HomeMy WebLinkAbout20080806 Ver 4_Revised App Dated 9_20_2017_20170922itial Review of Submittal
Staff Review:
Submittal Type: r New Project
r Pre -Application Submittal
F More Information Response
Water Resources
ENVIRONMENTAL QUALITY
New Project - Please check the new project type if you are trying to submit a new project that needs an official approval
decision.
Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do
not have the expectation that your submittal will be considered a complete application requiring a formal decision.
More Information Response - Please check this type if you are responding to a request for information from staff and
you have and ID# and version for this response.
ID#* Version
20080806 4
Reviewer List:* Jennifer Burdette:eads\jaburdette
Select Reviewing Office:*
Central Office - (919) 707-9000
Project Submittal Interim Form
submitted: 9/2222017
Project Contact Information:
Name: Emily Hughes
Who is subrritting the information?
Email Address: Emily.B.Hughes@usace.army.mil
Project Information:
Existing ID #:* Existing Version:*
20080806 4
Project Name: Wilmington District Maintenance Dredging
and Placement Projects
Is this a public transportation project?
f Yes
r No
County (ies)*
Multi
Describe the attachments:
Please upload all files that need to be submited.
PCN_401 _Application_20Septl 7.pdf 528.42KB
PCNAdditionallnfo_20Sep17.pdf 194.85KB
2017ProjectPlans.pdf 36.96MB
Only pdf files are accepted.
V By checking the box and signing box below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the
"Uniform Electronic Transactions Act)
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
• I intend to electronically sign and submit the form.
Signature:
Action History (UTC -05:00) Eastern Time (US & Canada)
Submit by Anonymous User 9/22/2017 11:46:39 AM (Supplemental Submital)
Accept by Montalvo, Sheri A 9/22/2017 11:59:36 AM (NON -DOT - EAsting Project)
• The task was assigned to Montalvo, Sheri A 9/22/2017 11:46 AM
Page 1 of 10
PCN Form – Version 1.4 January 2009
Office Use Only:
Corps action ID no. _____________
DWQ project no. _______________
Form Version 1.4 January 2009
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? Yes No
1d. Type(s) of approval sought from the DWQ (check all that apply):
401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit
401 Water Quality Certification – Express Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
Yes No
For the record only for Corps Permit:
Yes No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in-lieu fee program.
Yes No
1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h
below. Yes No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No
2. Project Information
2a. Name of project:
2b. County:
2c. Nearest municipality / town:
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state project no:
3. Owner Information
3a. Name(s) on Recorded Deed:
3b. Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
Page 2 of 10
4. Applicant Information (if different from owner)
4a. Applicant is: Agent Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 3 of 10
PCN Form – Version 1.4 January 2009
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
1b. Site coordinates (in decimal degrees): Latitude: Longitude:
1c. Property size: acres
2. Surface Waters
2a. Name of nearest body of water to proposed project:
2b. Water Quality Classification of nearest receiving water:
2c. River basin:
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
3b. List the total estimated acreage of all existing wetlands on the property:
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
3d. Explain the purpose of the proposed project:
3e. Describe the overall project in detail, including the type of equipment to be used:
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Yes No Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made? Preliminary Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? Yes No Unknown
5b. If yes, explain in detail according to “help file” instructions.
6. Future Project Plans
6a. Is this a phased project? Yes No
6b. If yes, explain.
Page 4 of 10
PCN Form – Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
Wetlands Streams – tributaries Buffers Open Waters Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary (T)
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1
W2
W3
W4
W5
W6
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1
S2
S3
S4
S5
S6
3h. Total stream and tributary impacts
3i. Comments:
Page 5 of 10
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary (T)
4b.
Name of waterbody
(if applicable
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
O1
O2
O3
O4
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
Flooded Filled Excavated Flooded Filled Excavated
P1
P2
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required? Yes No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin? Neuse Tar-Pamlico Catawba Randleman Other:
6b.
Buffer Impact
number –
Permanent (P) or
Temporary (T)
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet)
6g.
Zone 2
impact
(square
feet)
B1
B2
B3
B4
B5
B6
6h. Total Buffer Impacts:
6i. Comments:
Page 6 of 10
PCN Form – Version 1.4 January 2009
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If yes, mitigation is required by (check all that apply): DWQ Corps
2c. If yes, which mitigation option will be used for this
project?
Mitigation bank
Payment to in-lieu fee program
Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type:
Type:
Type:
Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature:
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 10
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? Yes No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 10
PCN Form – Version 1.4 January 2009
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules? Yes No
1b. If yes, then is a diffuse flow plan included? If no, explain why.
Yes No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? %
2b. Does this project require a Stormwater Management Plan? Yes No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e. Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a. In which local government’s jurisdiction is this project?
3b. Which of the following locally-implemented stormwater management programs
apply (check all that apply):
Phase II
NSW
USMP
Water Supply Watershed
Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
attached? Yes No
4. DWQ Stormwater Program Review
4a. Which of the following state-implemented stormwater management programs apply
(check all that apply):
Coastal counties
HQW
ORW
Session Law 2006-246
Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? Yes No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No
5b. Have all of the 401 Unit submittal requirements been met? Yes No
Page 9 of 10
PCN Form – Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal/state) land? Yes No
1b. If you answered “yes” to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
Yes No
1c. If you answered “yes” to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
Comments:
Yes No
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
or Riparian Buffer Rules (15A NCAC 2B .0200)?
Yes No
2b. Is this an after-the-fact permit application? Yes No
2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
additional development, which could impact nearby downstream water quality? Yes No
3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered “no,” provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 10 of 10
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat? Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts? Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? Yes No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
Applicant/Agent's Printed Name
_______________________________
Applicant/Agent's Signature
(Agent's signature is valid only if an authorization
letter from the applicant is provided.)
Date
Ocean Isle Beach and
Wrightsville Beach
Coastal Storm Risk Management Projects
TANGENT 20 E
2,
1
8
3
,
0
0
0E
2,
1
8
5,
5
0
0
SHALLOTTE BOULEVARD(BY OTHERS)TRUCK HAUL ROUTETERMI
NAL GROI
N
E. FOURTH
E. FOURTH
OCEAN ISL
E BEACH
N 56,000E
2,
1
8
8,
0
0
0
N 53,500
APPROXIMATE PIPELINE ROUTEINSERT "A"SHALLOTTE BOULEVARDocibchgren2013.dgnNC105
C106
C107
CONTINUATION
ABOVE FOR
SEE INSERT "A"
THE BACKSLOPE 5 HORIZONTAL TO 1 VERTICAL.
WHERE IT IS NOT POSSIBLE TO TIE INTO THE 6-FOOT CONTOUR, THE CONTRACTOR SHALL CONSTRUCT
ELEVATION 6 FEET THAT LIE WITHIN THE BEACH FILL LIMITS SHALL NOT BE COVERED WITH FILL. IN AREAS
INCLUDING DISTRIBUTION AND MOVEMENT OF BEACH FILL MATERIAL. EXISTING SANDBAGS BELOW
EQUIPMENT SHALL NOT WORK CLOSER THAN 10 FEET FROM STRUCTURES DURING ALL WORK
PROPERTY. IN ORDER TO MINIMIZE THE RISK OF DAMAGE, WHEELED OR TRACKED EARTH MOVING
DESIGNATED REPRESENTATIVE AT NO COST TO THE GOVERNMENT OR TO THE OWNERS OF THE DAMAGED
OPERATIONS SHALL BE REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER OR HIS/HER
SANDBAGS, STRUCTURES AND ROADS. SANDBAGS, STRUCTURES AND ROADS DAMAGED BY CONTRACTOR
3. ALL CONTRACTOR OPERATIONS SHALL BE PERFORMED IN A MANNER THAT AVOIDS DAMAGE TO EXISTING
ALL VEHICLES INCLUDING EMERGENCY VEHICLES.
CONSTRUCT A RAMP AT ROAD CROSSINGS WHERE NECESSARY. THE RAMP SHALL BE SUITABLE FOR
TO DETERMINE THE EXACT PIPELINE ROUTE. AS PIPELINE IS BEING LAID, CONTRACTOR SHALL
PIPE, THE CONTRACTOR SHALL MEET ON SITE WITH THE CONTRACTING OFFICER’S REPRESENTATIVE
BEACH IS MS. DAISY IVEY, TOWN ADMINISTRATOR, PHONE No. 910-579-2166. PRIOR TO PLACEMENT OF
TO COMMENCEMENT OF PIPELINE PLACEMENT. POINT OF CONTACT WITH THE TOWN OF OCEAN ISLE
2. THE CONTRACTOR SHALL NOTIFY THE TOWN OF OCEAN ISLE BEACH NO LESS THAN 15 DAYS PRIOR
ANY PLACEMENT OF MATERIAL ON THE BEACH.
INVESTIGATE POTENTIAL PIPELINE ROUTES. ALL PIPELINE ROUTES MUST BE APPROVED PRIOR TO
IN 2013. ALL CONTRACTORS ARE ENCOURAGED TO VISIT THE SITE PRIOR TO SUBMITTING A BID TO
BETWEEN SHALLOTTE BOULEVARD AND SHALLOTTE INLET SINCE THE LAST BEACHFILL PLACEMENT
1. SEVERE EROSION FROM PAST STORMS HAS OCCURRED ON THE EAST END OF OCEAN ISLE BEACH
GENERAL NOTES:
2. PLATES C308 THRU C311 FOR BEACH FILL CROSS SECTIONS.
1. PLATES C105 THRU C107 FOR BEACH FILL GENERAL PLANS.
REFERENCE NOTES:
(BY OTHERS)
TERMINAL GROIN
(BY OTHERS)STAGING AREA
TERMINAL GROIN
(BY OTHERS)
TRUCK HAUL ROUTE
TERMINAL GROIN TANGENT 19(BY OTHERS)
STAGING AREA
CORRIDOR/
CONSTRUCTION
TERMINAL GROIN
AREAHARD
M
ATERI
AL
CONTRACT OPTION
ACCRETION FILL
ATLANTIC INTRACOASTAL W ATERW AY
ATLANTIC INTRACOASTAL WATERWAYHOLDENS BEACHBORROW AREAS
HALLOTTE I
NLETPIPELINE ROUTEACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
ACCESSBEACH
BERM - ELEV. +6.0
BERM - ELEV. +6.0
BERM - ELEV. +6.0 (ASSUMED SLOPE)15H:1V(ASSUMED SLOPE)15H:1V(ASSUMED SLOPE)15H:1V(ASSUMED SLOPE)15H:1V(ASSUMED SLOPE)15H:1V
I
I
I
ELEV. 6.7
E 2.174,350.576
N 51,568.139
NCGS NEWPORT
ELEV. 9.7’
E 2,168,328.551
N 49692.194
NCGS PETRA
NC 904
W . SECOND
E. SECOND
E. FIRST
W . FIRST
L
E
L
A
N
D
R
AEF
O
R
D
G
OL
DS
B
O
R
O
C
H
A
D
B
O
U
R
N
WIN
NIB
O
WW . FIRST
E. FIRST
E. FIRST
E. SECOND
E. SECOND
R
A
L
EI
G
H
G
R
E
E
N
S
B
O
R
OWI
NS
T
O
N-S
A
L
E
MHI
GH
P
OI
NT
L
UMBE
RT
ONDURHAMC
HARL
OT
T
E
PI 0+00.00
PI 10+76.63
PI 20+00.45
PI 30+20.69
PI 39+92.83
PI 50+34.12
PI 59+70.39
PI 70+47.57
PI 80+42.81
PI 90+48.36
PI 100+48.66
PI 111+13.41
PI 120+49.30
PI 130+60.78
PI 141+06.61
PI 150+50.24
PI 160+50.59
PI 170+50.89
PI 180+51.23
N 51,500
N 54,000
N 49,000
E
2,
1
7
4
,
5
0
0
E
2,
1
7
7
,
0
0
0
E
2,
1
7
9,
5
0
0E
2,
1
8
2,
0
0
0E
2,
1
8
4
,
5
0
0
EL. 8.02 (NAVD 88)
N 54691.35
E 2183885.86
STATION H 250 A 1970
ELEV. 5.2 ’
E 2,183,887.798
N 55,507.517
NCGS BRU 63
NORTH CAROLINA GEODETIC SURVEY MONUMENTS DESCRIPTION.
NORTHBOUND LANE OF THE BLVD, 23.9 FT SOUTH OF THE EDGE OF PAVEMENT.
SHALLOTTE BLVD AND SEVENTH STREET, 20.5 FT WEST OF THE CENTERLINE OF THE
BLVD. LOCATED 29.6 FT SOUTH OF THE CENTERLINE OF INTERSECTION (A P-K NAIL) AT
LOCATED IN THE NORTH END OF THE NORTHERNMOST GRASS MEDIAN OF SHALLOTTE
NCGS BRU 63
AND 69.0 WEST OF UNDERGROUND BOX (19161) .
OF A FIRE HYDRANT, 63.6 FT EAST-NORTHEAST OF UNDERGROUND ELECTRIC BOX (19162) ,
SIDEWALK, NEAR THE LOT LINE BETWEEN THE TWO HOUSES. LOCATED 22.6 FT SOUTH
LOCATED ALONG WEST FIRST STREET IN THE CENTER OF A 5-FT WIDE CONCRETE
NCGS PETRA
OF UNDERGROUND ELECTRICAL BOX (IC SCIO) .
EAST OF THE CENTERLINE INTERSECTION OF BEAUFORT STREET, AND 51.3 FT WEST
SIDEWALK, NEAR THE LOT LINE BETWEEN THE TWO HOUSES. LOCATED 23.0 FT
LOCATED ALONG WEST FIRST STREET IN THE CENTER OF 5-FT WIDE CONCRETE
NCGS LORI
STREET, AND 53.4 FT WEST OF STREET LIGHT POLE NUMBER 69.
STREET.LOCATED 23.3 FT EAST OF THE CENTERLINE INTERSECTION OF NEWPORT
SIDEWALK, IN SOUTHEAST QUADRANT OF INTERSECTION OF NEWPORT ST. AND FIRST
LOCATED ALONG EAST FIRST STREET IN THE CENTER OF A 5-FT WIDE CONCRETE
NCGS NEWPORT
CONTRACT OPTION
BERM - ELEV. +6.0
ACCRETION FILL
2
12
13
14
15
16
17
18
3
1
4
5
6
8
7
9
10
11
19
20
GENERAL PLANOCEAN ISLE BEACHG104600060012001800
SCALE IN FEET FILE NAME:WB100-03-56DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:ISSUE DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
fiof Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSX. XXXXXXX, XXXXXXXX05 JUNE 2017L. CREECHX. XXXXXXXNEW HANOVER & BRUNSWICK COUNTIES, NORTH CAROLINAWRIGHTSVILLE BEACH & OCEAN ISLE BEACHCOASTAL STORM RISK MANAGEMENTAPPROXIMATE PIPELINE ROUTE
EXISTING BASELINE
APPROXIMATE SLOPE INTERCEPT
BEACH FILL (NEW WORK)
PIPELINE ROUTES (APPROX.)
LEGENDBCOES Review
E 2,184,500E 2,184,000E 2,183,500E 2,183,000E 2,185,000-10-10-10PIPELINE ROUTEAPPROXIMATE DREDGE
BERM - ELEV. +6.0
N
55
,000
N
54
,500
CHARLOTTEE. THIRD
SHALLOTTE BOULEVARD111ACCESS
BEACH
E. FOURTH (ASSUMED SLOPE)15H:1VBEACH FILL LIMITS
STA. 10+00
(ASSUMED SLOPE)15H:1VCONTRACT OPTIONBERM - ELEV. +6.0
CONTRACT OPTIONBERM - ELEV. +6.0
30 YEAR PLAN
OCEAND ISLE BEACH
CONSTRUCTION EASEMENT
ACCESS
BEACH
ACCESS
BEACH
FILE NAME:WB100-03-56DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:ISSUE DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
fiof Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSX. XXXXXXX, XXXXXXXX05 JUNE 2017L. CREECHX. XXXXXXXNEW HANOVER & BRUNSWICK COUNTIES, NORTH CAROLINAWRIGHTSVILLE BEACH & OCEAN ISLE BEACHCOASTAL STORM RISK MANAGEMENTE. SECOND DURHAMVL
VL
VL
N
54
,000 0+005+0015+0020+0025+00STA 17+01.63TRANSITION
64’19.4’81.6’0000000011+009+509+006+002+25.68-0+79.16-1+29.54BEACH FILL - CONTRACT OPTION
BEACH FILL - CONTRACT OPTION 2
CONTRACT OPTIONSTA. -1+35.38 BEACH FILLSTA. -1+00 TO 24+80GENERAL PLANOCEAN ISLE BEACH
EASTING NORTHING STATION
COORDINATES
BASELINE COORDINATES
TEMPORARY CONSTRUCTION
C105MATCH LINE STA. 24+80 PLATE C106OCIBCH1REN2013.DGNN2001000
SCALE: 1" = 100’
25+00 2182446.0184 53726.2341
10+00 2183932.8532 53924.5320
-1+00 2185023.1988 54069.9504
EL. 8.02 (NAVD 88)
N 54691.35
E 2183885.86
STATION H 250 A 1970
DESCRIPTION AVAILABLE
5
MHW
5
EXISTING BEACH ACCESS LOCATIONS
EXISTING PIPE CULVERTS
EXISTING BASELINE
EXISTING INDEX CONTOURS
EXISTING INTERMEDIATE CONTOURS
EXISTING MEAN HIGH WATER LINE (1.79’ NAVD 88).
TEMPORARY CONSTRUCTION BASELINE
TEMPORARY CONSTRUCTION EASEMENT LINE
BEACH FILL (NEW WORK)
PIPELINE ROUTE
LEGEND
APPROXIMATE SLOPE INTERCEPT CONTRACT OPTION 2STA. 7+28.49 BEACH FILL FENCES, ETC. FROM DAMAGE DUE TO CONSTRUCTION.
10. THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES ON THE BEACH, INCLUDING ACCESS RAMPS, SIGNAGE,
BE PLACED AT EACH BEACH ACCESS AS A MINIMUM, BUT IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET.
9. THE CONTRACTOR SHALL CONSTRUCT SAND RAMPS OVER PIPE ALONG THE BEACH PIPELINE ROUTE. SAND RAMPS SHALL
TO IDENTIFY AND DISCUSS NECESSARY MEASURES TO BE TAKEN REGARDING WORK AROUND THE SANDBAGS.
OR HIS/HER DESIGNATED REPRESENTATIVE AND A REPRESENTATIVE FROM THE NC DIVISION OF COASTAL MANAGEMENT
OCEAN ISLAE BEACH, THE CONTRACTOR SHALL CONDUCT AN ONSITE MEETING WITH THE CONTRACTING OFFICER
HYDRAULICALLY OR MECHANICALLY, ON ANY EXPOSED SANDBAGS. PRIOR TO BEGINNING WORK ON
SHALLOTTE BLVD. AND DURHAM STREET. THE CONTRACTOR SHALL NOT DIRECTLY PLACE SAND, EITHER
8. SANDBAGS HAVE BEEN PLACE ALONG THE BEACH AND IN FRONT OF THE EXISTING STRUCTURES BETWEEN
RESIDENTIAL BUILDINGS, AND WITHIN 5 FEET OF ANY EXPOSED SANDBAGS .
MATERIAL LANDWARD OF THE TEMPORARY CONSTRUCTION EASEMENT LINE, WITHIN 10 FEET OF OR UNDERNEATH ANY
BE REQUIRED TO SLOPE (5H:1V) THE LANDWARD SIDE OF THE BERM WHERE NECESSARY TO AVOID PLACING BEACH FILL
10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS, AND ON ANY EXPOSED SANDBAGS. THE CONTRACTOR SHALL
7. NO BEACH FILL MATERIAL SHALL BE PLACED LANDWARD OF THE TEMPORARY CONSTRUCTION EASEMENT LINE, WITHIN
PARTICULAR PLANTS.
BITTER PANICUM AS SUPPLEMENTAL PLANTS. PLANTING SHALL BE ACCOMPLISHED DURING THE SEASON BEST SUITED FOR THE
AS DIRECTED BY THE CONTRACTING OFFICER. SEA OATS SHALL BE THE PREDOMINENT PLANT WITH AMERICAN BEACHGRASS AND
SEA OATS (UNIOLA PANICULATA), AMERICAN BEACHGRASS (AMMOPHILA BREVILIGULATA), AND BITTER PANICUM (PANICUM AMARUM),
TO THE BEACH SHALL BE RESTORED BY BEING REPLANTED UPON PROJECT COMPLETION. PLANTING STOCKS SHALL CONSIST OF
AS NEAR AS PRACTICABLE TO THE NATURAL CONDITION AND GRADE. DUNE VEGETATION DISTURBED BY THE PIPELINE CROSSING
FOR THE PRECONSTRUCTION RECORD. ANY DEGRADATION OF THE DUNE AREA CAUSED BY THE CONTRACTOR SHALL BE RESTORED
WITH THE CONTRACTING OFFICER TO PERFORM A RECORDABLE CONDITION SURVEY OF THE EXISTING DUNE AND VEGETATION
BE CONDUCTED PRIOR TO THE START OF THE BEACHFILL PLACEMENT OPERATIONS. THE CONTRACTOR SHALL COORDINATE
EXTREME CARE IN PLACING PIPELINE ACROSS THE DUNES TO THE BEACH. A JOINT INSPECTION OF THE EXISTING DUNE WILL
6. IN ORDER TO MINIMIZE DAMAGE TO THE EXISTING DUNES AND VEGETATION THEREON, THE CONTRACTOR SHALL EXERCISE
VERTICAL DATUM ELEVATIONS ARE REFERENCED TO NORTH AMERICAN VERTICAL DATUM - NAVD 1988.
5. ALL HORIZONTAL DATUM BASED ON NORTH CAROLINA STATE PLANE COORDINATES NORTH AMERICAN DATUM 1983. ALL
4. THE EXISTING TOPOGRAPY IS BASED ON SURVEYS TAKEN AUGUST 2013.
3. THE CONSTRUCTION BERM SLOPE IS DEPENDENT UPON MATERIAL PROPERTIES AND WAVE ENVIRONMENT DURING PLACEMENT.
BASED THE CONTRACT BEACH PROFILE SURVEY AND THE SLOPE OF THE MATERIAL DURING PLACEMENT.
AT THE TIME OF CONSTRUCTION. THE WIDTH OF THE CONSTRUCTION BERM MAY BE ADJUSTED DURING CONSTRUCTION
2. THE WIDTH OF THE C0NSTRUCTION BERM IS DEPENDENT UPON THE PROPORTIONAL QUANTITY OF SAND TO BE PLACED
SECTIONS AND/OR AS DIRECTED BY THE CONTRACTING OFFICER. SEE PLATE C307 FOR TYPICAL SECTIONS.
POINT OF INTERSECTION WITH THE EXISTING GROUND, OR DUNE EXCEPT AT LOCATIONS AS NOTED BY THE TYPICAL
1. THE CONTRACTOR SHALL EXTEND 6.0’ N.A.V.D. BERM CREST HORIZONTALLY LANDWARD, WHERE POSSIBLE, TO
GENERAL NOTES:179.6’++264’329.8’335.4’338.3’374.9’534.9’ 534.9’ 534.9’ ++++333
222
PEDESTRIAN RAMPS AND PUBLIC ACCESS WAYS.
OF ANY PEDESTRIAN ACCESS RAMPS WITHIN THE DIRECT VICINITY OF THE DREDGING OPERATIONS, AND WARNING SIGNS AT ALL
MEASURES SHALL INCLUDE MOVEABLE SAFETY FENCE AT THESE LMITS TO EXTEND FROM DUNE TO THE WATERS EDGE, CLOSURE
TRAFFIC THRU THE LIMITS OF CONSTRUCTION A MINIMUM OF 1000’ AHEAD AND BEHIND THE DREDGE DISCHARGE POINT. SAFETY
12. THE CONTRACTOR SHALL PERFORM SAFETY PATROL THROUGHOUT THE LIFE OF THE CONTRACT TO PREVENT PEDESTRIAN
BE PROPERLY SECURED AND DISPOSED OF ON A WEEKLY BASIS.
DREDGING OPERATIONS AND/OR FOUND ON THE BEACH WITHIN THE LIMITS OF CONSTRUCTION. DEBRIS AND WASTE SHALL
11. THE CONTRACTOR SHALL CONDUCT DAILY OPERATIONS TO CLEAN UP TRASH AND DEBRIS PUMPED ON TO THE BEACH BY
GENERAL NOTES CONTINUED:
2. SEE PLATES C308, C309 AND 310 FOR CROSS SECTIONS.
1. SEE PLATE C307 FOR TYPICAL SECTIONS BERM.
REFERENCE NOTES:
SCALE IN FEET
01000500 1000 2000 WBLOCMAP2013.DGNW R IGH T S V ILLE B E A C H
IS LAND
IS LAND
MASO NBORO INLETSO UTH JETTYNORTH JETTYWEIR235500
0
- X
1
6
5
0
0
0
-
Y
1
7
0
0
0
0
-
Y
236000
0
- X
1
7
5
0
0
0
-
Y
1
8
0
0
0
0
-
Y
1
6
0
0
0
0
-
Y
236500
0
- X
STATION EASTING NORTHING
74
GUARD STATION
U.S. COAST
76
74
76
BEACHFILL AREA
STA. 80+00STAGING AREA
BORROW AREA
BORROW AREA
DUNE +12.5’
STORM BERM +9.5’
BERM +5.0’
CONSTRUCTION
DUNE +12.5’
STORM BERM +9.5’
BERM +5.0’
CONSTRUCTION STA. 160+00(1995)
REALIGNED CHANNEL
MASONBORO INLET
LOCATION MAPWRIGHTSVILLE BEACHG102
3+50.00 2,359,940-X 161,559-Y
9+99.76 2,360,289-X 162,108-Y
20+02.79 2,360,826-X 62,955-Y
30+12.89 2,361,380-X 163,799-Y
39+97.24 2,361,903-X 164,633-Y
49+97.46 2,362,414-X 165,493-Y
59+99.96 2,362,928-X 166,354-Y
69+97.47 2,363,510-X 167,164-Y
80+15.95 2,364,098-X 167,996-Y
89+97.38 2,364,665-X 168,797-Y
99+96.48 2,365,190-X 169,647-Y
109+96.04 2,365,699-X 170,507-Y
119+95.95 2,366,208-X 171,368-Y
130+20.21 2,366,737-X 172,244-Y
140+21.02 2,367,210-X 173,126-Y
149+91.80 2,367,668-X 173,982-Y
159+78.79 2,368,015-X 174,906-Y
168+64.03 2,368,446-X 175,679-Y
NOTES
EXISTING BASELINE
PROPOSED PIPELINE ROUTE
APPROXIMATE SLOPE INTERCEPT
BEACH FILL (NEW WORK)
LEGEND
N
ATLANTIC INTRACOASTAL W ATERW AY
ATLANTIC INTRACOASTAL WATERWAY
BANKS CHANNELSHINN CREEKG.P.S. POINTS
BASELINE STATION
WRIGHTSVILLE BEACH ARRINDALE STSAND DOLLAR LNMASO N INLET8.
7.
6.
5.
4.
3.
2.
1.
SEE NOTE 4
PIPE LINE ROUTE
APPROXIMATE
SEE NOTE 6
C101 C102 C103 C104
AND DUNE PLAN.
SEE PLATES C101, C102 C103 AND C104 FOR DETAILS FOR WRIGHTSVILLE BEACH CONSTRUCTION BERM
MATERIAL ON THE BEACH.
PIPELINE ROUTES. ALL PIPELINE ROUTES MUST BE APPROVED PRIOR TO ANY PLACEMENT OF
ARE ENCOURAGED TO VISIT THE SITE PRIOR TO SUBMITTING A BID TO INVESTIGATE POTENTIAL
MAY HAVE ERODED PORTIONS OF THE PROJECT AREA AND PIPELINE ROUTE. ALL CONTRACTORS
PAST STORMS IN THE NORTH CAROLINA AREA SINCE THE CONTRACT SURVEYS WERE TAKEN
BEACH DIRECTOR OF PUBLIC WORKS.
THE CONTRACTOR SHALL COORDINATE USE OF THIS AREA WITH THE TOWN OF WRIGHTSVILLE
THE SPIT AT THE SOUTHERN END OF WRIGHTSVILLE BEACH IS AVAILABLE AS A STAGING AREA.
AT STA 160+00 WITH A BERM WIDTH OF 0’.
AREA ON THE NORTH END SHALL BEGIN AT STA 141+00 AT A BERM WIDTH OF 205’ AND END
BERM WIDTH OF 0’ AND END AT STA 85+55 WITH A BERM WIDTH OF 205’. THE TRANSITION
THE FILL. THE TRANSITION AREA ON THE SOUTH END SHALL BEGIN AT STA 80+00 WITH A
BEACH FILL FOR WRIGHTSVILLE BEACH SHALL HAVE A TRANSITION AREA AT EACH END OF
GIVE CONTRACTING OFFICER 10 DAY ADVANCE NOTICE OF NEED OF PIPELINE DELINEATION .
CONTRACTING OFFICER PRIOR TO CONSTRUCTION. THE CONTRACTOR IS REQUIRED TO
COORDINATED WITH THE TOWN OF WRIGHTSVILLE BEACH AND APPROVED BY THE
PIPELINE ROUTE ON THE WRIGHTSVILLE BEACH PORTION OF THE PROJECT SHALL BE
IN FEET NAVD 88.
HORIZONTAL CONTROL IN N.C. STATE PLANE COORDINATES NAD 83. VERTICAL CONTROL
REPRESENTATIVE.
SPECIFICATION SECTION 01 57 19 AS DIRECTED BY THE CONTRACTING OFFICER
TILLING OF THE BEACH FILL SHALL BE PERFORMED IN ACCORDANCE WITH CONTRACT
DUNE CROSSOVERS SHOULD OCCUR AT EXISTING BREAKS IN THE DUNES.FILE NAME:WB100-03-56DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:ISSUE DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
fiof Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSX. XXXXXXX, XXXXXXXX05 JUNE 2017L. CREECHX. XXXXXXXNEW HANOVER & BRUNSWICK COUNTIES, NORTH CAROLINAWRIGHTSVILLE BEACH & OCEAN ISLE BEACHCOASTAL STORM RISK MANAGEMENTBCOES Review
Wilmington Harbor
Inner Ocean Bar Project
0
SCALE IN FEET
4000 2000 2000 4000 6000
SCALE: 1" = 2000’B A L D H E A D I S L A N DCASWELL
FORT
MAP
PROJECT VICINITY
N
PROJECT SITE PLAN
CH
A
N
N
E
L
SO
UTHPORT C a p e F e a r R i v e rCHANNELBALDHEAD-CASWELL CHANNELSMITH ISLANDCHANNEL REACH 1
BALDHEAD SHOAL
CHANNEL REACH 2BALDHEAD SHOALREACH 3BALDHEAD SHOAL CHANNELA
t
l a n
t
i c
O c e a nwhiob_dredge-cuts_site_18.dgnNot To Scale
SEE NOTE 2
RESTRICTED AREA
ARCHAEOLOGICAL
SEE NOTE 1
WATER SUPPLY LINE,
DISTRIBUTION CABLES AND
UNDERWATER ELECTRICAL
APPROX. LOCATION OF
REACH SEE SHEET CB102
BALDHEAD SHOAL CHANNELSTATION 150+00SHEETS CB103 AND CB104
DISPOSAL AREAS SEE
APPROXIMATE BASE BEACH
CB104 & CB105
DISPOSAL AREA SEE SHEETS
APPROXIMATE OPTIONAL BEACH
(BASE) SEE SHEET CB101
SMITH ISLAND CHANNEL
(OPTION) SEE SHEET CB101
SMITH ISLAND CHANNEL
3. PHOTOGRAPHY DATE: JANUARY 2016. COPYRIGHT 2016 DIGITAL GLOBE.
TO THE CONTRACTOR AFTER CONTRACT AWARD.
ARCHAEOLOGICAL RESTRICTED AREA. COORDINATES OF THE ARCHAEOLOGICAL RESTRICTED AREA WILL BE PROVIDED
2. NO VESSEL ANCHORAGE OR PLACEMENT OF SPUDS, PIPELINE OR OTHER EQUIPMENT WILL BE ALLOWED WITHIN THE
CABLES AND WATER SUPPLY LINE.
SHALL AVOID ANY BOTTOM DISTURBING ACTIVITIES (ANCHORS, SPUDDING, ETC.) NEAR THE ELECTRICAL DISTRIBUTION
OF OAK ISLAND TO BALD HEAD ISLAND. SEE REFERENCE DRAWINGS R-1 THRU R-6 FOR AS-BUILTS. THE CONTRACTOR
1. UNDERWATER ELECTRICAL DISTRIBUTION CABLES AND A WATER SUPPLY LINE EXTEND FROM THE EAST END
NOTES
Sheet ID. Title
REFERENCE DRAWINGS
INDEX OF DRAWINGS
GI01
GI01 INDEX OF DRAWINGS, PROJECT VICINITY MAP AND PROJECT SITE PLAN
PROJECT SITE PLANPROJECT VICINITY MAP ANDINDEX OF DRAWINGS,FILE NAME:DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:ISSUE DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
fiof Engineers
US Army Corps
22"x34"SIZE:DA MONTH YEARWILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSWH 104-04-165JTHWKBLTCBRUNSWICK COUNTY, NORTH CAROLINAWILMINGTON HARBOR INNER OCEAN BARMAINTENANCE DREDGINGFEATLANTIC OCEAN
PAMLICO SOUND
RI
VE
RROA NOK
E
RIVER CH OWA N
CAPE
FEAR
R
IVER
HYDEBEAUFORTPITT
EDGECOMBE
WASHINGTON TYRREL
DARE
PAMLICO
CRAVEN
JONES
ONSLOW
DUPLIN
PENDER
NEWHANOVERDURHAM
HALIFAX
NORTHAMPTON
HERTFORD
GATES
WILSON
CUMBERLAND
CARTERET
PERQ
UIMA
NSPASQUOTANKCAMDENCURRITUCK
MARTIN
BERTIE
GREENE
LENOIR
V I R G I N I A
S O U T H C A R O L I N A
Wilmington
Manteo
Elizabeth City
Cape Hatteras
Cape Lookout
Cape Fear
Rodanthe
PROJECT
City
Morehead
CB101 SMITH ISLAND CHANNEL
CB104 CASWELL BEACH AND OAK ISLAND DISPOSAL AREA STA. 106+10.50 TO STA. 220+32.00
CB301 TYPICAL SECTIONS BEACH DISPOSAL AREA
CB303 BEACH FILL CROSS SECTIONS STA. 60+00 TO STA. 115+00
CB102 BALDHEAD SHOAL CHANNEL REACH 2
CB302 BEACH FILL CROSS SECTIONS STA. 0+00 TO STA. 35+00
CB304 BEACH FILL CROSS SECTIONS STA. 120+00 TO STA. 175+00
CB305 BEACH FILL CROSS SECTIONS STA. 180+00 TO STA. 235+00
CB306 BEACH FILL CROSS SECTIONS STA. 240+00 TO STA. 255+00
CB103 CASWELL BEACH DISPOSAL AREA STA. 0+00 TO STA. 35+00 AND STA. 60+00 TO STA. 106+10.50
CB105 OAK ISLAND DISPOSAL AREA STA. 220+32 TO STA. 255+00
BRUNSWICK
R-1 AS-BUILT CABLE ROUTE INDEX, NOTES & LEGEND
R-4 PLAN AND PROFILE STA. 0+00 TO STA. 28+00
R-5 PLAN AND PROFILE STA. 28+00 TO STA. 57+00
R-2 AS-BUILT CABLE LOCATION STA. 57+00 TO STA. 85+58
R-6 PLAN AND PROFILE STA. 57+00 TO STA. 85+58
R-3 INDEX SHEET - GENERAL NOTES
BCOES REVIEW
Wilmington Harbor
Anchorage Basin Project
HORSESHOE SHOAL CHANNEL NEW HANOVERCOUNTYOBRUNSWICK CUNTYCape Lookout
ATLANTIC OCEAN
City
Morehead
DISPOSAL AREA
FERRY SLIP ISLAND
DISPOSAL AREA
SOUTH PELICAN ISLAND
Southport
SEE SHEETS CN105, CN106, AND CN107
BASIN EXTENSION
BERTHS 1 THRU 9 & TURNING
NC STATE PORTS AUTHORITY
PROJECT
SEE PLATE CN109
Wilmington
Beach
Carolina
Beach
Wrightsville
Island
Bald Head
BETWEEN CHANNEL
ANCHORAGE BASIN
SEE SHEETS CN102 AND CN103
SEE SHEET CN104
Cape Fear River
32-ft TURNING BASIN
SEE SHEET CN101
Sheet No. Title
REFERENCE DRAWINGS
64201
SCALE IN MILES
N
87
87
17
17
74
17
76
133
421
133
211
421 74 133
132117
TO I-40
A t l a n t i c O c e a nGI01
SEE SHEETS GI01 AND CN108
whab17_indxloc.dgnDISPOSAL AREA
EAGLE ISLAND CELL No. 3
R-4
R-3
R-2
R-1
OVERVIEW AND LOCATION MAPSINDEX OF DRAWINGS, PROJECT32ft TURNING BASIN AFTER DREDGING SURVEY CONTRACT W912PM-14-C-0010
32ft TURNING BASIN BEFORE DREDGING SURVEY CONTRACT W912PM-14-C-0010
32ft TURNING BASIN AFTER DREDGING SURVEY CONTRACT W912PM-11-C-0007
32ft TURNING BASIN BEFORE DREDGING SURVEY CONTRACT W912PM-11-C-0007
SEE PLATE CN110
SEE PLATE CN111
CN112
CN111
CN110
CN109
CN108
CN107
CN106
CN105
CN104
CN103
CN102
CN101
GI01
TEMPORARY SILT FENCE DETAILS
SOUTH PELICAN ISLAND DISPOSAL AREA
FERRY SLIP ISLAND DISPOSAL AREA
HORSESHOE SHOAL CHANNEL
EAGLE ISLAND CELL No. 3 DISPOSAL AREA
NC STATE PORTS AUTHORITY BERTHS No. 6, No. 7, No. 8 AND No. 9
NC STATE PORTS AUTHORITY BERTHS No. 3, No. 4 AND No. 5
NC STATE PORTS AUTHORITY BERTHS No. 1, No. 2 AND TURNING BASIN EXTENSION
BETWEEN CHANNEL
ANCHORAGE BASIN STA. 40+00 TO STA. 84+05
ANCHORAGE BASIN STA. 0+00 TO STA. 40+00
32-FT TURNING BASIN
INDEX OF DRAWINGS, PROJECT OVERVIEW AND LOCATION MAPS
FILE NAME:WH104-04-160DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:ISSUE DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
fiof Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLNEW HANOVER AND BRUNSWICK COUNTIES, NCANCHORAGE BASIN, 42FT & 32-FT PROJECTSMAINTENANCE DREDGING, WILMINGTON HARBOR30 JUN 2017W912PM-17-B-0009INDEX OF DRAWINGS
PROJECT OVERVIEW
PROJECT LOCATION
DARE
NEWHANOVERMOORECHATHAMALAMANCE
CARTERET
V I R G I N I A
S O U T H C A R O L I N A
Wilmington
Manteo
Elizabeth City
Cape Hatteras
Cape Fear
Rodanthe
Not To Scale
PAMLICO SOUNDROANOKERIVER
NEUSE
RI
VE
R CHOWANCAPE
FEAR
R
IVER
HYDEBEAUFORTPITT
EDGECOMBE
WASHINGTON TYRREL
PAMLICO
CRAVEN
JONES
ONSLOW
DUPLIN
PENDER
BRUNSWICK
COLUMBUS
ROBESON
HOKE
LEECASWELL PERSON
ORANGE
DURHAM
WAKE
JOHNSTON
FRANKLIN
VANCE
WARREN
HALIFAX
NORTHAMPTON
HERTFORD
GATES
NASH
WILSON
SAMPSON
CUMBERLAND GRANVILLEPERQUIMANSPASQUOTANKCAMDENCURRITUCKMARTIN
BERTIE
GREENE
LENOIR
WAYNE
HARNETT
BLADEN
REAVES POINT CHANNEL-30N -50.3 -49.1 -48.4 -48.0 -47.8 -47.6 -47.5 -47.0 -46.5 -46.1 -45.9 -45.7 -45.7 -45.7 -45.6 -45.3 -45.3 -45.3 -45.2 -45.2-45 -45.0 -45.0 -44.9 -44.9 -44.4 -44.4 -44.4 -44.3 -44.3 -44.3 -44.2 -44.1 -44.1 -44.1 -44.0 -44.0 -44.0 -43.9 -43.8 -43.8 -43.7 -43.6 -43.6 -43.6 -43.5 -43.4 -43.3 -43.3 -43.3 -43.1 -43.1 -43.1 -42.9 -42.8 -42.8 -42.7 -42.6 -42.4 -42.2 -41.6 -41.5 -41.0 -41.0 -40.4 -40.2-40 -40.0-40-45 -39.9 -39.8 -39.8 -39.7 -39.7 -39.4 -39.4 -39.2 -39.1 -39.1 -38.9 -38.9 -38.8 -38.7 -38.7 -38.4 -38.2 -38.2 -37.7 -37.6 -37.6 -37.5 -37.4 -37.4 -37.2 -37.1 -37.1 -37.0 -37.0 -36.9 -36.9 -36.8 -36.6 -36.3 -36.3 -36.2 -36.2 -36.1 -35.7 -35.7 -35.7 -35.7 -35.6-35 -35.0 -35.0-35 -34.9 -34.9 -34.9 -34.8 -34.7 -34.5 -34.4 -34.3 -34.3 -34.2 -34.1 -34.1 -33.9 -33.7 -33.6 -33.6 -33.5 -33.4 -33.4 -33.4 -33.3 -33.2 -33.2 -33.2 -32.9 -32.8 -32.8 -32.8 -32.7 -32.7 -32.6 -32.6 -32.6 -32.5 -31.9 -31.9 -31.8 -31.7 -31.6 -31.4 -31.2 -31.1 -31.0 -31.0 -30.9 -30.7 -30.7 -30.5 -30.5 -30.4 -30.3 -30.3 -30.2 -30.1-30 -29.9 -29.8 -29.7 -29.7 -29.4 -29.2 -29.1 -28.8 -28.6 -28.5 -28.4 -28.1 -28.1 -28.0 -27.9 -27.8 -27.6 -27.2 -27.0 -26.4 -26.1 -26.0 -26.0 -25.8 -25.5 -25.4 -25.2 -25.1-25 -25.0-25 -24.9 -23.8 -23.5 -23.3 -23.2 -23.0 -22.9 -22.9 -22.8 -22.5 -22.5 -21.0-20-20 -19.9 -19.5 -19.4 -19.3 -19.1 -19.1 -19.1 -19.1 -19.0 -17.7 -17.7 -17.5 -17.1 -16.9 -16.8 -16.3 -16.3 -15.9 -15.7 -15.4-15 -15.0-15-5 -14.9 -14.9 -13.9 -13.2 -13.2 -13.1 -12.5 -12.3 -12.0 -11.8 -11.6 -10.6 -10.3-10-10 -9.7 -9.7 -9.6 -8.9 -8.7 -8.6 -8.1 -8.1 -6.9 -6.7 -6.6 -6.4 -6.1 -6.0 -5.4-5 -4.9 -4.9 -4.7 -4.6 -4.5 -4.5 -4.2 -4.2 -4.2 -4.1 -4.0 -3.9 -3.9 -3.9 -3.9 -3.8 -3.8 -3.8 -3.8 -3.7 -3.7 -3.7 -3.7 -3.7 -3.7 -3.7 -3.6 -3.6 -3.6 -3.6 -3.6 -3.6 -3.6 -3.5 -3.5 -3.4 -3.4 -3.4 -3.4 -3.3 -3.3 -3.2 -3.2 -3.2 -3.2 -3.2 -3.2 -3.2 -3.1 -3.1 -3.1 -3.1 -3.0 -3.0 -3.0 -3.0 -3.0 -3.0 -3.0 -2.9 -2.9 -2.9 -2.9 -2.9 -2.9 -2.8 -2.8 -2.8 -2.8 -2.8 -2.8 -2.7 -2.7 -2.7 -2.7 -2.7 -2.7 -2.7 -2.7 -2.7 -2.6 -2.6 -2.6 -2.6 -2.6 -2.6 -2.6 -2.6 -2.6 -2.6 -2.6 -2.5 -2.5 -2.5 -2.5 -2.5 -2.5 -2.5 -2.5 -2.5 -2.5 -2.5 -2.4 -2.4 -2.4 -2.4 -2.4 -2.4 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.3 -2.2 -2.2 -2.2 -2.2 -2.2 -2.2 -2.2 -2.2 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.1 -2.0 -2.0 -2.0 -1.9 -1.9 -1.8 -1.8 -1.8 -1.8 -1.8 -1.7 -1.7 -1.7 -1.7 -1.7 -1.7 -1.6 -1.6 -1.6 -1.6 -1.6 -1.6 -1.5 -1.5 -1.5 -1.5 -1.5 -1.5 -1.4 -1.4 -1.4 -1.4 -1.3 -1.3 -1.3 -1.3 -1.2 -1.2 -1.2 -1.2 -1.2 -1.2 -1.2 -1.1 -1.1 -1.1 -1.1 -1.1 -1.1 -1.1 -1.1 -1.1 -1.1 -1.1 -1.1 -1.1 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.9 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.8 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.7 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.5 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.2 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1 -0.1NOTES
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PHOTOGRAPHY DATE: 1 FEBRUARY 2017, COPYRIGHT 2017 DIGITAL GLOBE.
ADDTIONAL DISPOSAL AREA REQUIREMENTS.
SEE PARAGRAPH "DISPOSAL OF DREDGED MATERIAL" IN SECTION 35 20 23 OF THE SPECIFICATIONS FOR
COST FOR DREDGING.
ALL COSTS FOR WORK AT FERRY SLIP ISLAND SHALL BE CONSIDERED INCIDENTAL TO AND INCLUDED IN THE
WAS 5.6 ACRES.
THE APPROXIMATE AREA OF THE ISLAND AT 0’ MHW (EL. 4.0’ MLLW) AT THE TIME OF THE SURVEY
THE ISLAND. THE CONTRACTOR SHALL SUBMIT A DISPOSAL PLAN FOR THE CONTRACTING OFFICER’S APPROVAL.
THE CONTRACTOR MAY USE MULTIPLE DISCHARGE POINTS TO INSURE MOUNDING OF DREDGED MATERIAL ON
COMPLETION OF DISPOSAL OPERATIONS.
THE FOOTPRINT OF THE LIMITS OF CONSTRUCTION SHALL NOT EXCEED 7.0 ACRES ABOVE 0’ MHW FOLLOWING
MAXIMUM ELEVATION OF DISPOSAL AREA SHALL NOT EXCEED +24’ MLLW.
WILMINGTON HARBOR NAVIGATION CHANNEL.
ALL DREDGED MATERIAL SHALL BE PLACED BY CONTROL OF EFFLUENT, DIRECTING THE FLOW AWAY FROM THE
ROUTE AND OPTIMAL LOCATIONS FOR THE DISCHARGE OF EFFLUENT.
OFFICER’S REPRESENTATIVE AND A REPRESENTATIVE OF THE AUDUBON SOCIETY TO DETERMINE THE PIPELINE
PRIOR TO PLACEMENT OF PIPE ON THE ISLAND THE CONTRACTOR SHALL MEET ONSITE WITH THE CONTRACTING
VERTICAL DATUM: MEAN LOWER LOW WATER (MLLW).
HORIZONTAL DATUM: NAD 1983.
SIDE OF CIVIL WAR BATTERY BUCHANAN, FORT FISHER, NC.
ELEVATION MONUMENT: USCG MONUMENT, FED-1993, ELEV. 22.46’ MLLW, N 78271.9, E 2321064.3, LOCATED AT THE
NOT BE AN ACCURATE REPRESENTATION OF CURRENT CONDITIONS.
DUE TO EROSION FROM WIND AND WAVES, THE ELEVATIONS, CONTOURS AND SHORELINE OF THE ISLAND MAY
DATE OF TOPOGRAPHIC & HYDROGRAPHIC SURVEY: 30 MARCH AND 4 APRIL 2016.DISPOSAL AREAFERRY SLIP ISLANDCN110000
0
0
00000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00whab17_ferryslip.dgn1425’+
-FILE NAME:WH104-04-160DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:ISSUE DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
fiof Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLNEW HANOVER AND BRUNSWICK COUNTIES, NCANCHORAGE BASIN, 42FT & 32-FT PROJECTSMAINTENANCE DREDGING, WILMINGTON HARBOR30 JUN 2017W912PM-17-B-0009 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.8 0.8 0.8 0.8 0.8 0.9 0.9 0.9 0.9 1.0 1.0 1.1 1.1 1.1 1.2 1.2 1.2 1.2 1.2 1.3 1.5 1.5 1.5 1.5 1.5 1.5 1.6 1.7 1.7 1.8 1.8 1.8 1.9 1.9 2.0 2.0 2.0 2.0 2.1 2.1 2.1 2.2 2.2 2.2 2.3 2.3 2.4 2.5 2.5 2.5 2.5 2.5 2.6 2.6 2.6 2.7 2.7 2.7 2.7 2.7 2.7 2.8 2.8 2.8 2.8 2.8 2.9 2.9 2.9 3.1 3.1 3.2 3.2 3.3 3.3 3.3 3.3 3.3 3.3 3.4 3.5 3.5 3.5 3.6 3.6 3.6 3.6 3.8 3.8 3.8 3.9 4.0 4.1 4.1 4.2 4.2 4.2 4.4 4.5 4.6 4.7 4.8 4.8 4.805002320000
83000
2320000
83500
2310000
83500
555
5
5
5 5.1 5.1 5.3 5.6 5.7 6.0 6.0 6.1 6.2 6.3 6.4 6.4 6.4 6.5 6.5 6.5 6.5 6.6 6.6 6.8 7.0 7.9 8.0 8.1 8.2 8.2 8.2 8.4 8.5 8.5 8.5 8.7 8.7 8.9 9.0 9.1 9.3 9.3 9.3 9.4 9.6 9.7 9.8 10.010
10
15
10.1 10.3 10.4 10.4 10.5 10.7 10.8 11.0 11.1 11.3 11.4 11.5 11.6 11.8 11.9 11.9 12.1 12.1 12.4 12.4 12.7 12.8 12.9 13.0 13.0 13.2 13.3 13.6 13.9 14.1 14.4 14.6 15.0 15.0 16.0 16.1 16.8 17.0CHANNEL PRISM LINE
STA 47+50
CHANNELHORSESHOE SHOALSCALE: 1" = 100’
SCALE IN FEET
100 200 3002001000
SNOWS MARSH CHANNEL
N
-45.0 -44.2 -43.2
-42.8
-42.7
-42.6 -42.5
-42.4
-42.3
-42.3
-42.2
-42.1
-42.0
-41.9
-41.7
-41.7
-41.5
-41.4
-41.3
-41.2
-41.1
-41.0
-41.0
-40.9
-40.9
-40.8 -40.6
-40.4
-40.3
-40.2
-40.1 -40 -39.5
-39.5
-39.3
-39.2
-38.6
-37.7
-36.8
-36.4
-35.1
-35
-34.1
-33.0
-32.3
-32.0-30 -29.7
-29.4
-29.3
-28.5
-28.4
-27.7
-27.6
-27.3
-26.6
-26.6
-26.0
-25.8
-25.6
-25.6
-25.5
-25.4
-25.4
-25.0 -25
-24.7
-24.6
-24.3
-24.2
-24.1
-24.1 -23.9
-23.6
-23.5
-23.3
-23.1
-23.0
-22.9
-22.8
-22.8
-22.4
-22.4
-22.3
-22.3
-22.2
-22.1
-22.1
-22.1
-22.1
-22.0
-21.9
-21.9
-21.8 -21.8
-21.8
-21.7
-21.7
-21.7 -21.6
-21.6
-21.6
-21.4
-21.4 -21.3
-21.2 -21.2
-21.1
-21.1
-21.1
-21.1
-21.0
-21.0
-21.0
-21.0
-21.0
-20.9
-20.8
-20.8
-20.8
-20.7
-20.7
-20.6
-20.5 -20.4
-20.4
-20.4
-20.4
-20.3
-20.3
-20.3
-20.2
-20.2
-20.2
-20.2 -20.1
-20.0
-20.0
-20.0
-20-20-20 -19.9 -19.9
-19.9
-19.8
-19.8
-19.7
-19.7
-19.7
-19.7
-19.6
-19.6
-19.6
-19.6
-19.6
-19.6
-19.5 -19.5
-19.5
-19.5
-19.5
-19.4 -19.4
-19.4
-19.4
-19.4
-19.3
-19.3 -19.3
-19.3
-19.2
-19.1
-19.1
-19.1
-19.0
-19.0
-18.9
-18.8
-18.7
-18.7
-18.7
-18.7
-18.6
-18.5
-18.5
-18.4
-18.4
-18.4
-18.3
-18.2
-18.2
-18.2
-18.0
-17.9 -17.8
-17.8
-17.6
-17.6
-17.6
-17.5
-17.4
-17.4
-17.3
-17.3
-17.3
-17.2
-17.2
-17.1
-17.1
-17.0
-17.0
-16.9
-16.9 -16.8
-16.8
-16.7 -16.5
-16.5 -16.4
-16.3
-16.2
-16.2
-16.1
-16.1
-16.1 -16.1
-16.0
-15.9
-15.9
-15.8
-15.8
-15.7
-15.5
-15.5
-15.5
-15.3
-15.3
-15.2
-15.0
-15
-14.9
-14.9
-14.9
-14.7 -14.7
-14.4 -14.2
-13.9
-13.9
-13.8
-13.7
-13.3
-13.3
-13.2
-13.2
-13.2
-13.1
-13.1
-13.0
-13.0
-13.0
-13.0
-12.9
-12.9
-12.8
-12.7
-12.7
-12.5
-12.5
-12.3
-12.2 -12.2
-12.1
-12.1
-12.1
-12.1
-12.1
-11.9
-11.9
-11.8
-11.7
-11.7
-11.6
-11.6
-11.6
-11.5
-11.4 -11.4
-11.4
-11.3
-11.2
-11.0
-10.9
-10.9
-10.9
-10.6 -10.6
-10.6
-10.6
-10.4
-10.4 -10.4
-10.1
-10.0
-10.0
-10
-10
-10
-15
-15
-20-25-30-35-40
-9.9
-9.8
-9.6
-9.5
-9.4
-9.1
-8.9
-7.9
-7.9
-7.8
-7.6
-7.1
-7.0
-7.0
-6.7
-6.6
-6.6
-6.4
-6.4
-6.2
-6.1
-6.0
-6.0 -5.6
-5.5
-5.4
-5.4 -5.2
-5-5
-4.9
-4.8
-4.7
-4.7
-4.6
-4.6 -4.6
-4.4
-4.4 -4.4
-4.4
-4.3 -4.3 -4.3
-4.1
-4.0
-3.9
-3.9
-3.8
-3.8
-3.8 -3.7 -3.7
-3.6
-3.6
-3.5
-3.4
-3.4
-3.4
-3.3
-3.3
-3.2
-3.2 -3.2
-3.2
-3.2
-3.2
-3.2
-3.1
-3.1
-3.1
-3.1
-3.1
-3.0
-3.0
-3.0
-2.9
-2.9
-2.9
-2.9
-2.9
-2.8
-2.8
-2.8 -2.7
-2.7
-2.7
-2.6
-2.6
-2.6
-2.6
-2.5
-2.5
-2.4
-2.4
-2.4 -2.4
-2.3
-2.3 -2.3
-2.3
975’ -+
-2.2
-2.2
-2.2
-2.1
-2.1
-2.0
-2.0
-1.9
-1.9 -1.8
-1.8
-1.7
-1.7
-1.7
-1.7
-1.6
-1.6
-1.5
-1.5
-1.5
-1.5
-1.5
-1.5
-1.4
-1.4
-1.4
-1.4
-1.4
-1.3
-1.3
-1.3
-1.2 -1.2
-1.1
-1.0 -1.0
-1.0
-1.0
-0.9
-0.9
-0.9
-0.9
-0.8
-0.8
-0.8
-0.8
-0.8
-0.8
-0.8
-0.7
-0.7
-0.7
-0.7
-0.7
-0.7
-0.6
-0.6
-0.5
-0.5
-0.5
-0.5
-0.5 -0.5
-0.4
-0.4
-0.4 -0.4 -0.4
-0.4
-0.4
-0.4
-0.4
-0.3 -0.3
-0.3
-0.3
-0.3
-0.3
-0.3
-0.3 -0.3 -0.3
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.1
-0.1
-0.1
-0.1
-0.1 -0.1
-0.1
-0.1
-0.0
69000
2311000
69000
2312000
70000
2310000
CHANNEL PRISM LINE STA 88+06 70000
2312000
CHANNEL PRISM LINE
NOTES
MARSH
VEGETATION
VEGETATION
VEGETATION
PERIMETER OF MARSH
WATER
OPEN
MARSH
15.
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PHOTOGRAPHY DATE: 1 FEBRUARY 2017 COPYRIGHT 2017 DIGITAL GLOBE.
ADDTIONAL DISPOSAL AREA REQUIREMENTS.
SEE PARAGRAPH "DISPOSAL OF DREDGED MATERIAL" IN SECTION 35 20 23 OF THE SPECIFICATIONS FOR
COST FOR DREDGING.
ALL COSTS FOR WORK AT SOUTH PELICAN ISLAND SHALL BE CONSIDERED INCIDENTAL TO AND INCLUDED IN THE
WAS 7 ACRES.
THE APPROXIMATE AREA OF THE ISLAND AT 0’ MHW (EL. 4.0’ MLLW) AT THE TIME OF THE SURVEY
THE ISLAND. THE CONTRACTOR SHALL SUBMIT A DISPOSAL PLAN FOR THE CONTRACTING OFFICER’S APPROVAL.
THE CONTRACTOR MAY USE MULTIPLE DISCHARGE POINTS TO INSURE MOUNDING OF DREDGED MATERIAL ON
COMPLETION OF DISPOSAL OPERATIONS.
THE FOOTPRINT OF THE LIMITS OF CONSTRUCTION SHALL NOT EXCEED 7.0 ACRES ABOVE 0’ MHW FOLLOWING
MAXIMUM ELEVATION OF DISPOSAL AREA SHALL NOT EXCEED +22’ MLLW.
WILMINGTON HARBOR NAVIGATION CHANNEL AND AWAY FROM THE MARSH AREA.
ALL DREDGED MATERIAL SHALL BE PLACED BY CONTROL OF EFFLUENT, DIRECTING THE FLOW AWAY FROM THE
ANY TIME PLACE MATERIAL OR ALLOW ANY EQUIPMENT TO CROSS INTO THE STAKED MARSH AREA.
TEMPORARY SILT FENCE ALONG THE NORTH SIDE OF THE STAKED MARSH AREA. THE CONTRACTOR SHALL NOT AT
PLACEMENT OF DREDGED MATERIAL THE CONTRACTOR SHALL CONSTRUCT AN APPROPRIATE BERM AND PLACE
BEFORE THE START OF ANY WORK BY THE CONTRACTOR THE CORPS WILL STAKE THE MARSH LINE. PRIOR TO THE
ROUTE AND OPTIMAL LOCATIONS FOR THE DISCHARGE OF EFFLUENT.
OFFICER’S REPRESENTATIVE AND A REPRESENTATIVE OF THE AUDUBON SOCIETY TO DETERMINE THE PIPELINE
PRIOR TO PLACEMENT OF PIPE ON THE ISLAND THE CONTRACTOR SHALL MEET ONSITE WITH THE CONTRACTING
VERTICAL DATUM: MEAN LOWER LOW WATER (MLLW).
HORIZONTAL DATUM: NAD 1983.
SIDE OF CIVIL WAR BATTERY BUCHANAN, FORT FISHER, NC.
ELEVATION MONUMENT: USCG MONUMENT, FED-1993, ELEV. 22.46’ MLLW, N 78271.9, E 2321064.3, LOCATED AT THE
NOT BE AN ACCURATE REPRESENTATION OF CURRENT CONDITIONS.
DUE TO EROSION FROM WIND AND WAVES, THE ELEVATIONS, CONTOURS AND SHORELINE OF THE ISLAND MAY
DATE OF TOPOGRAPHIC & HYDROGRAPHIC SURVEY: 30-31 MARCH 2016.
CN111
0.0
0.0 0.0 0.0
0.0
00000
0
0DISPOSAL AREASOUTH PELICAN ISLANDwhab17_spelican.dgnFILE NAME:WH104-04-160DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:ISSUE DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
fiof Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLNEW HANOVER AND BRUNSWICK COUNTIES, NCANCHORAGE BASIN, 42FT & 32-FT PROJECTSMAINTENANCE DREDGING, WILMINGTON HARBOR30 JUN 2017W912PM-17-B-0009 0.0
0.1
0.1
0.1 0.1
0.1 0.2
0.2
0.2
0.4
0.4
0.5
0.5
0.6
0.6
0.6
0.6
0.7
0.7
0.7
1.0
1.0
1.0 1.1 1.1
1.2
1.2
1.2 1.2
1.3
1.3
1.3
1.3
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4 1.4
1.4
1.4 1.4
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5 1.5 1.5 1.6 1.6
1.6
1.6 1.6
1.6
1.6
1.6
1.6
1.6
1.6
1.6 1.6
1.6
1.6
1.6
1.6
1.6
1.6
1.6
1.6
1.6
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.9
1.9
1.9
2.0
2.0
2.0
2.0
2.0
2.1
2.1
2.1
2.2
2.2
2.3
2.3
2.3
2.3
2.4
2.4
2.5
2.5
2.5
2.6
2.6
2.6
2.6
2.6
2.7
2.7
2.7 2.7 2.8
2.8
2.9
2.9
2.9
2.9
3.0
3.2
3.2
3.3
3.3
3.3
3.3
3.4
3.4 3.5
3.5
3.6 3.6 3.7
3.8
3.8
3.8
3.8
3.9
3.9
3.9
3.9
3.9
3.9
3.9
4.0 4.0 4.0 4.0 4.0 4.0
4.1
4.1
4.1
4.1
4.1
4.1
4.1 4.1 4.1
4.2
4.2
4.2
4.2
4.3
4.3
4.4
4.4
4.4
4.4
4.4
4.4
4.5
4.5
4.5
4.6
4.6
4.6 4.6
4.7
4.7 4.7
4.7
4.7 4.8 4.8
4.8
4.8
4.9
4.9
4.9
4.9 4.9
5.0
5.0
5.0
55 55
5555 555555
5
55
5 5.0
5.0
5.0
5.0
5.1
5.1
5.1
5.1 5.1
5.1
5.1
5.2
5.2
5.2
5.2
5.3
5.3
5.3
5.3 5.3
5.3
5.3
5.4
5.4
5.4
5.4 5.5
5.6
5.7
5.7
5.8
5.8 5.9
5.9
5.9
6.0
6.1
6.3
6.4
6.5
6.5
6.6
6.7
6.9 7.0
7.4
7.7
8.3
9.0
9.2 9.7
10.0
10.0
10
10
10
4
4
4
10.6
11.0
11.3
11.3 11.3 11.4
11.6
12.1
12.8
12.9
13.1
13.5
13.6
14.0
1716 14.3
14.5
14.6
14.61515
15.1
15.1
15.5
15.7 15.9
16.0
16.4
16.8
16.9
17.7
17.8
18.4
18.5
18.9
19.0 19.0
19.1
19.7 19CN112
1
18SCALE: 1" = 100’
SCALE IN FEET
100 200 3002001000
SEE DETAIL
TEMPORARY SILT FENCE
Manteo-Rollinson-Silver Lake Harbor-
Atlantic Harbor Interior Channels
Project
Sheet No. Title
N O R T H C A R O L I N A
SITES
SITES
SEE SHEET GI02
SEE SHEET GI03
SEE SHEET GI03
SEE SHEET GI04
GI01 AND INDEX OF DRAWINGSLOCATION MAP, PROJECT OVERVIEWFILE NAME:MB104-04-163DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:AWARD DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLW912PM-17-B-0007CARTERET, HYDE, AND DARE COUNTY, NORTH CAROLINA- BIG FOOT SLOUGH - ATLANTIC HARBOR CHANNELSMANTEO - ROLLINSON - HATTERAS TO HATTERAS INLETMAINTENANCE DREDGING14 SEPTEMBER 2017W912PM-17-C-0012S-1
CN120
CN119
CN118
CN117
CN116
CN115
CN114
CN113
CN112
CN111
CN110
CN109
CN108
CN107
CN106
CN105
CN104
CN103
CN102
CN101
GI04
GI03
GI02
GI01
TIMBER STOPLOG DETAIL
NEW DUMP ISLAND DISPOSAL AREA
ATLANTIC HARBOR CHANNELS
BIG FOOT SLOUGH DISPOSAL ISLAND
BIG FOOT SLOUGH
CORA JUNE ISLAND DISPOSAL AREA
HATTERAS FERRY CHANNEL RANGES 3 THRU 5
HATTERAS FERRY CONNECTING CHANNEL AND RANGE 5
ROLLINSON CHANNEL STA. 0+00 TO STA. 130+00
WELLS ISLAND DISPOSAL AREA
PARNELL ISLAND DISPOSAL AREA
OLD HOUSE CHANNEL RANGE 2 STA. 150+00 TO STA. 263+99
OLD HOUSE CHANNEL RANGE 2 STA. 60+00 TO STA. 150+00
OLD HOUSE CHANNEL RANGE 1 AND RANGE 2 STA. 0+00 TO STA. 60+00
ISLAND "L" AND ISLAND "MN" DISPOSAL AREAS
RANGE 17 AND RANGE 17 EXTENSION
ISLAND "D" DISPOSAL AREA
WALTER SLOUGH
RANGE 16
ISLAND "H" DISPOSAL AREA
RANGE 14A, 14B & 14C
LOCATION MAP ATLANTIC HARBOR, ATLANTIC HARBOR OF REFUGE AND DISPOSAL AREA
HATTERAS, ROLLINSON AND BIG FOOT SLOUGH VICINITY MAP
MANTEO AREA LOCATION MAP AND PROJECT OVERVIEW
LOCATION MAP, PROJECT OVERVIEW AND INDEX OF DRAWINGSBODIE I
S
LANDWanchese
Manteo
A t l a
n t i c O c e a
n
Harbor
Manns CROATAN
S
OUNDROANOKE
S
OUNDBROAD CREEKNa
gs He
a
d
Oregon Inlet345
InletHatteras
InletOcracoke
A t l a n t i c O c e a n
64 BYPASS
64
264 R O A N O K EI S L A N D12
264
64
12
12SH
A
L
L
O
W
B
A
G
B
A
Y
INDEX OF DRAWINGS
Hatteras
Cape
Buxton
HatterasDare Count
yHyde Count
yHyde Count
yCart
er
et Count
yOcracoke
Harbor
Silver Lake
Atlantic
of Refuge
Atlantic Harbor
I
nl
etDrum PAMLICO SOUND FY17.dgnMIC_Loc_Overall_PEA I
SLANDOc
r
a
c
okeHa
tt
er
a
s
Columbia
N
0 4 8 MILES48 MILES
SCALE: 1" = 4 MILES
NOT TO SCALE
N
GI02 AND INDEX OF DRAWINGSPROJECT OVERVIEWMANTEO AREA LOCATION MAP,FILE NAME:MB104-04-163DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:AWARD DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLW912PM-17-B-0007CARTERET, HYDE, AND DARE COUNTY, NORTH CAROLINA- BIG FOOT SLOUGH - ATLANTIC HARBOR CHANNELSMANTEO - ROLLINSON - HATTERAS TO HATTERAS INLETMAINTENANCE DREDGING14 SEPTEMBER 2017W912PM-17-C-00122 MILES 1 2 MILES01
ISLAND "G"BODI
E I
S
LANDISLAND "F"OLD HOUSE CHANNELCROATAN
S
OUNDSCALE: 1" = 1 MILE
N O R T H C A R O L I N A
SITES
_FY17.dgnMIC_Loc_ManteoISLAND "D" SEE SHEET CN105
ISLAND "L" SEE SHEET CN107
ISLAND "MN" SEE SHEET CN107
Columbia Na
gs He
a
d
Wanchese
RANGE 15 A t l a
n t i c O c e a
n
RANGE 14
Harbor
Manns
ISLAND "H" SEE SHEET CN102
RANGE 16 SEE SHEET CN103
SEE SHEET CN104
WALTER SLOUGH
RANGE 2 (OHC) SEE SHEETS CN108, CN109, & CN110
PARNELL ISLAND SEE SHEET CN111
WELLS ISLAND SEE SHEET CN112
RANGE 14 (A, B & C) SEE SHEET CN101
ManteoR O A N O K EROANOKE
S
OUNDI S L A N DOregon Inlet
PEA
I
SLANDHatt
er
a
sOc
r
a
c
oke
E
n
gelhard
Stu
mp
y
P
oint
ISLAND "C"
HOUSE CHANNEL
BRIDGE TO OLD
RANGE 17 SEE SHEET CN106
RANGE 17 EXTENSION SEE SHEET CN106
BYPASS
64
264
64
S HALLOWBAG BAYBROAD CREEK345 12
64
NOTGNIHSAWEGDIRB MUAB
12
SEE SHEET CN108
RANGE 1 (OHC)
264
N
12 MILES 0 2 MILES1
SEE SHEET CN118
DISPOSAL ISLAND
BIG FOOT SLOUGH
Sites
SCALE: 1" = 1 MILE
NOT TO SCALE
FILE NAME:MB104-04-163DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:AWARD DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLW912PM-17-B-0007CARTERET, HYDE, AND DARE COUNTY, NORTH CAROLINA- BIG FOOT SLOUGH - ATLANTIC HARBOR CHANNELSMANTEO - ROLLINSON - HATTERAS TO HATTERAS INLETMAINTENANCE DREDGING14 SEPTEMBER 2017W912PM-17-C-0012GI03 VICINITY MAPAND BIG FOOT SLOUGHHATTERAS, ROLLINSON,slvr-hatt-roll_loc.dgnBuxton
Hatteras
Ocracoke
Ocracoke Inlet
Hyde County
Carteret County Hyde Count
yDa
r
e Count
yA t l a n t i c O c e a n
PAMLICO SOUND
HARBOR
SILVER LAKE
Ocracoke Island
InletHatteras Hatteras
Cape
S
E
E S
H
E
E
T
C
N113
R
O
L
LI
N
S
O
N
C
H
A
N
N
E
L
SEE SHEET CN116
ISLAND
CORA JUNE
SEE SHEETS CN114 & CN115
CHANNEL
HATTERAS FERRY
S
EE
S
HEET CN1
1
7BIG
F
OOT
S
LOUGH
y
k 3 .
ATLANTIC HARBOR
`_
0 REFUGE F E 4
'y+ GE RANG
ATLANTIC HARBOR
OF REFUGE RANGE 3
!'
ATLANTIC HARBOR
�. -� �• OF REFUGE RANGE 2 -
_ "J '-,ATLANTIC HARBOR
..� r ; a `�°�s. +• 5i1 -� . - OF REFUGE RANGE I
_ ?
Vol
{`k
�TLANTICRBOR
SEE SHEET CN119
rvhyY" -
-' 1. 1'4C GOVERNMUG T I'URNISHED DISPCS,%L AREA FOR DREOGEO MATERIAL IE NE% Ol2MP ISLAND
-OI`POSALAREA
2. AREA TO FF OREOGEO SHOWN THUS-
? THECON7rACTOR SHALL OFTAIN CONTRACTINO OFNCER'8 APPROVAL OF THE PIPELINE. ROUTE TO
THE NSPOSALAREA PRIOR TO COMMENCEMENTOF WnRA,
HOR2CO TAL DATUM: NAD 1.9D. '
5. PWCTOCRAPHYOATCD13rFSRUAR 20I7•COPVRIGE72017 DIGITAL GLOEE,
6. FOR DETAILS OH`AREA$ TO RE CRCD3CD: SEE SHEETCNI IB.
4j� ll
SCALE: 1" = 100'
SCALE IN FEET
100 200 3002001000
SPILLWAY SOUTH,
INV 15.3'
29.00'
WEIR
TOP EXIST.RANGE 14A -0.8 -0.1 -0.1 -0.1 -0.1 -0.0 -0.0 -0.0 -0.030"OD HDPE
EXIST
RIPRAP AREA
30"OD HDPE
EXIST
-0.0 -0.0 -0.0MIC_IsleH_FY17.dgn
13. PHOTOGRAPH DATE: 2 DECEMBER 2016, COPYRIGHT 2016 DIGITAL GLOBE.
12. FOR DETAILS OF AREAS TO BE DREDGED SEE SHEET CN101.
11. SEE SHEET S-1 FOR TIMBER STOPLOG DETAILS
THE BID SCHEDULE.
SHALL BE INCLUDED IN THE CONTRACT PRICE FOR MOBILIZATION AND DEMOBILIZATION AS LISTED IN
TOOLS, SUPPLIES AND INCIDENTALS NECESSARY TO FURNISH AND INSTALL THE TIMBER STOPLOGS
SHALL PROVIDE 40 NEW STOPLOGS FOR EACH SPILLWAY. ALL COSTS FOR LABOR, MATERIAL, EQUIPMENT,
PROVIDE PROPER DRAINAGE OF RETAINED WATER FROM THE DISPOSAL AREA. THE CONTRACTOR
10. THE CONTRACTOR SHALL FURNISH AND INSTALL TIMBER STOPLOGS IN EACH SPILLWAY RISER TO
THE SHORELINE OF THE ISLAND.
DIAMETER HDPE PIPE THAT EXTENDS THROUGH THE DIKE EMBANKMENT TO THE WATERS BEYOND
EACH SPILLWAY SYSTEM CONSISTS OF A 4'X4' STEEL FRAMED RISER BOX CONNECTED TO A 30"
9. THERE ARE 2 EXISTING SPILLWAY SYSTEMS LOCATED AT THE SOUTH END OF THE DISPOSAL AREA.
CONTRACTING OFFICER OR HIS/HER DESIGNATED REPRESENTATIVE.
COORDINATE THE PIPELINE ALIGNMENT AND THE DISCHARGE POINT FOR APPROVAL WITH THE
8. PRIOR TO COMMENCEMENT OF DREDGING AND DISPOSAL OPERATIONS THE CONTRACTOR SHALL
ANY WORK ON THE DISPOSAL ISLAND.
OFFICER OR HIS/HER DESIGNATED REPRESENTIVE FOR APPROVAL PRIOR TO COMMENCEMENT OF
MAINTAINED THROUGHOUT THE CONTRACT DURATION SHALL BE SUBMITTED TO THE CONTRACTING
7. A SAFE ACCESS PLAN DETAILING HOW SAFE ACCESS TO ISLAND "H' WILL BE ESTABLISHED AND
MATERIAL FROM RANGES 14A, 14B AND 14C.
6. ISLAND "H" IS THE GOVERNMENT FURNISHED DISPOSAL AREA FOR MAINTENANCE DREDGING
ISLAND "H"
RANGE 14
RIPRAP AREA
INV 13.3'
29.00'
WEIR
TOP EXIST.
RIPRAP AREA
SAND BAG AREA
SAND BAG AREA
SAND BAG AREA
ISLAND "H" DISPOSAL AREASPILLWAY NORTH,
CN102
ALLOWED UNTIL ALL NESTING ACTIVITY IS COMPLETE OR UNTIL SEPTEMBER 1.
IMPACTS CANNOT BE AVOIDED, DISPOSAL INTO ISLAND H DISPOSAL AREA WILL NOT BE
WITHOUT ADVERSELY IMPACTING THESE NESTS. IF IT IS DETERMINED THAT ADVERSE
REPRESENTATIVE SHALL BE CONTACTED FOR INSTRUCTIONS ON HOW TO PROCEED
ACTIVITY BE OBSERVED, THE CONTRACTING OFFICER OR HIS/HER DESIGNATED
INSPECT THE DIKE AND DISPOSAL AREA FOR NESTING BIRDS. SHOULD ANY NESTING
REPRESENTATIVE FROM THE NORTH CAROLINA WILDLIFE RESOURCES COMMISSION TO
ONSITE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND A
DREDGED MATERIAL INTO ISLAND H AFTER MARCH 31, THE CONTRACTOR SHALL MEET
5. PRIOR TO THE COMMENCEMENT OF ANY WORK ON ISLAND H OR ANY DISCHARGE OF
4. FIELD SURVEY PERFORMED 5 APRIL 2017.
3. ALL COORDINATES ARE BASED ON NCGRID (NAD83).
2. ALL ELEVATIONS ARE BASED ON NAVD 88.
1. SURVEYING AND MAPPING BY U.S. ARMY CORPS OF ENGINEERS.
NOTES :
0.0FILE NAME:MB104-04-163DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:AWARD DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLW912PM-17-B-0007CARTERET, HYDE, AND DARE COUNTY, NORTH CAROLINA- BIG FOOT SLOUGH - ATLANTIC HARBOR CHANNELSMANTEO - ROLLINSON - HATTERAS TO HATTERAS INLETMAINTENANCE DREDGING14 SEPTEMBER 2017W912PM-17-C-0012 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.57775003006500 21.5 21.7 21.7 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.8 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 21.9 22.0 22.2 22.2 22.3 22.3 22.6 22.7 22.8 22.9 23.1 23.1 23.3 23.4 23.4 23.6 23.6 23.7 23.8 23.8 23.8 23.9 24.0 24.1 24.2 24.4 24.4 24.6 24.7 24.8 24.9 25.0 25.0 25.1 25.1 25.2 25.3 25.3 25.3 25.3 25.3 25.4 25.4 25.4 25.4 25.4 25.5 25.5 25.5 25.5 25.5 25.5 25.6 25.6 25.6 25.6 25.7 25.7 25.8 25.8 25.8 25.9 25.9 25.9 25.9 26.0 26.0 26.0 26.0 26.0 26.1 26.1 26.1 26.1 26.2 26.2 26.2 26.2 26.2 26.3 26.3 26.3 26.3 26.4 26.4 26.4 26.4 26.5 26.5 26.5 26.5 26.6 26.6 26.6 26.6 26.6 26.6 26.6 26.7 26.7 26.7 26.7 26.8 26.8 26.8 26.8 26.8 26.9 26.9 26.9 27.0 27.0 27.1 27.1 27.1 27.2 27.2 27.2 27.2 27.2 27.3 27.4 27.4 27.5 27.6 27.6 27.6 27.7 27.7 27.9 28.0 28.2 28.3 28.3NN 28.3 28.3 28.3 28.5 28.5 28.5 28.5 28.6 28.6 28.6 28.6 28.6 28.6 28.7 28.7 28.7 28.8 28.8 28.8 28.8 28.8 28.8 28.9 28.9 28.9 28.9 28.9 28.9 28.9 29.0 29.0 29.0 29.0 29.0 29.0 29.0 29.0 29.1 29.1 29.1 29.1 29.1 29.1 29.1 29.2 29.2 29.2 29.2 29.2 29.2 29.2 29.2 29.2 29.3 29.3 29.3 29.3 29.3 29.3 29.3 29.3 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.5 29.5 29.5 29.5 29.5 29.5 29.5 29.5 29.5 29.6 29.6 29.6 29.6 29.6 29.6 29.6 29.6 29.6 29.6 29.6 29.7 29.7 29.7 29.8 29.8 29.8 29.8 29.8 29.8 29.8 29.8 29.9 29.9 29.9 29.9 29.9 29.9 29.9 30.0 30.0 30.0 30.0 30.0 30.0 30.1 30.1 30.2 30.3 30.3 30.3 30.3 30.4 30.5 30.6 30.6
SCALE: 1 : 2000
SCALE IN FEET
200 100 200 4000
ISLAND "D"
DREDGING AREA
MIC_IsleD_FY17.dgnRANGE 16
RANGE
1
7RANGE 15N
CN105 ISLAND "D" DISPOSAL AREAFILE NAME:MB104-04-163DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:AWARD DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLW912PM-17-B-0007CARTERET, HYDE, AND DARE COUNTY, NORTH CAROLINA- BIG FOOT SLOUGH - ATLANTIC HARBOR CHANNELSMANTEO - ROLLINSON - HATTERAS TO HATTERAS INLETMAINTENANCE DREDGING14 SEPTEMBER 2017W912PM-17-C-00123.
2.
1.
NOTES
TO BE DREDGED SEE SHEETS CN103 & CN104.
FOR LOCATION OF DISPOSAL AREA SEE SHEET GI02. FOR DETAILS OF AREAS
ADDITIONAL DISPOSAL AREA REQUIREMENTS.
DISPOSAL OF DREDGED MATERIAL IN SPECIFICATION SECTION 35 20 23 FOR
TO DETERMINE THE PIPELINE ROUTE AND INITIAL DISCHARGE POINT. SEE PARA.
SENTATIVE FROM THE NORTH CAROLINA WILDLIFE RESOURCES COMMISSION
ONSITE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND A REPRE-
PRIOR TO PLACEMENT OF PIPE ON THE ISLAND THE CONTRACTOR SHALL MEET
PHOTOGRAPHY DATE: 02 DECEMBER 2016, COPYRIGHT 2016 DIGITAL GLOBE.
SCALE: 1" = 200'
SCALE IN FEET
200 400 6004002000
LINE
PROPERTY
DISPOSAL AREAS ISLAND "L" AND ISLAND "MN"E 3012773.9
N 753219.7
E 3011770.6
N 754133.8
CN107 FILE NAME:MB104-04-163DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:AWARD DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLW912PM-17-B-0007CARTERET, HYDE, AND DARE COUNTY, NORTH CAROLINA- BIG FOOT SLOUGH - ATLANTIC HARBOR CHANNELSMANTEO - ROLLINSON - HATTERAS TO HATTERAS INLETMAINTENANCE DREDGING14 SEPTEMBER 2017W912PM-17-C-0012NDREDGING AREAS (TYP.)MIC_IsleL-MN_FY17.dgnISLAND "L"
ISLAND "MN"
RANGE
17
EXTENS
ION
OLD HOUSE CHANNEL - RANGE 1
RANGE 2
OLD HOUSE CHANNEL
H
O
USE C
H
A
N
NEL - R
A
N
GE 6
B
RI
D
GE T
O
OL
D
PROPERTY
PRIVATEAREA
DISPOSAL
5' FROM PROPERTY LINE
TEMPORARY SAFETY FENCE
INSTALL
4.
3.
2.
1.
NOTES
FENCING" IN SPECIFICATION SECTION 35 30 23 FOR ADDITIONAL REQUIREMENTS.
THE TEMPORARY SAFETY FENCE FROM THE ISLAND. SEE PARAGRAPH "TEMPORARY SAFETY
LINE. UPON COMPLETION OF DISPOSAL OPERATIONS THE CONTRACTOR SHALL REMOVE
SHALL FURNISH AND ERECT A TEMPORARY SAFETY FENCE OFFSET 5' FROM THE PROPERTY
PRIOR TO COMMENCEMENT OF DISPOSAL OPERATIONS ON ISLAND "L" THE CONTRACTOR
SEE SHEETS CN106 & CN108.
FOR LOCATION OF DISPOSAL AREAS SEE SHEET GI02. FOR DETAILS OF AREAS TO BE DREDGED,
SECTION 35 20 23 FOR ADDITIONAL DISPOSAL AREA REQUIREMENTS.
POINTS. SEE PARAGRAPH "DISPOSAL OF DREDGED MATERIAL" IN SPECIFICATION
COMMISSION TO DETERMINE THE PIPELINE ROUTES AND INITIAL DISCHARGE
AND A REPRESENTATIVE FROM THE NORTH CAROLINA WILDLIFE RESOURCES
SHALL MEET ONSITE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE
PRIOR TO PLACEMENT OF PIPE ON ISLANDS "L" AND "MN" THE CONTRACTOR
PHOTOGRAPHY DATE: 2 DECEMBER 2016, COPYRIGHT 2016 DIGITAL GLOBE.
SCALE: 1" = 100'
SCALE IN FEET
100 200 3002001000
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.5
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4 -0.3
-0.3
-0.3
-0.3
-0.2
-0.2
-0.1
-0.1
-0.1
0.1
0.9
1.0
1.6
1.7
2.1
2.6
2.7
2.8
3.4
3.5
3.8
4.2
4.3
5.1
5.7
5.8
5.9
7.0
7.3
7.5
7.9
8.1
8.4
8.7
8.9
9.7
9.9
10.4
10.9
12.0
13.7
13.9
NRANGE 2
MIC_Parnell_FY17.dgnOLD HOUSE CHANNEL
S
TA. 8
5
+
0
0
ISLAND
PARNELL
PARNELL ISLAND DISPOSAL AREACN111 FILE NAME:MB104-04-163DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:AWARD DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLW912PM-17-B-0007CARTERET, HYDE, AND DARE COUNTY, NORTH CAROLINA- BIG FOOT SLOUGH - ATLANTIC HARBOR CHANNELSMANTEO - ROLLINSON - HATTERAS TO HATTERAS INLETMAINTENANCE DREDGING14 SEPTEMBER 2017W912PM-17-C-0012NOTES
7.
6.
5.
4.
3.
2.
1.
BE DREDGED SEE SHEETS CN108 & CN109.
FOR LOCATION OF DISPOSAL AREA SEE SHEET GI02. FOR DETAILS OF AREAS TO
ADDITIONAL DISPOSAL AREA REQUIREMENTS.
DISPOSAL OF DREDGED MATERIAL IN SPECIFICATION SECTION 35 20 23 FOR
TO DETERMINE THE PIPELINE ROUTE AND INITIAL DISCHARGE POINT. SEE PARA.
SENTATIVE FROM THE NORTH CAROLINA WILDLIFE RESOURCES COMMISSION
ONSITE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND A REPRE-
PRIOR TO PLACEMENT OF PIPE ON THE ISLAND THE CONTRACTOR SHALL MEET
FIELD SURVEY PERFORMED 24 MARCH 2017.
ALL COORDINATES ARE BASED ON NCGRID (NAD83).
ALL ELEVATIONS ARE BASED ON NAVD 88.
SURVEYING AND MAPPING BY U.S. ARMY CORPS OF ENGINEERS.
PHOTOGRAPHY DATE: 2 DECEMBER 2016, COPYRIGHT 2016 DIGITAL GLOBE.
SCALE: 1" = 100'
SCALE IN FEET
100 200 3002001000
-0.5
-0.5
-0.5
-0.5
-0.5
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4
-0.4
-0.3
-0.3
-0.3
-0.3
-0.3
-0.3
-0.3
-0.3
-0.2
0.4
0.8
1.0
1.2
1.5
2.0
2.2
2.2
2.3
2.4
2.6
2.8 3.0 3.3
3.4
3.6
3.8
4.2
4.5
4.7
5.0
5.4
5.7
5.8
6.2
6.8
7.2
7.6
7.8
10.9
N
ISLAND
WELLSRANGE 2
MIC_Wells_FY17.dgnOLD HOUSE CHANNELS
TA. 1
3
0
+
0
0
CN112 WELLS ISLAND DISPOSAL AREAFILE NAME:MB104-04-163DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:AWARD DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLW912PM-17-B-0007CARTERET, HYDE, AND DARE COUNTY, NORTH CAROLINA- BIG FOOT SLOUGH - ATLANTIC HARBOR CHANNELSMANTEO - ROLLINSON - HATTERAS TO HATTERAS INLETMAINTENANCE DREDGING14 SEPTEMBER 2017W912PM-17-C-0012NOTES
BE DREDGED SEE SHEET CN110.
FOR LOCATION OF DISPOSAL AREA SEE SHEET GI02. FOR DETAILS OF AREAS TO
ADDITIONAL DISPOSAL AREA REQUIREMENTS.
DISPOSAL OF DREDGED MATERIAL IN SPECIFICATION SECTION 35 20 23 FOR
TO DETERMINE THE PIPELINE ROUTE AND INITIAL DISCHARGE POINT. SEE PARA.
SENTATIVE FROM THE NORTH CAROLINA WILDLIFE RESOURCES COMMISSION
ONSITE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND A REPRE-
PRIOR TO PLACEMENT OF PIPE ON THE ISLAND THE CONTRACTOR SHALL MEET
FIELD SURVEY PERFORMED 24 MARCH 2017.
ALL COORDINATES ARE BASED ON NCGRID (NAD83).
ALL ELEVATIONS ARE BASED ON NAVD 88.
SURVEYING AND MAPPING BY U.S. ARMY CORPS OF ENGINEERS.
PHOTOGRAPHY DATE: 2 DECEMBER 2016, COPYRIGHT 2016 DIGITAL GLOBE.
7.
6.
5.
4.
3.
2.
1.
SCALE: 1" = 100'
SCALE IN FEET
100 200 3002001000
N
ISLAND
CORA JUNE
FERRY CHANNEL
RANGE 5 - HATTERAS cora-june-isle_17.dgnCN116 DISPOSAL AREACORA JUNE ISLANDFILE NAME:MB104-04-163DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:AWARD DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLW912PM-17-B-0007CARTERET, HYDE, AND DARE COUNTY, NORTH CAROLINA- BIG FOOT SLOUGH - ATLANTIC HARBOR CHANNELSMANTEO - ROLLINSON - HATTERAS TO HATTERAS INLETMAINTENANCE DREDGING14 SEPTEMBER 2017W912PM-17-C-0012BE DREDGED SEE SHEETS CN113, CN114, & CN115.
FOR LOCATION OF DISPOSAL AREA SEE SHEET GI03. FOR DETAILS OF AREAS TO
ADDITIONAL DISPOSAL AREA REQUIREMENTS.
DISPOSAL OF DREDGED MATERIAL IN SPECIFICATION SECTION 35 20 23 FOR
TO DETERMINE THE PIPELINE ROUTE AND INITIAL DISCHARGE POINT. SEE PARA.
SENTATIVE FROM THE NORTH CAROLINA WILDLIFE RESOURCES COMMISSION
ONSITE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND A REPRE-
PRIOR TO PLACEMENT OF PIPE ON THE ISLAND THE CONTRACTOR SHALL MEET
PHOTOGRAPHY DATE: 31 JANUARY 2017, COPYRIGHT 2017 DIGITAL GLOBE.
NOTES
3.
2.
1.
N
DISPOSAL ISLANDBIG FOOT SLOUGH CN118
75+00
70+00
80+00
65+00
60+00
bigfoot-isle_17.dgnDISPOSAL ISLAND
BIG FOOT SLOUGHB I G
F O O T
S L O U G H C H A N N E L81+35 FILE NAME:MB104-04-163DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:AWARD DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLW912PM-17-B-0007CARTERET, HYDE, AND DARE COUNTY, NORTH CAROLINA- BIG FOOT SLOUGH - ATLANTIC HARBOR CHANNELSMANTEO - ROLLINSON - HATTERAS TO HATTERAS INLETMAINTENANCE DREDGING14 SEPTEMBER 2017W912PM-17-C-0012 0.4
0.5 0.5 0.5
0.6
0.6
0.6
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7 0.7
0.7
0.7
0.7
0.7
0.8
0.8
0.8
0.8 0.8
0.8
0.8
0.8
0.8
0.8
0.8 0.8
0.8
0.8
0.8
0.8
0.8
0.8 0.8
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9 0.9
0.9
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1
1.1 1.1 1.2
1.2
1.2
1.2
1.2 1.2
1.2
1.2
1.2
1.3
1.3
1.3
1.3 1.4
1.4
1.4
1.4
1.4
1.5
1.5 1.5
1.6
1.6
1.6 1.7
1.7
1.7
1.7
1.8
1.8
1.8
1.8
2.0
2.0
2.0
2.1
2.1
2.1
2.1
2.1
2.2
2.2
2.2
2.5
2.5
2.6
2.6
2.7
2.8
2.8
2.9
2.9
2.9
2.9
3.1
3.1
3.1
3.1
3.2
3.2
3.2
3.3
3.3
3.3
3.3
3.6 3.6
3.6
3.7
3.8
3.9
3.9
3.9
4.1
4.3 4.4 4.4 4.6
4.6
4.7 4.7
4.8
4.8
4.8
5.1
5.6
5.7 5.8
5.8
6.2
6.4 6.4
6.4
7.1
7.1
7.2
7.4
7.5 7.8 7.9
8.0
8.1 8.6
8.8 8.8
9.1 9.3
10.3 10.4
11.8
NOTES
SEE SHEET CN117.
FOR LOCATION MAP SEE SHEET GI03. FOR DETAILS OF AREAS TO BE DREDGED
ADDITIONAL DISPOSAL AREA REQUIREMENTS.
DISPOSAL OF DREDGED MATERIAL IN SPECIFICATION SECTION 35 20 23 FOR
TO DETERMINE THE PIPELINE ROUTE AND INITIAL DISCHARGE POINT. SEE PARA.
SENTATIVE FROM THE NORTH CAROLINA WILDLIFE RESOURCES COMMISSION
ONSITE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND A REPRE-
PRIOR TO PLACEMENT OF PIPE ON THE ISLAND THE CONTRACTOR SHALL MEET
FIELD SURVEY PERFORMED 28 APRIL 2017.
ALL COORDINATES ARE BASED ON NCGRID (NAD83).
ALL ELEVATIONS ARE BASED ON NAVD 88.
SURVEYING AND MAPPING BY U.S. ARMY CORPS OF ENGINEERS.
PHOTOGRAPHY DATE: 15 DECEMBER 2016, COPYRIGHT 2016 DIGITAL GLOBE.
7.
6.
5.
4.
3.
2.
1.
SCALE: 1 : 2000
SCALE IN FEET
200 100 200 4000
SCALE: 1" = 100'
SCALE IN FEET
100 200 3002001000
N new-dump-isle_17.dgnCN120 DISPOSAL AREANEW DUMP ISLANDFILE NAME:MB104-04-163DRAWING CODE:DRAWN BY:SOLICITATION NO.:DESIGNED BY:DESCRIPTION1
A MARKSUBMITTED BY:DATECONTRACT NO.:CHECKED BY:AWARD DATE:B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
22"x34"SIZE:WILMINGTON, NORTH CAROLINA 2840369 DARLINGTON AVENUEWILMINGTON DISTRICTU.S. ARMY CORPS OF ENGINEERSJ.HARGROVE, J.MITCHELLL. CREECHF. ESCLUSAJ. HARGROVE, J. MITCHELLW912PM-17-B-0007CARTERET, HYDE, AND DARE COUNTY, NORTH CAROLINA- BIG FOOT SLOUGH - ATLANTIC HARBOR CHANNELSMANTEO - ROLLINSON - HATTERAS TO HATTERAS INLETMAINTENANCE DREDGING14 SEPTEMBER 2017W912PM-17-C-0012BE DREDGED SEE SHEET CN119.
FOR LOCATION OF DISPOSAL AREA SEE SHEET GI04. FOR DETAILS OF AREAS TO
ADDITIONAL DISPOSAL AREA REQUIREMENTS.
DISPOSAL OF DREDGED MATERIAL IN SPECIFICATION SECTION 35 20 23 FOR
TO DETERMINE THE PIPELINE ROUTE AND INITIAL DISCHARGE POINT. SEE PARA.
SENTATIVE FROM THE NORTH CAROLINA WILDLIFE RESOURCES COMMISSION
ONSITE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND A REPRE-
PRIOR TO PLACEMENT OF PIPE ON THE ISLAND THE CONTRACTOR SHALL MEET
PHOTOGRAPHY DATE: 13 FEBRUARY 2017, COPYRIGHT 2017 DIGITAL GLOBE.
NOTES
3.
2.
1.
ISLAND
NEW DUMP
PCN Additional Information:
B.3d. This PCN addresses the need for written approval from NCDWR for the discharge of dredged
material from two (2) CSRM project resulting from impacts associated with Hurricane Matthew, and
three (3) projects involving maintenance dredging of coastal navigation channels (see below/maps
attached). Maintenance dredging occurs on an as-needed basis to provide safe navigation to
commercial, public, and private shipping and boating interests. Placement locations include oceanfront
beaches, upland confined disposal facilities (CDFs), and unconfined bird nesting islands. The placement
locations included in this PCN have been used in previous years and only occur on 3 to 5-year cycles. No
new placement locations will be used pursuant to General Certifications approved in response to this
PCN.
1. Ocean Isle and Wrightsville Beach CSRM projects: The projects involve the dredging of sandy material
from the Shallotte Inlet borrow area and Masonboro Inlet and Banks Channel borrow areas with a
hydraulic cutterhead suction dredge(pipeline), and pumping the material to the oceanfront beaches on
Ocean Isle and Wrightsville Beaches, respectively. Beach placement activities on Ocean Isle Beach and
Wrightsville Beach will be limited to the period of 16 November through 30 April for the protection of
nesting sea turtles. The Corps is seeking authorization for these projects under GC 4099, Emergency
Construction of Primary Dunes and Associated Excavation. See attached maps for project limits.
2. Wilmington Harbor Inner Ocean Bar: Maintenance dredging of Bald Head Island Channel 2 and Smith
Island Channel. The dredging shall be accomplished by a hydraulic cutter suction dredge and/or a
hopper dredge with pumpout capability (the environmental window for hopper dredging is 1 December
– 31 March). Placement of beach quality (sand) dredged material will occur on Caswell and Oak Island
Beaches, and will be limited to the period of 16 November – 30 April for the protection of nesting sea
turtles. The Corps is seeking authorization for this project under GC 4095, Projects Eligible for USACE
Regional General Permit 2878, Dredge and Discharge into Federally Authorized Navigation Channels.
See attached maps for project limits.
3. Wilmington Harbor Anchorage Basin: Maintenance dredging of the Anchorage Basin, Between
Channel, 32-ft Turning Basin, the North Carolina State Ports Authority (NCSPA) berth areas and Turning
Basin Extension. The environmental work window for dredging the Upper Harbor channel reaches and
state ports is 1 August – 31 January for the protection of juvenile shrimp and finfish. The Government
furnished disposal area is the Eagle Island Cell No. 3 upland diked disposal area; the Corps is seeking
authorization for this activity under GC 4090, Return Water from Upland Contained Disposal Areas. See
attached maps for project limits.
Dredged material (beach quality sand) from Horseshoe Shoal Channel shall be placed onto Ferry Slip and
South Pelican Islands by control-of-effluent method; the environmental work window is 1 September –
31 March for the protection of nesting waterbirds. The Corps is seeking authorization for this under GC
4105, Activities Involving Control of Effluent Disposal. See attached maps for project limits.
4. Manteo et al. Interior Channels: Maintenance dredging of the Manteo Interior Channels, Rollinson
Channel portions, Big Foot Slough, and Atlantic Harbor Channels. The dredging shall be performed by
hydraulic pipeline dredge, and placement of dredged material will be on Islands H, D, L, MN, Parnell,
Wells, Cora June, Big Foot, and New Dump Island. The Corps is seeking authorization for placement of
beach quality material on all islands except upland diked island H under GC 4105, Activities Involving
Control of Effluent Disposal. For all bird nesting disposal islands, the environmental window for
placement of dredged material is 1 September – 31 March. For upland diked Island H, the Corps is
seeking authorization under GC 4090, Return Water from Upland Contained Disposal Areas.
See attached maps for project limits.
B.3e. Projects addressed by this PCN will involve maintenance dredging of existing federally authorized
navigation channels/borrow areas using hydraulic pipeline dredges and hopper dredges with pump out
capability. Depending upon availability of dredge plant, dredges may be either commercial or
government owned. The discharge of dredged material will be on CDFs, undiked disposal islands (bird
islands), and oceanfront beaches. Material placed on oceanfront beaches and bird islands (via the
control-of-effluent method) will be beach quality sand (</= 10% fine-grained sediments; fine-grained
defined as less than 0.0625mm in size). Material placed in CDFs will usually contain greater than 10%
fine-grained sediments (although in certain situations, beach quality sand may be placed for temporary
storage in select CDFs). Each CDF will have one or more dewatering structures (spillways), constructed at
a location far away enough from the point of dredge outfall to allow maximum settling of sediments.
Each spillway structure is designed to allow surface water to flow into adjacent water bodies in
compliance with the State’s turbidity water quality standards (twice daily turbidity reports are required
to verify 25 NTUs or less). All work will be performed in compliance with all conditions of applicable
permits/authorizations/CAMA consistency concurrences, in addition to all environmental commitments
stated in relevant documents prepared by the Wilmington District in compliance with the National
Environmental Policy Act (NEPA).
3.5b. USACE submitted PCN application signed and dated May 1, 2008 (and December 16, 2011)
requesting use of GCs 3682, 3684, 3698, 3700 and 3703 for the same projects addressed above. March
14, 2012 letter from DWQ provided written approval to utilize said GCs for placement of dredged
material on previous disposal sites. Each federally authorized navigation channel/borrow area in North
Carolina has been analyzed in compliance with NEPA and has a corresponding Environmental
Assessment/Finding of No Significant Impact or Final Environmental Impact Statement. The NC Division
of Coastal Management consistency concurrences have been received for all USACE maintenance
dredging/borrow projects and corresponding disposal/placement alternatives. Please contact Emily
Hughes (910) 251-4635 for a list of these documents or to receive a copy. Many of these projects are
maintained at least once every 3 -5 years. Placement/disposal locations for each dredging occurrence
may vary but all have been used in the past.