Loading...
HomeMy WebLinkAboutSW3170902 - Wingate University Student Housing Apartments (3)P G 0 2017 September 18, 2017 NC Dept. of Environmental Quality DEMLR Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 Re: Stormwater Narrative Dear Robert, Enclosed are the design plans and calculations for the Wingate University Student Housing area to be located along E. Wilson Street within the Town of Wingate. The site is located at approximately 34d59'08" N and 80d26'31" W and consists of the construction of two student housing apartments and associated parking. A storm water dry detention basin and sand filter has been designed to treat the proposed impervious and a portion of the existing impervious for site A. A SCM is not proposed for site B due to the removal of existing impervious within site A and B along with the treatment of existing impervious contained in site A. Please see to enclosed storm calculations for a detailed breakdown of these areas. The site is owned and maintained by Wingate University. Please see the enclosed design plans, calculations, and application for additional information regarding the project. The proposed stormwater dry detention basin and sand filter have been designed using NCDENR's stormwater BMP manual and meets all the provisions within the manual. Please feel free to contact me with any questions or comments. Sincerely, Clinton D. La nce, PE, PLS, CPESC Principal p: 704-289-1013 www.lawrencesurveying.com 106 W. Jefferson St. f: 704-283-9035 Monroe, NC 28112 4X" LAWRENCEI ASSOCIATES Storm Drainage and Erosion Control Calculations for Wingate University Student Housing Apartments Wingate, North Carolina Project No.: 0538 Storm Drainage RipRap Calculations Tc Sediment Basin Sediment Basin Sand Filter Calculations Detention Pond Calculations p: 704-289-1013 www. LawrenceSurveying.com f: 704-283-9035 ��F ? 0 eon 106 W. Jefferson St. Monroe, NC 28112 Site A Pre DA#1=5.4 Acres Ex Imp=1.84 acres Grassed (assumed gravel lot does not exist and is grass) =3.56 Acres 0.15 Ac C Soils 74 Good Condition Grass 3.41 Ac B Soils 61 Good Condition Grass Post DA#1=5.4 Acres Imp=3.32 acres B Soils 62% Imp BUA Grassed 0.15 Ac C Soils 74 Good Condition Grass 1.93 Ac B Soils 61 Good Condition Grass 0.91 acres existing impervious being treated in SCM (cafeteria and parking) 0.93 acres existing impervious to be removed Site B Pre DA#2=4.02 Acres Ex Imp=0.94 acres to be removed Woods=0.7 acres 60 (B Soils in fair condition) Grass=2.38 acres 79 (C Soils in fair condition) Post DA#2=4.02 Acres Prop. Imp. =2.77 Grass=0.18 acres 61 (B Soils good condition) Grass=1.07 acres 74 (C Soils good condition) WQ Credit 0.91 acres existing impervious being treated in SCM (cafeteria and parking) Area A 0.93 acres existing impervious to be removed from Area A 0.94 acres existing impervious to be removed from Area B 2.78 acres Treated area is greater than total prop. Imp. Area B (2.78>2.77) 4. Sand Filter Design Section 11 NCDENR BMP Manual Project: WU-Student Housing Location: Wingate NC Date: 8/28/2017 Designer: Clint Lawrence, PE Flow to Basin Data Composite CN after development: 3.32 ac. Impervious Are. CN= 98 Soil Type: 0 ac. Roof area CN= SCS Soil Group: 0 ac. Gravel CN= 89 B Soils 1.93 ac. Grassed Area CN= 61 C Soils 0.15 ac. Grassed Area CN= 74 5.40 ac. Total Area CN= Composite CN 84.1093 Volumetric Runoff Cofficient, Rv: Rv =.05+.009(1) % Impervious Area Rv 0.603333 Water Quality Protection Volume. WQv: WQv=1.ORvA/12 WQv 0.27 Ac -Ft 11826.54 c.f WQv 0.603333 in. of runoff 61.48% Modified CN CN =1000/[10+5P+10WQv-10(WQv^2+1.25WQvP)^.5] P 1 Modified CN 95.61198 Sand Filter Area By Darcv's Equation; k= 3.5 ft/day Af =(WQv*df)/[k*(ha+df)*tf] df= 1.5 ft Af 1228.731 sf ha= 1.25 ft tf= 1.5 days A Sand Filter Media Stage -Storage: Qo=Af(K) (hf+df)/(df) (Cf) Use Af 1406 sf k 3.5 ft/day df 1.5 ft Underdrain Capacity: D=16((Q*n)/(s^0.5))^(3/8)) IF D is less than 7.84 use (2) 6' Pipes BMP section 5.7 Underdrain Capacity: 2# of 6" dia. Underdrains 64 ft Length of underdrains 256 # of 3/8 dia. Performations assuming 50% clogged Elev 533 0 534 0.028478009 535 0.085434028 536 0.142390046 537 0.199346065 538 0.256302083 3.165534 (2) 6" Undergrounds Proposed 0.009501 cfs Capacity of one perforation=CA(2gh)^.5 1.216117 cfs Capacity of all performations assuming 50% clogged 0.789 cfs Capacity of all 6" dia. PVC pipes by Manning Eq 0.394 cfs Capacity assuming 50% clogged OK underdrain capcity greater than max. media capacity Anti -Flotation Base: Boyant force=Weight of water displace by outlet structure 5.33 ft 5.33 ft 10 ft 9,500 lbs Wt of water displaced=Volume of structure*62.4 Ib/cf 19,150 lbs Wt of four 8" thick walls at 145 lb/cf (Pre Cast Structure) 2 Factor of Saftey None Req Wt. of base required at 145lb/cf 0 c.f. concrete required at 145 Ib/cf 0 ft min, square concrete base, 12" thick Elev. Forebay 1 @ FES 1 Forebay 2 @ FES 11 Primary Pond Vol 533 0 0 1,400 1,400 533.5 0 0 2,000 2,000 534 1,600 1,550 2,350 5,500 534.5 1,950 1,875 2,725 6,550 535 2,300 2,200 3,100 7,600 535.5 2,650 2,580 3,550 8,780 536 11,500 536.5 12,475 537 13,450 537.5 14,450 538 15,450 538.5 16,500 539 17,550 539.5 18,675 540 19,800 WQV @ 535.5= Forebay Vol @ 535.5= Primary Basin Vol @ 535.5= Forebay of WQV= 13,280 ft3 6,250 ft3 7,030 ft3 47.1 WQV Met Forebay Total 0 0 3,150 3,825 4,500 5,230 0 yy , o¢s am C531 Project File: Storm Bldg B-09.13.17.stm I No. Lines. 17 109-18-2017 HydraFlow Storm Sewers 2005 ?age 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Up Dn Up Dn Up Dn Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 44.0 0.17 360 090 015 3.03 5.0 101 5.9 2075 47.16 610 36 0.50 528.22 528.00 529.68 529.45 53300 000 CB21-FES20A 2 1 145.5 0.11 279 095 010 2.35 50 9.4 6.1 17.08 29.05 416 30 050 52945 528.72 530.87 531.03 53800 533.00 CB22-CB21 3 2 59.0 021 1.13 095 020 1.02 50 91 61 907 1613 4.82 24 0.51 53025 52995 531.32 531 21 53800 538.00 CB23-CB22 4 3 154.0 0.26 063 090 0.23 056 50 83 6.3 3.53 4.57 321 15 050 531.77 531.00 532.55 53228 538.00 53800 CB24-CB23 5 4 59.7 031 0.37 0.90 028 0.32 50 78 65 2.09 4.58 314 15 0.50 53227 531 97 53286 53275 539.90 53800 CB25-CB24 6 5 44.0 006 0.06 075 005 0.05 5.0 5.0 7.3 033 457 0.46 15 050 532.69 53247 53331 53331 540.50 53990 D126-CB25 7 2 670 0.12 1 55 040 005 1 23 50 6.8 67 8.24 16.11 452 24 0.51 53029 529.95 531 31 531 21 537.50 538.00 D127-CB22 8 7 48.0 037 1 43 090 0.33 1 18 50 65 68 802 1599 276 24 0.50 530.53 53029 532.19 53215 53950 537.50 CB28-DI27 9 8 650 0.37 0.97 0.90 033 0.77 50 6.2 69 529 12.83 405 18 149 532.00 531.03 53288 53237 541.00 539.50 CB29-CB28 10 9 81 0 0.21 0.60 040 0.08 044 5.0 5.6 7.1 3.07 6.46 433 15 1 00 53531 534.50 53601 535.20 54200 541 00 D130-CB29 11 10 785 0.39 039 090 035 035 5.0 50 73 2.55 7.92 374 15 1 50 53669 535.51 537.33 536.24 54320 54200 CB31-D130 12 8 26.0 0.09 0.09 0.90 008 0.08 50 5.0 73 059 4.57 050 15 050 531 41 531 28 53249 53249 539.80 53950 CB32-CB31 13 1 82.6 006 0.20 095 0.06 0.13 5.0 62 69 0.87 4.55 071 15 0.50 529.21 52880 531.23 531.21 53300 533.00 CB33-CB21 14 13 250 0.00 014 000 000 007 5.0 5.2 72 050 466 041 15 052 52934 52921 531 24 531 24 533.00 53300 CB34-CB33 15 14 60 014 014 050 0.07 007 5.0 50 7.3 051 456 0.41 15 050 529.37 52934 531.24 531.24 53300 53300 D135-CB34 16 1 76.3 044 0.44 090 0.40 040 5.0 5.0 7.3 287 456 234 15 0.50 529.83 529.45 531.29 531.13 53450 533.00 CB38-CB21 17 3 140 0.29 029 0.90 026 0.26 5.0 50 73 1 89 457 1.54 15 050 531.07 531 00 532.39 53237 53800 538.00 CB39-CB23 Project File* Storm Bldg B-09.13.17.stm Number of lines. 17 Run Date. 09-18-2017 NOTES, Intensity = 71 97 / (Inlet time + 12 40) ^ 0.80; Return penod = 10 Yrs Hydraflow Storm Sewers 2005 � ,t i�; �• `�,, � s ��� , ,.� ���" t ��� 35 t� I fes. +dry! i D116 CB15 Project File: Storm Bldg A FES 11-09 12 17.stm I No. Lines. 6 109-18-2017 I Hydraflow Storm Sewers 2005 Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Up Dn Up Dn Up Dn Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 99.5 0.24 1 13 085 020 0.97 50 7.2 6.6 899 1603 2.86 24 050 534.50 53400 53729 53713 541.00 53700 CB12-FES11 2 1 24.0 0.07 0.56 040 003 046 5.0 7.0 66 559 7.43 3.16 18 050 534.82 534.70 537.50 53743 540.50 541.00 D113-CB12 3 2 760 0.38 046 090 0.34 041 50 5.6 7.1 442 7.43 250 18 050 53540 535.02 53795 53781 541.25 54050 CB14-DI13 4 3 600 008 0.08 0.90 0.07 007 50 50 73 202 4.57 1.65 15 050 535.95 53565 53811 53805 541 50 541 25 CB15-CB14 5 2 115.0 003 0.03 0.50 002 0.02 5.0 5.0 73 1.16 4.57 0.94 15 0.50 535.65 535.07 537.93 537.90 54200 54050 D116-CB15 6 1 125 0.33 033 0.95 031 031 5.0 50 73 228 4.57 1 85 15 050 535.31 53525 53752 53750 540.40 541 00 CB17-CB12 Project File- Storm Bldg A FES 11-09 12 17.stm Number of lines- 6 Run Date 09-18-2017 NOTES* Intensity = 71 97 / (Inlet time + 12 40) " 0.80; Return period = 10 Yrs HydraFlow Storm Sewers 2005 a �� ire;•�."=,��Ic•� � f �''9�.�� � 'v':t}�n,} .3 Outfall Project File: Storm Bldg A FES 1-09.12.17.stm I No. Lines: 9 109-18-2017 I Hydraflow Storm Sewers 2005 Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID - coeff (1) flow full Incr Total Incr Total Inlet Syst Size Slope Up Dn Up Dn Up Dn 7Lme (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 40.5 006 247 095 0.06 1.96 50 104 5.8 15.67 2882 3.33 30 0.49 534.95 534.75 53717 53713 54260 53800 CB2-FES1 2 1 1430 0.78 2.41 0.90 070 1.90 5.0 98 60 11 36 1605 390 24 0.50 53617 53545 537.78 537.49 541 00 542.60 CB3-CB2 3 1 1880 0.00 000 000 0.00 000 5.0 5.0 00 421 457 358 15 0.50 537.14 53620 53803 537.49 54370 542.60 JB10-CB2 4 2 69.6 033 1 63 0.70 023 1 20 5.0 9.6 6.0 7.24 745 4.15 18 050 53702 536.67 53816 53815 541 50 541 00 CB4-CB3 5 4 65.6 016 1 04 095 015 0.78 5.0 9.2 61 474 7.33 3.44 18 0.49 537.54 53722 53840 538.44 542.50 541 50 CB5-CB4 6 5 958 016 0.16 040 006 006 50 50 73 046 4.57 099 15 0.50 53827 53779 538.66 53862 544.00 54250 Dl6-CB5 7 4 353 010 0.26 0.50 0.05 0.19 5.0 6.3 6.8 1.33 448 1.18 15 048 537.44 537.27 538.45 538.44 54200 541.50 D17 -C134 8 7 675 0.16 016 090 014 014 50 50 73 1 05 458 1 63 15 0.50 537.98 53764 538.52 53849 54250 54200 CB8-D17 9 5 64.0 072 0.72 0.78 056 0.56 50 50 7.3 4.08 457 4.38 15 050 53811 53779 53900 538.62 543.00 54250 CB9-CB5 Project File, Storm Bldg A FES 1-09 12 17.stm Number of lines: 9 Run Date: 09-18-2017 NOTES Intensity = 71 97 / (Inlet time + 12 40) A 0.80, Return period = 10 Yrs. Hydraflow Storm Sewers 2005 JB20 M, e•� �rt } f.' s /fir Outfall Project File: Storm Bldg A By -Pass 09 13.17.stm I No. Lines. 2 109-18-2017 I Hydraflow Storm Sewers 2005 Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grind / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Up Dn Up Din Up Din Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 260.5 000 0.00 000 000 0.00 00 09 0.0 6.45 742 4.73 18 0.50 53230 531 00 53340 532.08 542.30 54000 JB19-FES18 2 1 196.8 0.00 000 000 000 0.00 0.0 00 00 645 7.41 4.80 18 0.50 537.70 536.72 538.75 53769 54450 54230 JB20-JB19 Project File Storm Bldg A By -Pass 09 13.17.stm Number of lines. 2 Run Date- 09-18-2017 NOTES. Intensity = 71.97 / (Inlet time + 12.40) A 0 80, Return period = 10 Yrs Hydraflow Storm Sewers 2005 Riprap Velocity Dissipator Pad OUaTLETA Wingate University Student Housing Wingate, NC Design Storm: 10 -year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D -o = 30 in. D -o = 2.5 ft. Q-10 = 15.67 cfs V= 3.20 fps d-50 = 0.5 ft. Figure 8.06 a L -a = 16 ft. Figure 8.06 a Step 3. 3*D-o = 7.5 ft. Use: 8 ft W = 18.5 ft. Use: 19 ft Step 4. d -max 0.75 ft. Maximum Stone Diameter (1.5*d-50) d -max 9 in. Class B Rip -Rap Step 5. Thickness = 1.1 ft. Apron Thickness With Filter Fabric (1.5*d-50) Thickness = 14 in. Use: 18 in TERMINOLOGS Q10 = 10 -Year Design Storm, Peak Discharge, (cfs) D -o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip -Rap, (ft.) L -a = Length of Rip -Rap Apron 3 *D -o = Width of Rip -Rap Apron @ Pipe End of Apron, (ft.) W = Width of Rip -Rap Apron @ End of Apron, (ft.) d -max = Maximum Stone Diameter of Rip -Rap, (ft. & in.) Thickness = Thickness of Rip -Rap Apron With Filter Fabric, (ft. &in.) Riprap Velocity Dissipator Pad OUTLET B Wingate University Student Housing Wingate, NC Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NmEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 18 in. D-o = 1.5 ft. Q-10 = 6.45 cfs V= 4.29 fps d-50 = 0.3 ft. Figure 8.06 a L-a = 9 ft. Figure 8.06 a Step 3. 3*D-o = 4.5 ft. Use: 5 ft W = 10.5 ft. Use: 11 ft Step 4. d-max 0.45 ft. Maximum Stone Diameter (1.5*d-50) d-max 5.4 in. Class B Rip-Rap Step 5. Thickness = 0.7 ft. Apron Thickness With Filter Fabric (1.5*d-50) Thickness = 8 in. Use: 18 in TERMINOLOG7 Q 10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron 3 *D-o = Width of Rip-Rap Apron @ Pipe End of Apron, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, ($. &in.) Rip>rap Velocity Dissipator Pad OUTLET C Wingate University Student Housing Wingate, NC Design Storm: 10 -year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (mcDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D -o = 24 in. D -o = 2 ft. Q-10 = 6.4 cfs V= 3.62 fps d-50 = 0.4 ft. Figure 8.06 a L -a = 13 ft. Figure 8.06 a Step 3. 3*D-o = 6 ft. Use: 6 ft W = 15 ft. Use: 15 ft Step 4. d -max 0.6 ft. Maximum Stone Diameter (1.5*d-50) d -max 7.2 in. Class B Rip -Rap Step 5. Thickness = 0.9 ft. Apron Thickness With Filter Fabric (1.5*d-50) Thickness = 11 in. Use: 18 in TERMINOLOGI Q10 = 10 -Year Design Storm, Peak Discharge, (cfs) D -o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip -Rap, (ft.) L -a = Length of Rip -Rap Apron 3*D-o = Width of Rip -Rap Apron @ Pipe End of Apron, (ft.) W = Width of Rip -Rap Apron @ End of Apron, (ft.) d -max = Maximum Stone Diameter of Rip -Rap, (ft. & in.) Thickness = Thickness of Rip -Rap Apron With Filter Fabric, (ft. &in.) dk IL Riprap Velocity Dissipator Pad OUTLET D Wingate University Student Housing Wingate, NC Design Storm: 10 -year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D -o = 36 in. D -o = 3 ft. Q-10 = 20.75 cfs V= 6.10 fps d-50 = 0.6 ft. Figure 8.06 a L -a = 20 ft. Figure 8.06 a Step 3. 3KD-o = 9 ft. Use: 9 ft W = 23 ft. Use: 23 ft Step 4. d -max 0.9 ft. Maximum Stone Diameter (1.5*d-50) d -max 10.8 in. Class 1 Rip -Rap Step 5. Thickness = 1.4 ft. Apron Thickness With Filter Fabric (1.5*d-50) Thickness = 16 in. Use: 24 in TERMINOLOGS Q10 = 10 -Year Design Storm, Peak Discharge, (cfs) D -o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip -Rap, (ft.) L -a = Length of Rip -Rap Apron 3 *D -o = Width of Rip -Rap Apron @ Pipe End of Apron, (ft.) W = Width of Rip -Rap Apron @ End of Apron, (ft.) d -max = Maximum Stone Diameter of Rip -Rap, (ft. & in.) Thickness = Thickness of Rip -Rap Apron With Filter Fabric, (ft. &in.) 4. n Riprap Velocity Dissipator Pad OUTLET E Wingate University Student Housing Wingate, NC Design Storm: 10 -year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D -o = 24 in. D -o = 2 ft. Q-10 = 8.99 cfs V= 2.86 fps d-50 = 0.4 ft. Figure 8.06 a L -a = 13 ft. Figure 8.06 a Step 3. 3*D-o = 6 ft. Use: 6 ft W = 15 ft. Use: 15 ft Step 4. d -max 0.6 ft. Maximum Stone Diameter (1.5*d-50) d -max 7.2 in. Class B Rip -Rap Step 5. Thickness = 0.9 ft. Apron Thickness With Filter Fabric (1.5*d-50) Thickness = 11 in. Use: 18 in TERMINOLOG7 Q10 = 10 -Year Design Storm, Peak Discharge, (cfs) D -o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip -Rap, (ft.) L -a = Length of Rip -Rap Apron 3*D-o = Width of Rip -Rap Apron @ Pipe End of Apron, (ft.) W = Width of Rip -Rap Apron @ End of Apron, (ft.) d -max = Maximum Stone Diameter of Rip -Rap, (ft. & in.) Thickness = Thickness of Rip -Rap Apron With Filter Fabric, (ft. &in.) Appendices (�,°Y�'Y� r4' I� � Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12193 8.06.3 6 0�4 4 0 Temporary Sediment Basial I WU Student Housing Wingate, North Carolina 10 -Year Design Storm OBJECTIVE: Design a Temporary Sediment Trap for erosion control Determine the weir length, capacity & freeboard of the sediment trap SOLUTION - Qp: Use the calculated Time of Concentration and the Rational Method to determine the peak inflow from the design storm INPUT OUTPUT L= 285 ft. Hv = 10 ft. Tc = 17.00 minutes A = 1.30 acres C = 0.40 TRAP A.disturb = 1.00 acres DIMENSIONS: S-Trap.D = 3.5 ft. S-Trap.W = 25 ft. S-Trap.L = 50 ft. Surface Area= 2.45 cfs TERMINOLOGY: Cw = Weir Coefficient Lw = Weir Length, (ft.) H = Driving Head, (ft.) Qp = Peak Inflow, (cfs) Qw = Peak Discharge, (cfs) A.disturb = Disturbed Area, (acres) Freeboard = Freeboard of Weir, (ft.) Cap. -R. = Required Trap Capacity, (cf) Cap. -D. = Design Trap Capacity, (cf) S-Trap.H = Sediment Trap Height, (ft.) S-Trap.D = Sediment Trap Depth, (ft.) REFERENCES: (DEHNR, 1988, Malcom, 1991) I = 4.72 in./hr. Qp = 2.5 cfs X 1800 cf / acre Volume = 1800 cf Capacity = 2390 cf X 0.007 Required= 1068 sf Designed= 1250 sf L = Watershed Hydrailic Length, (ft) Hv = Watershed Vertical Relief, (ft) a = Statistical Rainfall Variable b = Statistical Rainfall Variable A = Watershed Area, (acres) C = Rational Runoff Coefficient Tc = Time of Concentration I = Rainfall Intensity, (in./hr.) S-Trap.W = Sediment Trap Width, (ft.) S-Trap.L = Sediment Trap Length, (ft.) Tc Basin #1 Tc = Ttl+Tt2+Tt3 .Tn where, Tc = time of concentration (hr), and n = number of flow segments 1) Sheet Flow Tt=(0.007(nL)^0.8) / ((P2)^0 5(S)^0.4 ) where. Tt = Travel Time (hrs) n = Manning roughness coefficient L = flow length (ft) P2=2-yr,24 hr rainfall= 3.12 inches S = slope (ft/ft) Paved Segment Mannings n = 0 011 Paved length = 30 Paved slope = 002 Tt = 0.01 hrs Unpaved Segment Mannings n = 0.24 Unpaved Length = 120 Unpaved Slope = 002 Tt = 0 28 hrs Tt1 = 0.29 hrs 2) Shallow Concentrated Flow Tt = L / (3600 V) where Tt = Travel Time (hrs) L = flow length (ft) V = average velocity (ft/s) and, 3600 = conversion from seconds to hours Paved Segment V = 20 3282 (S)^0 5 Paved length = 0 Paved slope = 00126 Velocity = 228 ft/sec Tt = 000 hrs Unpaved Segment V = 16 1345 (S)^0.5 Unpaved Length = 135 Unpaved Slope = 0 025 Velocity = 321 ft/sec Tt = 001 hrs Tt2 = 0.01 hrs 3) PIPE/CHANNEL flow Tt = L / (3600 V) L (length)= 0 ft V=(1.49 R^2/3"(s)^1/2)/n s (slope)= 0 15 ft/ft n (mannings)= 0.03 V= 3 00 ft/sec Tt = 0.000 hrs Tt3 = 0.000 hrs TC(total)= 0 30 hours TC(total)= 17 89 MIN. USE: 17 MIN. A Temporary Sediment Basin 2 WU Student Housing Wingate, North Carolina 10 -Year Design Storm OBJECTIVE: Design a Temporary Sediment Trap for erosion control Determine the weir length, capacity & freeboard of the sediment trap SOLUTION - Qp: Use the calculated Time of Concentration and the Rational Method to determine the peak inflow from the design storm INPUT IOUTPUT L = 590 ft. Hv = 16 ft. A = 3.60 acres C = 0.40 TRAP A.disturb = 3.40 acres DIMENSIONS: Capacity = 7072 cf S-Trap.D = 4.0 ft. S-Trap.W = 40 ft. S-Trap.L = 70 ft. Surface Area= 6.28 cfs TERMINOLOGY: REFERENCES Cw = Weir Coefficient Lw = Weir Length, (ft.) H = Driving Head, (ft.) Qp = Peak Inflow, (cfs) Qw = Peak Discharge, (cfs) A disturb = Disturbed Area, (acres) Freeboard = Freeboard of Weir, (ft.) Cap. -R. = Required Trap Capacity, (cf) Cap. -D. = Design Trap Capacity, (cf) S-Trap.H = Sediment Trap Height, (ft.) S-Trap.D = Sediment Trap Depth, (ft.) (DEHNR, 1988; Malcom, 1991) Tc = 21.00 minutes I = 4.36 in./hr. Qp = 6.3 cfs X 1800 cf / acre Volume = 6120 cf Capacity = 7072 cf X 0.007 Required= 2731 sf Designed= 2800 sf L = Watershed Hydrailic Length, (ft) Hv = Watershed Vertical Relief, (ft) a = Statistical Rainfall Variable b = Statistical Rainfall Variable A = Watershed Area, (acres) C = Rational Runoff Coefficient Tc = Time of Concentration I = Rainfall Intensity, (in./hr.) S-Trap.W = Sediment Trap Width, (ft.) S-Trap.L = Sediment Trap Length, (ft.) Tc Basin #2 Tc = Ttl+Tt2+Tt3 .Tn where, Tc = time of concentration (hr), and n = number of flow segments 1) Sheet Flow Tt=(0.007(nL)^0 8) / ((P2)^0 5(S)^0.4 ) where Tt = Travel Time (hrs) n = Manning roughness coefficient L = flow length (ft) P2=2-yr,24 hr rainfall= 3 12 inches S = slope (ft/ft) Paved Segment Mannings n = 0 011 Paved length = 0 Paved slope = 002 Tt = 0.00 hrs Unpaved Segment Mannings n = 0.24 Unpaved Length = 150 Unpaved Slope = 002 Tt = 0 33 hrs Tt1 = 0.33 hrs 2) Shallow Concentrated Flow Tt = L / (3600 V) where, Tt = Travel Time (hrs) L = flow length (ft) V = average velocity (ft/s) and, 3600 = conversion from seconds to hours Paved Segment V = 20 3282 (S)"0 5 0.15 ft/ft Paved length = 180 Paved slope = 0.0277 Velocity = 338 ft/sec Tt = 001 hrs Unpaved Segment: V = 16 1345 (S)^0.5 TO = 0.000 hrs Unpaved Length = 55 Unpaved Slope = 0.02 Velocity = 287 ft/sec Tt= 001 hrs USE: 21 MIN. Tt2 = 0.02 hrs 3) PIPE/CHANNEL flow Tt = L / (3600 V) L (length)= 0 ft V=(1 49 R^2/3" (s)^1/2)/n s (slope)= 0.15 ft/ft n (mannings)= 0.03 V= 3.00 ft/sec Tt = 0 000 hrs TO = 0.000 hrs TC(total)= 0.35 hours TC(total)= 21.20 MIN. USE: 21 MIN. 0 Temporary Sediment Basin 3 WU Student Housing Wingate, North Carolina 10 -Year Design Storm OBJECTIVE: Design a Temporary Sediment Trap for erosion control Determine the weir length, capacity & freeboard of the sediment trap SOLUTION - Qp: Use the calculated Time of Concentration and the Rational Method to determine the peak inflow from the design storm INPUT OUTPUT L = 300 ft Hv = 8 ft. Tc = 19.00 minutes I = 4.36 in./hr. A= 3.60 acres C = 0.40 Qp = 6.3 cfs TRAP A.disturb = 2.50 acres X 1800 cf / acre DIMENSIONS: S-Trap.D = 4.0 ft. Volume = 4500 cf S-Trap.W = 80 ft. S-Trap.L = 200 ft. Capacity = 38500 of Surface Area= 6.28 cfs X 0.007 Required= 2731 sf Designed= 16000 sf TERMINOLOGY: Cw = Weir Coefficient L = Watershed Hydrailic Length, (ft) Lw = Weir Length, (ft.) Hv = Watershed Vertical Relief, (ft) H = Driving Head, (ft.) a = Statistical Rainfall Variable Qp = Peak Inflow, (cfs) b = Statistical Rainfall Variable Qw = Peak Discharge, (cfs) A = Watershed Area, (acres) A.disturb = Disturbed Area, (acres) C = Rational Runoff Coefficient Freeboard = Freeboard of Weir, (ft.) Tc = Time of Concentration Cap. -R. = Required Trap Capacity, (cf) I = Rainfall Intensity, (in./hr.) Cap. -D. = Design Trap Capacity, (cf) S-Trap.H = Sediment Trap Height, (ft.) S-Trap.W = Sediment Trap Width, (ft.) S-Trap.D = Sediment Trap Depth, (ft.) S-Trap.L = Sediment Trap Length, (ft.) REFERENCES: (DEHNR, 1988, Malcom, 1991) To Basin #3 Tc = TH+Tt2+Tt3 . Tn where, Tc = time of concentration (hr), and n = number of flow segments 1) Sheet Flow Tt =(0 007(nL)^0 8) / ((P2)^0.5(S)^0.4 ) where. Tt = Travel Time (hrs) n = Manning roughness coefficient L = flow length (ft) P2=2-yr,24 hr rainfall= 3 12 inches S = slope (ft/ft) Paved Segment Mannings n = 0.011 Paved length = 0 Paved slope = 002 Tt = 000 hrs Unpaved Segment Mannings n = 024 Unpaved Length = 150 Unpaved Slope = 0 025 Tt = 0.30 hrs Ttl = 0.30 hrs 2) Shallow Concentrated Flow Tt = L / (3600 V) where. Tt = Travel Time (hrs) L = flow length (ft) V = average velocity (ft/s) and, 3600 = conversion from seconds to hours Paved Segment. V = 20 3282 (S)^0 5 Paved length = 0 Paved slope = 0 025 Velocity = 321 ft/sec Tt = 000 hrs Unpaved Segment. V = 16 1345 (S)^0.5 Unpaved Length = 150 Unpaved Slope = 0.025 Velocity = 321 ft/sec Tt = 001 hrs Tt2 = 0.01 hrs 3) PIPEICHANNEL flow Tt = L / (3600 V) L (length)= 0 ft V=(1 49 R^2/3"(s)^1/2)/n s (slope)= 0 15 fuft n (mannings)= 003 V= 3.00 ft/sec Tt = 0 000 hrs TO = 0.000 hrs TC(total)= 0 32 hours TC(total)= 19.06 MIN. USE: 19 MIN. Temporary Sediment Basin 4 WU Student Housing Wingate, North Carolina 10 -Year Design Storm OBJECTIVE: Design a Temporary Sediment Trap for erosion control Determine the weir length, capacity & freeboard of the sediment trap SOLUTION - Qp: Use the calculated Time of Concentration and the Rational Method to determine the peak inflow from the design storm. INPUT OUTPUT L = 400 ft. Hv = 15 ft Tc = 18.00 minutes A = 0.83 acres C = 0.40 TRAP A.disturb = 0.83 acres DIMENSIONS: S-Trap.D = 3.0 ft. S-Trap.W = 24 ft. S-Trap.L = 40 ft. Surface Area= 1.54 cfs TERMINOLOGY: Cw = Weir Coefficient Lw = Weir Length, (ft.) H = Driving Head, (ft.) Qp = Peak Inflow, (cfs) Qw = Peak Discharge, (cfs) A.disturb = Disturbed Area, (acres) Freeboard = Freeboard of Weir, (ft.) Cap. -R. = Required Trap Capacity, (cf) Cap. -D. = Design Trap Capacity, (cf) S-Trap.H = Sediment Trap Height, (ft.) S-Trap.D = Sediment Trap Depth, (ft.) REFERENCES: (DEHNR, 1988, Malcom, 1991) I = 4.63 in./hr. Qp = 1.5 cfs X 1800 cf / acre Volume = 1494 cf Capacity = 1638 cf X 0.007 Required= 669 sf Designed= 960 sf L = Watershed Hydrailic Length, (ft) Hv = Watershed Vertical Relief, (ft) a = Statistical Rainfall Variable b = Statistical Rainfall Variable A = Watershed Area, (acres) C = Rational Runoff Coefficient Tc = Time of Concentration I = Rainfall Intensity, (in./hr.) S-Trap.W = Sediment Trap Width, (ft.) S-Trap.L = Sediment Trap Length, (ft.) Tc Basin #4 Tc = TO+Tt2+Tt3 . Tin where, Tc = time of concentration (hr), and n = number of flow segments 1) Sheet Flow Tt=(0.007(nQA0 8) / ((P2)^0.5(S)^0 4 ) where* Tt = Travel Time (hrs) n = Manning roughness coefficient L = flow length (ft) P2=2-yr,24 hr rainfall= 3 12 inches S = slope (ft/ft) Paved Segment Mannings n = 0.011 Paved length = 0 Paved slope = 0.02 Tt = 0.00 hrs Unpaved Segment Mannings n = 024 Unpaved Length = 150 Unpaved Slope = 003 Tt = 0.28 hrs Tt1 = 0.28 hrs 2) Shallow Concentrated Flow Tt = L / (3600 V) where- Tt = Travel Time (hrs) L = flow length (ft) V = average velocity (ft/s) and, 3600 = conversion from seconds to hours Paved Segment: V = 20 3282 (S)^0 5 Paved length = 0 Paved slope = 0.025 Velocity = 321 ft/sec Tt = 000 hrs Unpaved Segment V = 16.1345 (S)^0 5 Unpaved Length = 250 Unpaved Slope = 004 Velocity = 407 ft/sec Tt = 0.02 hrs Tt2 = 0.02 hrs 3) PIPE/CHANNEL flow Tt = L / (3600 V) L (length)= 0 ft V=(1.49 R^2/3'(s)^1/2)/n s (slope)= 0 15 ft/ft n (mannings)= 003 V= 3 00 ft/sec Tt = 0.000 hrs Tt3 = 0.000 hrs TC(total)= 0 30 hours TC(total)= 18.02 MIN. USE: 18 MIN. Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain Cu It Days Skimmer Size Orifice Radius Orifice Diameter 1.5 Inch 0.5 Inch[es] 1.0 Inch[es] Estimate Volume of Basin Length width Top of grater surface in feet ,,5'0; ;25 Feet VOLUME 2390.5 Cu. Ft. Bottom dimensions in feet "t2'9 4 Feet Depth in feet Feet Caiculate Skimmer Size Basin Volume in Cubic Feet '72 -Cu. Ft 7,072-Cu.Ft Skimmer Size 2.0 Inch Days to Drain* 3 Days Orifice Radius 0.8 Inch[es] Orifice Diameter 1.6 Inch[es] In NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet 70' 40 Feet VOLUME 7072 Cu. Ft. Bottom dimensions in feet 46-,,`, 16 Feet Depth in feet 4 Feet Calculate Skimmer Size Basin Volume in Cubic Feet cu.Ft Skimmer Size 1.5 Inch Days to Drain* Orifice Radius 0.7 Inch[es] Orifice Diameter 1.4 Inch[es] *In NC assume 3 days to drain 6 - Estimate Volume of Basin Length Width Top of water surface in feet _200, _ 80 Feet VOLUME 38500 Cu. Ft. Bottom dimensions in feet 01 Feet Depth in feet Feet 11 Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* *In NC assume 3 days to drain 639 Cu.Ft 3' Days Skimmer Size Orifice Radius Orifice Diameter 1.5 Inch 0.4 Inch[es] -0.9 Inch[es] Estimate Volume of Basin Length Width Top of water surface in feet 40 24; Feet VOLUME 1638 Cu. Ft. Bottom dimensions in feet -,6 Feet Depth in feet 3,, Feet Hydraflow Table of Contents BMP Design09.1517.gpw Hydraflow Hydrographs by Intelisolve v9.2 Monday, Sep 18, 2017 2 - Year 18 HydrographReports........................................................................................................... 1 Hydrograph No. 1, SCS Runoff, Pre DA1......................................................................... 1 TR -55 Tc Worksheet.................................................................................................... 2 Hydrograph No. 2, SCS Runoff, Post DA1....................................................................... 3 Hydrograph No. 3, Reservoir, BMP1................................................................................ 4 PondReport - DRY POND........................................................................................... 5 Hydrograph No. 4, SCS Runoff, Pre -Site B...................................................................... 6 TR -55 Tc Worksheet.................................................................................................... 7 Hydrograph No. 5, SCS Runoff, Post Site B..................................................................... 8 Hydrograph No. 6, Combine, Pre Total............................................................................. 9 Hydrograph No. 7, Combine, Post Total......................................................................... 10 10 -Year 18 HydrographReports......................................................................................................... 11 Hydrograph No. 1, SCS Runoff, Pre DA1....................................................................... 11 Hydrograph No. 2, SCS Runoff, Post DA1..................................................................... 12 Hydrograph No. 3, Reservoir, BMP1.............................................................................. 13 Hydrograph No. 4, SCS Runoff, Pre -Site B.................................................................... 14 Hydrograph No. 5, SCS Runoff, Post Site B................................................................... 15 Hydrograph No. 6, Combine, Pre Total........................................................................... 16 Hydrograph No. 7, Combine, Post Total......................................................................... 17 25 - Year HydrographReports......................................................................................................... 18 Hydrograph No. 1, SCS Runoff, Pre DA1....................................................................... 18 Hydrograph No. 2, SCS Runoff, Post DA1..................................................................... 19 Hydrograph No. 3, Reservoir, BMP1.............................................................................. 20 Hydrograph No. 4, SCS Runoff, Pre -Site B.................................................................... 21 Hydrograph No. 5, SCS Runoff, Post Site B................................................................... 22 Hydrograph No. 6, Combine, Pre Total........................................................................... 23 Hydrograph No. 7, Combine, Post Total......................................................................... 24 50 - Year HydrographReports......................................................................................................... 25 Hydrograph No. 1, SCS Runoff, Pre DA1....................................................................... 25 Hydrograph No. 2, SCS Runoff, Post DA1..................................................................... 26 Hydrograph No. 3, Reservoir, BMP1.............................................................................. 27 Hydrograph No. 4, SCS Runoff, Pre -Site B.................................................................... 28 Hydrograph No. 5, SCS Runoff, Post Site B................................................................... 29 Hydrograph No. 6, Combine, Pre Total........................................................................... 30 Hydrograph No. 7, Combine, Post Total......................................................................... 31 100 -Year HydrographReports......................................................................................................... 32 Hydrograph No. 1, SCS Runoff, Pre DA1....................................................................... 32 Hydrograph No. 2, SCS Runoff, Post DA1..................................................................... 33 Hydrograph No. 3, Reservoir, BMP1.............................................................................. 34 . Contents continued... BMP Design 09.15.17 gpw Hydrograph No. 4, SCS Runoff, Pre -Site B.................................................................... 35 Hydrograph No. 5, SCS Runoff, Post Site B................................................................... 36 Hydrograph No. 6, Combine, Pre Total........................................................................... 37 Hydrograph No. 7, Combine, Post Total......................................................................... 38 OFReport.......................................................................................................... 39 • Hydr®graph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. I Pre DA 1 Hydrograph type = SCS Runoff Peak discharge = 12.29 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 24,578 cuft Drainage area = 5.400 ac Curve number = 74* Basin Slope = 0.0% Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 3.90 min Total precip. = 3.64 in Distribution = Type ll Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1 840 x 98) + (0 150 x 74) + (3 410 x 61)] / 5 400 Q (cfs) 14.00 1200 10.00 800 6.00 4.00 2.00 Pre DA1 Hyd. No. 1 -- 2 Year Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 11!1110 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Y. • TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. I Pre DA1 Description A B C Totals Sheet Flow = 0.00 0.00 0.00 Manning's n -value = 0.012 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.64 0.00 0.00 Land slope (%) = 3.00 0.00 0.00 Travel Time (min) = 1.43 + 0.00 + 0.00 = 1.43 Shallow Concentrated Flow Flow length (ft) = 150.00 285.00 0.00 Watercourse slope (%) = 2.00 3.50 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 2.87 3.02 0.00 Travel Time (min) = 0.87 + 1.57 + 0.00 = 2.44 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 TotalTravel Time, Tc.............................................................................. 3.90 min • Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Hyd. volume Post DA1 Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 5.400 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.64 in Storm duration = 24 hrs 3 Monday, Sep 18, 2017 Peak discharge = 18.61 cfs Time to peak = 716 min Hyd. volume = 37,799 cuft Curve number = 84* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 * Composite (Area/CN) = [(3 320 x 98) + (1.930 x 61) + (0.150 x 74)] / 5.400 Q (cfs) 21.00 18.00 1500 12.00 • MI . Me wit Post DAI Hyd. No. 2 -- 2 Year Q (cfs) 21.00 18.00 15.00 12.00 • E8 M 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) Storage Indication method used Q (cfs) 21.00 18.00 15.00 1200 9.00 6.00 300 0 00 0 240 Hyd No. 3 BMP1 Hyd No. 3 -- 2 Year Q (cfs) 480 720 Hyd No. 2 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 960 1200 1440 1680 1920 Time (min) Total storage used = 19,943 cult 4 " Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Sep 18, 2017 Hyd. No. 3 BMP1 Hydrograph type = Reservoir Peak discharge = 1.683 cfs Storm frequency = 2 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 24,504 cuft Inflow hyd. No. = 2 -Post DA1 Max. Elevation = 536.13 ft Reservoir name = DRY POND Max. Storage = 19,943 cuft Storage Indication method used Q (cfs) 21.00 18.00 15.00 1200 9.00 6.00 300 0 00 0 240 Hyd No. 3 BMP1 Hyd No. 3 -- 2 Year Q (cfs) 480 720 Hyd No. 2 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 960 1200 1440 1680 1920 Time (min) Total storage used = 19,943 cult Pond Report 5 Hydraflow Hydrographs by Intellsolve v9 2 Monday, Sep 18, 2017 Pond No. 1 - DRY POND Pond Data Contours - User -defined contour areas Conic method used for volume calculation Beglning Elevation = 533.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 533.00 1,400 0 0 050 53350 2,000 845 845 1 00 534.00 5,500 1,803 2,648 1.50 53450 6,550 3,008 5,656 200 53500 7,600 3,534 9,190 250 53550 8,780 4,091 13,281 300 536.00 11,500 5,054 18,336 350 536.50 12,450 5,985 24,321 400 53700 13,450 6,473 30,794 450 53750 14,450 6,973 37,766 500 538.00 15,450 7,473 45,239 5.50 53850 16,500 7,985 53,225 6.00 53900 17,550 8,510 61,735 6.50 539.50 18,675 9,054 70,789 7.00 54000 19,800 9,616 80,405 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 2400 000 0.00 0.00 Crest Len (ft) = 1600 1 00 600 Inactive Span (in) = 2400 000 0.00 000 Crest EI. (ft) = 54000 53550 538.00 53850 No. Barrels = 1 0 0 0 Weir Coeff. = 333 3.33 333 260 Invert EI. (ft) = 530.30 000 0.00 000 Weir Type = Riser Rect Rect Broad Length (ft) = 12000 0.00 0.00 000 Multi -Stage = Yes Yes Yes No Slope (%) = 0.50 0.00 000 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 060 060 060 Exfil.(in/hr) = 0 000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 000 Stage (ft) 8.00 6.00 4.00 2.00 0 00 Note Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 000 4.00 800 Total Q Elev (ft) 541 00 53900 537.00 535.00 53300 12.00 16.00 2000 2400 2800 3200 3600 40.00 44.00 Discharge (cfs) i i 'f iii int g i t.! pi C :p; w it Hydraflow Hydrographs by Intelisolve v9 2 Hyd. No. 4 Hyd. volume Pre -Site B Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 4.020 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.64 in Storm duration = 24 hrs C Monday, Sep 18, 2017 Peak discharge = 8.847 cfs Time to peak = 722 min Hyd. volume = 24,872 cuft Curve number = 80* Hydraulic length = 0 ft Time of conc. (Tc) = 13.70 min Distribution = Type II Shape factor = 484 Composite (Area/CN) _ [(0.940 x 98) + (0 700 x 60) + (2 380 x 79)] / 4.020 Pre -Site B Q (cfs) Hyd. No. 4 -- 2 Year Q (cfs) 10.00 1000 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 7 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve v9.2 {Hyd. No. 4 Pre -Site B Description A B C Totals Sheet Flow Manning's n -value = 0.012 0.011 0.011 Flow length (ft) = 175.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.64 0.00 0.00 Land slope (%) = 0.02 0.00 0.00 Travel Time (min) = 12.02 + 0.00 + 0.00 = 12.02 Shallow Concentrated Flow Flow length (ft) = 100.00 240.00 0.00 Watercourse slope (%) = 3.00 4.00 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) = 3.52 3.23 0.00 Travel Time (min) = 0.47 + 1.24 + 0.00 = 1.71 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 13.70 min ' 8 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Sep 18, 2017 Hyd. No. 5 Post Site B Hydrograph type = SCS Runoff Peak discharge = 16.85 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 35,286 cuft Drainage area = 4.020 ac Curve number = 90* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 3.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(2.770 x 98) + (0.180 x 61) + (1 070 x 74)] / 4.020 Q (cfs) 1800 15.00 12.00 •m .m 3.00 Dost Site B Hyd. No. 5 -- 2 Year Q (cfs) 18.00 15.00 12.00 M 000 300 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 5 Time (min) 9 Hydr®graph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 6 Pre Total Hydrograph type = Combine Peak discharge = 19.72 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 49,451 cuft Inflow hyds. = 1, 4 Contrib. drain. area= 9.420 ac Pre Total Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 300 0 00 21.00 1800 15.00 12.00 9.00 600 300 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No 6 Hyd No. 1 Hyd No. 4 Elf Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Sep 18, 2017 Hyd. No. 7 Post Total Hydrograph type = Combine Peak discharge = 16.85 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 59,790 cuft Inflow hyds. = 3, 5 Contrib. drain. area= 4.020 ac Q (cfs) 18.00 15.00 12.00 • m mm 3.00 0.00 Post Total Hyd No. 7 -- 2 Year Q (cfs) 18.00 15.00 l 12.00 900 6.00 3.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 3 Hyd No. 5 t = 716 min Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 2 Hyd. No. I Hydraulic length Pre DA1 Time of conc. (Tc) Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 5.400 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.33 in Storm duration = 24 hrs II Monday, Sep 18, 2017 Peak discharge = 23.93 cfs Time to peak = 716 min Hyd. volume = 48,335 cuft Curve number = 74* Hydraulic length = 0 ft Time of conc. (Tc) = 3.90 min Distribution = Type II Shape factor = 484 Composite (Area/CN) _ [(1 840 x 98) + (0 150 x 74) + (3 410 x 61)] / 5 400 Pre DA1 Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 24.00 24.00 20.00 2000 16.00 l 16.00 1200 12.00 800 800 400 0.00 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 12 Hydr®graph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 2 Post DA1 Hydrograph type = SCS Runoff Peak discharge = 31.69 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 65,672 cuft Drainage area = 5.400 ac Curve number = 84* Basin Slope = 0.0% Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.33 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(3 320 x 98) + (1 930 x 61) + (0 150 x 74)] / 5 400 Q (cfs) 35.00 3000 25.00 20.00 15.00 10.00 5.00 Post DAII Hyd No. 2 -- 10 Year Q (cfs) 35.00 3000 25.00 20.00 15.00 1000 5.00 0.000.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 2 13 yd"Cisgra I', Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Sep 18, 2017 Hyd. No. 3 BMP1 Hydrograph type = Reservoir Peak discharge = 6.902 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 52,377 cuft Inflow hyd. No. = 2 -Post DA1 Max. Elevation = 537.13 ft Reservoir name = DRY POND Max. Storage = 32,545 cuft Storage Indication method used Q (cfs) 35.00 CM 25.00 2000 1500 10.00 500 BMP1 Hyd. No. 3 -- 10 Year Q (cfs) 35.00 30.00 25.00 rm 15.00 10.00 500 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 3 Hyd No 2 Total storage used = 32,545 cult r rl i Q (cfs) 35.00 30.00 25.00 rm 15.00 10.00 500 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 3 Hyd No 2 Total storage used = 32,545 cult 14 Hydr®graph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Sep 18, 2017 Cyd. No. 4 Pre -Site B Hydrograph type = SCS Runoff Peak discharge = 16.12 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 45,282 cuft Drainage area = 4.020 ac Curve number = 80* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.70 min Total precip. = 5.33 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(0 940 x 98) + (0.700 x 60) + (2.380 x 79)] 14.020 Pre -Site B Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 18.00 1500 12.00 9.00 6.00 300 0 00 18.00 15.00 12.00 9.00 6.00 3.00 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 i 15 Hydr®graph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 5 Post Site B Hydrograph type = SCS Runoff Peak discharge = 26.61 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 57,393 cuft Drainage area = 4.020 ac Curve number = 90* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.33 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(2 770 x 98) + (0 180 x 61) + (1 070 x 74)] / 4.020 Post Site B Q (Cfs) Hyd. No. 5 -- 10 Year Q (Cfs) 28.00 24.00 20.00 16.00 12.00 800 400 0 00 28 00 24.00 20.00 1600 12.00 8.00 400 000 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) Hyd No. 5 16 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. Pio. 6 Pre Total Hydrograph type = Combine Peak discharge = 37.74 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 93,617 cuft Inflow hyds. = 1, 4 Contrib. drain. area= 9.420 ac Q (cfs) 40.00 20.00 10.00 riTAIM Pre Total Hyd. No. 6 -- 10 Year Q (cfs) 40.00 30.00 20.00 10.00 101 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 1 Hyd No. 4 1 Hydr®graph Report 17 Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 7 Post Total Hydrograph type = Combine Peak discharge = 30.31 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 109,770 cuft Inflow hyds. = 3, 5 Contrib. drain. area= 4.020 ac Post Total Q (cfs) Hyd. No 7 -- 10 Year Q (cfs) 35.00 35.00 30.00 30.00 2500 2500 2000 ----- 20.00 15.00 ---- -- - --- ----. __-- - ---- - — - - -- - ---- ----- 15.00 10.00 10.00 5.00 - -------- ---- -- 5.00 0 00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No 3 Hyd No. 5 i 18 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. I Pre DA1 Hydrograph type = SCS Runoff Peak discharge = 31.72 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 64,290 cuft Drainage area = 5.400 ac Curve number = 74* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 3.90 min Total precip. = 6.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.840 x 98) + (0 150 x 74) + (3 410 x 61)] / 5 400 Q (cfs) 3500 30.00 2500 20.00 15.00 14 WT Pre DA1 Hyd. No. 1 -- 25 Year Q (cfs) 35.00 30.00 2500 20.00 15.00 10.00 500 !W!TI� 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No 1 Time (min) Composite (Area/CN) = [(3 320 x 98) + (1.930 x 61) + (0 150 x 74)] / 5 400 Q (cfs) 40.00 30.00 20.00 10.00 Post DA1 Hyd. No. 2 -- 25 Year Q (cfs) r 40.00 3000 20.00 10.00 WIFIRIM 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 19 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 2 Post DA1 Hydrograph type = SCS Runoff Peak discharge = 39.80 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 83,503 cuft Drainage area = 5.400 ac Curve number = 84* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 6.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(3 320 x 98) + (1.930 x 61) + (0 150 x 74)] / 5 400 Q (cfs) 40.00 30.00 20.00 10.00 Post DA1 Hyd. No. 2 -- 25 Year Q (cfs) r 40.00 3000 20.00 10.00 WIFIRIM 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) i Hydr®graph Report K11 HydraflowHydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 3 BMP1 Hydrograph type = Reservoir Peak discharge = 10.75 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 70,208 cuft Inflow hyd. No. = 2 -Post DA1 Max. Elevation = 537.69 ft Reservoir name = DRY POND Max. Storage = 40,529 cuft Storage Indication method used Q (cfs) 40.00 30.00 20.00 10.00 BIVIP1 Hyd. No. 3 -- 25 Year F if i. it �.i -J" l' Q (cfs) 40.00 30.00 2000 10.00 1[71i1� 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 Total storage used = 40,529 cult ` 21 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 4 Pre -Site B Hydrograph type = SCS Runoff Peak discharge = 20.73 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 58,572 cuft Drainage area = 4.020 ac Curve number = 80* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.70 min Total precip. = 6.37 in Distribution = Type II Storm duration, = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0 940 x 98) + (0 700 x 60) + (2.380 x 79)] / 4 020 Pre -Sete B Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 21.00 18.00 1500 12.00 9.00 6.00 3.00 0 00 21.00 1800 1500 12.00 9.00 600 3.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No 4 Time (min) 22 Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 5 Post Site B Hydrograph type = SCS Runoff Peak discharge = 32.57 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 71,231 cuft Drainage area = 4.020 ac Curve number = 90* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 6.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(2 770 x 98) + (0 180 x 61) + (1 070 x 74)] / 4 020 Q (cfs 35.00 30.00 25.00 20.00 15.00 1000 5.00 Post Site B Hyd. No. 5 -- 25 Year Q (cfs) 35.00 3000 2500 2000 1500 10.00 5.00 000 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No 5 Time (min) Hydr®graph Report Hydraflow Hydrographs by Intellsolve v9.2 Hyd. No. 6 Pre Total Hydrograph type = Combine Storm frequency = 25 yrs Time interval = 2 min Inflow hyds. = 1, 4 Q (cfs) 5000 i1 /1 20.00 10.00 23 Monday, Sep 18, 2017 Peak discharge = 49.38 cfs Time to peak = 718 min Hyd. volume = 122,862 cuft Contrib. drain. area= 9.420 ac Pre Total Hyd. No. 6 -- 25 Year Q (cfs) 50.00 3000 20.00 10.00 / // 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 1 Hyd No 4 Post Total Q (cfs) Hyd No. 7 -- 25 Year Q (cfs) 40.00 40.00 3000 30.00 2000 20.00 10.00 10.00 000 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 3 Hyd No. 5 24 • Hydr®graph Report Hydraflow Hydrographs by Intelisoive v9 2 Monday, Sep 18, 2017 Hyd. No. 7 Post Total Hydrograph type = Combine Peak discharge = 39.44 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 141,439 cuft Inflow hyds. = 3, 5 Contrib. drain. area= 4.020 ac Post Total Q (cfs) Hyd No. 7 -- 25 Year Q (cfs) 40.00 40.00 3000 30.00 2000 20.00 10.00 10.00 000 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 3 Hyd No. 5 25 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. I Pre DA1 Hydrograph type = SCS Runoff Peak discharge = 38.13 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 77,655 cuft Drainage area = 5.400 ac Curve number = 74* Basin Slope = 0.0% Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 3.90 min Total precip. = 7.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(1 840 x 98) + (0 150 x 74) + (3.410 x 61)] / 5 400 Q (cfs) 4000 30.00 20.00 10.00 Pre DA1 Hyd. No 1 -- 50 Year Q (cfs) 40.00 30.00 20.00 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 1 Composite (Area/CN) _ [(3 320 x 98) + (1 930 x 61) + (0.150 x 74)] / 5 400 Post DA'I Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 5000 5000 40.00 4000 30.00 30.00 20.00 2000 1000 1000 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 2 Time (min) 26 Hydr®graph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Sep 18, 2017 Hyd. No. 2 Post DA1 Hydrograph type = SCS Runoff Peak discharge = 46.35 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 98,127 cuft Drainage area = 5.400 ac Curve number = 84* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 7.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(3 320 x 98) + (1 930 x 61) + (0.150 x 74)] / 5 400 Post DA'I Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 5000 5000 40.00 4000 30.00 30.00 20.00 2000 1000 1000 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 2 Time (min) l it ter" ii { ;s iii i 1 ' ep o#i Hydraflow Hydrographs by Intelisolve v9 2 Hyd. No. 3 BMP1 Hydrograph type = Reservoir Storm frequency = 50 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post DA1 Reservoir name = DRY POND Storage Indication method used. Q (cfs) 50.00 0141110111111 3000 2000 1000 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage BiVIP1 Hyd No. 3 -- 50 Year 27 Monday, Sep 18, 2017 = 14.36 cfs = 724 min = 84,832 cuft = 538.09 ft = 46,609 cuft l ,x �i r n nn Q (cfs) 50.00 A 11 3000 20.00 10.00 D 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 ® Total storage used = 46,609 cult 28 Hydr®graph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 4 Pre -Site B Hydrograph type = SCS Runoff Peak discharge = 24.48 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 69,554 cuft Drainage area = 4.020 ac Curve number = 80* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.70 min Total precip. = 7.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0 940 x 98) + (0 700 x 60) + (2.380 x 79)] 14 020 Q (cfs) 28.00 24.00 2000 16.00 12.00 m Pre -Site B Hyd. No. 4 -- 50 Year Q (cfs) 28.00 24.00 20.00 16.00 1200 m 0.00 ' ' ' ' ' ' ' 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) * Composite (Area/CN) _ [(2 770 x 98) + (0 180 x 61) + (1 070 x 74)] / 4 020 Post Site B Q (cfs) Hyd No. 5 -- 50 Year Q (cfs) 4000 40.00 3000 3000 20.00 20.00 10.00 1000 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 5 Time (min) 29 Hydr®graph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 5 Post Site B Hydrograph type = SCS Runoff Peak discharge = 37.36 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 82,482 cuft Drainage area = 4.020 ac Curve number = 90* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 7.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(2 770 x 98) + (0 180 x 61) + (1 070 x 74)] / 4 020 Post Site B Q (cfs) Hyd No. 5 -- 50 Year Q (cfs) 4000 40.00 3000 3000 20.00 20.00 10.00 1000 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 5 Time (min) ydrograph Report Hydraflow Hydrographs by Intelisolve v9 2 Hyd. No. 6 Pre Total Hydrograph type = Combine Storm frequency = 50 yrs Time interval = 2 min Inflow hyds. = 1, 4 Q (cfs) 6000 - 50.00 - 3000 - 2000 - 10.00 - 000 0 120 240 Hyd No. 6 30 Monday, Sep 18, 2017 Peak discharge = 58.92 cfs Time to peak = 718 min Hyd. volume = 147,209 cuft Contrib. drain. area= 9.420 ac Pre Total Hyd. No. 6 -- 50 Year 360 480 600 720 Hyd No. 1 Q (cfs) - 60.00 - 50.00 W-1 - 3000 - 2000 - 10.00 000 840 960 1080 1200 1320 1440 1560 Hyd No 4 Time (min) f 360 480 600 720 Hyd No. 1 Q (cfs) - 60.00 - 50.00 W-1 - 3000 - 2000 - 10.00 000 840 960 1080 1200 1320 1440 1560 Hyd No 4 Time (min) 31 • Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Sep 18, 2017 Hyd. No. 7 Post Total Hydrograph type = Combine Peak discharge = 46.85 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 167,314 cuft Inflow hyds. = 3, 5 Contrib. drain. area= 4.020 ac Q (cfs) 50.00 A 1 11 30.00 20.00 1000 Post Total Hyd No. 7 -- 50 Year Q (cfs) 50.00 E1=8 3000 20.00 10.00 1 11 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 3 Hyd No. 5 32 • Hydr®graph Report Hydraflow Hydrographs by Intelrsolve v9 2 Monday, Sep 18, 2017 Hyd. No. I Pre DA1 Hydrograph type = SCS Runoff Peak discharge = 44.92 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 91,999 cuft Drainage area = 5.400 ac Curve number = 74* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 3.90 min Total precip. = 8.09 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(1.840 x 98) + (0 150 x 74) + (3.410 x 61)] / 5 400 Pre DAI Q (cfs) Hyd. No 1 -- 100 Year ,Q (cfs) 5000 50.00 40.00 40.00 3000 30.00 20 00 20.00 10.00 1000 0.00 -00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 1 Time (min) * Composite (Area/CN) = [(3 320 x 98) + (1 930 x 61) + (0 150 x 74)] / 5.400 Q (cfs) 60.00 5000 U I] 11 , 30.00 20.00 10.00 Post DA1 Hyd No. 2 -- 100 Year f 0.00 0 120 240 360 480 600 720 840 Hyd No 2 Q (cfs) 60.00 5000 30.00 20.00 10.00 0.00 960 1080 1200 Time (min) 33 • Hydr®graph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 2 Post DA1 Hydrograph type = SCS Runoff Peak discharge = 53.18 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 113,600 cuft Drainage area = 5.400 ac Curve number = 84* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 8.09 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(3 320 x 98) + (1 930 x 61) + (0 150 x 74)] / 5.400 Q (cfs) 60.00 5000 U I] 11 , 30.00 20.00 10.00 Post DA1 Hyd No. 2 -- 100 Year f 0.00 0 120 240 360 480 600 720 840 Hyd No 2 Q (cfs) 60.00 5000 30.00 20.00 10.00 0.00 960 1080 1200 Time (min) ' Hydr®graph Report 34 Hydraflow Hydrographs by Intelisolve v9.2 Monday, Sep 18, 2017 Hyd. No. 3 BMP1 Hydrograph type = Reservoir Peak discharge = 21.57 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 100,305 cuft Inflow hyd. No. = 2 -Post DA1 Max. Elevation = 538.42 ft Reservoir name = DRY POND Max. Storage = 51,671 cuft Storage Indication method used. BNIP1 Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 2000 10.00 10.00 000 - – — - 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 ® Total storage used = 51,671 cult " Composite (Area/CN) = [(0.940 x 98) + (0.700 x 60) + (2 380 x 79)] / 4.020 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 Way Pie -Site B Hyd. No. 4 -- 100 Year Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 K II 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No 4 Time (min) 35 ' Hydr®graph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 4 Pre -Site B Hydrograph type = SCS Runoff Peak discharge = 28.43 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 81,232 cuft Drainage area = 4.020 ac Curve number = 80* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.70 min Total precip. = 8.09 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(0.940 x 98) + (0.700 x 60) + (2 380 x 79)] / 4.020 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 Way Pie -Site B Hyd. No. 4 -- 100 Year Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 K II 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No 4 Time (min) j Hydr®graph Report Hydraflow Hydrographs by Intelisoive v9.2 Hyd. No. 5 Post Site B Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 4.020 ac Basin Slope = 0.0% Tc method = USER Total precip. = 8.09 in Storm duration = 24 hrs 36 Monday, Sep 18, 2017 Peak discharge = 42.35 cfs Time to peak = 716 min Hyd. volume = 94,316 cuft Curve number = 90* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 * Composite (Area/CN) _ [(2 770 x 98) + (0 180 x 61) + (1 070 x 74)] / 4 020 Post Site B Q (cfs) Hyd No. 5 --100 Year Q (cfs) 50.00 50.00 40.00 4000 30 00 3000 20.00 2000 10.00 10.00 0.00 - 000 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 5 Time (min) 37 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9 2 Monday, Sep 18, 2017 Hyd. No. 6 Pre Total Hydrograph type = Combine Peak discharge = 6 8.9 8 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 173,232 cuft Inflow hyds. = 1, 4 Contrib. drain. area= 9.420 ac Q (cfs) 7000 .1 I1 50.00 40.00 3000 20.00 10.00 Pre Total Hyd No. 6 -- 100 Year Q (cfs) 7000 5000 3000 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No 6 Hyd No 1 Hyd No. 4 KR Hydr®graph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Sep 18, 2017 Post Total Hydrograph type = Combine Peak discharge = 55.05 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 194,621 cuft Inflow hyds. = 3, 5 Contrib. drain. area= 4.020 ac Post Total Q (cfs) Hyd No 7 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 4000 40.00 30.00 30.00 2000 F 20.00 1000 1000 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No 3 Hyd No 5 5 ! t i•A �' it S 9 ���,i la{a{ ! t� 6 � � ' t F i \ � ��! 'V �•.�. Hydraflow Hydrographs by Intelisolve v9.2 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 40388 55000 0.0041 ------- 2 667847 12.4000 08642 -------- 3 541272 11 3000 08138 -------- 5 71.1645 12.6000 08301 -------- 10 71 9699 124000 08031 ------- 25 644785 11 3000 07471 -------- 50 575957 102000 0.7006 -------- 100 51 8259 93000 06585 -------- File name. CLTNC Updated 03 22 07.IDF Intensity = B / (Tc + D)"E RE Monday, Sep 18, 2017 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 400 399 3.99 399 398 398 398 398 397 397 397 397 2 566 455 3.82 331 2.92 262 238 218 202 1 88 1.76 1.65 3 558 449 378 328 291 262 2.39 220 204 1 90 1.78 1.68 5 6.58 535 453 395 351 316 288 265 246 230 215 203 10 7.26 593 5.04 4.41 393 355 3.25 299 278 260 245 231 25 8.01 656 560 492 440 400 367 340 317 298 281 266 50 856 7.01 601 529 475 433 399 371 347 326 309 293 100 899 7.38 634 561 505 462 4.27 398 373 352 3.34 318 Tc = time in minutes Values may exceed 60 Precir) file name Monroe ow Storm Rainfall Precipitation Table (in) Distribution 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr SCS 24-hour 1 00 3.64 000 0.00 533 637 721 809 SCS 6 -Hr 000 0.00 000 000 000 000 000 000 Huff -1st 000 000 000 000 000 0.00 000 000 Huff -2nd 000 000 000 000 000 000 000 000 Huff -3rd 000 000 0.00 000 000 000 000 000 Huff -4th 000 000 000 000 000 000 000 000 Huff -Indy 000 000 000 000 000 000 000 000 Custom 000 000 0.00 0.00 000 000 000 000