STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F EASLEY
GOVERNOR
AGENDA
Eastern Concurrence Meeting
Thursday, December 11, 2008
Room 101, Parker Lincoln Building
Raleigh, North Carolina 27611
LYNDo TIPPETT
SECRETARY
J -5- 00s.1
- Michele James, Project Planning Engineer, NCDOT PDEA
TIP No. R-3407, NC 33 from US 64 near Tarboro to US 13/NCI 1-903 in Greenville
Edgecombe and Pitt Counties, Divisions 2 and 4
Team Members:
William Wescott, USACE
Michele James, PDEA
Ron Lucas, FHWA
Chris Mihtscher, USEPA
Gary Jordan, USFWS
Ron Sechler, NMFS
Rob Ridings and Brian Wrenn, DWQ
Sean McKenna, DMF
Travis Wilson, WRC
Renee Gledhill-Earley, SHPO
Steve Sollod, DCM
Daniel Van Lieve, Upper Coastal Plain RPO
(non-signatory)
Eddy Davis, Mid-East RPO (non-signatory)
NCDOT Technical Support Staff and Other Agency Staff:
Ricky Green, Division 4
Wendi Williams, Division 4
Neil Lassiter, Division 2
Ed Eatmon, Division 2
Jimmy Goodnight, Roadway Design
Tun Goins, Roadway Design
Jerry Snead, Hydraulics
BenJetta Johnson, Congestion Management
Earlene White, TPB
Njoroge Wauiama, Geotechnical
Shannon Lasater, Highways Admin Office
Chris Rivenbark, NEU
Mary Pope Furr, HEU
Tun Gardiner HEU
Charles Cox, PDEA
Rob Hanson, PDEA
* The purpose of this meeting is to reach concurrence on MA.
MAILING ADDRESS TELEPHONE 919-733-3141 LOCATION
NC DEPARTMENT OF TRANSPORTATION FAX 919-733-9794 TRANSPORTATION BUILDING
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1 SOUTH WILMINGTON STREET
1548 MAIL SERVICE CENTER WEBSITE WWW DOH DOT STATE NC US RALEIGH NC
RALEIGH NC 27699-1548
Concurrence Point 2A
NEPA/404 Merger Team Meeting
TIP Project No. R-3407
Federal Project No MASTP-33(3)
WBS No 34539 1 1
Widening of NC 33 from US 264 in
Greenville to US 64 Southeast of Tarboro
Edgecombe and Pitt Counties
December 11, 2008
Transportation Building Board Room
Purpose of Meeting:
The,purpose of this meeting is to submit information to the Merger Team on the,
alternatives'that have been studied in detail and to reach concurrence on Point 2A ,
(Bridging Decisions and Final Alternatives to Carry Forward) for TIP Project No R73407,
,
Agenda for Meeting:
• Project Description and Status
• Discussion of Bridging Locations
• Discussion of Final Alternatives to Carry Forward
• Comments and Questions
Project Planning Engineer: Michele L. James
(919) 733-7844, Ext. 233
mjames@ncdot.gov
R-3407 CP 2A - Bridging Decisions
December 11, 2008
PROJECT DESCRIPTION
TIP Project R-3407 is programmed in the 2009-2015 State Transportation Improvement
Program (STIP) for the widening of NC 33 to a multilane facility from the US 264 Bypass in
Greenville to US 64 southeast of Tarboro The project has been divided into seven sections, with
two to three alternatives per section under consideration They include and corridors utilizing
existing facilities and corridors located on new location The attached vicinity map shows the
location of the project The sections vary from 0 51 to 4 67 miles in length
A four-lane median divided facility with partial access control is proposed It is
anticipated approximately 200 feet of right of way will be required to accommodate this facility
The median width of 46 ft will be reduced in Sections 4 and 6
Studies are underway in accordance with the requirements set forth in the National
Environmental Policy Act (NEPA) of 1969, as amended Right of way acquisition is scheduled
for Federal Fiscal Year (FFY) 2013 (Section 1 only) and construction is scheduled for Post Year
The total estimated cost for the proposed project is $78,100,000, including $6,500,000 for right
of way and $71,600,000 for construction cost
PURPOSE AND NEED (CP 1)
The Purpose and Need Statement (CPI), as approved by the NEPA/404 Merger Team on
February 17, 2005 is stated as follows "The purpose of the project is to improve the safety
and capacity of NC 33 between Tarboro and Greenville."
DETAILED STUDY ALTERNATIVES CARRIED FORWARD (CP 2)
Concurrence Point 2 (CP 2) was signed on August 24, 2006 At this meeting, the team
agreed to consider the following alternatives for each section
• Section 1, from US 64 in Tarboro to dust west of NC 42 Two alternatives, northern widening
and best fit
• Section 2, from dust west of NC 42 to approximately 0 35 mile east of NC 42 Two
alternatives, northern widening and best fit
• Section 3, from approximately 0 35 mile east of NC 42 to approximately 0 30 mile west of
SR 1608 (Thigpen Road) Two alternatives, northern widening and best fit
• Section 4, from approximately 0 30 mile west of SR 1608 (Thigpen Road) to 0 40 miles east
of SR 1409 (Penny Hill Road) Four alternatives, northern widening, southern widening, best
fit and avoidance of the Penny Hill historic doctor's office
• Section 5, from approximately 0 40 mile east of SR 1409 (Penny Hill Road) to
approximately 0 33 mile west of NC 222 Two alternatives, southern widening and best fit
2
R-3407 CP 2A - Bridging Decisions
December 11, 2008
• Section 6, from approximately 0 33 mile west of NC 222 to approximately 0 46 mile east of
NC 222 Best fit alignments with options in and around Belvoir
• Section 7, from approximately 0 46 mile east of NC 222 to US 264 in Greenville Two
alternatives, northern widening and best fit
CONCURRENCE POINT 2A
The proposed alternatives for TIP Project R-3407 are located within the Tar-Pamlico
River Basin Jurisdictional streams and wetlands have been identified within the project study
corridor Table 1 details the current sections/ alternatives and impacts associated with each
alternative Wetland and stream impacts for each project section are provided in Table 2
Wetlands and streams are shown in Figure 2
Wetland and stream impacts were calculated based on the current preliminary design
Wetland impacts are calculated from slope stake to slope stake, plus an additional 25 feet outside
of each limit as determined from the current functional design plans for each alternative, The
totals are rounded to the nearest Y 1 acre for wetlands and the nearest foot for streams
Revisions to Current Alternatives: y
rt t i 1
Section 4: To, avoid both the Tar River and the Historic Property, NCDOT evaluated one ' ,
bypass option in addition to the widening alternatives
Section 6: In order to minimize impacts to the Belvoir community, NCDOT evaluated 2 bypass
options in addition to the widening alternative
CP 2A Field MeetinE:
A field meeting was held November 3, 2008 The attendees reviewed high quality
wetland sites and potential bridge locations Table 3 lists each of the high quality crossings and
mayor hydraulic crossings NCDOT's hydraulic structure recommendations are provided in this
table At this meeting, the Agencies in attendance agreed with all of NCDOT's
recommendations for hydraulic structures
3
R-3407 CP 2A - Bridging Decisions
December 11, 2008
Table 1: R-3407 Preliminary Impacts
?" '"
n _
Section 1 ?Sectiom 1
Section 2 Sect ion-2
Impact Best _ forth Best Fit - _ N rttt
C
- Widening
_ideuiu -
W
Length (miles) 4 7 47 05
Interchanges 0 0 0 0
Railroad Crossings 0 0 0 0
Schools 0 0 0 0
Recreational Areas and 0 0 0 0
Parks
Churches 0 0 0 0
Cemeteries 1 cemetery 2 cemetery 0 0
11 graves 20 graves
Potential Residential 9 7 13 8
Relocations
Potential Business 0 0 0 0
Relocations
Historic Properties (Listed
on or eligible for the 0 0 0 0
National Register)
Section 4(f)/6(f) Impacts 0 0 0 0
(Park/Historic)
Archaeological Sites TBD TBD TBD TBD
NRCS - Potential TBD TBD TBD TBD
Farmland Conversion
Wetlands Impacts (acres) 1 8 2 7 01 3
Stream Impacts (feet) 420 439 0 0
Water Supply Watershed NO NO NO NO
Protected Areas
Wildlife Refuges and 0 0 0 0
Gamelands
Federally Listed Species 1 * 1 * 0 0
within Corridor
Known Hazardous Mat'l 0 0 0 0
Sites/ Spill Basins
Adverse / Disproportionate
Impacts to Minority/Low NO NO NO NO
Income Populations
Right of Way Cost $2,750,000 $2,845,000 $1,489,000 $855,000
Utility Cost $3,145,232 $3,021,256 $1,021,608 $884,124
Construction Cost $18,500,000 $18,900,000 $2,300,000 $2,250,000
Total Cost $24,395,232 $24,757,256 $4,810,608 $3,991,124
*Section 1 - Documented Bald Eagle nest on south side of NC 33
4
R-3407 CP 2A - Bridging Decisions
December 11, 2*68
Table 2: R-3407 Prelimi pacts (cont
_
Section 3 Section 3
Section 1. Section 4
Impact
[lest Fit North
( -
North fllyp, Forth
w 1*Nidening, NVide uin
Length (miles) 1 3 1 3 7 17
Interchanges 0 0 0
Railroad Crossings 0 0 0 0
Schools 0 0 0 0
Recreational Areas and 0 0 0 0
Parks
Churches 0 0 0 0
Cemeteries 0 0 0 0
Potential Residential 1 1 3 6
Relocations
Potential Business 0 0 Q 1
Relocations
Historic Properties (Listed
on or eligible for the _ 0 0 0 1 ,
National Register)
Section 4(f)/6(f) Impacts 0 0 0 ' 1
(Park/Historic) .
Archaeological Sites, + TBD TBD TBD TBD_--,
NRCS -Potential TBD TBD TBD TBD" 1
Farmland Conversion :
Wetlands Impacts (acres) 12 1 1 10 25
Stream Impacts (feet) 1114 948 297 320
Water Supply Watershed YES YES YES YES
Protected Areas
Wildlife Refuges and 0 0 0 0
Gamelands
Federally Listed Species 0 0 1 * 1
within Corridor
Known Hazardous Mat'l 0 0 0 0
Sites / Spill Basins
Adverse / Disproportionate
Impacts to Minority/Low NO NO NO NO
Income Populations
Right of Way Cost $401,000 $426,000 $813,000 $1,258,000
Utility Cost $1,248,420 $1,345,848 $655,724 $1,339,422
Construction Cost $5,000,000 $5,000,000 $8,300,000 $6,800,000
Total Cost $6,649,420 $6,771,848 $9,768,724 $9,397,422
* Section 4 - Tar River spmeymussel
R-3407 CP 2A - Bridging Decisions
December 11, 2008
Table 3: R-3407 Preliminary Impacts (cont.)
SectionA Section 5
-Impact
??ith? ? S
Section S
Smid)
NN/din Best Fit i.dcnin _, .
Length (miles) 1 7' 11 39
Interchanges 0 0 0
Railroad Crossings 0 0 0
Schools 0 0 0
Recreational Areas and
Parks
Churches 0 1 1
Cemeteries 0 0 0
Potential Residential 2 5 8
Relocations y
Potential Business 1
j 4 3
Relocations
Historic Properties (Listed 1
on or eligible for the (Penny Hill
Dr 0 0
National Register) Office)
Section 4(f)/6(f) Impacts
0
0
(Park/Historic)
l
Archaeological Sites TBD TBD TBD
NRCS - Potential TBD TBD TBD
Farmland Conversion
Wetlands Impacts (acres) 68 1 5 1 8
Stream Impacts (feet) 320 1130 2077
Water Supply Watershed YES YES YES
Protected Areas
Wildlife Refuges and 0 0 0
Gamelands
Federally Listed Species 1 0 0
within Corridor
Known Hazardous Mat'l 0 0 0
Sites/ Spill Basins
Adverse / Disproportionate
Impacts to Minority/Low NO NO NO
Income Populations
Right of Way Cost $759,000 $2,041,000 $2,364,000
Utility Cost $903,888 $3,992,692 $3,861,600
Construction Cost $7,200,000 $14,600,000 $14,500,000
Total Cost $8,862,888 $20,633,692 $20,725,600
* Section 4 - Tar River spmeymussel
t r 3'
6
R-3407 CP 2A - Bridging Decisions
December 11, 2008
Table 4: R-3407 Preliminary Impacts (cont.
SE i 6 ?'Sc?ti?ri" 6 Scctibn-6
lrnp pct 13 it \???th ?tss _ South BN "Iss -
Length (miles) 0 1
Interchanges 0 0 0
Railroad Crossings 0 0 0
Schools 0 0 0
Recreational Areas and 0 0 0
Parks
Churches 0 0 0
Cemeteries 0 0 0
Potential Residential 18 '? 1 2
Relocations
Potential Business 1 0 0
Relocations
Historic Properties (Listed _
on or eligible for the 0 0 0
National Register)
Section 4(f)/6(f) Impacts 0 0 0
(Park/Historic)' y
Archaeological Sites TBD TBD TBD,
NRCS - Potential TBD TBD TBD' '
Farmland Conversion
Wetland's Impacts acres 0 2 22
•,;
Stream Impacts (feet) 288 200 493
Water Supply Watershed YES YES YES
Protected Areas
Wildlife Refuges and 0 0 0
Gamelands
Federally Listed Species 0 0 0
within Corridor
Known Hazardous Mat'l 0 0 0
Sites / Spill Basins
Adverse / Disproportionate
Impacts to Minority/Low NO NO NO
Income Populations
Right of Way Cost $1,875,000 $561,000 $513,000
Utility Cost $259,220 $223,408 $201,900
Construction Cost $3,600,000 $7,300,000 $6,100,000
Total Cost $5,734,220 $8,084,408 $6,814,900
7
.r rs f .
? e7 ?
R-3407 CP 2A - Bridging Decisions
December 11, 2008
Table 5: R-3407 Prehminipacts (cont.)
- Section 7 Section 7-
I?upact Best Fit North VNidenin
Length (miles) 0 40
Interchanges 0 0
Railroad Crossings 0 0
Schools 1 t-?s 1
Recreational Areas and 0 0
Parks
Churches 0 0
Cemeteries 1 cemetery 1 cemetery
(6 graves) ( 6 graves)
Potential Residential 18 • 23
Relocations ,
Potential Business 2 2
Relocations
Historic Properties (Listed
on or eligible for the- 0 0
National Register)
Section 4(f)/6(f) Impacts, 0 0
(Park/Historic)
Archaeological Sites TBD, TBD
NRCS - Potential TBD TBD
Farmland Conversion
Wetlands Impacts (acres) 3 3
Stream Impacts (feet) 965 , 750
Water Supply Watershed YES YES
Protected Areas
Wildlife Refuges and 0 0
Gamelands
Federally Listed Species 0 0
within Corridor
Known Hazardous Mat'l 0 0
Sites/ Spill Basins
Adverse / Disproportionate
Impacts to Minority/Low NO NO
Income Populations
Right of Way Cost $3,084,000 $3,862,000
Utility Cost $3,224,196 $3,345,726
Construction Cost $13,100,000 $13,700,000
Total Cost $19,408,196 $20,907,726
f ? F t Y <
?
? t
8
R-3407 CP 2A - Bridging Decisions
December 11, 2008
Table 2A: R-3407 Wetland and Stream Impacts - Section 1-Northern Widening
Riverine
?? elland/ Wetland Length of Non- Riper ine
Stream -Wetland Area Stream `1C DWO
(N?etlands)
?ldcutification ' Type Impacted
- Impacted Ratin4, -Perennial
- (Acres) - (ft), n ,Intermittent
- (streams)
Pond 1 08
Pond 2 19
WA PFO1 C 37 47
Cromwell
207 35 57 P
Canal
WC PFO 1 C 20
UT1 37 3 50 P
WD PFO1 C 03 30
UT2 195 39 75 P
UT2 02 39 75 P
Wl PFO1C 29 57
WL PFO 1 C 13 70
WN PFO 1 C 18 40
WO PFO 1 C 1 25 48
TOTALS: 2.7 439
Table2B: R-3407 Wetland and Stream Impacts - Section 1-Best?Fit Widening ` t
- ? R??enne ?, °
?? etlan?/ NN'etland
' 1 moth of
7=
. ' a-
- '
NongR?v ei Ife
ctland1iEa
1 '
Sftc im _- JNCDN1O _ F -
iIdentrtlc?iti??n . T??pc fm??acted
- Itiip ietEd? . R?t?n?
. ,T ,??crnn??l`/?
AC'I eS) ?r
(1t) -lntcrnfiftcnt
Pond 1 0 0
Pond 2 0 0
WA PFO 1 C 44 47
Cromwell 224 35 57 P
Canal
WC PFO 1 C 22
UT1 35 3 50 P
WD PFO 1 C 03 30
UT2 161 39 75 P
WI PFO 1 C 76 57
WL PFO 1 C 14 70
WN PFO 1 C 16 40
WO PFO 1 C 01 48
TOTALS: 1.8 420
9
R-3407 CP 2A - Bridging Decisions
December 11, 2008
Table 2C: R-3407 Wetland and Stream Impacts - Section 2-Northern Widening
_
Wetland
r
-
Length of, Riverine
Non
Riverine
Wetland/
Stream ? ?
'Wetland 1
?
-
?Area Stream ate NC DWQ ce,
_ wetlands
Identification Type -Impacted Impacted Rating Perennial
(Acr=es)
(ft) - m
Intermittent
(streams)
WP PEM 30 16
TOTALS: .3
Table 21): R-3407 Wetland and Stream Impacts - Section 2-Best Fit
W ?
{
«tctland/ Wetland Letioth.ot i
- .Non- Riverine
-
«'
etland
Area
Stream I
nC=D«Q -
,"Oyetlands)
Type Iniliacted Impacted_ Rat ligl_
Perennial
4 (fentifica tion
?
,
Intermittent
b = I _ ? (streams)
UT3 327 25
5 P
UT4 621 28 75 P
WQ PFO 1 C 1 14 71
UT5 214 26 75 P
TOTALS: 1.1 948
- Riverine i
R Mond/ ??'ctland _ Length of Non- Riverine
Str
am NVetland area Stream NC UN1'Q (wetlands)
e
Identification T?'pe Impacted Impacted Ratln?; Perenlllaf
(Acres) (ft Intermittent
(streams)
WP PEM 01 16
TOTALS
:
.O1
? t
Table 2E: R-3407 Wetland and Stream Impacts - Section 3-Northern Widening
10
R-3407 CP 2A - Bridging Decisions
December 11, 2008
N_
a
Table 2F: R-3407 Wetland and Stream Impacts - Section 3-Best Fit Widening
Riverine,/,,
??A ctland/
\N
d Wetland ?
A Lengib of Non- Riverine,
NC D\
S
)
aStrea edan rea tream
Q1 (NNetlands)
- -
y
n
Identification Tvpe -Impacted ?
Impacted IZatin
Percnnial /
(Acres) (ft) Intermittent
(streams)
UT3 285 255 P
UT4 613 28 75 P
WQ PFO1 C 1 21 71
UT5 216 26 75 P
TOTALS: 1.2 1114
Table 2G: R-3407 Wetland and Stream Impacts - Section 4 - Northern Widening
Riverine-l -
?1 ctland/ = \N'etland : ? Lenoth of Non- RiNerine
?1 etland area Strean) NC )
(NN'etlands)
Stream Type Impacted Iriipactki hating Perennial;
Identification
(acres) (ft) Intermittent
(ctreat>i><s) -
WST PFO1 C 89 56
WU PFO 1 C 31 75
PFO 1 C/
WX 1 28 43
PEM
Cheeks Mill 320 49 00 P
Creek
TOTALS: 2.5 320
Table 211: R-3407 Wetland and Stream Impacts - Section 4 - Southern Widening
_w ro _. Ri?er-inc /
NN'etland/ ?? ctland Length of - Non- Riverine
Wetland Area Stream NC DNVQ (wetlands)
Stream "INI)e Impacted Impacted Rating
Rating
Perennial /
Identification (Acres) (O ? lntermittent`
?? ? stre<<nr<s
WST PFO1C 5 35 56
WU PFO 1 C 84 75
PFO1 C/
WX 59 43
PEM
Cheeks Mill
320 49 00 P
Creek
TOTALS: 6.8 320
R-3407 CP 2A - Bridging Decisions
December 11, 2008
Table 21: R-3407 Wetland and Stream Impacts - Section 4 - Northern Bypass
^ W Riverine l
' Wetland/ Wetland Length of Non- Riverine'
Stream -Wetland Area ,Stream NC DWQ (wetlands)
Identi
Identification Type Impacted Impacted Rating
Nerellnial /
(:acres) (ftj Intermittent
(s h-earns)
WST PFO1 C 69 56
PFO 1 C/
WX
PEM 27 43
Cheeks Mill
Creek 297 49 00 P
TOTALS: 1.0 297 ia?
Table 2J: R-3407 Wetland and Stream Impacts - Section 5 - Best Fit Widening
i v a Rig erin'e /
Wetland/ Wetland Length of Non- Riverine
Stream Wetland .area Stream N C DAN Q (wetlands)
ldentification
yl)e
Impacted
Impacted Rating --
Perennial
/
(:Acres) (ft) Intermittent
(strea?u?} ,a
, PFO 1 C/
WX 19 43
PEM
y UT 6 228 42 00 P
UT 7 161 32 50 P
UT 8 166 24 50 P
UT 9 138 30 25 P
WAC PFO 1 C 19 82
Conetoe Creek 201 48 00 P
WAC PFO 1 C 1 14 82
UT 10 236 29 75 P
TOTALS: 1.5 1130
12
R-3407 CP 2A - Bridging Decisions
December 11, 2008
Table 2K: R-3407 Wetland and Stream Impacts - Section 5 - Southern Widening
Riverine
?N eI Land/ Wetland Length of
n ( Non- Riverine
Strcani'? Wetland a,
' - a ..- Area Stream NC DWQ (wetlands)
Identitcation Type `Impacted Impacted R-,rtin
g
Perennial /
- (Acres) (ft) Intermittent .
streams
UT6 169 42 00 P
WX PFO 1 C/ 45 43
PEM
UT 7 157 32 50 P
UT 8 165 24 50 P
UT 9 133 30 25 P
WAC PFO 1 C 25 82
Conetoe Creek 215 48 00 P
WAC PFO 1 C 1 11 82
UT 10 1238 29 75 P
TOTALS: 1.8 2077
Table 2L: R-3407 Wetland and Stream Impacts - Section 6 - Best Fit
w
j Riverine
N1 etlandl ?1"etland t Length of
? Non- Riverine
Wetland .area Stream NC DNVQ (wetlan(I s)
Stream
TN )e -'
Impacted
Impacted
Rating --
Perennial /
Identification
(Acres) (ft) Intermittent
- (Streams)
UT11 165 25 50 P
UT12 123 29 25 P
TOTALS: 0 288
Table 2M: R-3407 Wetland and Stream Impacts - Section 6 - Northern Bypass
- Riverine i
NN etland/ Wetland _
4 Length ref Non- RiN erine
Wetland Area Stream NC DNVQ '(wetlands)
Stream
Identification j Type Impacted Impacted Rating; Perennial /
(?cres) (ft) Intermittent
streams
UTO 1/ 200 29 75 P
WAR FD 15 58
TOTALS: 0.2 200
13
R-3407 CP 2A - Bridging Decisions
December 11, 2008
. rr
? '6 v
Table 2N: R-3407 Wetland and Stream Impacts - Section 6 - Southern Bypass
Riverine /
Wetland/ `"Wetland
* Length of Non- Riverine
Stream Weiland ,,,Area Stream NC DWQ (we_il`ands
111 ?
Identifications T e Im acted Im acted 'Rating
- Pere`nniall
E
(Acres)
(ft) , ,
Intermittent`
(streams)
UT 10 493 29 75 P
WAR FD 2 20 58
TOTALS: 2.2 493
Table 20: R-3407 Wetland and Stream Impacts - Section 7 - Northern Widening
, , _ -` ' - `t - Riverine/-
7 Wetland/ Wetland a Length of Non- Riverine
- Wetland ,Wetland Area Stream NC DWQ (wetlands)
Identification = Type Impacted Impacted Rating Perennial / .
(Acres) A Intermittent
r,, n ; streams ,
UT13 153 34 25 P
WAR FD 16 58-
WAS FF 16 24
UT 15 59 18 75 P
UT 16 153 32 75 P
UT 17 46 2025 P
UT 18 156 31 75 P
UT 19 136 18 00 I
j
UT 20 47 6 00 I
TOTALS: .3 750 1
? f< 5 i
,
14
r caw -1....
R-3407 CP 2A - Bridging Decisions
December 11, 2008
Table 2P: R-3407 Wetland and Stream Impacts - Section 7 - Best Fit Widening
Rirerinc
Wetland/ Wetland Length of Non- Riverine,
Stream Wetland Area, Stream NC DNVQ (Wetlands)
Identification Type Impacted Impacted Rating
perennial
(Acres) (ft) Intermittent
(streams)
UT13 173 34 25 P
WAR FD 14 58
WAS FF 16 24
UT 15 134 18 75 P
UT 16 155 32 75 P
UT 17 116 2025 P
UT 18 168 31 75 P
UT 19 152 18 00 I
UT 20 62 6 00 I
TOTALS: .3 965
15
Table 3: R-3407 Hydraulic Structure Recommendations
L'tkkI]d/Str-CilIn
I xistrll f
E ?t ?n?? (lnrlnl'ntK
llNdraul?c ? Section 1CDOT lZccomfile nd .ltion
SVStein
' Structure froin Meld Visit
r-iissiu
C
Cromwell Canal Yes 1BF 2@7'x7' Retain and Extend Concurred with NCDOT
WA
Cromwell Canal
WA Yes 1 NS 2@7'x7' Retain and Extend Concurred with NCDOT
UT 2 Cromwell Yes 1 BF 1@9'X 8' Retain and Extend Concurred with NCDOT
Canal
UT 2 Cromwell Yes 1 NS 1@9'X 8' Retain and Extend Concurred with NCDOT
Canal
UT
Tar River WN Yes 1 BF 2@48" RCP Replace w/2 @7'X5' RCBC Concurred with NCDOT
UT
Tar River WN Yes 1 NS 2@48" RCP Replace w/2 @7'X5' RCBC Concurred with NCDOT
UT 5 Tar River
WQ Yes 3 BF 2@48" RCP Retain and Extend Concurred with NCDOT
UT 5 Tar River Yes 3 NS 2@48" RCP Retain and Extend Concurred with NCDOT
WQ
Suggs (Cheek
Yes
4 NS
91' Bridge Replace Existing Location
Concurred with NCDOT
Mill) Creek WU 120', New NBL 170' x ;
Suggs (Cheek °
' yes 4 SS 91' Bridge Replace Existing Location, Concurred witti NCDOT
Mill) Creek
WU 120', New SBL 220'
Suggs (Cheek' ' Replace Existing Location
Mill) Creek WU
Yes
4 BYPN Bridge
9 1
to East Dual 220" Concurred with NCDOT
UT 6
Tar River Yes 5 BF 48" CMP Replace w/1 @6'X5' RCBC Concurred with NCDOT
UT 6
Tar River yes 5 NS 48" CMP Replace w/1 @6'X5' RCBC Concurred with NCDOT
UT 9
Tar River Yes 5 SS 60" CMP Replace w/1 @6'X5' RCBC Concurred with NCDOT
UT 9
Tar River Yes 5 BF 60" CMP Replace w/1 @6'X5' RCBC Concurred with NCDOT
Conetoe Creek Yes 5 SS 120' BRG Retain Existing Bridge, Concurred with NCDOT
WAC Add 120' Dual
Conetoe Creek
Yes
5 BF
120' BRG Retain Existing Bridge,
Concurred with NCDOT
WAC Add 120' Dual
UT 13
Tar River yes 7 NS 84" CMP Replace w/2@7'X7' RCBC Concurred with NCDOT
UT 13
Tar River yes 7 BF 84" CMP Replace w/2 @7'X7' RCBC Concurred with NCDOT
UT 16 2@112"X75"
Tar River yes 7 NS
CMPA [Replace w/2 @7'X7' RCBC Concurred with NCDOT
Note: "BF" - Best Fit
"NS" - North Side Widening
"SS" - South Side Widening
"BYPN" - North Bypass
"BYPS" - South Bypass
"W" - Wetland
"BRG" - Bridge
"CMP" - Corrugated Metal Pipe
"CMPA" - Corrugated Metal Pipe Arch
"RCP" - Reinforced Concrete Pipe
"RCBC" - Reinforced Concrete Box Culvert
? PROjYr I
64
258
k"ll
G
264
0 1.5 3
-aw Miles /
1
Air
a. NowrN 0q9 WIDENING OF NC 33 FROM Cnty: EDGECOME & PITT
NORTH CAROLINA DEPARTMENT
OF TRANSPORTATION US 64 SOUTHEAST OF
Div: 284 TIP# R3407 Figure
z DIVISION OF HIGHWAYS TARBORO TO US 264
PROJECT DEVELOPMENT AND WBS: 34539
ENVIRONMENTAL ANALYSIS BRANCH
9? EDGECOMBE & PITT COUNTIES
"•»°F TRpNg? TIP PROJECT R-3407 Date: JULY 2007
w "C
it ®•??,jr. ?' a.Hm,l t r t e.g 4' ?.?,`,'•. -•: >r 4 Y HS a` ?i' •?
+ *? 'II,Aab 2?+ Q? ? tl•4. ..;,. f: _ ,?..? ,? r - y'r, I"is.... 2'a, ? 14? -, ,?, ?+H?... ? -t?
}4T•^ ?• 1 Y. ti.. ? }•??. K ? 4 4 } ??d r ?1?4.._?? Yyy"`r???'? ? ??^ .5{.??? ? `u?? ?
- f r o;? ,,kk ? T ,???+aYY h c'Y?• ? " ??s Rw `r" W `" i 4
M ?
;SAL_-?A%,r
n
+.: 'ONOUd
?. z. Nr,
o a -
?C
r ... ;. o 0 o 0 o z m 0 CD
C =1
N
m
m
• Zo
?m
m
A
P
cn o
go ` n
m c:
0,:5
i WIDENING OF NC 33 FROM NORTH CAROLINA DEPARTMENT ?Tr
US 64 SOUTHEAST OF h y
OF TRANSPORTATION
--I N =
co
co
m
TARBORO TO US
m 264 DIVISION OF HIGHWAYS
In
O? X
N ?- p
90 PROJECT DEVELOPMENT AND
EDGECOMBE & PITT COUNTIES ENVIRONMENTAL ANALYSIS BRANCH
NSQ
v ° o co
m N TIP PROJECT R-3407 °Fp
CIO
117
m 7
m
9
w"
01
Q° c
mK
°
p i WIDENING OF NC 33 FROM
ppgiH ?
NORTH CAROLINA DEPARTMENT
US 64 SOUTHEAST OF
OF TRANSPORTATION ry 9
N
N m co n TARBORO TO US 264 DIVISION OF HIGHWAYS
0
, x
rv ?-
p
90 PROJECT DEVELOPMENT AND
w, EDGECOMBE & PITT COUNTIES ENVIRONMENTAL ANALYSIS BRANCH
M
V
C)
°
m OF TRPri
'v
TIP PROJECT R-3407
N
m Zip
< ?
m
(n
w
W N<
Q°
? m=
WIDENING OF NC 33 FROM
NOATN
I ,
NORTH CAROLINA DEPARTMENT 4
9
US 64 SOUTHEAST OF OF TRANSPORTATION y g
m
?
- o TARBORO TO US 264 DIVISION OF HIGHWAYS
?
C m
N ?
A
co PROJECT DEVELOPMENT AND
9QOPY
EDGECOMBE & PITT COUNTIES
ENVIRONMENTAL ANALYSIS BRANCH ~?'?
V C) ° m N
N TIP PROJECT R-3407°""p
(n
_ z o
O?
<
cn O
N o
WIDENING OF NC 33 FROM N°RTM?
m
m ?
"' w .
90 m - NORTH CAROLINA DEPARTMENT
US 64 SOUTHEAST OF y
?•
N K w G) OF TRANSPORTATION
TARBO
O
= co m - R
TO US 264 DIVISION OF HIGHWAYS
C m
No
'
° o
PROJECT DEVELOPMENT AND '
EDGECOMBE & PITT COUNTIES '
ENVIRONMENTAL ANALYSIS BRANCH
,,°F,?,,,_ ` c
(D o 00 ' V TIP PROJECT R-3407
1 -4 CIO I m
= o N 5 WIDENING OF NC 33 FROM of N«nH t
<R w • • m NORTH CAROLINA DEPARTMENT
m -n m A 90 p'` US 64 SOUTHEAST OF OF TRANSPORTATION
= m cyl A m - TARBORO TO US 264 DIVISION OF HIGHWAYS
--I w PROJECT DEVELOPMENT AND
O? N 1 90 EDGECOMBE & PITT COUNTIES ENVIRONMENTAL ANALYSIS BRANCH ?> gQ°p
OF Tan?
-4 °0 0 co TIP PROJECT R-3407
co ?, m
cn
m
-n Zo
<
M
W
.cn 0
N
A 0
m
WIDENING OF NC 33 FROM H?TH
NORTH CAROLINA DEPARTMENT
US 64 SOUTHEAST OF OF TRANSPORTATION P s
TARBORO TO US 264 DIVISION OF HIGHWAY
= m _ S
V ? j C7
O PROJECT DEVELOPMENT AND f
C
-
N
W
S?° EDGECOMBE & PITT COUNTIES =i
ENVIRONMENTAL ANALYSIS BRANCH M0, TOW
°o o W TIP PROJECT R-3407
-1 00 ?, m
`a
O
O
X
m
r
(n
_
m
m ?! z o
m
00
w
A o
Q° 0
m ;
o
(
?
WIDENING OF NC 33 FROM "ATM
NORTH CAROLINA DEPARTMENT
/ US 64 SOUTHEAST OF gy
OF TRANSPORTATION N T
N 00 W ? ,
C m
p
=j m
C) TARBORO TO US 264 DIVISION OF HIGHWAYS
O c(D
y`
' ;
N
W ' O
K Q° EDGECOMBE & PITT COUNTIES PROJECT DEVELOPMENT AND
SQC v
ENVIRONMENTAL ANALYSIS BRANCH it ?N
°o o co T N
TIP PROJECT R-3407
y co v m
N
_
m 'r! 0
< "
M
W
w
`' 0
`
90 0
c
m
0-7
WIDENING OF NC 33 FROM Nop*n
NORTH CAROLINA DEPARTMENT
US 64 SOUTHEAST OF OF TRANSPORTATION °? gy
p
TARBORO TO US 264
?
c ? m DIVISION OF HIGHWAYS
-
n
PROJECT DEVELOPMENT AND Q
i
?
0, 90 EDGECOMBE & PITT COUNTIES ENVIRONMENTAL ANALYSIS BRANCH
pNS°P
fT°
N
CD -P,
oo s
TIP PROJECT R-3407
v co ° m
? .• ? ? a ? ._, r _ ? ? ? ,-ate p ,'?, ?-?
0 C:
m
e v
C a
54
i
,+ f
l ? _ ti y
_r
sk
J L d.. ,?i {L ,, y J ! I j 1 'r I I I cr J -? )t dAre, K a>,,Y
1 '.
x 7s
i:idt 1z?ix ¦y i4 ti.?:'I q in i r
~^h T _V I t I I is I° I t`. t 11 , IY ;R
.Y
• 5 r
°" , ' 41 4 5 1 Y?I k t l`° °. t l 1 I ,w w x :° ti
r, t A
'•' - (° hl? r S1 k I` y 1` a •?' ?''
{vr '_ r •.??., J?„" auk., 1 ? 1 I Y ?`y F:, `;h a i'1 , ,?1I:.y; - , ? ? •+i,.. ?:
T?td?`
? Ile 1?',??II?'? I?S? 11.11 .,e 5
rr 1 j9 Pt rte,
.°s
:-+1• - ; 1 7 , ',- aYr }t' _ '?f `?'It i lti k.' '? ? 1 4 V1J CU/ i a r R^` ?`" '4'e'd14.•
0,
'4 }:?tj yr5 P 4?? I?'lll? `'w - , ?' aaM
i7 i
j?_=yam' _ - _.. `?.•?'..? ??) I'r,^?-" ??1- r't.. '?Kr.
Ilk
'f 43. Y Y•'j }_ ?fJF -S C / l '? ?• may ?' KS
?y ??cww L 1 •c? '- f- i
v 6
04
(m) sk
Iv
-- `fir •. .: "!.-I`(t _ ? ?' _ -., ' _
ti `? I 5
1 ? 4
, 2f
lb?
J Y ti -?4t" '? 'YA'M ? r ?P?J? 1 ?.?'r Yf ? 9+- I - '? l'i; 1-_ 1 5. 6
_ S
t I .t t? .
a
,
CD C ~
CD 0) C
CD D CD
CD CD
pJ N Q
't 5?1 ?_ ?Jw ei z7 G.
N (n (D
- - _ Y se N (D
(D
O r6. 1 J Y?` n-:. ? .
T Y ;t (I1
(D `? , s 1 r
m
m -n
m ,^
"
N 0
° m
m
m
K
w °;
?
w o
?
90 n
m =
o?
T
G)
WIDENING OF NC 33 FROM Of NORTH Cq9
? NORTH CAROLINA DEPARTMENT
US 64 SOUTHEAST OF OF TRANSPORTATION N 9
T
_ m co m - ARBORO TO US 264 DIVISION OF HIGHWAYS -
C
0
N 1 -
w PROJECT DEVELOPMENT AND
EDGECOMBE & PITT COUNTIES
ENVIRONMENTAL ANALYSIS BRANCH
(D o E
I
TIP PROJECT R-3407 ?FT4P'
•? co ?, M
a
::3 CD
CD cn
(D r D ,? `. - {,ram
a ;, J F?v
co m Cf) CD
(n M CL
3 m CD o?i
cn m ?. < >Z 'r r F ?..
CL N N D co 7
cn ;
N 4 `
C
fn
m
m -n Zo
< m 5
w O
N
u° a
m
WIDENING OF NC 33 FROM NORTH CAROLINA DEPARTMENT °° "a+Tf ``
A US 64 SOUTHEAST OF OF TRANSPORTATION y
N co c'' A m TARBORO TO US 264
c
p DIVISION OF HIGHWAYS
C 70 PROJECT DEVELOPMENT AND `'
?,
rv
w
Q° EDGECOMBE & PITT COUNTIES
ENVIRONMENTAL ANALYSIS BRANCH y}
"'
A
-' °o 0 co °srap
v TIP PROJECT R-3407
y 00 m
fn
= z o
O?
< O
N 0
WIDENING OF NC 33 FROM NOaTNC
` "
m
m 11
N =.
m
m ?,, • •
•A
90 m?
o
m l NORTH CAROLINA DEPARTMENT
°
9g
US 64 SOUTHEAST OF OF TRANSPORTATION N 9
TARBORO TO US 264
DIVISION OF HIGHWAYS o
<D
O C7
0--l PROJECT DEVELOPMENT AND
EDGECOMBE & PITT COUNTIES
?
? ENVIRONMENTAL ANALYSIS BRANCH
?, H9Q0
°FTap
°o o co TIP PROJECT R-3407
V oo -4 m
C13
?
O
O
m
r
~ t• J
, ~ yr? n w x <
N K 0
O
N
,. =3 rL (D :3
lu
Er
-n
V)
=
m
m _T z o
<
<
rn
co
cn
w .
A
W 0
N
90
-ch, 0
rn
0,:5
m
WIDENING OF NC 33 FROM OF NOATH C4
NORTH CAROLINA DEPARTMENT
US 64 SOUTHEAST OF
OF TRANSPORTATION
S
O
OF HIGHWAYS
TARBORO TO US 264
c DIVI
I
N
(D
O rn
W C7
0
?Pv
PROJECT DEVELOPMENT AND
RANCH ??
41 EDGECOMBE & PITT COUNTIES
? K Q. AT??'Ng
ENVIRONMENTAL ANALYSIS B
°o 0 CD TIP PROJECT R-3407
.? l oo ? m
W
0
0
X
m
r
r
D
K
g.. *d
y low
C ..
,,n?f y f l .Z:
3
,
..d? {?tir?, ??t'?"'?-i? ,xu ?^ ? I .' a',F?t?? ? ??_? ?',? •rs??.",?I , w - t•..i d_ ' _ 17f??° :?. .'c, "i:
1,y}?y?-•`r%a'?'`A F ? ?,' tB ?-r ???'?-,aY7?drti7 '+? ? _ 4t J ? - zr
-44
AW
t•
C
%
y I ?'t'•`??3 4 1 ?. ?
"I 4? 3
4 ". - ¢ :3- ? li yT f y ,, i ??,7-` ??i`dr'4E '•, ''^ :•.4 4 [? ; A:,- 'p?a.1y `?i?' -y,, ?, wr L;,
r
TT ? r %? ?Jf ? t X
s x
i
< 7 f? '.1z ? ? If'i•? :? '? ? c? i r ? ry. ? r;e "-
1.
a ., .f r s O o n o g co e o co
Q v (n n D D CD
y7? 4 d "? - x (G
m m
m CD
4x
M CD ID a,
CD :3 m.
?o y
cn L>
(D (D
N
=
m
m -n
= zo
O?
<
m
00
A v
N
Q° o
m
o``
WIDENING OF NC 33 FROM ,OATH ?
NORTH CAROLINA DEPARTMENT of 4,9
US 64 SOUTHEAST OF r
OF TRANSPORTATION 9
TARBORO TO US 264
m m DIVISION OF HIGHWAYS a
1 PROJECT DEVELOPMENT AND ?.
O N EDGECOMBE & PITT COUNTIES ENVIRONMENTAL ANALYSIS BRANCH NT O
P.
C) Ao co F TR
TIP PROJECT R-3407
.i oo ?, m
= Zo
ow
m 0
N`
sO 0
0
m _
o?5
WIDENING OF NC 33 FROM OF NOATH X49
NORTH CAROLINA DEPARTMENT w g
US 64 SOUTHEAST OF
OF TRANSPORTATION
oo A m TARBORO TO US 264 DIVISION OF HIGHWAYS
N
?7+ m n
O PROJECT DEVELOPMENT AND ; r
o
N
?,>
K 90 EDGECOMBE & PITT COUNTIES
ENVIRONMENTAL ANALYSIS BRANCH ?NT OF TRA
°o o W TIP PROJECT R-3407
y oo ?, m
<
?
0
0
m
r
0
cn
=
m
m `TI
N to z o
<
<
m
co
?,
co
co 0
N
Q°
- 0
?
m
G)
WIDENING OF NC 33 FROM NOAtH
NORTH CAROLINA DEPARTMENT
US 64 SOUTHEAST OF OF TRANSPORTATION g
TARBORO TO US 264
DIVISION OF HIGHWAYS 9
M n
0 PROJECT DEVELOPMENT AND °
?P
0? Q. EDGECOMBE & PITT COUNTIES ENVIRONMENTAL ANALYSIS BRANCH", S?
O
AF
°o 0 00 F T
TIP PROJECT R-3407
.4 00 m
c-C13
<
O
O
m
r
r
D
fn
m
m -n
N = z o
cu
m
m
C o
90 a
??
m
WIDENING OF NC 33 FROM NORTH CAROLINA DEPARTMENT NOAtH C49O`y
US 64 SOUTHEAST OF OF TRANSPORTATION y
TARBORO TO US 264
DIVISION OF HIGHWAYS
v '+
O (D
%
N
W C7
0 PROJECT DEVELOPMENT AND °
EDGECOMBE & PITT COUNTIES ENVIRONMENTAL ANALYSIS BRANCH ~??
N
°
o o
co
TIP PROJECT R-3407
•? co -" m