Loading...
HomeMy WebLinkAbout20171200 Ver 1_Maps from KH-September 20, 2017 meeting_20170920Y- - Reach 3 - Priority 1 restoration approach. Elevate invert of channel to reconnet with historic floodplain to the extent feasible. Re -meander channel with appropriate dimensions, restore riparian wetlands adjacent to the channel, and install in -stream log cross canes, toe -wood and other woody debris to help maintain pools/restored profile. Establish a 75' wide riparian buffer along both banks of th restored channel. Reaches 2 - Restore headwater stream ::'-tJ{ system by filling the existing channel and establishing _ _ , - a 50' wide buffer to each side of the valley centerline. Existing trees and roots will be supplemented by tree, shrub and herbaceous plantings to provide a stabilized flow path for the restored system. Reach 1- Restore headwater stream system by filling the existing channel and establishing a 100' buffer to each side of the valley centerline. Existing trees and roots will provide stabilized flow path for restored stream and riparian wetlands. Legend Weyerhaeuser Properties Proposed Conservation Easements Ground Water (<1ft Below Existing Grade) Site 10-A - Updated Mitigation Approach (2017-09-14) • Enhancement 2 — — — Headwater Restoration Restoration (Priority 1) Cross-section location. Reach 4 - Enhance stream channel -` by establishing a 50' riparian buffer along both banks. This will provide shade to reduce heat and - will improve habitat. a 7 ;. 0 350 700 Feet Prepared For: Prepared By Figure 10-A.1:Site 10-A Proposed Mitigation Approach A Weyerhaeuser Kimley>Morn Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 E Legend Site 10-A - Updated Mitigation Approach (2017-09-14) Enhancement 2 — — — Headwater Restoration Restoration (Priority 1) Prepared For: A Weyerhaeuser N: Prepared By. Kimley»)Horn 1 % 1 Ob 09 • i 0 350 700 Feet Figure 10-A.2: USGS T0p0 Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 T fO 10 P Q°''� O G0 woe Ce <O °,9 A Legend 0 Enhancement 2 " f Headwater Restoration Restoration (Priority 1) 41Q OWeyerhaeuser Properties 0 OV 0 350 700 Feet Prepared For: Prepared By: Figure 10-A.3: NRCS Soils A Weyerhaeuser Kimley))>HOrn Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 Upstream Drainage Area = 190 AC I. Reach 2 Drainage Area = 65 AC dw Legend __ i------ j Total System Drainage Area GlobalWatershed Reach 1 Upstream Drainage Area Total Drainage Area = 475 AC7_1 Site 10-A -Updated Mitigation Approach (2017-09-14) Enhancement 2 - - - Headwater Restoration Restoration (Priority 1) Prepared For: Repand 6y: A Weyerhaeuser Kimley»)Horn _117- £ ii ^N ILI g�.r t.l r. " -L, i :r- tr L F` Reach 4 Drainage Area = 165 AC .r�i 0 500 1,000 Feet Figure 10-A.4:Site 10-A Drainage Areas Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 Legend Site 10-A - Updated Mitigation Approach (2017-09-14) Enhancement 2 Headwater Restoration Restoration (Priority 1) Elevation AMSL 50' 20' Prepared For: A Weyerhaeuser Prepared By. Kimley>»Horn 0 350 700 Feet Figure 10-A.5: LiDAR Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 19 Lys To BoB Lo � l /i lit1 _ _ _ _ ._ .., .� s _ _ — m _ _ -. e Legend = Weyerhaeuser Properties Site 10-A - Updated Mitigation Approach (2017-09-14) Enhancement 2 — — — Headwater Restoration Restoration (Priority 1) Hydric - Hydric (1 to 32%) Hydric (66 to 99%) f� Prepared Por. Prepared By: A Weyerhaeuser Kimley»>Horn Pa i =.•ice.=. , 4�_�. 1 V g i fb s 0 350 700 Feet Figure 10-A.6: SSURGO Hydric Soils Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 Soil I Description Ba IBaryboro loam BoB By lBonneau loamy sand, 0 to 4 per: 113yars loam CrB :- Ct ICraven fine sandy loam, 1 to 4 pe Croatan muck ExB '. GoA Exum fine sandy loam, 1 to 6 per: Goldsboro loamy fine sand, 0 to 2 3 La - Le Leaf silt loam Lenoir loam Lo Leon sand _ LoA Lenoir loam, 0 to 1 percent slopes Ly Me Lynchburg fine sandy loam Muckalee loam, frequently flooded Pa Pantego loam Ra Rains fine sandy loam, 0 to 2 pen: - Ro Roanoke silt loam To Tonnotley fine sandy loam Tr Torhunta sandv loam 19 Lys To BoB Lo � l /i lit1 _ _ _ _ ._ .., .� s _ _ — m _ _ -. e Legend = Weyerhaeuser Properties Site 10-A - Updated Mitigation Approach (2017-09-14) Enhancement 2 — — — Headwater Restoration Restoration (Priority 1) Hydric - Hydric (1 to 32%) Hydric (66 to 99%) f� Prepared Por. Prepared By: A Weyerhaeuser Kimley»>Horn Pa i =.•ice.=. , 4�_�. 1 V g i fb s 0 350 700 Feet Figure 10-A.6: SSURGO Hydric Soils Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 55 50 45 700 —175 —i5n _ioF ,nn 55 50 �0 —25 U 25 50 75 100 125 150 175 200 5 S 4 J Q U WFC 2 GRAPHIC SCALE IN FEET 1 0 10 20 40 HORIZONTAL 0 Prepared For: Prepared By. Figure 10-A: Reach 1 Cross-section A Weyerhaeuser Kimley> Horn Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 I ,- . Legend Site 10-B - Updated Mitigation Approach (2017-09-14) Enhancement 1 Enhancement 2 — — — Headwater Restoration Preservation Prepared For. A Weyerhaeuser »rs Prepared By Kimley>»Horn 41 N A 0 fIL 0 1 1 0 350 700 Feet Figure 10-6.2: USGS Topo Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 La i Le I ` GoA C rA GoA Ly ,. Ba IM A / Le \ GRao r �� e CrB GoA LY � GoA La 113 GOA LY Legend Ct Q Weyerhaeuser Properties To Site 10-B -Updated Miti Mitigation A Tr ! g Approach (2017-09-14) - Enhancement 1 Tr Enhancement 2 — — — Headwater Restoration GoA Preservation 0 350 700 Feet To l ONE= Prepared For. Prepared By: Figure 10-13.3: NRCS Soils A Weyerhaeuser Kimley)))Horn Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 Legend Elevation AMSL 50' 20' Site 10-B - Updated Mitigation Approach (2017-09-14) Enhancement Enhancement 2 — — — Headwater Restoration Preservation 0 350 700 Feet Prepared For. Prepared By. Figure 10-13.5: LiDAR A Weyerhaeuser Kimley»)Horn Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 55 50 45 _0 55 50 V zb 50 75 100 125 150 175 200 5 4 J Q V w 2 w GRAPHIC SCALE IN FEET 1 0 10 20 40 HORIZONTAL 0 Prepared For Prepared By: Figure 10-13: Reach 1 Cross-section A Weyerhaeuser Kimley> Horn Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 E k - bk% rt 0 xs ` f -,1 NL 1 Legend Site 10-C- Updated Mitigation Approach (2017-09-14) Preservation f� — — — Headwater Restoration � 0 350 700 Feet i Ir Prepared For: Prepared B, Figure 10-C.2: USGS Topo A Weyerhaeuser Kimley>»Horn Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 CrA LX GoA N LeA �..... Ra C rA Le G o A , Ra Ra Pa GoA Ly C rA i Le La e J Lo C rA Ra Le_..., Ba GoA GoA GoA i Pa Ly Legend Lo i Weyerhaeuser Properties Site 10-C- Updated Mitigation Approach (2017-09-14) 1 !. Preservation LoPa, — — - Headwater Restoration Ra 0 350 700 Feet Prepared For. Prepared By. Figure 10-C.3: NRCS Soils A Weyerhaeuser Kimley»)Horn Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 Total Drainage Area = 665 AC Legend Total System Drainage Area Upstream Drainage Area Site 10-C- Updated Mitigation Approach (2017-09-14) Preservation — — — Headwater Restoration Prepared Per Prepared 8y. A Weyerhaeuser Kimley> Horn Upstream Drainage Area = 175 AC r r • �. +ri� , �� i t _— 0 500 1,000 Feet ■ Figure 10-C.4:Site 10-C Drainage Areas Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017 Legend Elevation AMSL 50' 20' Site 10-C- Updated Mitigation Approach (2017-09-14) Preservation — — — Headwater Restoration Prepared Foc Prepared By: 0 0 350 700 Feet Figure 10-C.5: LiDAR Weyerhaeuser Kimley)))Horn Middle Neuse Umbrella Stream Mitigation Bank September 14, 2017