Loading...
HomeMy WebLinkAbout20171061 Ver 1_More Information Received_20170922Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 9/22/2017 3:23:54 PM (Supplemental Submital) Accept by Carpenter,Kristi 9/25/2017 1:38:57 PM (DOT - E�asting Project) • The task was assigned to Carpenter,Kristi 9/22/2017 3:23 PM Water Resources ENVIRONMENTAL OUALITY Staff Review: Submittal Type: l" New Project C' Pre-Application Submittal C' More Information Response New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre-Application Submittal - Please check the pre-application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. ID#* Version* 20171061 1 Reviewer List:* Dave Wanucha:eads\djwanucha Select Reviewing Office:* Winston-Salem Regional Office - (336) 776-9800 Project Submittal Interim Form subrritted: 9/22/2017 Project Contact Information: Name: Marla Chambers Who is subrritting the inforrration? Email Address: marla.chambers@ncwildlife.org Project Information: Project Name: Replace Bridge #153 on SR 1728 with Crownspan Is this a public transportation project? l•' Yes C' No TI P#: WBS#: 176P. 11. R.120 (Applies to DOT projects only) County (ies) * Wilkes County(ies)* Describe the attachments: Attached are NCWRC comments on the subject project. Please upload all files that need to be submited. WiIBrg153SR1728DungeonC2017-09.pdf 116.72KB Only pdF files are accepted. r% By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the form. Signature: ���t ./ra � �r�����°td North Carolina Wildlife Resources Commission Gordon Myers, Executive Director Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 September 22, 2017 M E M O R A N D U M TO: Eric Alsmeyer, Regulatory Project Manager Raleigh Regulatory Field Office, USACE FROM: Marla Chambers, Western NCDOT Coordinator Habitat Conservation Program, NCWRC SUBJECT: Review of NCDOT’s application for Section 404 and 401 permits to replace Bridge No. 153 over Joshua (or Dungeon) Creek on SR 1728 (Longbottom Road), Wilkes County, North Carolina. The North Carolina Department of Transportation has submitted an application to obtain a Section 404 Permit from the U.S. Army Corps of Engineers and a 401 Water Quality Certification from the NC Division of Water Resources. Staff biologists with the North Carolina Wildlife Resources Commission have reviewed the information provided. These comments are provided in accordance with the provisions of the state and federal Environmental Policy Acts (G.S. 113A-1through 113-10; 1 NCAC 25 and 42 U.S.C. 4332(2)(c), respectively), the Clean Water Act of 1977 (33 U.S.C. 466 et seq.), the Endangered Species Act (16 U. S. C. 1531-1543; 87 Stat 884), and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d), as applicable. The NCDOT proposes to replace Bridge No. 153 over Joshua (or Dungeon) Creek on SR 1728 (Longbottom Road) with a three-sided bottomless culvert measuring 20’ x 1’ (4’ including footers) x 93’ with 143 linear feet of riprap impacts. Our information shows the bridge over Dungeon Creek, and Joshua Creek as a tributary upstream of the project. Class 1 riprap will be countersunk inside of the new structure to maintain channel width. Temporary impacts total 24 lf. Rainbow Trout are expected in the project area, therefore a moratorium prohibiting in-stream work and land disturbance within the 25-foot trout buffer should apply from January 1 to April 15 to protect the egg and fry stages of trout. Sediment and erosion control should adhere to the Design Standards in Sensitive Watersheds. Tree removal should be minimized. BRIDGE NO. 153, SR 1728 PAGE 2 SEPTEMBER 22, 2017 JOSHUA CR., WILKES CO. NCWRC will not object to the issuance of the Section 404 and 401 permits provided that the following conditions are implemented: 1. In-stream work and land disturbance within the 25-foot wide buffer zone are prohibited during the trout spawning seasons of January 1 through April 15 to protect the egg and fry stages of trout. 2. Sediment and erosion control measures shall adhere to the Design Standards in Sensitive Watersheds and be strictly maintained until project completion. 3. Herbaceous vegetation shall be planted on all bare soil as soon as possible following the completion of permanent or temporary ground disturbing activities to provide appropriate long-term erosion control. 4. Tall fescue and straw mulch shall not be used in riparian areas. We encourage NCDOT to utilize onsite vegetation and materials for bank stabilization when practicable. Erosion control matting shall be used on steep slopes and for establishing permanent vegetation in riparian areas. The matting shall be well anchored with staples or wooden stakes and, whenever possible, include live stakes of native trees. Matting in riparian areas should not contain plastic mesh, which can entangle and trap small animals. 5. Storm water should be directed to buffer areas or retention basins and should not be routed directly into the waterway. 6. The natural dimension, pattern, and profile of the waterway above and below the crossing should not be modified by widening the channel or changing the depth of the waterway. 7. Removal of vegetation in riparian areas should be minimized. Native trees and shrubs should be planted along the banks, as appropriate to the setting, to reestablish the riparian zone and to provide long-term erosion control. 8. Grading and backfilling should be minimized, and tree and shrub growth should be retained, if possible, to ensure long term availability of shoreline cover for fish and wildlife. 9. Where practicable, riprap placed for bank stabilization should be limited to the banks below the high water mark, and vegetation should be used for stabilization above the high water elevation. 10. If concrete will be used during construction, work must be accomplished so that wet (uncured) concrete does not contact surface waters. This will lessen the chance of altering the water chemistry and causing a fish kill. 11. Discharging hydroseeding mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. BRIDGE NO. 153, SR 1728 PAGE 3 SEPTEMBER 22, 2017 JOSHUA CR., WILKES CO. 12. Heavy equipment should be operated from the bank rather than in the channel whenever possible in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the waterway. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids or other toxic materials. Thank you for the opportunity to review and comment on this project. If you have any questions regarding these comments, please contact me at marla.chambers@ncwildlife.org or (704) 244- 8907. cc: Dave Wanucha, NCDWR Heath Slaughter, NCDOT