HomeMy WebLinkAbout20170988 Ver 1_SR 1001 - Bridge 135 (B-5726) - Division 7 - STR - CF 02 - Guilford_20170922
Carpenter,Kristi
From:Harmon, Beth
Sent:Friday, September 22, 2017 5:39 PM
To:Bailey, David E CIV USARMY CESAW (US); Parker, Jerry
A; Thomson, Nicole J
Cc:Norton, April R; Mills, James M; Carpenter,Kristi;
Browning, Kimberly D CIV USARMY CESAW (US);
Fitzpatrick, Linda F
Subject:RE: B-5726; Guilford Co - NWP 14 - SAW-2017-00078
Attachments:SR 1001 - Bridge 135 (B-5726) - Division 7 - STR - CF
02 - Guilford.pdf
Follow Up Flag:Follow up
Flag Status:Flagged
Dave -- Please see attached the signed mitigation responsibility transfer form for the
bridge replacement project on SR 1001 in Guilford County (TIP B-5726). Please let me
know if you need anything else for this project.
Beth.
Beth Harmon
NCDOT Coordinator
Division of Mitigation Services
Department of Environmental Quality
919-707-8420 office
beth.harmon@ncdenr.gov
1652 Mail Service Center
Raleigh, North Carolina 27699-1652
Email correspondence to and from this address is subject to the North Carolina Public
Records Law and may be disclosed to third parties.
-----Original Message-----
From: Bailey, David E CIV USARMY CESAW (US)
\[mailto:David.E.Bailey2@usace.army.mil\]
Sent: Monday, September 18, 2017 4:03 PM
To: Parker, Jerry A <jparker@ncdot.gov>; Thomson, Nicole J <njthomson2@ncdot.gov>
Cc: Norton, April R <april.norton@ncdenr.gov>; Harmon, Beth
<beth.harmon@ncdenr.gov>; Mills, James M <mmills@ncdot.gov>; Carpenter,Kristi
<kristilynn.carpenter@ncdenr.gov>; Browning, Kimberly D CIV USARMY CESAW (US)
<Kimberly.D.Browning@usace.army.mil>
Subject: B-5726; Guilford Co - NWP 14 - SAW-2017-00078
Nikki and Jerry,
1
I have attached the Nationwide Permit 14 verification including Special Conditions and
terms and conditions for the above referenced project to this email. Please note the
Compensatory Mitigation requirement. Please let me know if you have any questions or
would like a hard copy mailed to you.
Sincerely,
Dave Bailey
---
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our
automated Customer Service Survey is located at:
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
Thank you for taking the time to visit this site and complete the survey.
2
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
CompensatorY Miti�ation Responsibility Transfer Form
Permittee: NCDOT Action ID: SAW-2017-00078
Project Name: NCDOT / 85726 / Bridge 135 / SR 1001 / North Church Street / Squirrel Creek / Guilford County / Division 7 COU11ty: Guilfofd
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation respansibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this
form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be
used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one
8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor
and/or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The 5ponsor must verify that the mitigation requirements (credits) shown below are available at the
identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank
ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and
the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all
reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements
Permittedlmpa
Stream
Warm
53
linear
Cool I Cold
HUC and Basin:
Wetland Impacts (
Riverine Riparian Non-Riverine
Fear River Basin
Coastal
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by.this sponsor.
ipensatory Mitigation Requirements:
Stream Mitigation (credits)
Warm Cool Cold
106
HUC and Basin: 03030002, Cape Fear River Basin
Wetland M
n Riverine � Riparian Non-Riverine � Non-Riparian � Coastal
Mitigation Site Debited: NCDMS
(List the name of the bank to be debited. For umbrella banks, also list the speci�c site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigacian Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shawn below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS�, as approved by the USACE, are
currently available at the mitigation site identified above. Further, 1 understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor
Name of S nsor's
Sign ure of Spa
Page 1 of 2
►�rrrr� � �
Authorized Representative
s
��
Form Updated 14 September, 2017
USACE Wilmington District
Compensatory Mitigation Responsibility Transfer Form, Page 2
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North
Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit
issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit
issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the
Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
� Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE
Project Manager (address below) is provided with a signed copy of this form.
� If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District�guidance
and a new version of this form must be completed and included in the USACE administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions:
This form is not valid unless signed below by the USACE Praject Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form a/ong with an updated bank ledger ta:1J the Permittee, 2) tbe USACE
Project Manager at the address below, and 3J the Wilmington District Mitigotion O�ce, Attn: Todd Tugwell, 3331 Heritoge
Trode Drive, Suite 105, Wake Forest, NC 27587 (emuil: todd.tugrwell@usace.army.mil). Questions regarding this form or
any of the permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager:
USACE Field Office:
Email:
David Bailey
Raleigh Regulatory Field Office
US Army Corps uf Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
David.E.Bailev2@ usace.armv.m il
. Digitally signed by BAILEY.DAVID.E.1379283736
r � DN: c=US, �U.S. Government, ou=DoD, ou=PKl,
ou=USA, cn=BAILEY.DAVID.E.1379283736
Date: 2017.09.1815:52:08 -04'00'
USACE Project Manager Signature
Seotember 18. 2017
Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classificatians (including stream temperature and wetland groupings) is
available at http://ribits.usace.armv.mil.
Page 2 of 2
The Wilmington District is committed to providing the highest level of support to the puhlic. To help us ensure we continue to do so, please complete the
Customer Satisfaction Survey located at our website at htto://reeulatorv.usacesurvev.com/ to complete the survey online.