Loading...
HomeMy WebLinkAbout20081218 Ver 1_General Correspondence_20081031ftK WDICKSON community infrastructure consultants October 29, 2008 !r. 0 ? ? ? ? .200$ Division of Water Quality a wN wAtEK stoRMwA?? CM 401 /Wetlands Unit WERVADSWo 1650 Mail Service Center Raleigh, NC 27699-1650 ATTN: Robert Krebs; Barry Love; Annette Lucas; Ian McMillan RE: Tate Boulevard Access New Research Park DWQ Project #08-1218 Dear DWQ: I am submitting this letter on behalf of my client CCF Associates I, LP & Whitener to verify our intent to submit revised plans and calculations based upon the comment letter we received from your office dated September 30, 2008. WK Dickson is currently working with our client to prepare the requested Stormwater Management Plan (SMP). We have been able to revise the plans and application based upon the comments of Barry Love. We are currently working on a Best Management Practice Design that will remove a minimum of 85 percent TSS as requested by Annette Lucas. We are also working on a conceptual stormwater management plan for the remainder of the site. Please accept this letter as our intent to address your comments and provide the requested information within the next 45 calendar days. Thank you for your understanding in this matter. Please contact me if you have further questions or comments. Sincerely, Jeffrey J. Swartz, PE, LEED AP Cc: John Fuller, Esquire Michael Whitener M:\Projects\Whither-l-uller\8009200FII\Documents\A_General Corresp\DWQ-10-29-08.doc 401 4th Street, SW Suite 201 Hidor?, NC 28602 Tel: 828.327.69"I1 Fax: 828.327.9164 www.wkdickson.com 11 nspo ?:.?i1 O1, +iE't R,- ources a ?.!i,ban