HomeMy WebLinkAbout20171200 Ver 1_Maps from KH-September 20, 2017 meeting_20170920Y- - Reach 3 - Priority 1 restoration approach.
Elevate invert of channel to reconnet with historic
floodplain to the extent feasible. Re -meander
channel with appropriate dimensions, restore
riparian wetlands adjacent to the channel, and
install in -stream log cross canes, toe -wood and
other woody debris to help maintain pools/restored
profile. Establish a 75' wide riparian buffer along
both banks of th restored channel.
Reaches 2 - Restore headwater stream
::'-tJ{ system by filling the existing channel and establishing
_ _ , - a 50' wide buffer to each side of the valley centerline.
Existing trees and roots will be supplemented by tree,
shrub and herbaceous plantings to provide a
stabilized flow path for the restored system.
Reach 1- Restore headwater stream system
by filling the existing channel and establishing
a 100' buffer to each side of the valley centerline.
Existing trees and roots will provide stabilized
flow path for restored stream and riparian wetlands.
Legend
Weyerhaeuser Properties
Proposed Conservation Easements
Ground Water (<1ft Below Existing Grade)
Site 10-A - Updated Mitigation Approach (2017-09-14)
• Enhancement 2
— — — Headwater Restoration
Restoration (Priority 1)
Cross-section location.
Reach 4 - Enhance stream channel
-` by establishing a 50' riparian buffer
along both banks. This will provide
shade to reduce heat and
- will improve habitat.
a
7 ;.
0 350 700 Feet
Prepared For: Prepared By
Figure 10-A.1:Site 10-A Proposed Mitigation Approach
A Weyerhaeuser Kimley>Morn Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
E
Legend
Site 10-A - Updated Mitigation Approach (2017-09-14)
Enhancement 2
— — — Headwater Restoration
Restoration (Priority 1)
Prepared For:
A Weyerhaeuser
N:
Prepared By.
Kimley»)Horn
1
% 1
Ob 09
•
i 0 350 700 Feet
Figure 10-A.2: USGS T0p0
Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
T
fO
10
P Q°''�
O G0
woe
Ce
<O °,9
A
Legend 0
Enhancement 2 " f
Headwater Restoration
Restoration (Priority 1) 41Q
OWeyerhaeuser Properties 0 OV 0 350 700 Feet
Prepared For: Prepared By:
Figure 10-A.3: NRCS Soils
A Weyerhaeuser Kimley))>HOrn Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
Upstream Drainage Area = 190 AC
I.
Reach 2 Drainage Area = 65 AC
dw
Legend
__
i------ j Total System Drainage Area
GlobalWatershed
Reach 1 Upstream Drainage Area
Total Drainage Area = 475 AC7_1
Site 10-A -Updated Mitigation Approach (2017-09-14)
Enhancement 2
- - - Headwater Restoration
Restoration (Priority 1)
Prepared For:
Repand 6y:
A Weyerhaeuser Kimley»)Horn
_117- £ ii
^N
ILI
g�.r t.l r. "
-L,
i
:r-
tr L
F`
Reach 4 Drainage Area = 165 AC .r�i
0 500 1,000 Feet
Figure 10-A.4:Site 10-A Drainage Areas
Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
Legend
Site 10-A - Updated Mitigation Approach (2017-09-14)
Enhancement 2
Headwater Restoration
Restoration (Priority 1)
Elevation
AMSL
50'
20'
Prepared For:
A Weyerhaeuser
Prepared By.
Kimley>»Horn
0 350 700 Feet
Figure 10-A.5: LiDAR
Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
19
Lys
To
BoB
Lo
� l
/i
lit1 _ _ _ _ ._ .., .� s _ _ — m _ _ -. e
Legend
= Weyerhaeuser Properties
Site 10-A - Updated Mitigation Approach (2017-09-14)
Enhancement 2
— — — Headwater Restoration
Restoration (Priority 1)
Hydric -
Hydric (1 to 32%)
Hydric (66 to 99%)
f�
Prepared Por.
Prepared By:
A Weyerhaeuser Kimley»>Horn
Pa
i =.•ice.=. , 4�_�.
1 V g
i
fb s 0 350 700 Feet
Figure 10-A.6: SSURGO Hydric Soils
Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
Soil
I Description
Ba
IBaryboro loam
BoB
By
lBonneau loamy sand, 0 to 4 per:
113yars loam
CrB
:- Ct
ICraven fine sandy loam, 1 to 4 pe
Croatan muck
ExB
'. GoA
Exum fine sandy loam, 1 to 6 per:
Goldsboro loamy fine sand, 0 to 2
3 La
- Le
Leaf silt loam
Lenoir loam
Lo
Leon sand
_ LoA
Lenoir loam, 0 to 1 percent slopes
Ly
Me
Lynchburg fine sandy loam
Muckalee loam, frequently flooded
Pa
Pantego loam
Ra
Rains fine sandy loam, 0 to 2 pen:
- Ro
Roanoke silt loam
To
Tonnotley fine sandy loam
Tr
Torhunta sandv loam
19
Lys
To
BoB
Lo
� l
/i
lit1 _ _ _ _ ._ .., .� s _ _ — m _ _ -. e
Legend
= Weyerhaeuser Properties
Site 10-A - Updated Mitigation Approach (2017-09-14)
Enhancement 2
— — — Headwater Restoration
Restoration (Priority 1)
Hydric -
Hydric (1 to 32%)
Hydric (66 to 99%)
f�
Prepared Por.
Prepared By:
A Weyerhaeuser Kimley»>Horn
Pa
i =.•ice.=. , 4�_�.
1 V g
i
fb s 0 350 700 Feet
Figure 10-A.6: SSURGO Hydric Soils
Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
55
50
45
700 —175 —i5n _ioF ,nn
55
50
�0 —25 U 25 50 75 100 125 150 175 200 5
S
4
J
Q
U
WFC 2
GRAPHIC SCALE IN FEET 1
0 10 20 40
HORIZONTAL 0
Prepared For: Prepared By.
Figure 10-A: Reach 1 Cross-section
A Weyerhaeuser Kimley> Horn Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
I
,- .
Legend
Site 10-B - Updated Mitigation Approach (2017-09-14)
Enhancement 1
Enhancement 2
— — — Headwater Restoration
Preservation
Prepared For.
A Weyerhaeuser
»rs
Prepared By
Kimley>»Horn
41
N
A
0
fIL
0 1
1
0 350 700 Feet
Figure 10-6.2: USGS Topo
Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
La i
Le
I `
GoA
C rA
GoA
Ly
,. Ba
IM
A
/ Le \ GRao
r
��
e CrB GoA LY
�
GoA
La 113
GOA
LY
Legend Ct Q
Weyerhaeuser Properties To
Site 10-B -Updated Miti Mitigation A Tr !
g Approach (2017-09-14) -
Enhancement 1 Tr
Enhancement 2
— — — Headwater Restoration GoA
Preservation 0 350 700 Feet
To
l ONE=
Prepared For.
Prepared By:
Figure 10-13.3: NRCS Soils
A Weyerhaeuser Kimley)))Horn Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
Legend
Elevation
AMSL
50'
20'
Site 10-B - Updated Mitigation Approach (2017-09-14)
Enhancement
Enhancement 2
— — — Headwater Restoration
Preservation
0 350 700 Feet
Prepared For. Prepared By.
Figure 10-13.5: LiDAR
A Weyerhaeuser Kimley»)Horn Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
55
50
45
_0
55
50
V zb 50 75 100 125 150 175 200 5
4
J
Q
V
w 2
w
GRAPHIC SCALE IN FEET 1
0 10 20 40
HORIZONTAL 0
Prepared For Prepared By:
Figure 10-13: Reach 1 Cross-section
A Weyerhaeuser Kimley> Horn Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
E
k
- bk%
rt 0 xs `
f -,1
NL
1
Legend
Site 10-C- Updated Mitigation Approach (2017-09-14)
Preservation
f�
— — — Headwater Restoration � 0 350 700 Feet
i
Ir
Prepared For: Prepared B,
Figure 10-C.2: USGS Topo
A Weyerhaeuser Kimley>»Horn Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
CrA
LX GoA N
LeA
�..... Ra
C rA
Le G o A , Ra
Ra Pa
GoA
Ly
C rA
i
Le La
e J Lo
C rA
Ra
Le_...,
Ba
GoA GoA GoA
i
Pa
Ly
Legend Lo
i
Weyerhaeuser Properties
Site 10-C- Updated Mitigation Approach (2017-09-14) 1 !.
Preservation LoPa,
— — - Headwater Restoration Ra 0 350 700 Feet
Prepared For. Prepared By.
Figure 10-C.3: NRCS Soils
A Weyerhaeuser Kimley»)Horn Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
Total Drainage Area = 665 AC
Legend
Total System Drainage Area
Upstream Drainage Area
Site 10-C- Updated Mitigation Approach (2017-09-14)
Preservation
— — — Headwater Restoration
Prepared Per
Prepared 8y.
A Weyerhaeuser Kimley> Horn
Upstream Drainage Area = 175 AC
r
r • �. +ri� , ��
i t _—
0 500 1,000 Feet ■
Figure 10-C.4:Site 10-C Drainage Areas
Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017
Legend
Elevation
AMSL
50'
20'
Site 10-C- Updated Mitigation Approach (2017-09-14)
Preservation
— — — Headwater Restoration
Prepared Foc
Prepared By:
0
0 350 700 Feet
Figure 10-C.5: LiDAR
Weyerhaeuser Kimley)))Horn Middle Neuse Umbrella Stream Mitigation Bank
September 14, 2017