traps as fill slope construction approaches completion. 13. Perform final site grading and temporary soil stabilization. 14. Remove the temporary dike and temporary pump -around systems. 15. Install final soil stabilization and construct the parking lot. 16. Provide project close-out documentation and coordinate final inspections. 2. The stream culvert cross-section does not specify the bedding depth. Condition 11 requires that the placement of culverts and other structures in streams be below the elevation of the streambed by one foot for culverts with a diameter greater than 48 inches, and 20% of the culvert diameter for culverts having a diameter less than or equal to 48 inches, to allow low passage of water and aquatic life. Please explain how you plan to meet this requirement. If you cannot meet the condition, please provide justification. [15A NCAC 02H .0506(b)(3)] The proposed stormwater pipe in the stream was incorrectly referred to as a culvert in the initial PCN application. Attached is the revised page 4 of the PCN application form to clarify that a stormwater pipe is proposed for construction, not a "culvert" as previously stated, and to include the additional temporary buffer impacts associated with constructing a pre -cast concrete endwall at the outlet of the proposed stormwater pipe. The stormwater pipe is proposed to not be embedded because it is an extension of the existing stormwater collection system that originates at the existing overflow riser pipe within the wet pond stormwater control measure. Embedment of the proposed pipe would not allow migration of any aquatic organisms since the proposed pipe connects to other existing stormwater pipes. 3. Please provide calculations used to determine that the flows from the proposed stormwater structures will be at non-erosive velocities based on land cover receiving the discharge or will not overwhelm the receiving stream and cause erosion where the direct discharge is proposed. [15A NCAC 02H .0506(b)(3) & (4)] Pre -development and post -development peak stormwater runoff discharge and the flow velocity entering the stream were evaluated as shown in the attached calculations. Due to factors such as a large drainage basin, a comparatively small net increase in impervious area, the large volume of the wet pond basin and the 12 -inch diameter of the pond overflow riser pipe, the peak discharge and flow velocity entering the stream does not change measurably. Effectively, the wet pond SCM detains inflow runoff and creates a tempering effect on the stormwater discharges to the stream. Furthermore, the peak discharge and flow velocity of runoff from the pond is higher than the discharge and flow velocity of runoff that bypasses the wet pond SCM. Basically, stormwater runoff from the southwest parking lot peaks earlier in time than the peak discharge from the wet pond SCM. Therefore, the proposed phase 1 development is not expected to increase the peak velocity of flow entering the stream. The calculated peak flow velocity is 4.6 feet per second for a 10 -year storm event as requested. 4. Please update Table 3a to indicate all permanent and temporary impacts associated with the proposed culvert installation. Table 3a is updated on the attached revised page 4 of the PCN application form. 5. Please provide more details regarding avoidance and minimization of the stream impacts for this project. [15A NCAC 02H .0506(f) and (g)] This should include alternative designs and layouts of the parking lot. Can the proposed parking lot be moved or reconfigured to minimize the impacts to the stream? Please revise the plans to minimize the impacts or provide a detailed explanation of why this plan for the activity cannot be practically accomplished, reduced or reconfigured to better minimize disturbance to the stream. The avoidance and minimization measures described in Section D.I. of the revised PCN application executed July 28, 2017, remain unchanged. Basically, even more parking is needed for the ultimate expansion of the PARI research and education facilities than is proposed. There are no other relatively flat, undeveloped areas remaining within the topographic bowl surrounding the project site. There are no other viable ways the proposed parking area can be reconfigured without constructing terraces up the adjacent mountain slopes. Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received by October 8, 2017, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. You may provide your response via email or mail to the address noted below. Feel free to contact me if you have any questions. Kevin Mitchell Environmental Specialist—Asheville Regional Office Water Quality Regional Operations Section NCDEQ— Division of Water Resources 828-296-4650 Office Email Kevin.mitchell@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 ¢yfia, othi Compares,-., Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Storm Pipe & Endwall Unnamed tributary PER Corps 2 149 S2 T Endwall Construction Unnamed tributary PER DWQ 2 30 S3 - Choose one S4 - Choose one S5 - Choose one - S6 - Choose one 3h. Total stream and tributary impacts 179 3i. Comments: The proposed pipe with endwall will be an extension of the existing stormwater system that functions as an outfall for the adjacent stormwater wet detention basin. The proposed pipe will not collect any additional stormwater runoff. The impacted stream is an unnamed tributary to Lamance Creek. Page 4 of 10 PCN Form — Version 1.4 January 2009 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 1 Pre - Wet Basin Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 44.600 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.97 in Storm duration = 24 hrs " Composite (Area/CN) = [(4.700 x 98) + (39.900 x 44)] / 44.600 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' 0 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre - Wet Basin Hyd. No. 1 -- 10 Year Monday, 09 / 18 / 2017 = 126.26 cfs = 723 min = 361,314 cuft = 50* = Oft = 15.00 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 I i i / I I I I I I X 1 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 3 Route Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 - Post - Wet Basin Reservoir name = Pond 1 Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 140.00 120.00 100.00 :� 11 •1 11 40.00 20.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Route Hyd. No. 3 -- 10 Year 0.00 0 120 240 Hyd No. 3 Monday, 09 / 18 / 2017 = 49.15 cfs = 735 min = 273,218 cuft = 2862.65 ft = 102,538 cuft Q (cfs) 140.00 120.00 100.00 :1 11 •1 11 40.00 20.00 rn.1 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 011111 Total storage used = 102,538 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 2 Post - Wet Basin Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 44.600 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.97 in Storm duration = 24 hrs " Composite (Area/CN) = [(5.300 x 98) + (39.300 x 44)] / 44.600 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' 0 120 240 Hyd No. 2 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post - Wet Basin Hyd. No. 2 -- 10 Year Monday, 09 / 18 / 2017 = 126.26 cfs = 723 min = 361,314 cuft = 50* = Oft = 15.00 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 I i i / I I I I I I X 1 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 3 Route Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 - Post - Wet Basin Reservoir name = Pond 1 Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 140.00 120.00 100.00 :� 11 •1 11 40.00 20.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Route Hyd. No. 3 -- 10 Year 0.00 0 120 240 Hyd No. 3 Monday, 09 / 18 / 2017 = 49.15 cfs = 735 min = 273,218 cuft = 2862.65 ft = 102,538 cuft Q (cfs) 140.00 120.00 100.00 :1 11 •1 11 40.00 20.00 rn.1 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 011111 Total storage used = 102,538 cuft Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Monday, 09 / 18 / 2017 Pond No. 1 - Pond 1 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Weir Structures Storage / Discharge Table Pond Data [A] Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 2859.00 ft Stage / Storage Table [B] [C] [D] Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 2859.00 17,037 0 0 1.00 2860.00 25,763 21,248 21,248 2.00 2861.00 29,837 27,772 49,020 3.00 2862.00 32,829 31,318 80,338 4.00 2863.00 35,881 34,340 114,679 Culvert / Orifice Structures Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Weir Structures Storage / Discharge Table [A] [B] [C] [PrPRSr] PrfRsr Wr A Wr B Wr C [A] [B] [C] [D] Rise (in) = 48.00 Inactive Inactive Inactive Crest Len (ft) = 3.14 Inactive 0.00 0.00 Span (in) = 48.00 0.00 0.00 0.00 Crest EI. (ft) = 2859.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert EI. (ft) = 2860.00 0.00 0.00 0.00 Weir Type = 1 Broad --- --- Length (ft) = 324.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 3.00 0.00 0.00 n/a N -Value = .022 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 2.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Civ B CIV C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 2859.00 0.00 --- --- --- 0.00 --- --- --- 0.000 --- 0.000 1.00 21,248 2860.00 0.00 --- --- --- 0.32s --- --- --- 1.193 --- 1.193 2.00 49,020 2861.00 8.47 is --- --- --- 0.00 --- --- --- 1.381 --- 9.853 3.00 80,338 2862.00 30.25 is --- --- --- 0.00 --- --- --- 1.520 --- 31.77 4.00 114,679 2863.00 59.99 is --- --- --- 0.00 --- --- --- 1.661 --- 61.65 ject Name: PARI Commercial Expansion Phase 1 ACE ject No. 1684 '- pared By: RMB e Prepared: 6/13/2017 F z e Revised: 9/19/2017 (Revised for Phase 1, Amendment 1) Mehael D. L -y, P.E. nOa 55 34 Big Bear 7rai1 Fa.F� FpWp� y� Asheville,NC 28805 _) 0.90 8.24 0.000 Pond+F1+F2 1 8.358 828-545-5393 2836.0 0.50 CMP 0.022 22.9 60 2.6 wcwvaceasheville_com mlovoy�aceashevilLe.com STORMWATER DRAINAGE PIPE CALCULATIONS Permit # TBD c7 w a oz a z d Wa' < U �� W F.' INVERT STRUCTURE a G C 04 = x z rEi, k,_ O ELEVATION FROM_j TO F "A" "C" "1" Upper Tower (ACRES) (IN./HR) (CFS) (CFS) NC Firm # C-2849 I(TN.) (FPS) (FT) I (FT) - TIJ'IE OFCONCFNIRATION=5VIIN.; II MIF OI PI::Vk II,O%�-='-6NUN. - '- F3 F1 124 0.37 d C O 2858.5 z F z w Wv W w io nOa 55 Ia,0.�D�G Fa.F� FpWp� y� F1 FO (Outlet) 134 0.00 _) 0.90 8.24 0.000 Pond+F1+F2 1 8.358 2836.7 2836.0 0.50 CMP 0.022 22.9 60 I(TN.) (FPS) (FT) I (FT) - TIJ'IE OFCONCFNIRATION=5VIIN.; II MIF OI PI::Vk II,O%�-='-6NUN. - '- F3 F1 124 0.37 0.90 1 8.24 2.735 i None 2.735 2858.5 .6 2856.0 2.02 HDPE 0.011 8.9 18#1E3.2 5.9 2862.0 3.5 Catch Basin F2 F1 86 0.76 j 0.90 8.24 5.623 ( None 5.623 2851.3 2849.5 2.03 HDPE 0.011 11.7 18.0 8.5 2862.0 7.4 Catch Basin F1 FO (Outlet) 134 0.00 _) 0.90 8.24 0.000 Pond+F1+F2 1 8.358 2836.7 2836.0 0.50 CMP 0.022 22.9 60 2.6 2863.2 26.5 Junction Box TIME. OF CONCENTRAHON =15.MIN.;,TIME OF PEAK FLOW =+/-735MRV. = +/-12.151W. F1 FO (Outlet) ( 134 0.000 Pond+F1+F2 49.150 j 2836.7 1 2836.0 0.50 1 CMP j 0.022 1 44.5 ( 60 j 32.0 ( 4.6 2863.21 26.5 Junction Box Vote:' = Total discharge is calculated from stormwater basin modeling. C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Storm Pipe & Endwall Unnamed tributary PER Corps 2 149 S2 T Endwall Construction Unnamed tributary PER DWQ 2 30 S3 - Choose one S4 - Choose one S5 - Choose one - S6 - Choose one 3h. Total stream and tributary impacts 179 3i. Comments: The proposed pipe with endwall will be an extension of the existing stormwater system that functions as an outfall for the adjacent stormwater wet detention basin. The proposed pipe will not collect any additional stormwater runoff. The impacted stream is an unnamed tributary to Lamance Creek. Page 4 of 10 PCN Form — Version 1.4 January 2009 i� GI FI EI J CI 0 12 10 7,9 / 7 \ 2810j/z/ / / i j/�/ \ \ \ CONTRACTOR SHALL CONVERT \ \ - TD #1 TO ITS PERMANENT /j v v v v STATE AND MAT WITH NORTH /// / \ \ v AMERICAN GREEN S75 OR - // 28 PROPOSED / / v v v APPROVED EQUIVALENT - / / / // z/� / \ \ \ \ � _ - - 2 HDPE @ 1.82% \ \ / // // �✓ / PROPOSED PERMANENT DITCH vv ---- - PD #1 @ 2% - - - - - - - - MINIMUM SLOPE _28 Ln �/ / / \\ // / °z°// \ (SEE DETAIL) - _00 / / / / / /2// 288 / / / / / / �- 5 STORMWATER -NOTE- NO STORMWATER PERMIT IS REQUIRED PER NCDEQ STORMWATER PERMITTING INTRACIIVE MAP WEBSITE. TTHROAATEPROPOSDNLETEA2 - 1 TOP. 2878.00 r' _ INV.: 2875.00 �- \ - //' (STRUCTURE SHALL NOT BE / ���� j /,,'%�// _ - - EXISTING SEWER / INSTALLED UNTIL SEDIMENT / / , / / / \ _ \ (TYP.) j ///' TRAP IS REMOVED) A =� / / / \ v v a°o V \ v /� / / �� PROPOSED EXISTING BUILDING _ 45LF - 15" FFE: 2875.20 ® A \ V A \ / HDPE @ 8.89% v � L V i / EXISTING /i // / /// / - _ - S`� _ S EXISTING PROPOSED A4 EXISTING GUARD HOUSE / \ 18" CMP 28 \ \ \ 0 3 SITE INFORMATION: ADDRESS: 1 PARI DRIVE PIN#: 8545-30-6278 DEED BOOK/PG: 442/749 PLAT BOOK/PG: NA TOTAL ACREAGE (COMBINED) ±204 ACRES ±8,886,240 SF TRANSYLVANIA COUNTY ZONING: NA LEGEND STORM DRAINAGE PIPE EXISTING CONTOURS PROPOSED CONTOURS PROPOSED RIP -RAP APRON PROPOSED WA TER BAR PROPOSED STORM INLET PERMANENT DITCH • 0 Know what's below. Call before you dig. GUARD -_-_ _ _ _ �� - L= - - // / j / �� (YARD INLET) _ / / /j / / / i, - - - - \ S\ 71 \ \�S\ \ \ SHACK _ - - _ _ _- - _ -- - - - PROPOSED OPEN ./ / / / // // ✓� TOP: 2873.50 - a / / / /r - \ \\� \ \ \ \ - - -_ THROAT INLET A3 //// / j/ / j/ ------ _\ \\\�S i / / INV.: 2871.50 / - - - - - - - TOP: 2880.00 / �i / / / W w \ - - - - - _- - - - -_- / / / i, 2874 \ \ �\W\` ----- ,==T- INV.: 2876.00 j / PROPOSED 7LF (STRUCTURE SHALL NOT ___--- BE INSTALLED UNTIL / i / / - 15" HDPE @ SEDIMENT TRAP IS��� f - �3 7.14% W W- REMOVED) i 28 / / PROPOSED CURB CONCRETE STEPS - / INLET Al N 2872 // TOP: 2875.20 / EXISTING GRATE / / / INV.: 2871.00 // / / / i INLET AO f / ---- TOP: UNADJUSTED INV.: 2838.00 PROPOSED EXISTING \ \ / / 43LF - 15" / / / /� / WET POND \ \ / // HDPE @ 6.98% \ �/ / / / i - STORMWATER N \ I / EXISTING WATER PROPOSED / 0 ` / / / EXISTING CONTROL / MEASURE _- (TYP.) CURB INLET B4 / 24" CMP �, / TOP: 2869.00 INV.: 2866.00 - I / / / / 2868 // , // / / �/ EXISTING r 24" CMP i APPROXIMATE EXISTING BUILDING - _ / % / / /' ILOCATION OF EXISTING RISER PROPOSED / / - !4 /// I STRUCTURE 32'F - 15" _ - - - - - - \ 2 6� // PROPOSED OPEN HDPE @ 3.13% - - 8\ / THROAT INLET B5 / / /� a -- \ V A �- _ TOP: 2863.50 PROPOSED ° - ° \ / INV.: 2861.00 73LF 15" V EXISTING / HDPE @ 0.50% / GO 1 � 18" RCP \ - \ \a ' -28d5 ° ° EXISTING BUILDING J PROPOSED ), / / / / / ° a FFE: 2870.35 PROPOSED w -- A 113LF - 15" = CURB INLET B3 \ HDPE @ 3.81% c - / / TOP: 2868.0041- PROPOSED PIPE i \ 865 OUTLET EO INV.: 2865.00 j v -; 2 PROPOSED INV.: 2859.64 tz / % / / - ' ---- / 20LF - 15 - � - HDPE @ 4.00% \ / a 2 �q _ 0c 0 z JOE HOUSE RD. ONVRGN ��� R M���ooN�P -o D. / 28 N s SITE US6 4 HWY VICINITY MAP (NOT TO SCALE) - W �� n ` - - - - --- - W ■ �/ \ 2 28 PROPOSED OUTLET \ \ / PROPOSED I ° s2 6� STRUCTUREE1 E1 2861.20 / / i / / / / 2865 - --- - ---- -- - - .--- - 57LF 15 9 / / / W / ii - ---__ / - \ a EXISTING BUILDING INV.: 2860.00 / ,� / _ �- \ > / , HDPE @ 0.88% STRUCTURE SHALL NOT / N EXISTING � � 2g ( PROPOSED BUILDING - - - -�+- - 48" CMP 286 6� BE INSTALLED UNTIL FINAL FFE: 2870.35 ///iii////ii / %ago% \ \ �- i, EXISTING STORM a _ / -_ - -_ -_ 2� CONVERSION TO DETENTION DRAINAGE (TYP.) -: ----�_ 86A/ POND BEGINS 2855 ) N ° ° ° a EXISTING FENCE - - - t \ \ _ / PROPOSED I \ ° < ° \� ° °�� °� %/ \ - -cw- (TYP.) _ �/� ° �%\ \ EXISTING 30LF 15" a j !/ / =s 285\/ \ 12" HDPE , EXISTING / % HDPE @ 3.67%2868 d 18 l - i CMP\w6, /// // // / / \/ \ 2 3 N �a ♦ cP / J PROPOSED OPEN 86 - 1 ♦ ♦ �\ 2�s, \ /// /�i ii / / - - - - - a - -=�� / - - - = EXISTING A -- / THROAT INLET B2 �, ♦ \ / / / "` - -_- _ -- - - ' - - - - - _ / TOP: 2863.00 2�� / r - - - - -= - - - - - - 18" RCP / INV.: 2860.70 \ 2860 - ///// � j !_ - 1.1 1 / ♦♦� / � l / 2863 // / - - - - / d/ / / / \ \� / PROPOSED OPEN / // NA \\\I THROAT INLET 131 TOP: 2863.50 INV.: 2860.20 PROPOSED SEGMENTAL BLOCK RETAINING WALL. PEDESTRIAN SAFE HANDRAIL SHALL BE ADDED TO TOP OF WALL WHEREVER HEIGHT OF WALL EXCEEDS 30" (COORDINATE TYPE & STYLE WITH ARCHITECT) (DESIGN BY OTHERS)(TYP.) J / I / / ?8e� PROPOSED � ��-_ �_ - _--___- �_-- - ----------- / / / / /// /% / j PROPOSED / - , %/i \ \ \ 96LF - 15" _ -zeas -� - / / /// // /// / / / / / / 15LF - 18" / - - �-PD� \ / HDPE @ 3.96% �/� / / _ - �\ \ - - - HDPE @ 0.67% I - EXISTING GRAVEL °����'�// ° ° ROAD (TYP.) �k PROPOSED CURB INLET D2 - - - - / / / TOP: 2868.00 PROPOSED PIPE / \ \ // / - - - - _ / / / OUTLET BO / \ // / / - - - - - - PROPOSED / / /// INV.: 2865.00 INV.: 2860.10 - / / / / / - - - - - ` - - PERMANENT DITCH // 7 PROPOSED WET/DRY POND // --_-- - - - - - / �/ / %/ // / / / / // \ MINIMUM SLOPE - - - - - - - / /� // / / FOREBAY STORMWATER CONTROL (SEE DETAIL) PROPOSED OPEN - - - - - / MEASURE SEE DETAIL CONTRACTOR THROAT INLET D1 EXISTING PAVED ( )( / \ / ROAD (TYP.) \ SHALL CONVERT BASIN TO FINAL / PROPOSED CONDITION SEDIMENT TRAP 49LF - 12" TOP: 2864.20 HASBEENREMOVED)HDPE @ 0.61% CONTRACTOR SHALL CONVERT INV.: 2861.20 TD #1 TO ITS PERMANENT STATE AND MAT WITH NORTH PROPOSED OPEN AMERICAN GREEN S75 OR PROPOSED PIPE THROAT INLET C1 APPROVED EQUIVALENT OUTLET DO . TOP: 286200 INV.: 2860.10 30' STREAM/ INV.: 2860.40 PROPOSED PIPE BUFFER / OUTLET CO INV.: 2860.10 12 11 10 9 7 0 5 0 3 NORTH CAROLINA FIRM NUMBER C-2849 MICHAEL LOVOY, P.E. 34 BIG BEAR TRAIL ASHEVILLE, NC 28805 (828) STORMWATER PLAN GRAPHIC SCALE 30 0 15 30 60 120 ( IN FEET ) 1 inch = 30 ft. 2 \I 119 Brookstown Ave. Suite 100 Winston-Salem NC 27101 p. 336-724-1503 www.cjmw.com PERMIT SET FOR CONSTRUCTION 1►11111111��0 ` O p,RCHl1'F�. �Vip O�F�iSSI�p�LH9�jjii/� �? CERT. NOG�o = ALf U 50356 = 38 ASTON -SALEM' Version Issue Name I pate 1 RESPONSE TO 06.08-17 NCDEQ COMMENTS 06-13.2017 sheet z Z Copyright 2016 CJMW Architecture, P.A. STORMWATER PLAN C4.1 date: 5126/2017 commission: 17-0050 drawn bv: UAG PROJECT TEAM INFORMATION OWNER/DEVELOPER: PISGAH ASTRONOMICAL RESEARCH INSTITUTE 1 PARI DRIVE ROSMAN, NC 28772 CONTACT: DONALD CLINE (828)862-5554 CIVIL ENGINEER: ADVANTAGE CIVIL ENGINEERING 34 BIG BEAR TRAIL ASHEVILLE, NC 28805 CONTACT: MIKE LOVOY, P.E. (828)545-5393 GENERAL CONTRACTOR: FRANK L. BLUM CONSTRUCTION CO. PO BOX 4153 WINSTON SALEM, NC 27115 CONTACT: CHRIS WHITE (336)724-5528 SURVEYOR: KEE MAPPING AND SURVEYING PO BOX 2566 ASHEVILLE, NC 28802 CONTACT: BRAD KEE (828)575-9021 NOTES 1 . ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE NCDENR AND BUNCOMBE COUNTY STANDARDS AND SPECIFICATIONS. 2. ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH NCDENR AND BUNCOMBE COUNTY STANDARDS AND SPECIFICATIONS. 3. SINGLE PHASE CONSTRUCTION. 4. ALL WORK SHALL BE PERFORMED BY A NORTH CAROLINA LICENSED UTILITY CONTRACTOR. 5. CONTRACTOR TO COORDINATE EXACT LOCATION OF PROPOSED AND EXISTING UTILITIES. 6. EROSION CONTROL IS FIELD PERFORMANCE BASED AND ADDITIONAL SILT FENCES, TEMPORARY SEDIMENT BASINS, AND ALL OTHER MEASURES MAY NEED TO BE ADDED IN ADDITION TO THE APPROVED PLAN AS NECESSARY. MEASURES SHOWN CAN AND SHOULD BE ADJUSTED TO ASSURE MAXIMUM PROTECTION ON SITE. 7. CONTRACTOR IS RESPONSIBLE FOR INSTALLING, MAINTAINING, AND REMOVING ALL NECESSARY EROSION AND SEDIMENTATION MEASURES. 8. CONTRACTOR TO FIELD VERIFY ALL PIPES AND DEPTHS PRIOR TO ORDERING MATERIALS AND CONSTRUCTION. 9. ADD MEASURES AS NEEDED IN ENVIRONMENTALLY SENSITIVE AREAS. 10. PROJECT LIES OUTSIDE 1 00 -YEAR FLOOD PLAIN. 1 1 . CONTRACTOR RESPONSIBLE FOR KEEPING ACCURATE LOG OF SITE CONDITIONS IN ACCORDANCE WITH NPDES PERMIT. 12, SOIL TYPE "A" (UDORTHENTS) 13. ALL DISTURBED AREAS TO BE SEEDED WITHIN 14 WORKING DAYS OF COMPLETION PER NCDENR AND BUNCOMBE COUNTY STANDARDS AND SPECS 14. ALL RETAINING WALL ELEVATIONS SHOWN ARE FROM TOP OF WALL TO FINISH GRADE ELEVATION. CONTRACTOR TO ACCOUNT FOR FOOTER/COVER OVER FOOTER. 1 S. CONTRACTOR IS RESPONSIBLE FOR OBTAINING GRADING AND EROSION CONTROL PERMIT FOR WASTE OR BORROW SITES. 16. ALL STORM OUTFALLS SHALL HAVE ONLY CLASS II LARGE RIP -RAP FOR ALL APRONS UNLESS OTHERWISE SPECIFIED. 17. ALL AREAS TO BE GRADED TO DRAIN TO SEDIMENT BASIN OR LOW ELEVATION AREAS. 18. BIO -RETENTION CELLS AND AREAS AROUND CONCRETE FLUMES TO INCLUDE BLUEGRASS SOD. 19. STORM DRAINAGE BOXES SHALL BE A STANDARD 3'X 3' (I.D.) PRECAST STRUCTURE UNLESS OTHERWISE NOTED. - W �� n ` - - - - --- - W ■ �/ \ 2 28 PROPOSED OUTLET \ \ / PROPOSED I ° s2 6� STRUCTUREE1 E1 2861.20 / / i / / / / 2865 - --- - ---- -- - - .--- - 57LF 15 9 / / / W / ii - ---__ / - \ a EXISTING BUILDING INV.: 2860.00 / ,� / _ �- \ > / , HDPE @ 0.88% STRUCTURE SHALL NOT / N EXISTING � � 2g ( PROPOSED BUILDING - - - -�+- - 48" CMP 286 6� BE INSTALLED UNTIL FINAL FFE: 2870.35 ///iii////ii / %ago% \ \ �- i, EXISTING STORM a _ / -_ - -_ -_ 2� CONVERSION TO DETENTION DRAINAGE (TYP.) -: ----�_ 86A/ POND BEGINS 2855 ) N ° ° ° a EXISTING FENCE - - - t \ \ _ / PROPOSED I \ ° < ° \� ° °�� °� %/ \ - -cw- (TYP.) _ �/� ° �%\ \ EXISTING 30LF 15" a j !/ / =s 285\/ \ 12" HDPE , EXISTING / % HDPE @ 3.67%2868 d 18 l - i CMP\w6, /// // // / / \/ \ 2 3 N �a ♦ cP / J PROPOSED OPEN 86 - 1 ♦ ♦ �\ 2�s, \ /// /�i ii / / - - - - - a - -=�� / - - - = EXISTING A -- / THROAT INLET B2 �, ♦ \ / / / "` - -_- _ -- - - ' - - - - - _ / TOP: 2863.00 2�� / r - - - - -= - - - - - - 18" RCP / INV.: 2860.70 \ 2860 - ///// � j !_ - 1.1 1 / ♦♦� / � l / 2863 // / - - - - / d/ / / / \ \� / PROPOSED OPEN / // NA \\\I THROAT INLET 131 TOP: 2863.50 INV.: 2860.20 PROPOSED SEGMENTAL BLOCK RETAINING WALL. PEDESTRIAN SAFE HANDRAIL SHALL BE ADDED TO TOP OF WALL WHEREVER HEIGHT OF WALL EXCEEDS 30" (COORDINATE TYPE & STYLE WITH ARCHITECT) (DESIGN BY OTHERS)(TYP.) J / I / / ?8e� PROPOSED � ��-_ �_ - _--___- �_-- - ----------- / / / / /// /% / j PROPOSED / - , %/i \ \ \ 96LF - 15" _ -zeas -� - / / /// // /// / / / / / / 15LF - 18" / - - �-PD� \ / HDPE @ 3.96% �/� / / _ - �\ \ - - - HDPE @ 0.67% I - EXISTING GRAVEL °����'�// ° ° ROAD (TYP.) �k PROPOSED CURB INLET D2 - - - - / / / TOP: 2868.00 PROPOSED PIPE / \ \ // / - - - - _ / / / OUTLET BO / \ // / / - - - - - - PROPOSED / / /// INV.: 2865.00 INV.: 2860.10 - / / / / / - - - - - ` - - PERMANENT DITCH // 7 PROPOSED WET/DRY POND // --_-- - - - - - / �/ / %/ // / / / / // \ MINIMUM SLOPE - - - - - - - / /� // / / FOREBAY STORMWATER CONTROL (SEE DETAIL) PROPOSED OPEN - - - - - / MEASURE SEE DETAIL CONTRACTOR THROAT INLET D1 EXISTING PAVED ( )( / \ / ROAD (TYP.) \ SHALL CONVERT BASIN TO FINAL / PROPOSED CONDITION SEDIMENT TRAP 49LF - 12" TOP: 2864.20 HASBEENREMOVED)HDPE @ 0.61% CONTRACTOR SHALL CONVERT INV.: 2861.20 TD #1 TO ITS PERMANENT STATE AND MAT WITH NORTH PROPOSED OPEN AMERICAN GREEN S75 OR PROPOSED PIPE THROAT INLET C1 APPROVED EQUIVALENT OUTLET DO . TOP: 286200 INV.: 2860.10 30' STREAM/ INV.: 2860.40 PROPOSED PIPE BUFFER / OUTLET CO INV.: 2860.10 12 11 10 9 7 0 5 0 3 NORTH CAROLINA FIRM NUMBER C-2849 MICHAEL LOVOY, P.E. 34 BIG BEAR TRAIL ASHEVILLE, NC 28805 (828) STORMWATER PLAN GRAPHIC SCALE 30 0 15 30 60 120 ( IN FEET ) 1 inch = 30 ft. 2 \I 119 Brookstown Ave. Suite 100 Winston-Salem NC 27101 p. 336-724-1503 www.cjmw.com PERMIT SET FOR CONSTRUCTION 1►11111111��0 ` O p,RCHl1'F�. �Vip O�F�iSSI�p�LH9�jjii/� �? CERT. NOG�o = ALf U 50356 = 38 ASTON -SALEM' Version Issue Name I pate 1 RESPONSE TO 06.08-17 NCDEQ COMMENTS 06-13.2017 sheet z Z Copyright 2016 CJMW Architecture, P.A. STORMWATER PLAN C4.1 date: 5126/2017 commission: 17-0050 drawn bv: UAG Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 1 Pre - Wet Basin Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 44.600 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.97 in Storm duration = 24 hrs " Composite (Area/CN) = [(4.700 x 98) + (39.900 x 44)] / 44.600 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' 0 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pre - Wet Basin Hyd. No. 1 -- 10 Year Monday, 09 / 18 / 2017 = 126.26 cfs = 723 min = 361,314 cuft = 50* = Oft = 15.00 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 I i i / I I I I I I X 1 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 3 Route Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 - Post - Wet Basin Reservoir name = Pond 1 Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 140.00 120.00 100.00 :� 11 •1 11 40.00 20.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Route Hyd. No. 3 -- 10 Year 0.00 0 120 240 Hyd No. 3 Monday, 09 / 18 / 2017 = 49.15 cfs = 735 min = 273,218 cuft = 2862.65 ft = 102,538 cuft Q (cfs) 140.00 120.00 100.00 :1 11 •1 11 40.00 20.00 rn.1 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 011111 Total storage used = 102,538 cuft Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 2 Post - Wet Basin Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 44.600 ac Basin Slope = 0.0% Tc method = User Total precip. = 7.97 in Storm duration = 24 hrs " Composite (Area/CN) = [(5.300 x 98) + (39.300 x 44)] / 44.600 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' 0 120 240 Hyd No. 2 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post - Wet Basin Hyd. No. 2 -- 10 Year Monday, 09 / 18 / 2017 = 126.26 cfs = 723 min = 361,314 cuft = 50* = Oft = 15.00 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 I i i / I I I I I I X 1 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 3 Route Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 - Post - Wet Basin Reservoir name = Pond 1 Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 140.00 120.00 100.00 :� 11 •1 11 40.00 20.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Route Hyd. No. 3 -- 10 Year 0.00 0 120 240 Hyd No. 3 Monday, 09 / 18 / 2017 = 49.15 cfs = 735 min = 273,218 cuft = 2862.65 ft = 102,538 cuft Q (cfs) 140.00 120.00 100.00 :1 11 •1 11 40.00 20.00 rn.1 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 011111 Total storage used = 102,538 cuft Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Monday, 09 / 18 / 2017 Pond No. 1 - Pond 1 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Weir Structures Storage / Discharge Table Pond Data [A] Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 2859.00 ft Stage / Storage Table [B] [C] [D] Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 2859.00 17,037 0 0 1.00 2860.00 25,763 21,248 21,248 2.00 2861.00 29,837 27,772 49,020 3.00 2862.00 32,829 31,318 80,338 4.00 2863.00 35,881 34,340 114,679 Culvert / Orifice Structures Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Weir Structures Storage / Discharge Table [A] [B] [C] [PrPRSr] PrfRsr Wr A Wr B Wr C [A] [B] [C] [D] Rise (in) = 48.00 Inactive Inactive Inactive Crest Len (ft) = 3.14 Inactive 0.00 0.00 Span (in) = 48.00 0.00 0.00 0.00 Crest EI. (ft) = 2859.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert EI. (ft) = 2860.00 0.00 0.00 0.00 Weir Type = 1 Broad --- --- Length (ft) = 324.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 3.00 0.00 0.00 n/a N -Value = .022 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 2.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Civ B CIV C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 2859.00 0.00 --- --- --- 0.00 --- --- --- 0.000 --- 0.000 1.00 21,248 2860.00 0.00 --- --- --- 0.32s --- --- --- 1.193 --- 1.193 2.00 49,020 2861.00 8.47 is --- --- --- 0.00 --- --- --- 1.381 --- 9.853 3.00 80,338 2862.00 30.25 is --- --- --- 0.00 --- --- --- 1.520 --- 31.77 4.00 114,679 2863.00 59.99 is --- --- --- 0.00 --- --- --- 1.661 --- 61.65 ject Name: PARI Commercial Expansion Phase 1 ACE ject No. 1684 '- pared By: RMB e Prepared: 6/13/2017 F z e Revised: 9/19/2017 (Revised for Phase 1, Amendment 1) Mehael D. L -y, P.E. nOa 55 34 Big Bear 7rai1 Fa.F� FpWp� y� Asheville,NC 28805 _) 0.90 8.24 0.000 Pond+F1+F2 1 8.358 828-545-5393 2836.0 0.50 CMP 0.022 22.9 60 2.6 wcwvaceasheville_com mlovoy�aceashevilLe.com STORMWATER DRAINAGE PIPE CALCULATIONS Permit # TBD c7 w a oz a z d Wa' < U �� W F.' INVERT STRUCTURE a G C 04 = x z rEi, k,_ O ELEVATION FROM_j TO F "A" "C" "1" Upper Tower (ACRES) (IN./HR) (CFS) (CFS) NC Firm # C-2849 I(TN.) (FPS) (FT) I (FT) - TIJ'IE OFCONCFNIRATION=5VIIN.; II MIF OI PI::Vk II,O%�-='-6NUN. - '- F3 F1 124 0.37 d C O 2858.5 z F z w Wv W w io nOa 55 Ia,0.�D�G Fa.F� FpWp� y� F1 FO (Outlet) 134 0.00 _) 0.90 8.24 0.000 Pond+F1+F2 1 8.358 2836.7 2836.0 0.50 CMP 0.022 22.9 60 I(TN.) (FPS) (FT) I (FT) - TIJ'IE OFCONCFNIRATION=5VIIN.; II MIF OI PI::Vk II,O%�-='-6NUN. - '- F3 F1 124 0.37 0.90 1 8.24 2.735 i None 2.735 2858.5 .6 2856.0 2.02 HDPE 0.011 8.9 18#1E3.2 5.9 2862.0 3.5 Catch Basin F2 F1 86 0.76 j 0.90 8.24 5.623 ( None 5.623 2851.3 2849.5 2.03 HDPE 0.011 11.7 18.0 8.5 2862.0 7.4 Catch Basin F1 FO (Outlet) 134 0.00 _) 0.90 8.24 0.000 Pond+F1+F2 1 8.358 2836.7 2836.0 0.50 CMP 0.022 22.9 60 2.6 2863.2 26.5 Junction Box TIME. OF CONCENTRAHON =15.MIN.;,TIME OF PEAK FLOW =+/-735MRV. = +/-12.151W. F1 FO (Outlet) ( 134 0.000 Pond+F1+F2 49.150 j 2836.7 1 2836.0 0.50 1 CMP j 0.022 1 44.5 ( 60 j 32.0 ( 4.6 2863.21 26.5 Junction Box Vote:' = Total discharge is calculated from stormwater basin modeling.