HomeMy WebLinkAbout20081218 Ver 1_General Correspondence_20081031ftK
WDICKSON
community infrastructure consultants
October 29, 2008
!r.
0 ? ? ? ? .200$
Division of Water Quality a wN wAtEK
stoRMwA?? CM
401 /Wetlands Unit WERVADSWo
1650 Mail Service Center
Raleigh, NC 27699-1650
ATTN: Robert Krebs; Barry Love; Annette Lucas; Ian McMillan
RE: Tate Boulevard Access New Research Park
DWQ Project #08-1218
Dear DWQ:
I am submitting this letter on behalf of my client CCF Associates I, LP & Whitener to
verify our intent to submit revised plans and calculations based upon the comment letter
we received from your office dated September 30, 2008.
WK Dickson is currently working with our client to prepare the requested Stormwater
Management Plan (SMP). We have been able to revise the plans and application based
upon the comments of Barry Love. We are currently working on a Best Management
Practice Design that will remove a minimum of 85 percent TSS as requested by Annette
Lucas. We are also working on a conceptual stormwater management plan for the
remainder of the site.
Please accept this letter as our intent to address your comments and provide the requested
information within the next 45 calendar days. Thank you for your understanding in this
matter. Please contact me if you have further questions or comments.
Sincerely,
Jeffrey J. Swartz, PE, LEED AP
Cc: John Fuller, Esquire
Michael Whitener
M:\Projects\Whither-l-uller\8009200FII\Documents\A_General Corresp\DWQ-10-29-08.doc
401 4th Street, SW
Suite 201
Hidor?, NC 28602
Tel: 828.327.69"I1
Fax: 828.327.9164
www.wkdickson.com
11 nspo ?:.?i1 O1, +iE't R,- ources a ?.!i,ban