HomeMy WebLinkAbout20171210 Ver 1_PCN Form Submission_20170922Action History (UTC-05:00) Eastern Time (US & Canada)
�brrrit by Anonymous User 9/22/2017 3:20:39 PM (Start Event)
Accept by Carpenter,Kristi 9/25/2017 1:49:41 PM (DOT Initial Review)
• The task was assigned to Carpenter,Kristi . The due date is: September 27, 2017 5:00 PM
9/22/2017 3:21 PM
�� �
6fvlslaa of Water Resources
Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
June 28, 2017 Ver 1.8
*
Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red.
Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx
A. Processing Information
County (or Counties) where the project is located:*
Henderson
Is this a NCDOT Project?*
C� Yes �' No
(NCDOT only) T.I.P. or state project number:
U-5840, SR 1547 Old Airport Road
WBS #
(for NCDOT use only)
1a. Type(s) of approval sought from the Corps:*
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?*
�J Nationwide Permit (NWP)
r Regional General Permit (RGP)
Nationwide Permit (NWP) Number:
NWP Number Other:
List all MNnurrbers you are applying for not on the drop down list.
14 - Linear transportation
1c. Type(s) of approval sought from the DWR:*
check all that apply
� 401 Water Quality Certification - Regular
r Non-404 Jurisdictional General Permit
r 401 Water Quality Certification - E�ress
r Riparian Buffer Authorization
1d. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
*
C' Yes C•' No
�' Yes C� No
If so, attach the acceptance letter from rritigation bank or in-lieu fee program
�' Yes C' No
Acceptance Letter Attachment
Qick the upload button or drag and drop files here to attach docurrent
i SR 1545 Improvements (U-5840) - Division 14 - STR - FB 05 (cool).pdf 61.17KB
FlLE IYFE MJST BE FDF
1f. Is the project located in any of NC's twenty coastal counties?*
C' Yes �' No
B. Applicant Information
1a. Who is the Primary Contact?*
Dave McHenry
1b. Primary Contact Email:*
dgmchenry@ncdot.gov
1c. PrimaryContact Phone:*
(xxx)xxx-xxxx
(828)586-2141
1d. Who is applying for the permit?
rJ Owner r Applicant (other than owner) r AgenUConsultant
(Check all that apply)
2. Owner I nformation
2a. Name(s) on recorded deed:
NCDOT. Division 14
2b. Deed book and page no.:
2c. Responsible party:
(for Corporations)
2d.Address
Street Address
253 Webster Road
Address Line 2
��
Sylva
Fbstal / Zip Code
28779
2e. Telephone Number:
(xxx)x�c-�oc
(828)586-2141
2f. Fax Number:
(xxx)xxx-xxxx
2g. Email Address:*
dgmchenry@ncdot.gov
State / R-ovince / F�gion
NC
Country
USA
C. Project Information and Prior Project History
1. Project Information
� 1a. Name of project:*
U-5840, SR 1547 Old Airport Road Improvements
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality/town:*
Fletcher
1d. Driving directions*
If it is a new project and can not easily be found in a C� rrapping system Rease provide directions.
Take I-26 east (south) from Asheville, ebt on NC 25 heading south, take left onto SR 1547 Old Airport Road
2. Project Identification
2a. Property Identification Number:
(tax RNor parcel ID)
2b. Propertysize:
(in acres)
40
2c. Project Address
Street Address
Address Line 2
�Y
Fbstal / Zip Code
State / Rovince / F�gion
Country
2d. Site coordinates in decimal degrees
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as
appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
Latitude:*
35.435921
ex:34.208504
3. Surface Waters
Longitude:*
-82.489032
-77.796371
3a. Name of the nearest body of water to proposed project:*
Cane Creek
3b. Water Resources Classification of nearest receiving water:*
C
Surface Water Lookup
3c. What river basin(s) is your project located in?*
French Broad
RiverBasin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The site is a stream crossing and roadside intermittent stream along a secondary road in a mixed commercial and
residential urban area.
4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
DWR)
Gick the upload button or drag and drop files here to attach docurrent
U-5840 USGS 031016.pdf 763.11 KB
Fle type rrust be pdF
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
C7ick the upload button or drag and drop files here to attach docurrent
20170920_15583003685_181_Hydric_Rating_by_Map_Unit.pdf 372.97KB
Fle type rrust be pdf
4d. List the total estimated acreage of all existing wetlands on the property:
0
4e. List the total estimated linear feet of all existing streams on the property:
(interrrittent and perennial)
445
4f. Explain the purpose of the proposed project:
The purpose of the project is to improve safety for bicycles and improve traffic flow and control on the existing 2-3
lane urban connector road.
4g. Describe the overall project in detail, including the type of equipment to be used:
The center turn lane will be extended to the full length of the approximate 1 mile road section. Outside lanes will be
i widened in part to accommodate bicycle traffic. Work will occur with heavy equipment in stages. Erosion controls
including temporary flow bypasses will be used at the stream impact area to avoid excavation in flowing water. An
off-site detour will be used for the stream crossing work.
4h. Please upload project drawins for the proposed project.
C7ick the upload button or drag and drop files here to attach docurrent
U-5840 plan sheets.pdf 4.66M6
Fle type rrust be pdf
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?*
C� Yes �' No �' Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made? *
r Preliminary l" Approved f Unknown
Corps AID Number:
Exarrple: SAV�2017-99999
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other
Brandon Phillips
SN Inc.
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5d1. Jurisdictional determination upload
aick the upload button or drag and drop files here to attach docurrent
i PDJ Package U-5840.pdf
Fle type rrust be FDF
6. Project History
4.64MB
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
C' Yes C' No f Unknown
7. Future Project Plans
7a. Is this a phased project?*
C' Yes �' No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre-construction notification.
D. Proposed I m pacts I nventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands rJ Streams-tributaries r Buffers
r Open Waters r Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites
impacted.
Row 1
3a. Site # - 3b.lmpact
Reason for type
impact
1 P
N�p label (e.g. F2rrranent (Fj or
RDad Q'ossing 1) Terrporary (�
3c. Type of 3d. Stream 3e. Stream 3f. 3g. Stream 3h. Impact
impact name Type Jurisdiction width length
type
Culvert UT Cane Perennial Both Average 30
Cree k(A) F�rennial (Fff� or s (linear feet)
interrrittent (IfVi)
f t
Row 2 1A T Dewatering UT Cane Perennial Both
N�p label (e.g. F�rrranent (P� or Creek (A) F�rennial (� or
13�ad CYossing 1) Terrporary (� interrrittent (IfVn
Row 3 1B P Bank UT Cane Perennial Both
fv�p label (e.g. F2rrrenent (� or Stabilizatio Creek (� F2rennial (�) or
R�ad Q'ossing 1) Tenporary (� n interrrittent (IN�
Row 4 1C P Bank UT Can Perennial Both
fv�p label (e.g. F2rrrenent (Pj or Stabilizatio Creek (A� F2rennial (� or
Fd�ad Q-ossing 1) Terrporary (� n interrrittent (IN�
��)
Average 70
g (linear feet)
(feet)
Average 15
g (linear feet)
(feet)
Average 25
s (linear feet)
(feet)
3a. Site #- 3b.lmpact 3c. Type of 3d. Stream 3e. Stream 3f. 3g. Stream 3h. Impact
Reason for type impact name Type Jurisdiction width length
impact type
Row 5 1D T Culvert UT Cane Intermittent Both Average 45
fv�p label (e.g. F2rrranent (� or Cree k(B) F2rennial (� or � (linear feet)
Fd�ad C7ossing 1) Terrporary (� interrrittent (IN� (feet)
*' All Perennial or Intermittent streams must be verified by DWR or delegated local government.
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
70
3i. Total temporary stream impacts:
115
3i. Total stream and tributary impacts:
185
3j. Comments:
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list
all open water impacts below.
5. Pond or Lake Construction
If pond or lake construction is proposed, then complete the chart below.
6. Buffer Impacts (for DWR)
If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below.
E. Impact Justification and Mitigation
I 1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
The minimal amount of stream impact is proposed for the road improvements. The culvert will be up-sized, which
should reduced the hydraulic constriction posed by the currently undersized culvert in this urban stream. An off-
site detour will be used, which reduces the amount of culvert typically needed in order to do phased/staged
construction.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:*
BMP erosion controls will be used. Temporary dewatering will be used to avoid excavation in flowing water.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
G Yes C' No
2c. If yes, mitigation is required by (check all that apply):
� DWR rJ Corps
2d. If yes, which mitigation option(s) will be used for this project?
r Mitigation bank r% Payment to in-lieu fee program r Permittee Responsible Mitigation
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached.
� r Yes
4b. Stream mitigation requested:
(linear feet)
75
4c. If using stream mitigation, stream temperature:
cool
4d. Buffer mitigation requested (DWR only):
(squarefeet)
4e. Riparian wetland mitigation requested:
(acres)
4f. Non-riparian wetland mitigation requested:
(acres)
4g. Coastal (tidal) wetland mitigation requested:
I (acres)
4h. Comments
We request a 1:1 mitigation ratio since the streams fall-out as "LOW" per NCSAM evaluation - see NCSAM sheets
in PJD package.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1a. Does this project require a Stormwater Management Plan?
C� Yes C' No
1b. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
NCDOT NCS000250
1c. What is the overall percent imperviousness of this project?
80
%
1d. Who will be responsible for the review of the Stormwater Management Plan?*
� Certified Local Government r DEMLR Stormwater Review
r DWR 401 & Buffer Permitting Branch rJ DWR Transportation Permitting Branch
2. Diffuse Flow Plan
2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
C' Yes �' No
If no, explain why:
� Project is not in subject watersheds.
5. DWR 401 Stormwater Review
5a. Is the Stormwater Management Plan (including BMP Supplemental Forms and Operation and Maintenance Agreements) attached?
C' Yes �' No
Stormwater Management Plan Upload
C7ick the upload button or drag and drop files here to attach docurrent
file type rrust be pdf
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
C' Yes �' No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? *
C' Yes �' No
2b. Is this an after-the-fact permit application?*
C' Yes C•' No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water quality?*
C' Yes G No
3b. If you answered "no," provide a short narrative description.
The road capacity is not being increased (e.g. more thru-lanes) and the road is staying on its current alignment,
so the project will not foster additional development.
4. Sewage Disposal (DWR Requirement)
4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the
proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant.
The project is a roadway improvement project that will not generate wastewater.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
C' Yes C•' No
I Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?*
C' Yes C•' No
Sc. If yes, indicate the USFWS Field Office you have contacted.
5d. Is this a DOT project located within Division's 1-8?*
C' Yes
r No
5e. Will you cut anytrees in order to conduct the work in waters of the U.S.?*
�' Yes C' No
5f. Does this project involve bridge maintenance or removal?*
C' Yes C•' No
Sf(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat
use can be found in the NLEB SLOPES, Appendix F, pages 3-7.
C' Yes C' No
I Link to the NLEB SLOPES document: http://sav�reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf
If you answered "Yes" to 5f(1), did you discover any signs of bat use?*
C' Yes r No C' Unknown
If yes, please show the location of the bridge on the permit drawings/project plans.
C7ick the upload button or drag and drop files here to attach docurrent
Fle rrust be FDF
5g. Does this project involve the construction/installation of a wind turbine(s)?**
C' Yes r No
If yes, please show the location of the wind turbine(s) on the permit drawings/project plans.
Gick the upload button or drag and drop files here to attach docurrent
Fle rrust be FDF
Sh. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as
jackhammers, mechanized pile drivers, etc.?*
C•' Yes C' No
If yes to either, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on
the property.
aick the upload button or drag and drop files here to attach docurrent
I U-5840 NWP 14 cover letter.pdf
Fle rrust be FDF
330.93KB
5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?*
NHP and USFWS databases and surveys by qualified biologists.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
C' Yes �' No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NMFS
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
� Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?*
G Yes C' No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources? *
Review by NCDOT Human Environment Unit and no adverse effect determination from SHPO NR historic property.
Project will avoid an eligible property at west end of project. The boundary on the NR property will be reduced and
not be affected by the project.
7c. Historic or Prehistoric Information Upload
C7ick the upload button or drag and drop files here to attach docurrent
16-06-0056Effects.pdf 5.17M6
16-06-0056EffectsRequiredForm.pdf 342.53KB
AR16-06-0056nosurvey.pdf 3.77M6
Fle rrust be FDF
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
C' Yes C•' No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?*
FEMAwebsite above
Miscellaneous attachments not previously requested.
C7ick the upload button or drag and drop files here to attach docurrent
U-5840 photos.pdf 816.01 KB
Fle rrust be Ft7F
Signature
*
fJ By checking the box and signing below, I certify that:
■ I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions AcY');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
■ I intend to electronically sign and submit the PCN form.
Full Name:*
Dave McHenry
Signature
�
Date
9/22/2017
Initial Review
Is this project a public transportation project?
C� Yes C' No
Qily change this if the project has been reassigned.
Has this project met the requirements for acceptance in to the review process?*
C� Yes
C' No
BIMS # Assigned*
i 20171210
Version#*
Reviewing Office *
Asheville Regional Office - (828) 296-4500
Select Project Reviewer*
Kevin Barnett:eads\khbarnett