Loading...
HomeMy WebLinkAbout20081374 Ver 2_Geotechnical Engineering Evaluation_200812151 1 1 1 1 1 1 1 1 Geotechnical Engineering Evaluation For City Boulevard Development U.S. 1-85 North at City Boulevard Charlotte, North Carolina CESI Project No. 070233.000 May 1, 2007 Prepared For: Mr. David Niekamp Director of Development Retail Development Crescent Retail 400 South Tryon Street - Suite 1300 Cha lottp„ , 8285 0" 10 CARO, ?°? .•??SSl ••• ??fi °re -° r'n O.'.'P r ?dl?tttt}e Ci?R 0,. Prepared By: CESI P.O. Box 268 Concord, North Carolina 28026-0268 !l 61008 oSA,?q y? CE-.- ... exceeding our clients' expectations ' May 1, 2007 Mr. David Niekamp , Director of Development Retail Development Crescent Retail , 400 South Tryon Street- Suite 1300 Charlotte, NC 28285 Reference: Geotechnicai Engineering Evaluation , City Boulevard Development U.S 1-85 North at City Boulevard ' Charlotte, North Carolina CESI Project No. 070233.000 Mr. Niekamp: ' CESI has performed a subsurface exploration and geotechnical engineering evaluation for the referenced project. We completed these services in general accordance with our Proposal No. ' 06-12-40, dated December 12, 2006, and Proposal No. 06-12-40.2, dated February 12, 2007, as you authorized. This report explains our understanding of the project, documents our findings, and presents our , conclusions and engineering recommendations for site development. After you have reviewed our report, we recommend either a meeting or a telephone conference to discuss our recommendations. , We appreciate the opportunity to be of service to Crescent Retail; and we look forward to helping you through project completion. If you have any questions, please feel free to call us at , your convenience. Respectfully submitted, , ESI Victoria (Vikki) W. G6mez, E.I.T. lNegistration N. Camp, J , Project Engineer Manager No. 20429 ' J:KGeoTech\Projects\GEOTECHNICAL PROJECTS\Crescent • North Tract • 070233.000\Finat Report.vg.doc ' NCSS • NSPS e ACSM o NSPE e PENC ' 45 Spring Street S.W. ! P.O. Box 268 Concord, NC 28026-0268 • 704-786-5404 • Fax 704-786-7454 1-800-627-1024 www,concordengi neeri ng.com BELGATE COMMERCIAL CENTER DEVELOPMENT CHARLOTTE, NORTH CAROLINA STORMWATER MANAGEMENT CALCULATIONS Prepared for: Crescent Resources, LLC 400 S. Tryon Street, Suite 1300 Charlotte, North Carolina 28202 Prepared by: Kimley-Horn and Associates, Inc. 4651 Charlotte Park Drive, Suite 300 Charlotte, North Carolina 28217 CAR Q .?-11 `a19- 'FES3/0 f??y S A - p = co ?1 A.I11 0\1Z i2'vg DECEMBER 2008 KHA Ref: 018253029 ' TABLE OF CONTENTS ' OVERVIEW SITE MAPS SITE VICINITY MAP SCS SOIL SURVEY ' FEMA FIRM PANEL ' WATERSHED MAPS PRE-DEVELOPMENT WATERSHED MAP POST-DEVELOPMENT WATERSHED MAP WATER QUALITY WET POND CALCULATIONS BIORETENTION POND CALCULATIONS ANTI-FLOTATION DEVICE CALCULATIONS ' VOLUME AND SURFACE AREA TABLES ' WET DETENTION BASIN SUPPLEMENT FORMS BIORETENTION SUPPLEMENT FORMS WATER QUANTITY CURVE NUMBER CALCULATIONS TIME OF CONCENTRATION CALCULATIONS ' HYDROCAD HYDROLOGY REPORTS WET PONDS I AND 2 WET POND 3 WET POND 4 BIORETENTION POND I STORMWA TER MANAGEMENT CALCULATIONS i ' Belgate Commercial Center Development, Charlotte, NC B ack.. rg_ ound OVERVIEW This report contains the approach and results of a stormwater analysis conducted for the Belgate Commercial Center Development. The 81-acre project site is located in the north east quadrant of the interchange of Interstate 85 and City Boulevard in the City of Charlotte (see vicinity map). The site has been mass graded per City of Charlotte permit numbers GRS-2007191 and LDC-2008-00326. Existing Conditions The existing on-site conditions (before mass grading) consisted of woods and meadow therefore this ground cover was used in the analysis. The site topography varies from elevation 745 ft to elevation 660 ft. Site runoff discharges into an existing stream along the east portion of the site. This stream drains to a culvert under I-85. Floodplain/Floodway The proposed site does not lie within a 100-year floodway boundary as determined by FIRM Panel # 3717900070C. Water Quality Water quality treatment by means of permanent Best Management Practices (BMP's) will be provided using four wet ponds and one bioretention pond as treatment. The ponds are designed to treat the first inch of runoff per the Stormwater Model Ordinance for North Carolina and will draw down over a period of two to five days. Wet Detention Basins, 1, 2 and 4 have been designed to provide a minimum 90% average annual removal of Total Suspended Solids (TSS). Wet Detention Basin 3 has been designed to provide a minimum of 85% average annual removal of TSS and therefore discharges to a filter strip. Water Quantity The proposed wet detention ponds have been designed to address the water quantity requirements to match pre- and post-development peak runoff rates for the 1-year, 24-hour storm events. (These ponds will also control the peak runoff rates for the 10- and 25-year, 6-hour storm events per the City of Charlotte rezoning notes on Petition 2006-155. However, these water quantity requirements will be reviewed by the City of Charlotte once the site develops.) The 100-year, 24-hour storm event was checked for 6" of freeboard at the top of bank. Results Pre-development Flow 1- r, 24-h r storm cfs Post-development Flow 1-yr, 24-hr storm cfs DA-1 2.48 2.12 DA-2 0.61 0.21 DA-3 3.35 0.55 DA-4 4.27 4.23 DA-5 0.92 0.74 STORMWA TER MANAGEMENT CALCULATIONS Belgate Commercial Center Development, Charlotte, NC Conclusion The proposed wet detention basins were designed using methods prescribed by the aforementioned resources. HydroCAD software was utilized to evaluate the pre-development and post-development flow rates. HydroCAD utilizes TR-55 methods of calculating times of concentration (based on sheet, shallow concentrated, and channelized flows) and SCS curve number method of generating hydrographs (results are provided in Appendix C). Based on the analyses provided herein, the proposed system will be adequate to address the stormwater requirements of the North Carolina Department of Environment and Natural Resources, Division of Water Quality. J'TURMWATER MANAGEMENT CALCULATIONS Belgate Commercial Center Development, Charlotte, NC 3 K,\CHL-LDEV\018253 Crescent\026 Belgate\Belgate Stormwater Management Plan\Calculatlons\Parcel J\SONs and VlcWty Map,dwg ,olp0 f J'r eat i -I FI BELGATE VICINITY MAP GORE Kimley-Horn and Associates, inc. COMMERCIAL CENTER NTS 1 ' THIS DOCUMENT , TOCEnn WTII TIE OONWM MD OW96 PRESENTED MOTE AS AN NSRa11ENT OF SERVICE, IS IN70M ONLY FOR THE PURPOSE AND WENT FOR W*CH IT WAS PREPARED. REUSE OF MO NPROPFR REUM M ON THIS DOCUMENT IMTNOUT WWITEN AUTHOR ZATION AND ADAPTATION BY IOHI.EY-IIORN AND ASSOCIATES, NC SHALL SE WTWUT UABRITY 70 NIYIEY-NOON AND ASSOCIATES. NC. BELGATE SOS SOIL SURVEY FIGURE KimleyHorn and Associates, inc. COMMERCIAL CENTER NTS 2 MS D=%Off, TDOETIER IITH THE CONCEPTS AND DESIGNS PF OM fEAEK AS AN INSTRUMENT OF SERVICE. IS INTENDED ONLY FOR THE PURPOSE AND ClMa FOR WMCIR R WAS PREPARED. RUSE OF AND WROPERR RIUNCE OR MS DOCUMENT WTHOUT W OTTEN A MaMTION AND ADAPTATION BY KWEY-HORN AND ASSOCIATES, NC. STALL BE WITHOUT UABRRY 70 IOLLEY-HORN AND ASSOCIATES. NC. m D r u, D? i y c m D irk ? O N "C C W i E a o E O 9 m _D GD"" c m " LL m ao m Dm a s - o y m m p m`?zD E T DI N 7 „• O y D mN? D n m c If D a E m N m W D Z ITS 3 ??EELL D *' `o y Q L) v? t ?? ?Eag [Ds 2 U C C D W O N W J j LL A d d C J z ozm L'i o a Q°° ap :9 ofEm m ow >t L W u -`? L L m ?_^ N Q E C E m m W D c E V mx ° > °1 ydE E m ? m??mo ` o row a- LEJ 02 LU O a z o ?• N7 Z \\\\?\ \ N ''?/ iD CO + \ `. i ?" ..ter.. - ?? ???\`•? •L N ,' ' 8'99 ,, ? '\ ???\ w ,_?., t 664 X61 t N •?? ?? `\'??. a S J x Z CT) ? uj z 0:? O 6 ry N LU \ ... ? 5 X r\ x q z to OS y.? O? N \` yC w z w :., °. Q ' t ?o aN m ti.t C.? 5 : ?; s a a? y v ? ?-+ a c Z °e? ?? ?? ? Q ? V o Q' H c ?I ??^, c? gEe ?? m J i Q p a p ? ry ? u ` W V D D w ? d ? x ? O 4 ? ? c ? g W r. ' LL. v_ z C 0_ ? S u u i?°.r W H v d o o d L O L D 0- CL E` o d cu II D m T N W O C J D b Q aD U D (n D Q IE C C ._ H ? C. F- LL : 3 m 2 r.. W '?T U Q I W = W rn O vLL?. - W p p a m N Q p v Q Z ' ' C? Q z a Q CT7 V C m o a? ads g ?? W ? W j C c•-- u p 6 ? CL. La Q ° o° tl m m ° ° d S ; 2 U as W U N ? r'r ? an ?? v 'Ea H o o Q ?° a x and :°P w oE - ,,6 i z C a y u Sfu o3 ? O Po' one Pa ?®® P ® P u D o _ LL ' 0 0 0 o v v a Q o a o n n n n n m m m co o m 0 m 0 to ? N al m oo m rn w m rn m rn w m m ? $ , \ - ' Q 4 o [7 l 7 rh m !7 m Ol m m m m f'1 ID In til m m M IA IA 10 ID u D \, i ' p U [7 [7 r9 tq t7 .- N N N N N N N N N N N N N N N N N ° . \ Q K m Ill } _ O ' 1 ?? ? ? ? / \ / 1 N E c - - _ _ _ _ - - - _ _ _ m w - - - - - - - - - - - - - t - • \ Q m m m Of m n m m D W m n m n C O m m O1 m m d' t Of N m _ o \ \` - = to d m N N n n rfJ m n n l ID N m - p a M T CC F N ^ m N m h M N N n O n n m m ID m m O m ID C y d\\''\ ? N N N [7 < tD m m m N N m PJ V a Ia m m 0 .. w w w p bb O W 2 w 2 w rc u dJ' ~ \ O n p U U p c c ti? ?? ' - .J LL O p U } m Q m U W LL U' S - 1C J } m Q } Q m U 0 W LL U S ?. Y J u c ;? `.\. r /' ^ y O D m p m . ; r?• Sd ?. , ? : - Q o H _ _?- W ? te ?? 2 • / ? / ` ' \ FD// \ \ ., \ .-.?_ .. P % •^? / Z W Zz OLL N Z Z S Z w cD Z 0 0 ? 0 Q Ox,. d0 HDno- runt) c o Q m - 1 - Clj X LL Z O N y O mom °E =dc?m ?D Ind D C d ? U O L E a y E ? v D E a D D d ? LL a U O C O W C QN N myZD a ?D ?o ?D a m a E-. c W m A rry D ,WCEEu ae¢ Q d L c c._IL DD.OC a h: m ° u `D2Edw aLL L" U O ? U N q O WCL a R ??rn E D U E p L am lC? m c°E m x m ? N d m a m D m t r r r? T U' 2? D d +L-+ `o n? N C U Du 7 N D C Lo O ?:,U_ 2 w C C N? N 7 ? U D O O Lo II r W J Q U Q D u- p1 D h ?' - e .. C7 r, p 4 m 'O' Q o V3 3 v °- ?° Lil ?] '7 J Z .? a LWWW I _ Wv f E? Z Q7 ? i ? ? ¢ Z i c _ s d? F-? u ILI LaJ O l C O o f u° W m L J O Z y C, le_. T n n L a- m W 5 a D C - u r r Y? ? D S n cM?? ??A[ d d z U X (,,,t z Z u p y U a < b0 m s E d 4 -j ?Ea @ W Q ?5? me e9 LLJ LL LJt Z 1 y° °u f? u i f ° W a _ . O doe Vo ??? 8 ? 4 B a i m o y U ? C m _ y C 3 y D m D_ C m G U Es myc E °v D U L LL C m Y F V m.D. C.J Co o d zD SS m mD 0 m P d D 'O $ d m m > a'm m n a°E9oo m m m _D =?EELL a?Q D m C c c dpp? w C J S ; LL ix EmL > LL L 6 U R. V - pp? p L L m Q m 3 $ m mom E E m CLL9 D m D U C 1`9Y ? m m X m D m - m L ? m m Em m D m a`3oa` n ? n v :? 60 off, LU `\'w is .\? Ld ? \?`\_?? • ?\\\ \• V-1 `• ?? \ ` z --4 \ \ O \ 5 PRE-DEVELOPMENT ' WATERSHED MAP STORMWATER MANAGEMENT CALCULATIONS Belgate Commercial Center Development, Charlotte, North Carolina = = M = = = M = = = m = m ? ? ? ? ? POST-DEVELOPMENT WATERSHED MAP STORMWATER MANAGEMENT CALCULATIONS Belaate Commercial Center Development, Charlotte, North Carolina = = = m = = = = m = m = = = m m m m m WET POND CALCULATIONS 1 1 1 1 1 1 STORMWATER MANAGEMENT CALCULATIONS ' Belgate Commercial Center Development, Charlotte, North Carolina PP-Z" Kimley-Horn and Associates, Inc. WET DETENTION BASIN I Project Information Project Name: Belgate Commercial Center KHA Project #: 018253029 Designed by: BRR Date: 11/11/2008 Revised by: BRR Date: 12/4/2008 Revised by: Date: Site Information Sub Area Location: Drainage Area 1 Drainage Area (DA) = 13.4 Acres Impervious Area (IA) = 12.1 Acres Percent Impervious (1) = 90.0 % Required Surface Area Permanent Pool Depth: 4.5 ft SA/DA = 3.8 (90% TSS Removal via Pond) Min Req'd Surface Area = 22181 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 +.009 (1) = 0.86 in/in Storage Volume Required = 41832 cf (above Permanent Pool) Elevations Area (s.f.) Bank Elevation = 729.00 ft Top of Pond Elevation = 729.00 ft Temporary Pool Elevation = 724.60 ft Permanent Pool Elevation = 723.00 ft Shelf Beginning Elevation = 723.50 ft Forebay Weir = 724.00 ft Shelf Ending Elevation = 722.50 ft Bottom Elevation = 714.00 ft Wet Basin Areas[Volumes Area @ Top of Temporary Pool = 29355 sf Area @ Top of Permanent Pool = 23520 sf Volume of Temporary Storage = 42300 cf Side Slopes of Pond = 3 : 1 Side Slopes of Shelf = 1 0 : 1 Side Slopes of Pond (below shelf) = 3 : 1 Is Permanent Pool Surface Area Sufficient (yes/n o)? Volume of Storage Provided 42300 cf Total Volume Sufficient (yes/no)? Yes Orifice Size = 3.50 inches 29,355 23,520 (Elevation = 724.60) (Elevation = 723.00) ( 23520 > 22181 ) sf WET DETENTION BASINI Project Information Project Name: Belgate Commercial Center KHA Project #: 018253029 Designed by: BRR Date: _ Revised by: BRR Date: _ Revised by: Date: Site Information Sub Area Location: Drainage Area 1 Drainage Area (DA) = 13.4 Acres Impervious Area (IA) = 12.0 Acres Percent Impervious (1) = 90.0 % (Drainage Area) Orifice Sizing Q2 Days = 0.2448 cfs Qs Days = 0.0979 cfs Orifice Size = 3.50 in Q orfce = 0.224 cfs Drawdown Time = 2.2 days (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) less than 5 days (yes/no) ? yes greater than 2 days (yes/no) ? yes Orifice Equation: Q=cA9d(2gh) Q2 < Q < Q5 c = 0.6 A9= Area of Pipe = n/4D2 g = gravity = 32.2 ft/s2 h = orifice head = 1 /3 (TPE-PPE-1 /2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter 11/11/2008 12/4/2008 pP-Kimley-Horn S I , and Associates, Inc. ' WET DETENTION BASIN a Project Information ' Project Name: Belgate Commercial Center KHA Project #: 018253029 Designed by: BRR Date: 11/11/2008 ' Revised by: BRR Date: 12/8/2008 Revised by: Date: ' Site Information Sub Area Location: Drainage Area 2 Drainage Area (DA) = 4.3 Acres Impervious Area (IA) = 3.4 Acres ' Percent Impervious (1) = 79.4 % Required Surface Area Permanent Pool Depth: 3 ft ' SA/DA = 4.5 (90% TSS Removal via Pond) Min Req'd Surface Area = 8488 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 +. 009 (1) = 0.77 in/in Storage Volume Required = 12024 cf (above Permanent Pool) ' Elevations Area (s.f.) Bank Elevation = 730.00 ft Top of Pond Elevation = 730.00 ft ' Temporary Pool Elevation = 726.30 ft 12,394 Permanent Pool Elevation = 725.00 ft 8,933 Shelf Beginning Elevation = 725.50 ft Forebay Weir = 725.00 ft ' Shelf Ending Elevation = 724.50 ft Bottom Elevation = 717.00 ft ' Wet Basin Areas/Volumes Area @ Top of Temporary Pool = 12394 sf (Elevation = 726.30 ) Area @ Top of Permanent Pool = 8933 sf (Elevation = 725.00 ) ' Volume of Temporary Storage = 13863 cf Side Slopes of Pond = 3 :1 ' Side Slopes of Shelf = 1 0 :1 Side Slopes of Pond (below shelf) = 3 :1 Is Permanent Pool Surface Area Sufficient (yes/no)? Yes ( 8933 > Volume of Storage Provided 13863 cf Total Volume Sufficient (yes/no)? Yes Orifice Size = 1.90 inches 8488 ) sf 1 WET DETENTION BASIN a Project Information Project Name: Belgate Commercial Center KHA Project #: 018253029 Designed by: BRR Date: 11/11/2008 Revised by: BRR Date: 12/4/2008 Revised by: Date: Site Information Sub Area Location: Drainage Area 2 Drainage Area (DA) = 4.3 Acres Impervious Area (IA) = 3.4 Acres Percent Impervious (1) = 79.4 % (Drainage Area) Orifice Sizing Q2 Days = 0.2448 cfs (Flowrate required for a 2 day drawdown) Q5 Days = 0.0979 cfs (Flowrate required for a 5 day drawdown) Orifice Size = 1.90 in (Diameter) Q orifice = 0.060 cfs Drawdown Time = 2.7 days less than 5 days (yes/no) ? yes greater than 2 days (yes/no) ? yes Orifice Equation: Q=CA02gh) Q2 < Q < Q5 c = 0.6 N= Area of Pipe = 7z/4D2 g = gravity = 32.2 ft/s2 h = orifice head = 1/3 (TPE-PPE-1/2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter PP-M" KimleyHorn and Associates, Inc. WET DETENTION BASIN 3 Project Information Project Name: Belgate Commercial Center KHA Project #: 0182 53029 Designed by: BRR Date: 11/11/2008 Revised by: BRR Date: 12/4/2008 Revised by: Date: Site Information Sub Area Location: Drainage Area 3 Drainage Area (DA) = 12.9 Acres Impervious Area (IA) = 10.6 Acres Percent Impervious (1) = 82.5 % Required Surface Area Permanent Pool Depth: 3 ft SA/DA = 3.43 (90% TSS Removal via Pond) Min Req'd Surface Area = 19244 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 +.009 (1) = 0.79 in/in Storage Volume Required = 37033 cf (above Permanent Pool) Elevations Area (s.f.) Bank Elevation = 688.00 ft Top of Pond Elevation = 688.00 ft Temporary Pool Elevation = 683.70 ft 25,468 Permanent Pool Elevation = 682.00 ft 19,662 Shelf Beginning Elevation = 682.50 ft Forebay Weir = 682.00 ft Shelf Ending Elevation = 681.50 ft Bottom Elevation = 677.00 ft Wet Basin Areas/Volumes Area @ Top of Temporary Pool = 25468 sf (Elevation = 683.70) Area @ Top of Permanent Pool = 19662 sf (Elevation = 682.00) Volume of Temporary Storage = 38361 cf Side Slopes of Pond = 3 :1 Side Slopes of Shelf = 1 0 :1 Side Slopes of Pond (below shelf) = 3 :1 Is Permanent Pool Surface Area Sufficient (yes/n o)? Yes ( 19662 > 19244) sf Volume of Storage Provided 38361 cf Total Volume Sufficient (yes/no)? Yes Orifice Size = 2.50 inches WET DETENTION BASIN Z5 Project Information Project Name: Belgate Commercial Center KHA Project #: 018253029 Designed by: BRR Date: _ Revised by: BRR Date: _ Revised by: Date: Site Information Sub Area Location: Drainage Area 3 Drainage Area (DA) = 12.9 Acres Impervious Area (IA) = 10.6 Acres Percent Impervious (1) = 82.5 % (Drainage Area) Orifice Sizing Qz Days = 0.2220 cfs Q5 Days = 0.0888 cfs Orifice Size = 2.50 in Q orfce = 0.120 cfs Drawdown Time = 3.7 days (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) less than 5 days (yes/no) ? yes greater than 2 days (yes/no) ? yes Orifice Equation: Q=CA02gh) Q2 < Q < Q5 c = 0.6 A9= Area of Pipe = rc/4D2 g = gravity = 32.2 ft/s2 h = orifice head = 1/3 (TPE-PPE-1/2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter 11/11/2008 12/4/2008 PP?ZFJ IGmley-Horn I? ®/ and Associates, Inc. WET DETENTION BASIN L{ Project Information Project Name: Belgate Commercial Center KHA Project #: 018253029 Designed by: BRR Date: 11/11/2008 Revised by: BRR Date: 12/4/2008 Revised by: BRR Date: 12/11/2008 Site Information Sub Area Location: Drainage Area 4 Drainage Area (DA) = 29.0 Acres Impervious Area (IA) = 22.1 Acres Percent Impervious (1) = 76.1 % Required Surface Area Permanent Pool Depth: 4.85 ft SA/DA = 3.125 (90% TSS Removal via Pond) Min Req'd Surface Area = 39531 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 + . 009 (1) = 0.73 in/in Storage Volume Required = 77439 cf (above Permanent Pool) Elevations Area (s.f.) Bank Elevation = 673.00 ft Top of Pond Elevation = 673.00 ft Temporary Pool Elevation = 669.00 ft 51,562 Permanent Pool Elevation = 667.00 ft 40,926 Shelf Beginning Elevation = 667.50 ft Forebay Weir = 667.00 ft Shelf Ending Elevation = 666.50 ft Bottom Elevation = 657.00 ft Wet Basin Areas/Volumes Area @ Top of Temporary Pool = 51562 sf (Elevation = 669.00) Area @ Top of Permanent Pool = 40926 sf (Elevation = 667.00) Volume of Temporary Storage = 92488 cf Side Slopes of Pond = 3 : 1 Side Slopes of Shelf = 1 0 : 1 Side Slopes of Pond (below shelf) = 3 : 1 Is Permanent Pool Surface Area Sufficient (yes/n o)? Yes ( 40926 > 39531 ) sf Volume of Storage Provided 92488 cf Total Volume Sufficient (yes/no)? Yes Orifice Size = 4.00 inches WET DETENTION BASIN y Project Information Project Name: Belgate Commercial Center KHA Project #: 018253029 Designed by: BRR Date: _ Revised by: BRR Date: _ Revised by: Date: Site Information Sub Area Location: Drainage Area 4 Drainage Area (DA) = 29.0 Acres Impervious Area (IA) = 22.1 Acres Percent Impervious (1) = 76.1 % (Drainage Area) Orifice Sizing Q2 Days = 0.5352 cfs Q5 Days = 0.2141 cfs Orifice Size = 4.00 in Q orifice = 0.328 cfs Drawdown Time = 3.3 days (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) less than 5 days (yes/no) ? yes greater than 2 days (yes/no) ? yes Orifice Equation: Q=cAgV(2gh) Q2 < Q < Q5 c = 0.6 A9= Area of Pipe = n/4D2 g = gravity = 32.2 ft/s2 h = orifice head = 1/3 (TPE-PPE-1/2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter 11/11/2008 12/4/2008 BIORETENTION POND CALCULATIONS STORMWATER MANAGEMENT CALCULATIONS Belgate Commercial Center Development, Charlotte, North Carolina 0 m m a ao w °°o N N r N m ui ui m m m N C C> J N ? O m m °o m` ?- Z o m m ID a.N > CD CD CD d Y 0 K ? Q z O f- z w W w _O to =°m rQ c E9 O xm E a u a `m d U m 3 ? E ` o a7 ? U N N U L N T O 0 0 N mf °f O n O n m a T ? v v ?n ?m Q Q o ° U ? ` II ¢ W c. V' m 2 O II 3 O' W N m a `o ¢ u m E z c m c o c m m Q -° > ° 6 m d c ? a rn 'n <° cn ? N u) = m `p c m m N p N 11 m m m - v m ° m m > m L p y ¢ o ° a o E o E m o c 2 w` 5 E C m O m O > ¢ m 7 m 6 > 3 O E m " m ? o m m m N m C t 3 3 m O > m L. G C.' co < < ° II II I II II ` ¢ Q ^ ?.. > fl? Z Q '.C-.. U m o U a m m . z m E m Q ¢ a`) N ° o Q m a E E > rn o m D ) c 2 E _ m N c ° E o m a a D m co o -o n - m E ° o m o o m ? c ? d m m E 0 N m O) m a 0 0 N N IA T ? N m m m m N 6 coo m N J N 00 Y O m m O m m # T E a r z m m m m d N > > CD W X a Y 0 X Q Z O F Z w w w _O m 00 Im iQ C Ea O Ym m E ? e m ?f O u a` m . W z m N c O U T j Z N 2 v c0 w F U _ N J U a N w O U ? m c _ O m O m y UJ m 0 m T C j N L N 0 3 V l6 ? m m O m N O C v an Q d Q m O > U c m m m n c 3t N V U ? Q y 3 O d w . o c m O c Q m 7 O = V L m w E CL (D x N - 3 Q Z j d O U) p O U L Y T m c Q I v c It°] CfO] ?O O m C cD J 0 N O - m ' N N O ? r - m > C to (A E'o J ._ O _ O m J U) °VO Y cc E ° 0 O LL U 2 O N m n ? ? O E ? C - C O II II II ? II > 0 Q Q 0 0 7- 0 J m m d 0 m co m 2! Q a . N i m 0 N oo CL E H c O rn c .Z to I ? m m o E ? c a O m Q E c o O ` C c m d m O in m O N a m a m O C O m > r N ° 0 N L m > m O ? m C co 1 "'Q m > E m ° CO ON' m m ° p ? `OI N O_ O v N U m N - _ 6 C ° o m Cl) a O m m w Y N 0 Q 3 m uJ ? O U O C w C) t U N mLL 2 U)2F II L 11 II II 11 II Q ?CJYQ SJ 0 7 1 i i n a 0 m m a co m O O N N ? rn ? N m m m m 6 16 N C m t0 LO J co Y O in co 8 00 E ? ? a a r Z O C m m m N Q m a w m m W o = co, Q' a Y a Z Z W W w _O IM I? m'a C E? O Y m ?0 E O C y u a H V U N n to 'n m N m r ci Z O r-j II 0 o M 7 0 w J ? m II 11 c O O 10 I^ II L Q S J 11 C7 3 N _ w v Y fq d M c -O N 5 c m 3 O o m m w m m 3 m m 3 N J ? C O p y ? c 3 m > m c 3 'o ? 0 o v o E 0 J E II If I C C E 2 u. LL > F F H V C y O ? m O fq L N Nf N 'i II II v 0 n m m N m C II y X LO m m m U 'n F m E 3 a m 0 r N O O m E O V C N O ? m V N L N p V y N O 0 ^i aa0 N O N N r P m X 0 - 0 n n u U N O ? F F t0 ? m w `6 m 3 3 ? m 3 m : 0 N L ? O > rn O a? E o 3 `o c ? 3 3 Q -OO II ?t n > a + m c ° o E a + ° .- o? m? m " m F o.? mx o > E u ID 0 O U II U m II m O F F O . > i= F- F - Yl O L N w If E h 1 1 1 1 Cm rQ Ea Ym PF Y Q W Q z O F z w W m O co O O N N rn ? N m ci ui 76 m m coo N c cc J ? a> ° lZ' IY m mm 0 0 m mU .n.0 .0 Z ° ac, cN N o a` y > M (D a` = p Y O .?C C C V a7 IL ca IY 0 3 m N ? U V 0 to m ? c d m ? o M 3 Q 3 n m ? -`0 N X 0 m U O al cc m m m d L 0 c a m _N N C m 0 U N m C 0 m c c m U In O C 47 d O_ m L O) 0 C N 0 0 c o y U C O_ y v d y N O. C L _d o O `m c In o. m c N m m m o c m ma ?zoLL ?a L II II II II II z p Q c n C N G w 0 0 ? < M c 0 7 1-1 n n n cm ooz z LL3 t^9 0 C Q tl Z 0 a ANTI-FLOTATION DEVICE CALCULATIONS STORMWATER MANAGEMENT CALCULATIONS Belgate Commercial Center Development, Charlotte, North Carolina CCI? ? a.„? NCDENR ANTIFLOATATION DEVICE DESIGN CALCULATIONS (per NCDENR Manual) Project Information Project Name: Belgate Commercial Center KHA Project #: 018253029 Designed by BRR Date: 12/1012008 Reused by. Date: Revised by. Date: Revised by Date: Pend 1 Drainage Area Information: Drainage Area (ac) = 13.56 Flow (025) (cis) = 15.5 Storage Dimensions: Basin Side Slopes (X: 1 ) = 3.0 (3:1 max side slopes) Storage Depth 'R' (ft) = 9.00 Elev (fl) Area (SF) Cumulative Volume (CF) Top of Basin Elevation 729.00 40,096 727.00 35,077 212,720 Temporary Pool Elevation 724060 29,355 135,402 Permanent Pool Elevation 723.00 19,445 96,362 720100 12,368 48,642 717.00 7,954 18,159 Bottom of Basin Elevation 714.00 4,152 0 Sizing of Antiflotation Block: Control Structure Length (n) = 48 Control Structure Width (n) = 36 Riser Area (sf) = 12.00 (Check riser geometry vs. area equation) Volume of Water Displaced (cf) = 108.0 Weight of Water Displaced (lb) = 6.739 Min. Required Weight of Anchor Block (lb) = 7,413 (1.1 factor of safety) Anchor Size: Width (If) = 5-0 Length (If) = 5.0 Height (it) = 3.50 Weight of Anchor (lb) = 7,665 O.K. > Minimum Required Weight Sizing of Emergency Spillway: Q. (cfs) = 15.5 Q.,_ lcfs) = 15.5 Water Depot Over Spillway (ft) = 0.5 Spillway Length (ft) = 20.0 (10 ft minimum spillway length, Cw 2.7) Spillway Crest Elevation (ft) = 727.50 (1 it min. above sediment storage depth) Freeboard (fl) = 1.06 (1 ft minimum) Prnd 2 Drainage Area Information: Drainage Area (ac) = 4.33 Flow (021) (cfs) = 42 Storage Dimensions: Basin Side Slopes (,K : 1 ) = 3.0 (3:1 max side slopes) Storage Depth 'R" (ft) = 8.00 Ekv (ft) Area (SF) Cumulative Vokane (CF) Top of Basin Elevation 730.00 18,429 728.00 15,069 71,832 Temporary Pool Elevation 72630 12,394 48,488 Permanent Pool Elevation 725.00 8.933 34,626 722.00 5,394 13,135 719.00 1,882 2,221 Bottom of Basin Elevation 717.00 339 0 Sizing of Antiflotation Block: Control Stmcture Length (m) = 48 Control Structure Width (n) = 36 Riser Area (sf) = 12.00 (Check riser geometry vs. area equation) Volume of Water Displaced (cf) = 96.0 Weight of Water Displaced (lb) = 5,990 Min. Required W eight of Anchor Block Qb) = 6,589 (1.1 factor of safety) Anchor Size: Width (g) = 5.0 Length (tF) = 5.0 Height (it) = 3.50 Weight of Anchor (lb) = 7,665 O.K. > Minimum Required Weight Sizing of Emergency Spillway: 0. (cts) = 42 Q,pw„,,.(cfs)= 42 Water Depth Over Spillway (ft) = 0.5 Spillway Length (ft) = 10.0 (10 ft minimun spillway length, C-2.7) Spillway Crest Elevation (ft) = 728.50 (1 ft min. above sediment storage depth) Freeboard (ft) = 121 (1 it minimum) Page 1 of 3 P-=n NCDENR ANTIFLOATATION DEVICE DESIGN CALCULATIONS (per NCDENR Manual) Project Information Project Name: Belgate Commercial Center KHA Pmject M, 018253029 Designed by BRR Date: 12/1012008 Revised by Date: Revised by Date: Revised by: Date: Pond 3 Drainage Area Information: Drainage Area (ac) = 12.88 Flow (Qis) (c1s) = 8.8 Storage Dimensions: Basin Side Slopes LX : 1 ) = 3.0 (3:1 max side slopes) Storage Depth "R" (ft) = 5.00 ev (it) ea (SF) um atrve Volume (CF) Top of Basin Elevation 688.00 35,106 687.00 32,768 206,917 Temporary Pool Elevation 683.70 25,468 110,826 Permanent Pool Elevation 682.00 19,392 72,697 681.00 15,973 55,014 680.00 14,813 39,621 Bottom of Basin Elevation 677.00 11,601 0 Sizing of Antiftotation Block: Control Structure Length (n) = 48 Control Structure Width (in) = 48 Riser Area (sf) = 16.00 (Check riser geometry vs. area equation) Vol_. of Water Displaced (cf) = 80.0 Weigh of Water Displaced (lb) = 4,992 Min. Required Weight of Anchor Block (Ib) = 5.491 (1.1 factor of safety) Ahx hor Size: Width (If) = 6.0 Length (If) = 6.0 Height (It) = 2.00 Weight of Ancor(lb)= 6,307 O.K.> Minimum Required Weight Sizing of Emergency Spillway: On (cfs) = 8.8 O,pr„r (cfs) = 8.8 Water Depth Over Spillway (ft) = 0.5 Spillway Length (ft) = 10.0 (10 It minimum spillway length, Cw=2.7) Spillway Crest Elevation (ft) = 686.46 (1 it men. above sediment storage depth) Freeboard (ft) = 1.07 (1 It minimum) Pond 4 Drainage Area Information: Drainage Area (ac) = 30.04 Flow (O,s) (cfs) = 62.0 Storage Dimensions: Basin Side Slopes (X: 1 ) = 3.0 (3:1 max side slopes) Storage Depth "R' (ft) = 12.00 Elav (ft) Area (SF) Cumulative Volume (CF) Top of Basin Elevation 673.00 66,412 671.00 58,751 441,113 Temporary Pool Elevation 669400 51,561 330,801 Permanent Pool Elevation 667.00 40,926 238,314 663.DD 24,317 107,828 659.00 12.767 33,660 Bottom of Basin Elevation 655.00 4,063 0 Sizing of Antiflotation Block: Control Seuclure Length (in) = 48 Control Structure Width (n) = 36 Riser Area (sf) = 12.00 (Check riser geometry vs. area equation) Volume of Water Displaced (cf) = 144.0 Weight of Water Displaced (Ib) = 8,986 Min. Required Weight of Anchor Block (Ib) = 9,684 (1.1 factor of safety) Anchor Size: Width (If) = 5.5 Length (it) = 5.5 Heigh (It) = 4.00 Weight of Anchor (lb) = 10,600 O.K. > Minimum Required Weight Sizing of Emergency Spillway: Q. (cfs) = 62.0 O.._ (cfs) = 62.0 Water Depth Over Spillway (ft) = 0.5 Spillway Length (ft) = 65.0 (10 If minimum spillway length, Cw=2.7) Spioway Crest Elevation (ft) = 671.50 (1 It min. above sediment storage depth) Freeboard (ft) = 1.00 (1 It minimum) Page 2 of 3 A NCDENR ANTIFLOATATION DEVICE DESIGN CALCULATIONS (per NCDENR Manual) Project Information Project Name: Belgate Commercial Center KHA Project #: 018253029 Designed by BRR Date: 12/1012008 Revised by Date: Revised by: Dale: Revised by. Date: Bioretention Pond 1 Drainage Area Information: Drainage Area (ac) = 2.59 Flow (Ozs) (cfs) = 1.1 Storage Dimensions: Basin Side Slopes LX_: 1 ) = 3.0 (3:1 max side slopes) Storage Depth "R* (ft) = 1.00 Elev (11) Area (SF) Cumulative Volume (CF) Top of Bioretention Pond Elevation 614.00 7,665 13,346 Temporary Pool Elevation 613.00 6,659 6,164 Bottom of Bioretention Pond Elevation 612.00 5,709 0 Control Structure Length (m) = 48 Control Stnclure Width (in) = 36 Riser Area (sf) = 12.00 (Check riser geometry vs. area equation) Volume of Water Displaced (cf) = 12.0 Weight of Water Displaced (Ib) = 749 Min. Required Weight of Anchor Block (Ib) = 824 (1.1 factor of safety) Anchor Size: Width (m = 3.0 Length (If) = 3.0 Height (If) = 1.50 Weight of Anchor (lb) = 1,183 O.K. > Minimum Required Weight Page 3 of 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 VOLUME AND SURFACE AREA TABLES STORMWATER MANAGEMENT CALCULATIONS Belgate Commercial Center Development, Charlotte, North Carolina m m¢ Y d pp- bh? u N C a) 0 M .cu U N R L ? O Q E N O O O m U C) CD 3 co Ln m a ? m co m a) E 2 O co 0 0 N N O O O co m cc 0 0 0 Of m I ( c O N + a T A " to va-0 -0 O Z v a a C i+ c a) a) U 00 of LA Q 'w > > d Y p w C.C O M ri c .N ra m c O C v v v 3 a) N O N f\ N Ln 1.0 ri M ri U E tD M N lD a) M M u o 0 00 O m m o m Ql N i N - I a w -4 m n n r N l0 O N O r L c N N N a1 t\ tD Ol 't N M f\ m M U o O 00 ri v r" ri Ln m m 00 1-4 o 00 ri ri ri N N N M r r O ] 00 r-I r" N M O C Ln N to Ln N O r M O r, Ln M N N N M N `J O ri N m m V Ln w r, w a) O Q 0 0 0 0 0 0 0 0 0 0 O ri O O O O O O O O O O O o ? w ' ? N ? m w N l11 lD lf'1 M Q) U L M r-4 N l0 N N N ? Ql n Lr) ?' Q v M ^ O 1-4 .M7 - N N M m V V Q m L11 p m V m O n W O1 O r-I N M Ln O p LO r-1 ri r-I ri 1-4 ri r-I N N N N m N t\ n f\ t\ n n f\ n t\ N n O c O O a n a) c m a L d a 0 Ln Ln w ri .i N ri O 00 N O ri Q) E n. Q) 3 0 E o '(7i _> > v O Y a > c N T c T La a) E a) L O a) O LL a LL r, M Ln ri m ri m ri o co r, n a o u cx m m m 'o M0 Ln cn oa r'') u 7 O O m N Dl O tD n Ln O L n O r, 0) ' 00 m r-( Ln m ri Q O rl .--I 0 r -, 0 N d ? N r, < o N -4 r-I co ? N > 1-4 N m ? Ln rl 00 m , I ri ri ri N N N a) E Ln N 00 co LT ri O t\ tD t\ m ^ N o0 O O 0 Q1 01 00 N O 0 Lf1 lD W i t\ 7 v O O ^ Ql 00 N Ul) l0 O LO ri t\ N O 00 M to lD e-1 m cl' 00 r m N w .... Ll r\ 00 O ?4 m W 00 N ^ r m m m m +C > -I .- I -I a i • -7 . -I O f- m tD r, tD 01 n 0) tD rl V a Lr) N M M tO M N LO m Lr) N r-1 N ct 00 m O 00 00 - 00 N M LO 0) Lr) N O W U a) N Ln 00 ri Ct 00 N Lr) r\ [t ri V r\ D1 V o l0 N Q O O ri ri ri N O N O N O m m M ,: Ln tO lD tO r\ 00 00 Q1 O O O O O O O O O o O O O O O J m (N m m w n N In Ln w Ln m m n m m N v= Lr) ? ° N t D D m lD tD N 00 a 00 rl Ln co Lr) n Ln am 2 L Ln . . M tD (n m 00 M Q1 w cT V In 01 M N lO O Lr) O .. Q Lr) lD ^ Q1 O ri N ri M ri U) N lD N 0) .--I N N n N a) N C) M N M Ln M r? m O d• a 2 o01n a Lr) m r" 00 rn o ri N `r) N m Lr) m ? m V Ln tD n m rn LO ri n ri ri r` ri ri n ri r, N r. N N N \ r,4 N N N N N N 1r, r ^ r n ^ ^ r\ r` r\ n r\ c L O '= O ?c O a a) a c N i Q 0 O c a) w co m u E c O O O Y O E o Q O m a H N O V ri r\ o m ri N rl Ln 00 M O N ri a) E II ai o n > Lan O Y Y Ln c c aJ al al a N ra (Ca E E - `O Cl- m 1 1 C w ° _o = N d Q E? Y ? .Ad 1 u L m C m U m ? U d a) v O U N O CY) m C0 N a) O E O 3 00 co 0 0 0 0 N N N :. ? N 76 76 1? 0 0 0 mlm 0 c 0 E u ++ T o Z o a) a o i., L a) u a tw T '^ 0 - 2 = = p CL N E co c O C a) a) 0 a a) ? 0 ? O O U E Lr) 0 rf) p 0 -1 zr --I u o o r- LD oo m m m Q rV v Lo n LD > v E v) -1 N Ln N C4 N m = u o o r m N Ln rn ,.-4 o rn ri ri ri ci > 0 r14 U) ^ r- r- r? f6 -. 00 N 0 0 -?t -I r m co Ln a) C14 a v 0 0 0 0 0 0 O O 0 0 0 0 0 0 O O J _ Ln t.0 ?t 00 O O O LD a) Q Ln M Ln Ln am 0 000 rn r4 r4 c-1 e--I e-I N N m W LL b LL cn O r-I N M I Ln m r-I N N N N N N N N r` r` n r\ r` n 0 C o o a a cu ' L ar L Q) a ° o Ln N O e-1 N r-I N O i1 ?--1 r-I M 0 ? o m u a) E n. (D o E o N > v > N cu E a L L L L° a L° a) O O M M O) Ln n r-I ei r4 N LD oo M 00 00 U E Ol pp O N V) l0 O N N t\ N 01 01 W V 7 Ql 00 14 'T n r\ W 00 V Ln r\ LD N N Q -4 M Lri C ? W O > r-i r14 N N M M lzl' Ln n Q) Ql E O O O LD I'D N d O r I O CY N Ln Ln C U O O M rl Ln Ol [t 00 N 00 N M N M 1-1 M M 0) N Ql O N Ln lD Ln O N 000 LO v -4 r-I N M Ct r, r, rr Ln M m Y j c-I O H ao WD ri Ln c-I m m m o 4- Ln -i Lr) m m D, i U t\ O Ol Ml N l0 Ol Ol CT Ql M M l LD M CT [t C) Ln M M J a 0 ? 0 M 0 Ln 0 n 0 Q1 0 0 Ol 0 r -I LO .-+ O N N N 00 N O m M 00 rn N ? 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 Q rv M N n M d' lD LD LD M M Ln M 0) :1, Q1 Ln r, m N N a v m Ln r'4 t` .-i N N N N .--I LD Ql M ct O r- It Q M 00 ? N M ? ? ? w 1 r i M ? -.0 z 00 r-I c -I e -r . -I r-I Z to t, oo m o A N rn v In Ln Ln w M r, oo rn o r-1 .-f ei r-4 N rV N N Rl N Ln N W N N N M W r\ r` r\ 4 V) r, w O O C O O o rl v rZ 0 C V) L CU w Y V E C o O C v O O_ !z ca m 0 0 E E co d Q. 0 LD M m -1 m ci M O a, .? 00 a) E _:3 O C a) c m E L a) D_ Q to C a) C m E L a) 0_ 1 1 1 1 1 1 1 1 1 1 1 U C N C (p ? O 2 H aTi Q Ea Y CN pp- kh- u Lm a? U 7 m v v (3) E Q E v 0 M a) rn N C 0) cl) LO _ N m 00 N w CO E C 0 co 00 co O N N N N ? r r N r r 0 o 0 co co co r- 0 E v 0 z CU v .r '0 Q a v W •o a Y a` m c co c O C v N a E N 00 ri r- r?.o-I r?-I U O O r, N (71 0?0 O O Q 0 N W Ol r? E N 1.0 m LO M 7 U O o r- CV a) Lo r-i r- n ri - v N N m e-4 N O H o o M co r- LD Lo r- Ln rn v m Ln LD n 00 0 a v 0 0 0 0 0 0 0 0 0 0 0 O cv w m 00 r- (.0 1 o Lr) -i o ` ?•' v °D -i 0 O ? N M - M m r r- o r, Q N M -:T m W w r? 00 Ql O N -I N m r, r, r- . . r L L 0 (.D D S L D L D 0 O O o D. ? a) U L ar L w o_ 0 n o6 ri ri N Lo 00 ri LO O O -4 t.0 a) E O 11 aj Q) E O- O O N > (U O N v T c ? ro E cu L L Q) O a U- a) 4) r-I N O M N Ln r, T-A N N O M LD I-R 2 ^ ^ U 7 O O ^ M o0 N M O ` -i . O Lr) t0 'D' n c-I N Q 00 co n r" Ln 00 N ? i 4 zi- Ln LD 00 61 N v C q 0"o 00 ( 0 0 n r 00 00 N 1.0 7 U 0 0 ^ ? t m . O N 0 m i o c v - m L D " p -- 00 Ol o ri & & 6 c-1 Ln r, m -i m m - > ri ri -1 N N m m F 00 m w m O r, r" m O n m Ol m N Ol m m r` ri rn O i O O Lr N r- d oo -;t r? N r-1 L ct 00 m 00 m 0 N m J Q v ri ri r N m N ) N N N m M Ln n Ln Ln rn Ln lD , LO Ln n o 00 O O O o o O O O 0 0 0 0 0 0 0 0 0 Z m 1-1 a r4 n LD O O Gl O O 00 -zr t\ 00 t` Ln CL a) ^ LDD 00 m r4 Ln O U) r, a tD O to 00 lD O L in Lr) M r-I O O1 00 -zt Lff C) O V r-I N V n r-I ~ Q v ^ 00 a) 0 ? N r N N O W ri e -I r -I N N N m m m 2 Q 0 LD n 00 0) O -I Ln N Ln m Ln lD r- 00 0 0 [6 N r- r, r- oo r oo -1 oo N oo m 00 o0 00 00 00 W N Lo lD LD LO LD LD m LD m l0 m LD LD LD LD LD a O O a) t O +- O Y 0 N D_ d D c CL o c Ln L [D Q] LF ? ?- U E O O LO O O E o O r- o in cu r, m m LD ri O m ao C', Ln a, r-I a) E 0 > c v E L a) a Q c a) C cu E L a, CL ti c c m o x -a E? Y m pp, lb- 11 LA 00 O C) C) NO O N N z N N N N N L6 L0 O 0 0 C N U <6 N E E O U rrn (D N i? C) C? w w in N co m m Lb O V Ln Lo d Q d 3 H C Id 01 E O c G E > > .n .n c o Z v a a Y Y G Ol 01 G Q 2 O 41 CC Lz G. Y y? Q) a 3 a) -4 r? rn m Lo r, o r, J ? m N n n o o m 4 Lr I ' Q r) 00 m 14 N r.4 a) v j -r m m m a) E o n N a a m 3 u O O 00 D) O Ln v O N lD N N Ln cl .-I Ln Ln O F- r\ LD N c1 m 00 O r l .-i .•-I m V Ln n O) N U) O -It O N N U r\ 00 m O N m Ln w 00 m W Q 0 0 0 0 0 0 0 0 0 0 O La Ln m iD N Ln LO N N N w N rn Lrr) ? 00 m Q m m v v Ln Lr) Lo r? r? 00 W a) Ln 0 m of m a Ln LO n N Lo tD LO LD Lo LD w LO w ID w LO W LO LO Lo LO O G O O ? fl . N C H N O_ o\° Ln Ln V 00 w i L1 O v in N 7! N - r? ^ L6N M N t` Lr Y m r-4 N ? O 3 rr C E O. O Y Ol 3 _O U E O 01 3 N ° Y :D L0 n E T G T Ln f6 ? L6 iF N E N O (v O , a LL O1 Ln m 'i N 0 lD O tD OO ?--I L!1 V N .--1 Q E e-i oo m m o w N o LT r\ 00 m r, Ln m m r\ d' o 3 O O v lD LD M 00 00 O 00 ID a) r, m rH Ln m LO LT LT Ln O C Q ° N r-i o LD o Lr y v v l) o Ln Ln -+ N m a m n m N N v 4 LO -I r- 4 Ol 4 -I Lo N .1 m r" m m V o n - e - - L cu 1-4 Ln N m N t\ M 00 N 7 00 !? O m LD n Ln e-i 11 Ln m 00 w N n O Q V LT m 00 m - LD w 3 V O O ZT LD Ln O LD a ^ N n N 00 Ln oo m n Ln 00 M O) to v Lr? r,? 16 -1 O N V) M ^ O r-i r-I -4 N N N -I a--I . -I N V Ln Ln LO LD O F C m Ln Lr) O C m o LD o .1 LT v N V Lr) r-I r\ Ln r, C - LD m u m 0) It -q m rl- oo .--i m LO m N 00 r\ LD M m M Ln Ln 00 -i O Ln a) m m r m O m 00 Ln LD oo V U ) M v N O v 0 0 0 0 N 0 N 0 m 0 m 0 c1 0 7 0 m 0 LD 0 - 0 . 0 CO 0 i N m 1 4 V Ln , .- r-i 14 - 4 -1 O Z N .-? N M O Ln Ln I- O C) M -I f\ -1 Lr) N 4 2 ,F W W M M e -I r\ r r, Q) Q) l0 .-i M N 00 Ln Ln LD N Ln N .-I ~ Q v O LT a N r\ ^ Lr) C, 01 -1 ' It LO 00 `l -q LO co O 00 00 Ti Ln 00 N LO Z '-1 1-1 cq 11 N N N N m M d' Lr) Ln Ln LD LD Z Q 000 Ln LD r, 00 LT O .-i N m a Ln Lo n 00 0) O ri N M f0 Lr) Ln Ln Lr) Lr) LD lO LD LO lD lD W 0 ^ Lo LD P, r-, n r W N l0 l0 1.0 lD lO w w w l0 w w w LD LD <D lD LD l0 lD a C w O o O !- O O Y 0 r Ln d N a G Y d - O Y C d L to w 2!' 10 co V E c O LO O OJ O E D- CL 0 0 O F E O co a O N LO In LD N Ln N LO r\ N N O lf1 0 N v E 3 > N C C 0J v G G EE cu (U D_ D. WET DETENTION POND SUPPLEMENT FORMS STORMWATER MANAGEMENT CALCULATIONS Bel.-ate Commercial Center Development, Charlotte, North Carolina 1 i NCDENR 1 1 1 1 1 1 1 1 1 1 1 1 Permit No (to be provided by DWQ) 0,F W AT f?9 O ?G v? o STORMWATER MANAGEMENT PERMIT APPLICATION FORM - 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. C PROJECT INFORMATION Project name Belgate Commercial Center Contact person Beverly Rosenbloom, El Phone number 704.319-7699 Date 12/11/2008 Drainage area number 1 L DESIGN INFORMATION Site Characteristics Drainage area 583,704.00 ffz Impervious area 527,076.00 ffz % impervious 90.30 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required Volume provided Storage Volume: SR Waters 1-yr, 24-hr runoff depth Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Basin Elevations Basin bottom elevation Sediment cleanout elevation Bottom of shelf elevation Permanent pool elevation SHWT elevation Top of shelf elevation Temporary pool elevation Forth SW401-Wet Detention Basin-Rev.4 41,832.00 ft3 42,300.00 -ft' in ft3 ft3 ft3 ft3 2.58 in 0.28 (unitless) 0.88 (unitless) 0.12 in/hr 2.48 ft3/sec 17.54 ft3/sec 15.06 ft3/sec 714.00 ft 715.00 It 722.50 ft 723.00ft 724.50 ft 22,585.00 ft 724.60 It Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) IL DESIGN INFORMATION Volume and Surface Area Calculations SA/DA ratio 3.80 (unitless) Surface area at the bottom of shelf 16,482.00 f 2 Volume at the bottom of shelf 79,604.00 ft3 Permanent pool, surface area required 22,181.00 f 2 Permanent pool, surface area provided 23,520.00 f? OK Permanent pool volume 108,717.00 ft3 Average depth for SAIDA tables 4.62 ft OK Surface area at the top of shelf 22,585.00 f 2 Volume at the top of shelf 121,356.00 ft3 Forebay volume 20,131.00 ft3 Forebay % of permanent pool volume 18.52 % OK ' Temporary pool, surface area provided 29,355.00 f? Drawdown Calculations Treatment volume drawdown time 2.20 days OK ' Treatment volume discharge rate 0.22 ft3/s Pre-development 1-yr, 24-hr discharge 2.48 ft3/s OK Post-development 1-yr, 24-hr discharge 2.12 ft3/s OK Additional Information Diameter of orifice 3.5 in Design TSS removal 90 % Basin side slopes 3.00 :1 OK ' Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 3.25 :1 OK ' Length to width ratio 2.74 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.00 ft OK Vegetated filter provided? Y (Y or N) OK ' Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK ' Drain mechanism for maintenance or emergencies 24-HOUR EMERGENCY PUMP I Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) Ill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. C-3_ 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. -C-10 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. v' C-10 3. Section view of the dry detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. C-3 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. ?f Calc Book 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. j 2 Attached 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. _ _Calc book- 7. The supporting calculations. -Attached- 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. -Attached- 9. A copy of the deed restrictions (if required). -Attached- 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. I Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 Permit (to be provided by DWQ) W AT?gO dr:" O G NC ENR ` STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Belgate Commercial Center Contact person Beverly Rosenbloom, El Phone number 704-319-7699 Date 12/11/2008 Drainage area number 2 tl. DESIGN INFORMATION " Site Characteristics Drainage area 188,614.80 ff2 Impervious area 149,846.40 fe % impervious 79.45 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required 12,024.00 ft3 Volume provided 13,863.00 -ft' Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ff3 Volume provided ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.58 in Rational C, pre-development 0.28 (unitless) Rational C, post-development 0.82 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.12 in/hr Pre-development 1-yr, 24-hr peak flow 0.61 ft3/sec Post-development 1-yr, 24-hr peak flow 5.09 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 4.48 ft3/sec Basin Elevations Basin bottom elevation 717.00 ft Sediment cleanout elevation 718.00 ft Bottom of shelf elevation 724.50 ft Permanent pool elevation 725.00 It SHWT elevation 724.50 ft Top of shelf elevation 725.50 ft Temporary pool elevation 726.30 ft Form SW401-Wet Detention Basin-Rev.4 Parts I. & Ii. Design Summary, Page 1 of 2 ' Permit No. (to be provided by DWQ) II. ;DESIGN INFORMATION Volume and Surface Area Calculations SA/DA ratio 4.50 (unitless) Surface area at the bottom of shelf 4,923.00 ff Volume at the bottom of shelf 20,767.00 ft3 Permanent pool, surface area required 8,488.00 ft2 ' Permanent pool, surface area provided 8,933.00 ff2 OK Permanent pool volume 30,011.00 ft3 Average depth for SA/DA tables 3.36 ft OK Surface area at the top of shelf 8,865.00 ff Volume at the top of shelf 35,068.00 ft3 Forebay volume 6,310.00 ft3 Forebay % of permanent pool volume 21.03 % OK ' Temporary pool, surface area provided 12,394.00 ftz Drawdown Calculations Treatment volume drawdown time Treatment volume discharge rate 2.70 0.06 days ft3/s OK Pre-development 1-yr, 24-hr discharge 0.61 ft3/s OK Post-development 1-yr, 24-hr discharge 0.21 ft3/s OK Additional Information Diameter of orifice 1.9 in Design TSS removal 90 % Basin side slopes 3.00 :1 OK ' Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 3.69 :1 OK Length to width ratio 3.56 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.00 ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies 24 HOUR EMERGENCY PUMP C I Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) Jill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan ' Initials Sheet No. W C-3 1 v 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. _C-10 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. Fl ' -C-10- 3. Section view of the dry detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. _C-3 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. Calc Book 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. ?K Attached 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the Dp entire drainage area is stabilized. h? _Calc book- 7. The supporting calculations. -Attached- 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. W -Attached- 9. A copy of the deed restrictions (if required). -Attached- 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County ' soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 A NCDENR Permit STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) W AA DIV o w4 L PROJECT INFORMATION Project name Belgate Commercial Center Contact person Beverly Rosenbloom, El Phone number 704-319-7699 Date 12/11/2008 Drainage area number 3 II. DESIGN INFORMATION Site Characteristics Drainage area 561,052.00 ff2 Impervious area 462,607.00 ff % impervious 82.45 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required 36,842.00 ft3 Volume provided 36,842.00 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.58 in Rational C, pre-development 0.28 (unitless) Rational C, post-development 0.82 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.12 in/hr Pre-development 1-yr, 24-hr peak flow 0.81 ft3/sec Post-development 1-yr, 24-hr peak flow 1.27 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 0.46 ft3/sec Basin Elevations Basin bottom elevation 677.00 ft Sediment cleanout elevation 678.00 ft Bottom of shelf elevation 681.50 ft Permanent pool elevation 682.00 ft SHWT elevation 678.50 ft Top of shelf elevation 682.50 ft Temporary pool elevation 683.60 ft Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No (to be provided by DWQ) 11. DESIGN INFORMATION Volume and Surface Area Calculations SAMA ratio 3.43 (unitless) Surface area at the bottom of shelf 16,115.00 ft2 Volume at the bottom of shelf 56,210.00 fta Permanent pool, surface area required 19,244.00 ff Permanent pool, surface area provided 19,319.00 ft' OK Permanent pool volume 65,068.00 ft3 Average depth for SA/DA tables 3.37 ft OK Surface area at the top of shelf 22,970.00 ftz Volume at the top of shelf 62,435.00 ft3 Forebay volume 12,016.00 ft3 Forebay % of permanent pool volume 18.47 % OK Temporary pool, surface area provided 25,268.00 ft2 Drawdown Calculations Treatment volume drawdown time 3.00 days OK Treatment volume discharge rate 0.28 ft3/s Pre-development 1-yr, 24-hr discharge 3.35 ft3/s OK Post-development 1-yr, 24-hr discharge 0.54 ft3/s OK Additional Information Diameter of orifice 3 in Design TSS removal 85 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 3.30 :1 OK Length to width ratio 3.30 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.05 It OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies Gravity I Form SW401-Wet Detention Basin-Rev.4 Parts I. & H. Design Summary, Page 2 of 2 ' Permit No. (to be provided by DWQ) ' III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan ' Initials Sheet No. _ C-4 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), ' Overflow device, and Boundaries of drainage easement. _C-11 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: ' Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, ' Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and tt?? -Filter strip. I?? C 11_ 3. Section view of the dry detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, ' Pretreatment and treatment areas, and Inlet and outlet structures. g?- C-4 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified ' on the plans prior to use as a wet detention basin. J Calc Book 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. Attached 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. _Calc book- 7. The supporting calculations. 13 f2 -Attached- 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 5 -Attached- 9. A copy of the deed restrictions (if required). J!?K -Attached- 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. 1 Form SW411-Wet Detention B8sin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 X04 J:aTF9o NC©ENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM ' LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIR ED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! ' if. PROJECT INFORMATION Project name Belgate Commercial Center Contact name Beverly Rosenbloom, El ' Phone number 704-319-7699 Date December 11, 2006 Drainage area number Pond 3 ' IL DESIGN INFORMATION For Level Spreaders Receiving Flow From a BMP Type of BMP Wet Detention Pond ' Drawdown flow from the BMP 2.49 cfs For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area ft Do not complete this section of the worksheet. Impervious surface area ft Do not complete this section of the worksheet. Percent impervious % Do not complete this section of the worksheet. Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 in/hr storm cfs Do not complete this section of the worksheet. Time of concentration min Rainfall intensity, 1 0-yr storm in/hr Do not complete this section of the worksheet. ' Peak flow from the 10-yr storm cfs Do not complete this section of the worksheet. Where Does the Level Spreader Discharge? To a grassed bioretention cell? (Y or N) ' To a mulched bioretention cell? (Y or N) To a wetland? (Y or N) To a filter strip or riparian buffer? Y (Y or N) Please complete filter strip characterization below. ' Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass 1 D0.00 ft ' Width of dense ground cover 0.00 ft Width of wooded vegetation 0.00 ft Total width 100.00 ft ' Elevation at downslope base of level lip 675.00 fmsl Elevation at top of bank of the receiving water 671.00 fmsl Slope (from level lip to to top of bank) 4.00 % OK Are any draws present? N (Y or N) OK Level Spreader Design Forebay surface area sq ft No forebay is needed. ' Feet of level lip needed per cfs 13 ft/cfs Answer "Y" to one of the following: Length based on the 1 in/hr storm? N (Y or N) Length based on the 10-yr storm? Y (Y or N) ' Length based on the BMP discharge rate? N (Y or N) Design flow 2.49 cfs Is a bypass device provided? N - (Y or N) A bypass device is not needed. I Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 2 ' Length of the level lip Are level spreaders in series? ' Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? ' Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material t i t i--------- M t 33.00 ft N (Y or N) #VALUE! (Y or N) Do not complete this section of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. cfs Do not complete this section of the worksheet. Do not complete this section of the worksheet. Y 1 1 B 1 t i - Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2 ' 111. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a ' requirement has not been m et, attach justification. ' Page/ Plan Initials Sheet No. C-4 1. Plans (1" 50' or larger) of the entire site showing: ' Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), ' High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. p p? C-6 2. Plan details (1" = 30' or larger) for the level spreader showing: Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and ' Design at ultimate build-out. C-6 3. Section view of the level spreader (1" = 20' or larger) showing: ' Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. ' 4. A date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. ' C-4 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. Calc Book 6. The supporting calculations. F. C- Attached 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. ' FA- Attached 8. A copy of the deed restrictions (if required). ' Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 PWA AF NCaENR F Permit No. (to be provided by DWQ) o?QF W A TE9OG h --1 STORMWATER MANAGEMENT PERMIT APPLICATION FORM o T 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Belgate Commercial Center Contact person Beverly Rosenbloom, El Phone number 704-319-7699 Date 12/11/2008 Drainage area number 4 111, DESIGN INFORMATION Site Characteristics Drainage area 1,264,982.40 ft2 Impervious area 962,240.40 fe % impervious 76.07 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required Volume provided Storage Volume: SR Waters 1-yr, 24-hr runoff depth Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Basin Elevations Basin bottom elevation Sediment cleanout elevation Bottom of shelf elevation Permanent pool elevation SHWT elevation Top of shelf elevation Temporary pool elevation Form SW401-Wet Detention Basin-Rev.4 77,439.00 ft3 92,488.00 -ft' in ft3 ..ft3 ft3 ft3 2.58 in 0.28 (unitless) 0.79 (unitless) 0.12 in/hr 4.27 ft3/sec 28.27 ft3/sec 24.00 ft3/sec 655.00 ft 656.00 ft 666.50 ft 667.00 ft ft 667.50 ft 669.00 ft Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) II: DESIGN INFORMATION Volume and Surface Area Calculations SAIDA ratio 3.13 (unitless) Surface area at the bottom of shelf 28,324.00 ftz Volume at the bottom of shelf 160,185.00 ft3 Permanent pool, surface area required 39,531.00 ftz Permanent pool, surface area provided 40,926.00 fiz OK Permanent pool volume 215,272.00 fts Average depth for SAIDA tables 5.26 ft OK Surface area at the top of shelf 46,417.00 f 2 Volume at the top of shelf 237,108.00 ft3 Forebay volume 39,737.00 ft3 Forebay % of permanent pool volume 18.46 % OK Temporary pool, surface area provided 51,561.00 -ft' Drawdown Calculations Treatment volume drawdown time 3.30 days OK Treatment volume discharge rate 0.33 ft3/s Pre-development 1-yr, 24-hr discharge 4.27 ft3/s OK Post-development 1-yr, 24-hr discharge 4.23 ft3/s OK Additional Information Diameter of orifice 4 in Design TSS removal 90 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio - 7.09 :1 OK Length to width ratio 6.18 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.05 ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies 24 HOUR EMERGENCY PUMP Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 ' Permit No. (to be provided by DWQ) ' IIL REQUIRED ITEMS CHECKLIST ' Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan ' Initials= Sheet No. C-4 1. Plans (1 " - 50' or larger) of the entire site showing: Design at ultimate build-out, ' Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, ' High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), ' Overflow device, and Boundaries of drainage easement. _C-12 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. W _C-12 3. Section view of the dry detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. 99 _C-4 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. Calc Book 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. Attached 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. _ _Calc book- 7. The supporting calculations. _RI -Attached- 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. -Attached- 9. A copy of the deed restrictions (if required). _L -Attached- 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. I Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 BIORETENTION POND ' SUPPLEMENT FORM 1 1 STORMWATER MANAGEMENT CALCULATIONS Belgate Commercial Center Development, Charlotte, North Carolina Permit Number: (to be provided by DWQ) ' W ATFR ? O G ' -? NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM ' 401 CERTIFICATION APPLICATION FORM BI ORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Belgate Commercial Center Contact name Beverly Rosenbloom Phone number 704-319-7699 Date December 11, 2008 Drainage area number IL DESIGN INFORMATION Site Characteristics Drainage area 112,820 ft2 Impervious area 59,242 ft2 Percent impervious 52.5% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? Y (Y or N) 1-yr, 24-hr runoff depth 2.58 in 1-yr, 24-hr intensity 0.12 in/hr Pre-development 1-yr, 24-hr peak flow 0.920 ft3/sec Post-development 1-yr, 24-hr peak flow 1.920 ft3/sec Pre/Post 1-yr, 24-hr peak control 1.000 ft3/sec Storage Volume: Non-SA Waters Minimum volume required 4,913.0 ft3 Volume provided 5,709.0 ft3 OK Storage Volume: SA Waters 1.5" runoff volume ft3 ' Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft3 ' Volume provided ft3 Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bioretention cell 6,659.0 ft' OK Length: 120 ft OK Width: 58 ft OK -or- Radius ft Media and Soils Summary Drawdown time, ponded volume 4.31 hr OK Drawdown time, to 24 inches below surface 3.88 hr OK Drawdown time, total: 8.19 hr In-situ soil. ' Soil permeability 0.52 in/hr OK Planting media soil: Soil permeability 2.00 in/hr OK ' Soil composition % Sand (by weight) 87% OK % Fines (by weight) 8%o OK ' Form SW401-Bioretention-Rev.5 Parts I and II. Design Summary, Page 1 of 3 1 1 1 1 1 1 1 1 1 1 Permit Number: (to be provided by DWQ) % Organic (by weight) 5% OK Total: 100% Phosphorus Index (P-Index) of media (unitless) Form SW401-Bioretention-Rev.5 Parts I and II. Design Summary, Page 2 of 3 Permit Number: ' (to be provided by DWQ) Basin Elevations Temporary pool elevation 713.00 fmsl OK Type of bioretention cell (answer "Y" to only one of the two following ' questions): Is this a grassed cell? Y (Y or N) OK Is this a cell with trees/shrubs? N (Y or N) Planting elevation (top of the mulch or grass sod layer) 712 fmsl Depth of mulch 3 inches OK Bottom of the planting media soil 709.5 fmsl ' Planting media depth 2.5 ft Depth of washed sand below planting media soil 0.33 inches ' Are underdrains being installed? Y (Y or N) How many clean out pipes are being installed? 7 OK What factor of safety is used for sizing the underdrains? (See 10 OK BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 1 ft the bottom of the cell to account for underdrains Bottom of the cell required 708.17 fmsl SHWT elevation 706.5 fmsl Distance from bottom to SHWT 1.67 ft Insufficient distance to SHWT. ' Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? IN Y (Y or N) OK Does volume in excess of the design volume flow evenly distributed through a vegetated filter? Y (Y or N) OK What is the length of the vegetated filter? 60 ft Does the design use a level spreader to evenly distribute flow? N (Y or N) Show how flow is evenly distributed. Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Y (Y or N) OK ' Is the BMP located at least 100 feet from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal to or less than 3:1? Y (Y or N) OK Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Y (Y or N) OK Inlet velocity (from treatment system) 0.61 ft/sec OK Is the area surrounding the cell likely to undergo development in the future? N Y or N) ( ) OK Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK ' Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8+inches gravel followed by 3-5 ft of grass) X Grassed swale OK Forebay Other Form SW401-Bioretention-Rev.5 Parts I and II. Design Summary, Page 3 of 3 Permit No: (to be assigned by DWQ) III. REQUIRED ITEMS CHECKLIST ' Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. ' Page/ Plan Initials Sheet No. - C- 3 1. Plans (1 ° 50' or larger) of the entire site showing: ' Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Cell dimensions, ' Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. -?a 2. Plan details (1"= 30' or larger) forthe bioretention cell showing: Cell dimensions Pretreatment system, High flow bypass system, ' Maintenance access, Recorded drainage easement and public right of way (ROW), Design at ultimate build-out, Off-site drainage (if applicable), ' Clean out pipe locations, Overflow device, and Boundaries of drainage easement. Indicate the P-Index between 10 and 30 3. Section view of the bioretention cell (120' or larger) showing: Side slopes, 3:1 or lower Underdrain system (if applicable), and ' Bioretention cell layers [ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone If applicable), #57 stone, underdrains (if applicable), SHWT level(s), and overflow structure] ' 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: Soil permeability, Soil composition (% sand, % fines, % organic), and P-index. 5. A detailed planting plan (120' or larger) prepared by a qualif ied individual showing: A variety of suitable species, Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, ' A planting detail, The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. 6 A . n assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. G -? 7. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. ' 8 Th . e supporting calculations (including underdrain calculations, if applicable). 9 A f th i . copy o e s gned and notarized inspection and maintenance (I&M) agreement. ' az_ T A 10. A copy of the deed restriction. Form SW401-Bioretention-Rev.5 Part III, Page 1 of 1 CURVE NUMBER CALCULATIONS n STORMWATER MANAGEMENT CALCULATIONS ' Belgate Commercial Center Development, Charlotte, North Carolina /v/l K ley-Ham S , and Assada n. Inc. Pre vs. Post Runoff Analysis Composite Curve Number (CN) Project Information Project Name: Belgate Commercial Center KHA Project #: 018253026 Designed by. BRR Date: 11/11/2008 Revised by. BRR Date: 12/1012008 Revised by Date: Composite Drainage Area Drainage Cover/Soil Hydrologic Soil Product of Curve Number Name Location Name (Type) Cover Description' Group Curve # (CN)" Area (ac) CN x area (CN) PRE-DEVELOPMENT Mecklenburg, Woods DA-1 OUTFALL 1 Enon. Wilkes Good Condition C 70 4.98 349 70 Mecklenburg, Meadow Enon, Wilkes Good Condition C 71 4.98 354 71 9.96 702 70.5 .-- Mecklenburg, Woods DA-2A OUTFALL 2A Enon, Wilkes Good Condition C 70 2.30 161 70 Mecklenburg, Meadow Enon, Wilkes Good Condition C 71 2.31 164 71 j 4.61 325 - 70.5 Mecklenburg, Woods DA-2B OUTFALL 2B Enon, Wilkes Good Condition C 70 1.24 87 70 Mecklenburg, Meadow Enon, Wilkes Good Condition C 71 1.24 88 71 1 2.48 175 70.5 Mecklenburg, Woods DA-3 OUTFALL 3 Eran, Wilkes Good Condition C 70 8.13 569 70 Mecklenburg, Meadow Enon, Wilkes Good Condition C 71 8.14 578 71 Woods Cecil Good Condition B 55 4.16 229 55 Meadow Cecil Good Condition B 56 4.17 242 58 24.60 1618 65.8 Mecklenburg, Woods DA-4 OUTFALL 4 Enon, Wilkes Good Condition C 70 9.32 652 70 Mecklenburg, Meadow Enon, Wilkes Good Condition C 71 9.32 662 71 Woods Cecil Good Condition B 55 0.12 7 55 Meadow Cecil Good Condition B 58 0.13 8 5B I I ' 18.89 1328 " 70.3 Mecklenburg, Woods DA-5 OUTFALL 5 Enon, Wilkes Good Condition C 70 1.89 132 70 Mecklenburg, Meadow Enon, Wilkes Good Condition C 71 1.89 134 71 Woods Cecil Good Condition B 55 0.59 32 55 Meadow Cecil Good Condition g 58 0.59 34 58 4.96 333 67.2 Total Pre-development Area = 65.50 K:\CHL_LDEV\018253 Crescent\026 Belgate\Belgate Stonnwater Management Plan\Calculations\Belgate\Stormwater Calculations_2008-1 1-11.xls 1 of 2 I ® 0. .nd A HOm taMes, Inc. Pre vs. Post Runoff Analysis Composite Curve Number (CN) Project Information Project Name: Belgate Commercial Center KHA Project #: 018253026 Designed by. BRR Date: 11/11/2008 Revised by: BRR Date: 12/10/2008 Revised by Date: Drainage Area Name Drainage Location Cover/Soil Name (Type) Cover Description' Hydrologic Soil Group Curve # (CN)" Area (ac) Product of CN x area Composite Curve Number (CN) POST DEVELOPMENT DA-1 POND 1 Impervious 98 12.20 1196 98 Mecklenburg, Enon, Wilkes Open Space -Good Condition C 74 1.36 100 74 13.56 1296.34 95.60 UND DA-1 OUTFALL 1 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 0.46 34 74 l { 0.46 34.20 - 74.00 - DA-2A POND 2 Impervious 98 3.44 337 98 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 0.89 66 74 4.33 402.98 93.07... UND DA-2A OUTFALL 2A Mecklenburg, Enon, Wilkes Open Space - G-d Condition C 74 0.27 20 74 - 027 20-05 - 74.00 UND DA-2B OUTFALL 2B Mecklenburg, Enon, Wilkes Open Space - Good Condition j c 74 0.69 51 74 0.69 51-06 - 74.OD DA-3 POND 3 Impervious 98 10.62 1041 98 Cecil Open Space - Good Condition B 61 1.70 104 61. Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 0.56 41 74 I i - `I { 12.88 1185.90 92.07 UND DA-3 OUTFALL 3 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 1.03 76 74 I 1.03 76.22 -- 74.00 DA4 POND 4 Impervious 98 18.04 1768 98 Impervious - Roadway 98 4.05 397 98 Cecil Open Space - Good Condition B 61 1.81 110 61 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 5.14 380 74 1 29.04 2655.59 91.45 UND DA4 OUTFALL 4 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 0.81 60 74 I 0.81 59.94 -.-.74.00 DA-5 810 1 Impervious 98 1.36 133 98 Cecil Open Space - Good Condition B 61 0.71 43 61 Mecklenburg, Enon. Wilkes Open Space - Good Condition C 74 0.52 38 74 2.59 215.07 83.04 UND DA -5 OUTFALL 5 Mecklenburg, Enon, Wilkes Woods Good Condition C 70 1.37 96 70 Mecklenburg, Enon, Wilkes Meadow Good Condition C 71 1.37 97 71 Mecklenburg, Enon, Wilkes Open Space - Good Condition C 74 0.22 16 74 Cecil Woods Good Condition B 55 0.26 14 55 Cecil Meadow Good Condition B 58 0.26 15 58 I 1 3.48 239 68.63 Total Post-development Area = 69.14 Cover Descriptions per TR-55 Manual From TR-55 Manual, Table 2-2 a d c K:\CHL_LDEV\018253 Crescent\026 Beigate\Beigate Stormwater Management Plan\Calculations\Beigate\Stormwater Calculations_2008-1 1-11.xis 2 of 2 TIME OF CONCENTRATION i CALCULATIONS STORMWATER MANAGEMENT CALCULATIONS Berate Commercial Center Development, Charlotte, North Carolina N O N V1 T a !0 O c •` Q _ O ? 1= V 3 ? ? U O ° CL I > d a O O N N T.I m m m N N N coo N m M c 'p m N U m m ? E 0 m m m A m m m * T >. T E a c Z m m N m _ O C y U a ? > C a Y 0? K 0 A E `o C m O a` r E F C m E 'm v m > m - m O am_ U Z m - T 9 = m s n m m .-. L 3 E IL m 0 3 o m LL N N m O m U Q O 9 m m a m c a? a N a 3 t r m c N N m m C C C m C ? C m N n ?n J L m m ? 3 v LL O a d 0 m 0 U 0 LL O T r m c m p Q N c'n ? r z w IL IL ? a L m w m m W WZ O w a m ?O ? ? ? m N m ?O o ? ? N N m N h N O m n R m N .n m ? r y W o ? a N rn m m N O O N N <h `- nO'1 N m N N M N O n N e u n n n n c c c c e c m m E cc m E v E m N E rn m ? m c E I ? F ? F of F < ? F n F m e F O A O A O O A O A O C C ` C C C ` C "' o u?`i o 0 0 c 0 ?$ c o ? c o U ? U I U ? U ? U ? U o O O o 0 0 E E E E E E F r r r r F- ? o m v m o m yj 0 o ui I 0 o u-i m cy N '? m rE N ? 0 o oi 0 0 m 0 0 m ci ri of I vi m: m O m Ci co O c O m O m Ci O O O N O G m O G M .O O O) O O O O ? O 0 ? O O tOD 0 O tOry O Ci O O O O O y O O ^ O O O O O O O O o n 1? ? N S o N ?' qo $ o m ? oo ° o °o , th O op m V C m V m V m V m V O 3c O 3? 75 O O 3? O 30 O O O O 3? O u O O O O O 3I O O 3a A Z Z Z Z Z ?i a °m $ °m ?i m 8i °m m m O? '-m ? ?? -y ? O m L O p .? m L p 'd W L O m N L U fn C L L 0 y O L to L 0 N O (n m c C L (n N m u) O C L to A d N E p U U U U U U U U U o U N N n a ? J J ILL ¢ Q LL Q LL r LL F r r r O =O O O o N co V p O O 1 1 1 1 1 1 1 1 1 9 F 11 u 2 N O C +: Q R O C C V 7 C d' O a U ° ° IL I > L CL NINI 7T21 m m m m m m c o o N c ? m N U m ?p O ?mIm M m 3t > E a a a z m m m O c c a Y Om K O E C a` H m ` m E T > A 5.: m p w U m w a ? 2 m a a m m m m r a m m 0 3 V O m IL ?^ [n `p N m O m U o` a a > 0- D N 6. m c c T N .r ~ L m c a m C c c m c m c ? U m 0 m J L Of 3 v LL 0 n N U O LL m m C m O Q ? J Z M CL a OJ W t m tu T W m O Z F '?' o o fO u c E < N fG 1fi f C W C V OC ? U O E r= 0 00 m ? i 0 N ? N C O O O O O m N v c o L U ° S ? o A Z d o ? ? C L L m ? ? ? O m U U J LL O Z u1 Q O O w° o? c c o a a o ?S LL O O C v O m N m N m ? LL m p ? m C C O ? O ? LL U N ? O H C m E t o p LL U LL N O N HYDROCAD HYDROLOGY REPORT WET PONDS 1 AND 2 1 t STORMWATER MANAGEMENT CALCULATIONS ' Belgate Commercial Center Development, Charlotte, North Carolina n 11 1S (2S) (4S) Pre-dev DA-1 Post-d v DA-1 Post-dev ND DA-1 N7 47 3P 8P Pond 1 Outfall 1 5S 6S 8S Pre-dev DA-2 Post-d v DA-2 Post-dev ND DA-2 7P '` 9P Pond 2 Subca Reach on Link Outfall 2 Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 2 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-dev DA-1 Runoff Area=9.960 ac 0.00% Impervious Runoff Depth>0.53" Tc=29.3 min CN=71 Runoff=2.48 cfs 0.437 of Subcatchment 2S: Post-dev DA-1 Runoff Area=13.560 ac 0.00% Impervious Runoff Depth>2.14" Tc=5.0 min CN=96 Runoff=17.54 cfs 2.416 of Subcatchment 4S: Post-dev UND DA-1 Runoff Area=0.460 ac 0.00% Impervious Runoff Depth>0.65" Tc=5.0 min CN=74 Runoff=0.19 cfs 0.025 of Subcatchment 5S: Pre-dev DA-2 Runoff Area=2.480 ac 0.00% Impervious Runoff Depth>0.53" Tc=30.2 min CN=71 Runoff=0.61 cfs 0.109 of Subcatchment 6S: Post-dev DA-2 Runoff Area=4.330 ac 0.00% Impervious Runoff Depth>1.85" Tc=5.0 min CN=93 Runoff=5.09 cfs 0.669 of Subcatchment 8S: Post-dev UND DA-2 Runoff Area=0.270 ac 0.00% Impervious Runoff Depth>0.65" Tc=5.0 min CN=74 Runoff=0.11 cfs 0.015 of Pond 3P: Pond 1 Peak Elev=725.48' Storage=69,644 cf Inflow=17.54 cfs 2.416 of Outflow=2.09 cfs 1.121 of Pond 7P: Pond 2 Peak Elev=727.02' Storage=23,459 cf Inflow=5.09 cfs 0.669 of Outflow=0.13 cfs 0.135 of Pond 8P: Outfall 1 Inflow=2.12 cfs 1.146 of Primary=2.12 cfs 1.146 of ' Pond 9P: Outfall 2 Inflow=0.21 cfs 0.150 of Primary=0.21 cfs 0.150 of Total Runoff Area = 31.060 ac Runoff Volume = 3.670 of Average Runoff Depth = 1.42" ' 100.00% Pervious = 31.060 ac 0.00% Impervious = 0.000 ac r ' Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1 S: Pre-dev DA-1 ' Runoff = 2.48 cfs @ 12.83 hrs, Volume= 0.437 af, Depth> 0.53" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs ' Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description ' 9.960 71 9.960 Pervious Area ' Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 29.3 Direct Entry, From spreadsheet Subcatchment 1S: Pre-dev DA-1 Hydrograph 2.48 cfs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr 2 Rainfall=2.58" Runoff Area=9.960 ac Runoff Volume=0.437 of LL Runoff Depth>0.53" 1 Tc=29.3 min CN=71 ¦ Runoff 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" ' Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCADO 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 4 ' Summary for Subcatchment 2S: Post-dev DA-1 [49] Hint: Tc<2dt may require smaller dt ' Runoff = 17.54 cfs @ 12.40 hrs, Volume= 2.416 af, Depth> 2.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs , Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description ' 13.560 96 13.560 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, From spreadsheet Subcatchment 2S: Post-dev DA-1 Hydrograph 19 18 17.54 cfs 17 Charlotte 24-hr 15 1-yr 24.00 hrs 1 yr - 24 hr 14 Rainfall=2.58" 13- 12:' Runoff Area=13.560 ac Runoff Volume=2.416 of 19 LL Runoff Depth>2.14" Tc=5.0 min CN=96 21 I -? ¦ Runoff 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ' Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 ' HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 4S: Post-dev UND DA-1 [49] Hint: Tc<2dt may require smaller dt Runoff = 0.19 cfs @ 12.45 hrs, Volume= 0.025 af, Depth> 0.65" ' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 0.460 74 ' 0.460 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) ' 5.0 Direct Entry, Subcatchment 4S: Post-dev UND DA-1 Hydrograph 0.21 0.2: ¦ Runoff 0.19 cfs 0.19 Charlotte 24-hr 0.18- 0.17 1-yr 24.00 hrs 1 yr - 24 hr ' 0.16- 0.15-. Rainfall=2.58" 0.14- 0.13-. Runoff Area=0.460 ac F 0.12 Runoff Volume=0.025 of 0.11- 0 0., Runoff Depth>0.65 " 0.09 0.08 Tc=5.0 min ' 0.06 CN=74 0.03 0.02 0.01- 0' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 5S: Pre-lev DA-2 Runoff = 0.61 cfs @ 12.85 hrs, Volume= 0.109 af, Depth> 0.53" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 2.480 71 2.480 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.2 Direct Entry, From Spreadsheet Subcatchment 5S: Pre-dev DA-2 , Hydrograph ' 0.65 0.61 cfs ¦ Runoff 0.6 Charlotte 24-hr 0.55 1-yr 24.00 hrs 1 yr - 24 hr ' 0.5 Rainfall=2.58" 0.45 Runoff Area=2.480 ac ' 0.4 Runoff Volume=0.109 of 0.35 0 0.3 Runoff Depth>0.53" ' il: - 0.25 Tc=30.2 min 0.2 CN=71 0.15- 0.1- 0.05- 13 0 0 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 6S: Post-dev DA-2 [49] Hint: Tc<2dt may require smaller dt Runoff = 5.09 cfs @ 12.40 hrs, Volume= 0.669 af, Depth> 1.85" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Descriotion 4.330 93 4.330 Pervious Area Tc Length Slope Velocity Capacity Description _(min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 6S: Post-dev DA-2 Hydrograph ¦ Runoff 5.09 cfs Idiiiiiii U. 0 Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Runoff Area-4.330 ac Runoff Volume=0.669' of Runoff Depth>1.85" Tc=5.0 min CN-93 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 8S: Post-dev UND DA-2 [49] Hint: Tc<2dt may require smaller dt Runoff = 0.11 cfs @ 12.45 hrs, Volume= 0.015 af, Depth> 0.65" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 0.270 74 0.270 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: Post-dev UND DA-2 Hydrograph 0.12- 1 cfs 0.1 0.11 Charlotte 24-hr 0.1 1-yr 24.00 hrs 1 yr - 24 hr 0.09 Rainfall=2.58" 0.08 Runoff Area=0.270 ac °07 Runoff Volume=0.015 of 0.06 Runoff Depth>0.65" LL 0.05 Tc=5.0 min 0.04 CN=74 0.03 ¦ Runoff 0.01 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Paae 9 Summary for Pond 3P: Pond 1 Inflow Area = 13.560 ac, 0.00% Impervious, Inflow Depth > 2.14" for 1 yr - 24 hr event Inflow = 17.54 cfs @ 12.40 hrs, Volume= 2.416 of Outflow = 2.09 cfs @ 14.09 hrs, Volume= 1.121 af, Atten= 88%, Lag= 101.1 min Primary = 2.09 cfs @ 14.09 hrs, Volume= 1.121 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 725.48'@ 14.09 hrs Surf.Area= 31,419 sf Storage= 69,644 cf Plug-Flow detention time= 324.5 min calculated for 1.118 of (46% of inflow) Center-of-Mass det. time= 204.6 min ( 996.3 - 791.7 ) Volume Invert Avail.Storage Storage Description #1 723.00' 195,358 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) ' 723.00 23,520 0 0 724.00 27,976 25,748 25,748 725.00 30,286 29,131 54,879 726.00 32,653 31,470 86,349 727.00 35,077 33,865 120,214 728.00 37,558 36,318 156,531 729.00 40,096 38,827 195,358 Device Routing Invert Outlet Devices #1 Primary 723.00' 24.0" x 40.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 722.00' S=0.0250'/' Cc= 0.900 n=0.013 #2 Device 1 723.00' 3.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 725.00' 1.50' W x 0.75'H Vert. Orifice/Grate C=0.600 #4 Device 1 725.60' 2.00' W x 0.50'H Vert. Orifice/Grate C=0.600 ' #5 Device 1 726.80' 2.00' W x 0.75H Vert. Orifice/Grate C=0.600 #6 Device 1 727.50' 3.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 Primary OutFlow Max=2.09 cfs @ 14.09 hrs HW=725.48' (Free Discharge) ' t-' =Culvert (Passes 2.09 cfs of 18.39 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.49 cfs @ 7.35 fps) 3=Orifice/Grate (Orifice Controls 1.59 cfs @ 2.22 fps) -Orifice/Grate ( Controls 0.00 cfs) 5=Orifice/Grate ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 10 Pond 3P: Pond 1 Hydrograph ¦ Inflow ¦ Primary 0 U. 71 L 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 © 2007 HydroCAD Software Solutions LLC Page 11 Summary for Pond 7P: Pond 2 Inflow Area = 4.330 ac, 0.00% Impervious, Inflow Depth > 1.85" for 1 yr - 24 hr event Inflow = 5.09 cfs @ 12.40 hrs, Volume= 0.669 of Outflow = 0.13 cfs @ 20.59 hrs, Volume= 0.135 af, Atten= 97%, Lag= 490.9 min Primary = 0.13 cfs @ 20.59 hrs, Volume= 0.135 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs ' Peak Elev= 727.02'@ 20.59 hrs Surf.Area= 13,512 sf Storage= 23,459 cf Plug-Flow detention time= 418.5 min calculated for 0.135 of (20% of inflow) Center-of-Mass det. time= 252.1 min ( 1,063.7 - 811.6 ) Volume Invert Avail.Storage Storage Description #1 725.00' 70,885 cf Custom Stage Data (Prismatic) Listed below (Recalc) ' Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 725.00 8,933 0 0 726.00 11,939 10,436 10,436 727.00 13,475 12,707 23,143 728.00 15,069 14,272 37,415 ' 729.00 16,721 15,895 53,310 730.00 18,429 17,575 70,885 ' Device Routing Invert Outlet Devices #1 Primary 725.00' 18.0" x 34.0' long Culvert RCP, groove end projecting, Ke= 0.200 Outlet Invert= 724.50' S=0.01477' Cc= 0.900 n=0.013 #2 Device 1 725.00' 1.9" Vert. Orifice/Grate C= 0.600 #3 Device 1 727.10' 2.00' W x 0.50'H Vert. Orifice/Grate C=0.600 #4 Device 1 727.80' 0.25' W x 0.17'H Vert. Orifice/Grate C=0.600 #5 Device 1 728.50' 4.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 Primary OutFlow Max=0.13 cfs @ 20.59 hrs HW=727.02' (Free Discharge) t1=Culvert (Passes 0.13 cfs of 10.63 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.13 cfs @ 6.71 fps) ' 3=Orifice/Grate ( Controls 0.00 cfs) -Orifice/Grate (Controls 0.00 cfs) 5=Orifice/Grate ( Controls 0.00 cfs) Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 12 Pond 7P: Pond 2 Hydrograph ¦ Inflow ¦ Primary v 3 0 LL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 13 Summary for Pond 8P: Ouffall 1 I [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 14.020 ac, 0.00% Impervious, Inflow Depth > 0.98" for 1 yr - 24 hr event ' Inflow 2.12 cfs @ 14.06 hrs, Volume= 1.146 of Primary 2.12 cfs @ 14.06 hrs, Volume= 1.146 af, Atten= 0%, Lag= 0.0 min ' Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 8P: Outfall 1 Hydrograph ¦ Inflow ¦ Primary v 3 0 LL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Belgate Commercial Center SWMP Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 14 Summary for Pond 9P: Outfall 2 [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 4.600 ac, 0.00% Impervious, Inflow Depth > 0.39" for 1 yr - 24 hr event Inflow = 0.21 cfs @ 12.47 hrs, Volume= 0.150 of Primary = 0.21 cfs @ 12.47 hrs, Volume= 0.150 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 9P: Ouffall 2 Hydrograph ¦ Inflow ¦ Primary v 3 0 LL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ' HYDROCAD HYDROLOGY REPORT ' WET POND 3 1 STORMWATER MANAGEMENT CALCULATIONS Belgate Commercial Center Development, Charlotte, North Carolina (is) Pre-development 2S 3S Post-dev lopment Postdeve opment - Uncle ained 47 ';?7 3P A Pond Outfall Su4 Reach on Link 081201 Pond calcs - with additional ro Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" ' Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 2 ' Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS ' Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-development Runoff Area=24.600 ac 0.00% Impervious Runoff Depth>0.35" Tc=35.0 min CN=66 Runoff=3.35 cfs 0.724 of Subcatchment 2S: Post-development Runoff Area=12.880 ac 0.00% Impervious Runoff Depth>1.77" Tc=5.0 min CN=92 Runoff=14.58 cfs 1.896 of ' Subcatchment 3S: Postdevelopment - Runoff Area=0.830 ac 0.00% Impervious Runoff Depth>0.65" Tc=5.0 min CN=74 Runoff=0.34 cfs 0.045 of Pond 3P: Pond Peak Elev=684.65' Storage=64,327 cf Inflow=14.58 cfs 1.896 of ' Primary=0.49 cfs 0.470 of Secondary=0.00 cfs 0.000 of Outflow=0.49 cfs 0.470 of Pond OUT: Outfall Inflow=0.55 cfs 0.515 of ' Primary=0.55 cfs 0.515 of Total Runoff Area = 38.310 ac Runoff Volume = 2.665 of Average Runoff Depth = 0.83" 100.00% Pervious= 38.310 ac 0.00% Impervious = 0.000 ac ' 081201 Pond talcs - with additional ro Charlotte 24-hr 1-yr 24.00 hrs 1 Yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 ' HydroCAD® 8.50 s/n 005123 @2007 HvdroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1S: Pre-development ' Runoff = 3.35 cfs @ 12.99 hrs, Volume= 0.724 af, Depth> 0.35" ' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 24.600 66 24.600 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 35.0 Direct Entry, From spreadsheet ' Subcatchment 1S: Pre-development Hydrograph 3.35 cfs ¦ Runoff Charlotte 24-hr ' 3 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" ' Runoff Area=24.600 ac 2 Runoff Volume=0.724 of Runoff Depth>0.35" Tc=35.0 min CN=66 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) 081201 Pond calcs - with additional ro Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 © 2007 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2S: Post-development [49] Hint: Tc<2dt may require smaller dt Runoff = 14.58 cfs @ 12.41 hrs, Volume= 1.896 af, Depth> 1.77' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 12.880 92 12.880 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, From spreadsheet Subcatchment 2S: Post-development Hydrograph 15 14.58 cfs 14 Charlotte 24-hr 13 1-yr 24.00 hrs 1 yr - 24 hr 12 Rainfall=2.58" 11 ,0 Runoff Area=12.880 ac 9 Runoff Volume=1.896 of LL ; Runoff Depth>1.77" 6 Tc=5.0 min 5 CN=92 4 3 2 1 ¦ Runoff 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) 0.34 Charlotte 24-hr 0.32-0.3' 1.-yr 24.00 hrs 1 yr - 24 hr 0.28 Rainfall=2,58•, 0.26 0.24 Runoff Area=0.830 ac 0.22 0.2. Runoff of 0 o.18 Runoff Depth>0.65" 0.16 0.14. Tc=5.0 min 0.12 CN=74 0.1 0.08 0.06 0.0a 081201 Pond talcs - with additional ro Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 3S: Postdevelopment - Undetained [49] Hint: Tc<2dt may require smaller dt Runoff = 0.34 cfs @ 12.45 hrs, Volume= 0.045 af, Depth> 0.65" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 0.830 74 0.830 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Postdevelopment - Undetained Hydrograph 0.38 0.36 ¦ Runoff 0.34 cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 26-21-2'2-23 24 Time (hours) 081201 Pond calcs - with additional ro Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 6 Summary for Pond 3P: Pond Inflow Area = 12.880 ac, 0.00% Impervious, Inflow Depth > 1.77" for 1 yr - 24 hr event Inflow = 14.58 cfs @ 12.41 hrs, Volume= 1.896 of Outflow = 0.49 cfs @ 18.42 hrs, Volume= 0.470 af, Atten= 97%, Lag= 360.6 min Primary = 0.49 cfs @ 18.42 hrs, Volume= 0.470 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 684.65'@ 18.42 hrs Surf.Area= 27,512 sf Storage= 64,327 cf Plug-Flow detention time= 418.0 min calculated for 0.470 of (25% of inflow) Center-of-Mass det. time= 269.3 min ( 1,086.4 - 817.0 ) Volume Invert Avail.Storage Storage Description #1 682.00' 168,830 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 682.00 19,662 0 0 683.00 24,001 21,832 21,832 684.00 26,105 25,053 46,885 685.00 28,268 27,187 74,071 686.00 30,488 29,378 103,449 687.00 32,584 31,536 134,985 688.00 35,106 33,845 168,830 Device Routing Invert Outlet Devices #1 Primary 676.00' 24.0" x 100.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 675.00' S=0.0100'/' Cc= 0.900 n= 0.012 Concrete pipe, finished #2 Device 1 682.00' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 683.70' 3.0" Horiz. Orifice 1 Limited to weir flow C= 0.600 #4 Device 1 686.35' 16.0' long x 0.5' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Secondary 686.46' 10.0' long x 0.5' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=0.49 cfs @ 18.42 hrs HW=684.65' (Free Discharge) L1=Culvert (Passes 0.49 cfs of 41.84 cfs potential flow) 1:3=Orifice Orifice/Grate (Orifice Controls 0.26 cfs @ 7.68 fps) 1 (Orifice Controls 0.23 cfs @ 4.69 fps) Broad-Crested Rectangular Weir ( Controls 0.00 cfs) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=682.00' (Free Discharge) Broad-Crested Rectangular Weir (Controls 0.00 cfs) 081201 Pond talcs - with additional ro Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 7 Pond 3P: Pond Hydrograph 14.58 cfs ¦ Inflow ? Outflow Inflow Area=12.880 ac ¦ Primary 16 ¦ Secondary 15 Peak Elev=684.65' 13 Storage=64,327 cf 14 12 11 10- 9 3 8 0 7 0.00 cfs 0 0 1 2 3 4 5 6 7 8 4-1''6-11 -1'2-"I'3 14 15 16 17 18 19 20 21 22 23 24 Time (hours) 081201 Pond calcs - with additional ro Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 8 Summary for Pond OUT: Outfall [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 13.710 ac, 0.00% Impervious, Inflow Depth > 0.45" for 1 yr - 24 hr event Inflow = 0.55 cfs @ 12.66 hrs, Volume= 0.515 of Primary = 0.55 cfs @ 12.66 hrs, Volume= 0.515 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond OUT: Outfall Hydrograph ¦ Inflow ¦ Primary w v 3 0 LL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 11 16 1U zu n zz za 44 Time (hours) HYDROCAD HYDROLOGY REPORT WET POND 4 STORMWATER MANAGEMENT CALCULATIONS Belgate Commercial Center Development, Charlotte, North Carolina 1 1 1 1 1 1 1 1 1 1 1S Pre-dev DA-5 (9s Post- Roa, Subca Reach on Link 2S 4S -5 Post-dev ND DA-5 "4 ? I Pond 1 N 8P Outfall 1 Pond 4 Model Prepared by Kimley-Horn and Associates, Inc. Page 2 HydroCAD® 8.00 s/n 005123 © 2006 HydroCAD Software Solutions LLC 12/11/2008 Area Listing (all nodes) Area (acres) CN Description (subcats) 18.890 70 (1S) 0.810 74 (4S) 25.990 91 (2S) 4.050 98 (9S) 49.740 Pond 4 Model Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Page 3 HydroCAD® 8.00 s/n 005123 © 2006 HydroCAD Software Solutions LLC 12/11/2008 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-dev DA-5 Runoff Area=18.890 ac Runoff Depth=0.49" Tc=29.4 min CN=70 Runoff=4.27 cfs 0.778 of Subcatchment 2S: Post-dev DA-5 Runoff Area=25.990 ac Runoff Depth=1.68" Tc=5.0 min CN=91 Runoff=28.27 cfs 3.646 of Subcatchment 4S: Post-dev UND DA-5 Runoff Area=0.810 ac Runoff Depth=0.65" Tc=5.0 min CN=74 Runoff=0.33 cfs 0.044 of Subcatchment 9S: Post- Road Runoff Area=4.050 ac Runoff Depth=2.35" Tc=0.0 min CN=98 Runoff=5.59 cfs 0.793 of Pond 3P: Pond 1 Peak Elev=669.63' Storage=123,378 cf Inflow=33.30 cfs 4.439 of Outflow=4.16 cfs 4.368 of Pond 8P: Outfall 1 Inflow=4.23 cfs 4.412 of Primary=4.23 cfs 4.412 of Total Runoff Area = 49.740 ac Runoff Volume = 5.261 of Average Runoff Depth = 1.27" 91.86% Pervious Area = 45.690 ac 8.14% Impervious Area = 4.050 ac Pond 4 Model Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Page 4 HydroCAD@ 8.00 s/n 005123 © 2006 HydroCAD Software Solutions LLC 12/11/2008 Subcatchment 1S: Pre-dev DA-5 Runoff = 4.27 cfs @ 12.85 hrs, Volume= 0.778 af, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 18.890 70 18.890 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 29.4 Direct Entry, From spreadsheet Subcatchment 1S: Pre-dev DA-5 , Hydrograph ¦ Runoff ' 4.27 cfs Charlotte 24-hr 4- ' 1 -yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" 3 Runoff Area=18.890 ac , Runoff Volume=0.778 of U. 2 Runoff Depth=0.49" Tc=29.4 min CN=70 lq? 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 ' Time (hours) Pond 4 Model Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Page 5 HydroCAD® 8.00 s/n 005123 © 2006 HydroCAD Software Solutions LLC 12/11/2008 Subcatchment 2S: Post-dev DA-5 [49] Hint: Tc<2dt may require smaller dt Runoff = 28.27 cfs @ 12.41 hrs, Volume= 3.646 af, Depth= 1.68" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 25.990 91 25.990 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, From spreadsheet Subcatchment 2S: Post-dev DA-5 Hydrograph 30 28.27 cfs Charlotte 24-hr 1-yr 24.00 hrs 9 yr 24 hr Rainfall=2.58" Runoff Area=25.990 ac Runoff Volume=3.646 of Runoff Depth=1.68" Tc=5.0 min CN=91 ¦ Runoff rn 18 16 LL 14 12 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Pond 4 Model Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" ' Prepared by Kimley-Horn and Associates, Inc. Page 6 HydroCAD® 8.00 s/n 005123 © 2006 HydroCAD Software Solutions LLC 12/11/2008 ' Subcatchment 4S: Post-dev UND DA-5 [49] Hint: Tc<2dt may require smaller dt i Runoff = 0.33 cfs @ 12.45 hrs, Volume= 0.044 af, Depth= 0.65" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description ' 0.810 74 0.810 Pervious Area ' Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, ' Subcatchment 4S: Post-dev UND DA-5 Hydrograph ' 0.36 ¦ Runoff 0.33 cfs ' 0.34 Charlotte 24-hr 0.32- 0.3-- 1-yr 24.00 hrs 1 yr - 24 hr 0.26 Rainfall=2.58" , 0.24 Runoff Area=0.810 ac N 0.22 0.2 Runoff Volume=0.044 of ' 0 018 Runoff Depth=0.65" LL 0.16 0.14 Tc=5.0 min 0.12 CN=74 ' 0.1 0.08 0.06- 0.04- 06 11 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 65 90 95 100 105 110 115 120 Time (hours) Pond 4 Model Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Page 7 HydroCAD® 8.00 s/n 005123 © 2006 HydroCAD Software Solutions LLC 12/11/2008 Subcatchment 9S: Post- Road ' [46] Hint: Tc=O (Instant runoff peak depends on dt) Runoff = 5.59 cfs @ 12.33 hrs, Volume= 0.793 af, Depth= 2.35" ' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" ' Area (ac) CN Description 4.050 98 4.050 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.0 Direct Entry, 5.0 Subcatchment 9S: Post- Road Hydrograph 6- 5.59 cfs ¦ Runoff Charlotte 24-hr 5-1 -yr 24.00 hrs 1 yr 24 hr Rainfall=2.58" 4 Runoff Area=4.050 ac Runoff Volume=0.793 of LL 3Runoff Depth=2.35" 2 Tc=0.0 min CN=98 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Pond 4 Model Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Page 8 HydroCAD@) 8.00 s/n 005123 © 2006 HydroCAD Software Solutions LLC 12/11/2008 Pond 3P: Pond 1 Inflow Area = 30.040 ac, Inflow Depth = 1.77" for 1 yr - 24 hr event Inflow = 33.30 cfs @ 12.40 hrs, Volume= 4.439 of Outflow = 4.16 cfs @ 14.11 hrs, Volume= 4.368 af, Atten= 87%, Lag= 102.6 min Primary = 4.16 cfs @ 14.11 hrs, Volume= 4.368 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 669.63'@ 14.11 hrs Surf.Area= 53,795 sf Storage= 123,378 cf Plug-Flow detention time= 1,280.4 min calculated for 4.366 of (98% of inflow) Center-of-Mass det. time= 1,272.6 min ( 2,085.4 - 812.7 ) Volume Invert Avail.Storage Storage Description #1 667.00' 325,763 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 667.00 33,080 0 0 668.00 48,053 40,567 40,567 669.00 51,561 49,807 90,374 670.00 55,127 53,344 143,718 671.00 58,751 56,939 200,657 672.00 62,525 60,638 261,295 673.00 66,412 64,469 325,763 Device Routing Invert Outlet Devices #1 Primary 663.50' 48.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 663.00' S= 0.0100'/' Cc= 0.900 n=0.013 #2 Device 1 667.00' 4.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 669.00' 2.20' W x 0.65'H Vert. Orifice/Grate C=0.600 #4 Device 1 670.15' 2.00' W x 0.75'H Vert. Orifice/Grate X2.00 C=0.600 #5 Device 1 670.90' 0.25' W x 0.50' H Vert. Orifice/Grate X 2.00 C=0.600 #6 Device 1 671.80' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 iary OutFlow Max=4.16 cfs @ 14.11 hrs HW=669.63' (Free Discharge) =Culvert (Passes 4.16 cfs of 122.91 cfs potential flow) -2=Orifice/Grate (Orifice Controls 0.66 cfs @ 7.55 fps) -3=Orifice/Grate (Orifice Controls 3.50 cfs @ 2.54 fps) --4=Orifice/Grate ( Controls 0.00 cfs) -5=Orifice/Grate ( Controls 0.00 cfs) -6=Orifice/Grate ( Controls 0.00 cfs) Pond 4 Model Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Page 9 HydroCAD® 8.00 s/n 005123 © 2006 HydroCAD Software Solutions LLC 12/11/2008 Pond 3P: Pond 1 Hydrograph ¦ Inflow ¦ Primary 3 0 LL 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Pond 4 Model Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Page 10 HydroCAD® 8.00 s/n 005123 © 2006 HydroCAD Software Solutions LLC 12/11/2008 Pond 8P: Outfall 1 [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 30.850 ac, Inflow Depth > 1.72" for 1 yr - 24 hr event Inflow = 4.23 cfs @ 14.09 hrs, Volume= 4.412 of Primary = 4.23 cfs @ 14.09 hrs, Volume= 4.412 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 8P: Ouffall 1 Hydrograph ¦ Inflow ¦ Primary v 3 0 U. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 1 UU WO 11U 115 i zU Time (hours) HYDROCAD HYDROLOGY REPORT BIORETENTION POND I STORMWATER MANAGEMENT CALCULATIONS Belgate Conunercial Center Development, Charlotte, North Carolina 1S 2S (4S) Pre-dev Pos dev Post-dev UN 11P Acdp CB -17 `a 3P 8P Pond 1 Outfall Subca Reach on Link Undetained Outfall Brookside Bioretention Charlotte 24-hr 1-yr 24.00 hrs 1 yr- 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 2 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-dev Runoff Area=4.960 ac 0.00% Impervious Runoff Depth>0.39" Tc=19.2 min CN=67 Runoff=0.92 cfs 0.160 of Subcatchment 2S: Post-dev Subcatchment 4S: Post-dev UND Pond 3P: Pond 1 Pond 8P: Outfall Runoff Area=2.590 ac 0.00% Impervious Runoff Depth>1.12" Tc=5.0 min CN=83 Runoff=1.92 cfs 0.241 of Runoff Area=3.490 ac 0.00% Impervious Runoff Depth>0.46" Tc=16.3 min CN=69 Runoff=0.83 cfs 0.132 of Peak Elev=712.92' Storage=5,670 cf Inflow=1.24 cfs 0.225 of Outflow=0.25 cfs 0.112 of Inflow=0.74 cfs 0.128 of Primary=0.74 cfs 0.128 of Pond 10P: CB-17 Peak Elev=714.97' Inflow=1.92 cfs 0.241 of Primary=1.24 cfs 0.225 of Secondary=0.68 cfs 0.016 of Outflow=1.92 cfs 0.241 of Pond 11P: Undetained Outfall Inflow=0.83 cfs 0.132 of Primary=0.83 cfs 0.132 of Total Runoff Area =11.040 ac Runoff Volume = 0.533 of Average Runoff Depth = 0.58" 100.00% Pervious =11.040 ac 0.00% Impervious = 0.000 ac ' Brookside Bioretention Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 ' HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1 S: Pre-dev ' Runoff = 0.92 cfs @ 12.73 hrs, Volume= 0.160 af, Depth> 0.39" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description ' 4.960 67 4.960 Pervious Area ' Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.2 Direct Entry, From spreadsheet Subcatchment 1S: Pre-dev Hydrograph ' 1 ¦ Runoff 0.92 cfs Charlotte 24-hr 1-yr 24.00 hrs 1 yr 24 hr Rainfall=2'.5$" Runoff Area 4.960 ac Runoff Volume=0.160' of Runoff Depth>0.39" ' Tc=19.2 min CN=67 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Brookside Bioretention Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" , Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 4 ' Summary for Subcatchment 2S: Post-dev [49] Hint: Tc<2dt may require smaller dt , Runoff = 1.92 cfs @ 1242 hrs, Volume=- 0.241 af, Depth> 1.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description ' 2.590 83 2.590 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, From spreadsheet Subcatchment 2S: Post-dev Hydrograph 2 1.92 cfs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Runoff Area=2.590 ac Runoff Volume=0.241 of U. 1 Runoff Depth>1.12" Tc=5.0 min CN=83 ¦ Runoff 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Brookside Bioretention Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCADO 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 4S: Post-dev UND Runoff = 0.83 cfs @ 12.66 hrs, Volume= 0.132 af, Depth> 0.46" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Area (ac) CN Description 3.490 69 3.490 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.3 Direct Entry, Subcatchment 4S: Post-dev UND Hydrograph noff 0.9- 3 cfs 0.8 0'85 Charlotte 24hr 0.8 0.75 1-yr 24.00 hrs 1 yr - 24 hr 0.7 0.65 Rainfall=2,58" 0.6 Runoff Area=3.490 ac 0.55 0.5 Runoff Volume=0.132 of LL 00.4- 0.35'. Runoff Depth>0.46 Tc=16.3 min 025 CN=69 0.2 0.15 0.1 0.05 0 0 1 2 3 4 5 6 7 8 9 10 11 12, 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Brookside Bioretention Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" , Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAM 8.50 s/n 005123 © 2007 HydroCAD Soft LLC Summary for Pond 3P: Pond 1 [79] Warning: Submerged Pond 10P Primary device # 1 OUTLET by 0.92' Inflow Area = 2.590 ac, 0.00% Impervious, Inflow Depth > 1.04" for 1 yr - 24 hr event Inflow = 1.24 cfs @ 12.42 hrs, Volume= 0.225 of Outflow = 0.25 cfs @ 14.23 hrs, Volume= 0.112 af, Atten= 80%, Lag= 108.6 min Primary = 0.25 cfs @ 14.23 hrs, Volume= 0.112 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 712.92'@ 14.23 hrs Surf.Area= 6,585 sf Storage= 5,670 cf Plug-Flow detention time= 313.3 min calculated for 0.112 of (50% of inflow) Center-of-Mass det. time= 188.3 min ( 1,050.8 - 862.5 ) Volume Invert Avail.Storage Storage Description #1 712.00' 13,346 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 712.00 5,709 0 0 713.00 6,659 6,184 6,184 714.00 7,665 7,162 13,346 Device Routing Invert Outlet Devices #1 Primary 708.50' 12.0" x 27.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 708.00' S=0.0185'/' Cc= 0.900 n= 0.010 PVC, smooth interior #2 Device 1 712.00' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 712.90' 4.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 Primary OutFlow Max=0.25 cfs @ 14.23 hrs HW=712.92' (Free Discharge) t--1=Culvert (Passes 0.25 cfs of 7.49 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.10 cfs @ 4.41 fps) 13=Orifice/Grate (Weir Controls 0.15 cfs @ 0.49 fps) Brookside Bioretention Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 © 2007 HydroCAD Software Solutions LLC Page 7 Pond 3P: Pond 1 Hydrograph 0 LL 11 n G ¦ Inflow ¦ Primary D 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Brookside Bioretention Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 8 Summary for Pond 8P: Outfall [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 2.590 ac, 0.00% Impervious, Inflow Depth > 0.60" for 1 yr - 24 hr event Inflow = 0.74 cfs @ 12.42 hrs, Volume= 0.128 of Primary = 0.74 cfs @ 12.42 hrs, Volume= 0.128 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 8P: Outfall Hydrograph ¦ Inflow ¦ Primary w v 3 0 LL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Brookside Bioretention Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 9 Summary for Pond 10P: CB-17 [57] Hint: Peaked at 714.97' (Flood elevation advised) Inflow Area = 2.590 ac, 0.00% Impervious, Inflow Depth > 1.12" for 1 yr - 24 hr event Inflow = 1.92 cfs @ 12.42 hrs, Volume= 0.241 of Outflow = 1.92 cfs @ 12.42 hrs, Volume= 0.241 af, Atten= 0%, Lag= 0.0 min Primary = 1.24 cfs @ 12.42 hrs, Volume= 0.225 of Secondary = 0.68 cfs @ 12.42 hrs, Volume= 0.016 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 714.97'@ 12.42 hrs Device Routing Invert Outlet Devices #1 Primary 713.00' 12.0" x 58.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 712.00' S=0.0172'/' Cc= 0.900 n= 0.010 PVC, smooth interior #2 Secondary 714.60' 24.0" x 55.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 714.30' S= 0.00557' Cc= 0.900 n= 0.012 Concrete pipe, finished #3 Device 1 713.00' 6.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=1.24 cfs @ 12.42 hrs HW=714.97' (Free Discharge) L1=Culvert (Passes 1.24 cfs of 4.58 cfs potential flow) L3=Orifice/Grate (Orifice Controls 1.24 cfs @ 6.31 fps) Secondary OutFlow Max=0.66 cfs @ 12.42 hrs HW=714.97' (Free Discharge) L2=Culvert (Barrel Controls 0.66 cfs @ 2.53 fps) Brookside Bioretention Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" ' Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD@ 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 10 Pond 10P: CB-17 Hydrograph ¦ Inflow ? Outflow ¦ Primary ¦ Secondary ' w 3 0 LL 1 F C 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Brookside Bioretention Charlotte 24-hr 1-yr 24.00 hrs 1 yr - 24 hr Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 11 Summary for Pond 11P: Undetained OutFall [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 3.490 ac, 0.00% Impervious, Inflow Depth > 0.46" for 1 yr - 24 hr event Inflow = 0.83 cfs @ 12.66 hrs, Volume= 0.132 of Primary = 0.83 cfs @ 12.66 hrs, Volume= 0.132 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 11 P: Undetained Outfall Hydrograph 0 U. ¦ Inflow ¦ Primary U 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Brookside Bioretention Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HvdroCAD® 8.50 s/n 005123 @2007 HvdroCAD Software Solutions LLC Page 12 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-dev Runoff Area=4.960 ac 0.00% Impervious Runoff Depth=0.00" Tc=19.2 min CN=67 Runoff=0.00 cfs 0.000 of Subcatchment 2S: Post-dev Subcatchment 4S: Post-dev UND Pond 3P: Pond 1 Pond 8P: Outfall Runoff Area=2.590 ac 0.00% Impervious Runoff Depth=0.13" Tc=5.0 min CN=83 Runoff=0.61 cfs 0.029 of Runoff Area=3.490 ac 0.00% Impervious Runoff Depth=0.00" Tc=16.3 min CN=69 Runoff=0.01 cfs 0.001 of Peak Elev=712.17' Storage=983 cf Inflow=0.61 cfs 0.029 of Outflow=0.03 cfs 0.023 of Inflow=0.03 cfs 0.023 of Primary=0.03 cfs 0.023 of Pond 10P: CB-17 Peak Elev=713.67' Inflow=0.61 cfs 0.029 of Primary=0.61 cfs 0.029 of Secondary=0.00 cfs 0.000 of Outflow=0.61 cfs 0.029 of Pond 11 P: Undetained Outfall Inflow=0.01 cfs 0.001 of Primary=0.01 cfs 0.001 of Total Runoff Area =11.040 ac Runoff Volume = 0.029 of Average Runoff Depth = 0.03" 100.00% Pervious =11.040 ac 0.00% Impervious = 0.000 ac ' Brookside Bioretention Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 _H_ydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 1S: Pre-dev Runoff = 0.00 cfs @ 6.14 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Area (ac) CN Description 4.960 67 4.960 Pervious Area Tc Length Slope Velocity Capacity Description min (feet) (ft/ft) (ft/sec) (cfs) 19.2 Direct Entry, From spreadsheet Subcatchment 1S: Pre-dev Hydrograph 0.001- 0.00 cfs 0.001-. 0.001- 0.001-- 0.000 0.000 .2 0.000 , o.00 n 0.000 Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Runoff Area=4.960 ac Runoff Volume=0.000 of Runoff Depth=0.00" Tc=19.2 min CN=67 ¦ Runoff 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Brookside Bioretention Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD@ 8.50 s/n 005123 © 2007 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 2S: Post-dev [49] Hint: Tc<2dt may require smaller dt Runoff = 0.61 cfs @ 3.20 hrs, Volume= 0.029 af, Depth= 0.13" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Area (ac) CN Description 2.590 83 2.590 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, From spreadsheet Subcatchment 2S: Post-dev Hydrograph ¦ Runoff U bS 0.61 cfs 0.6 Charlotte 6-hr 0.55 1 -inch 1-inch 0.5 Rainfall=1.00" 0.45 Runoff Area=2.590 ac 0.4 w 0..35 35 Runoff Volume=0.029 of 0.3 Runoff Depth=0.13" 0.25 Tc=5.0 min 0.2 CN=83 0.15 0.1 0.05 0 1 2 3 4 5 6 7 8 9 10 11 1,2 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Brookside Bioretention Charlotte 6-hr 1-inch 1-inch Rainf611=1.00" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 4S: Post-dev UND Runoff = 0.01 cfs @ 5.73 hrs, Volume= 0.001 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Area (ac) CN Description 3.490 69 3.490 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.3 Direct Entry, Subcatchment 4S: Post-dev UND Hydrograph 0.007 0.006 0.01 cfs Charlotte 6-hr 0.005 1-inch 1-inch 0.005 0.004 Rainfall=1.00" 0004 Runoff Area=3.490 ac 0.003 Runoff Volume=0.001 of LL 0003 Runoff Depth=0.00" 0002 Tc=16.3 min o.°oz CN 69 0.001- 0.001- 0.000, ¦ Runoff 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 '2''2'''2''3 2,4 Time (hours) Brookside Bioretention Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 16 Summary for Pond 3P: Pond 1 [79] Warning: Submerged Pond 10P Primary device # 1 OUTLET by 0.17' Inflow Area = 2.590 ac, 0.00% Impervious, Inflow Depth = 0.13" for 1-inch event Inflow = 0.61 cfs @ 3.20 hrs, Volume= 0.029 of Outflow = 0.03 cfs @ 6.03 hrs, Volume= 0.023 af, Atten= 95%, Lag= 169.7 min Primary = 0.03 cfs @ 6.03 hrs, Volume= 0.023 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 712.17'@ 6.03 hrs Surf.Area= 5,870 sf Storage= 983 cf Plug-Flow detention time= 382.3 min calculated for 0.023 of (80% of inflow) Center-of-Mass det. time= 361.7 min ( 596.9 - 235.2 ) Volume Invert Avail.Storage Storage Description #1 712.00' 13,346 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 712.00 5,709 0 0 713.00 6,659 6,184 6,184 714.00 7,665 7,162 13,346 Device Routing Invert Outlet Devices #1 Primary 708.50' 12.0" x 27.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 708.00' S= 0.0185 'P Cc= 0.900 n= 0.010 PVC, smooth interior #2 Device 1 712.00' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 712.90' 4.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 Primary OutFlow Max=0.03 cfs @ 6.03 hrs HW=712.17' (Free Discharge) t1=Culvert (Passes 0.03 cfs of 6.73 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.03 cfs @ 1.42 fps) 3=Orifice/Grate ( Controls 0.00 cfs) 1 F 1 Brookside Bioretention Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Paae 17 Pond 3P: Pond 1 Hydrograph 0 LL 11 ¦ Inflow ¦ Primary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Brookside Bioretention Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 18 Summary for Pond 8P: Outfall [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 2.590 ac, 0.00% Impervious, Inflow Depth > 0.11" for 1-inch event Inflow = 0.03 cfs @ 6.03 hrs, Volume= 0.023 of Primary = 0.03 cfs @ 6.03 hrs, Volume= 0.023 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 8P: Outfall Hydrograph ¦ Inflow ¦ Primary v 3 0 LL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Brookside Bioretention Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAM 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 19 Summary for Pond 10P: CB-17 [57] Hint: Peaked at 713.67' (Flood elevation advised) Inflow Area = 2.590 ac, 0.00% Impervious, Inflow Depth = 0.13" for 1-inch event Inflow = 0.61 cfs @ 3.20 hrs, Volume= 0.029 of Outflow = 0.61 cfs @ 3.20 hrs, Volume= 0.029 af, Atten= 0%, Lag= 0.0 min Primary = 0.61 cfs @ 3.20 hrs, Volume= 0.029 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 713.67'@ 3.20 hrs Device Routing Invert Outlet Devices #1 Primary 713.00' 12.0" x 58.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 712.00' S=0.0172/' Cc= 0.900 n= 0.010 PVC, smooth interior #2 Secondary 714.60' 24.0" x 55.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 714.30' S= 0.0055'/' Cc= 0.900 n= 0.012 Concrete pipe, finished #3 Device 1 713.00' 6.0" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=0.61 cfs @ 3.20 hrs HW=713.66' (Free Discharge) 'L1=Culvert (Passes 0.61 cfs of 1.53 cfs potential flow) L3=Orifice/Grate (Orifice Controls 0.61 cfs @ 3.09 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=713.00' (Free Discharge) L2=Culvert ( Controls 0.00 cfs) Brookside Bioretention Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" ' Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 20 , Pond 10P: CB-17 Hydrograph ¦ Inflow ? Outflow ¦ Primary ¦ Secondary I 7, F 9 0 LL J 7 J C 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Brookside Bioretention Charlotte 6-hr 1-inch 1-inch Rainfall=1.00" Prepared by Kimley-Horn and Associates, Inc. Printed 12/11/2008 HydroCAD® 8.50 s/n 005123 @2007 HydroCAD Software Solutions LLC Page 21 Summary for Pond 11 P: Undetained Outfall [40] Hint: Not Described (OutFlow=Inflow) Inflow Area = 3.490 ac, 0.00% Impervious, Inflow Depth= 0.00" for 1-inch event Inflow = 0.01 cfs @ 5.73 hrs, Volume= 0.001 of Primary = 0.01 cfs @ 5.73 hrs, Volume= 0.001 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 11 P: Undetained Outfall Hydrograph ¦ Inflow ¦ Primary w v 3 0 U. + o r u 9 1u 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours)