Loading...
HomeMy WebLinkAbout20161079 Ver 1_Compliance Evaluation Inspection_20170922Wetland Inspection Report Project Num: 20161079 Version: 1 Status: Issued Project Name: PNG Southern Alamance System Enhancement Project Type: Other County: Alamance Region: Winston-Salem Location: PNG Southern Alamance System Enhancement Latitude: +360 03' Longitude: -79° 33'08" SW Plan Location Site Owner Name Piedmont Natural Gas Inspection Date: 9/22/2017 Reason for Inspection Routine Inspection Type: Site Inspection (non -DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Sue L Homewood Phone: 336-776-9694 Secondary Inspector(s): Facility Compliance Status: ❑ Compliant 0 Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: 0 Permit (401 WQC) Inspection Summary: page: 1 Site Number: 20161079 Owner: Rumley, Phiilip Inspection Date: 9/22/2017 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? ❑ M ❑ ❑ Are the culverts and/or filled areas installed properly? ❑ 0 ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ❑ M ❑ ❑ Comment: Temporary impacts for work bridge in Back Creek were not approved. Three other crossinas were approved as temporary excavation for pipe installation however they all have fill. According to proiect manager, fill is intended to be permanent for long term maintenance. page: 2 Wetland Inspection Report Project Num: 20161079 Version: 1 Status: Issued Project Name: PNG Southern Alamance System Enhancement Project Type: Other County: Alamance Region: Winston-Salem Location: PNG Southern Alamance System Enhancement Latitude: +36° 03' Longitude: -79° 33'08" SW Plan Location Site Owner Name Piedmont Natural Gas Inspection Date: 9/22/2017 Reason for Inspection Routine Inspection Type: Site Inspection (non -DOT) Inspection Contact Person: Title: Phone: Onsite Representative(s): Primary Inspector: Sue L Homewood Phone: 336-776-9694 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: Buffer/AuthorizationNariance Question Areas: Buffer/AuthorizationNariance Cc Inspection Summary: page: 1 Site Number: 20161079 Owner: Rumley, Phiilip Inspection Date: 9)22/2017 inspection Type: Site Inspection (non -DOT} Reason for ViMt: Routine Buffer/Authorization/Variance 4 Yes No NA NE Does the impact(s) match what was approved in the buffer authorization or variance? 0 ❑ ❑ ❑ Is the site compliant with other conditions of the buffer authorization or variance? 0 1-300 Comment: Proiect still under construction. Impacts for construction road/access/line installation within limits. Portion of access must be re-established as indicated in buffer authorization application and approval. page: 2 ��yy����.. )4. i I` •+int y r'�•_�T.'�F S i �l�lriy. �. ,� to ��yy����.. )4. i I` •+int y r'�•_�T.'�F S i �l�lriy. �. r, cAqrj 4. ,A q� 7 7Q4R r, cAqrj 4. o C'.i r .rIA Mimi 4... M Kp �yi lk- ��'.1�.. ♦��� �.ii. el.�#\1f.�1 `�AINt'PV �f'� l'YI ONE