Loading...
HomeMy WebLinkAboutAddInfoRequestEnergy, Mineral & Land Resources ENVIRONMENTAL OUALITY July 14, 2017 Mr. Marc R. Van Dine, PLS, PE Design Resource Group 2475 Wilkinson Blvd. Charlotte, NC 28208 Subject: Request for Additional Information Stormwater Permit No. SW3170604 Deal Road Subdivision Union County Dear Mr. Van Dine: ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director The Division of Energy, Mineral, and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on June 27, 2017. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. On SWU-101 items IV. 8 and 10, complete all impervious area information in square feet. 2. The following forms must be completed and originals submitted: a. Supplement -EZ form b. O&M Agreement EZ form c. High Density Residential Deed Restrictions form d. The above forms can be downloaded at https:Hdeq.nc.gov/about/divisions/energ - mineral-land-resources/energy-mineral-land-rules/stormwater-pro rg am/post- construction 3. Since the project proposes handling runoff predominantly using storm drainage piping, SCM's, and is not dispersing flow, it must meet all of the high density requirements and MDC's in the SCM Design Manual and the revise 2017 rules. Revise the SCM to be from the list ofrip marX SCMs to treat the water quality volume (1"). Dry ponds are secondary SCM's. Nothing Compares, SState of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 512 N. Salisbury Street 11612 Mail Service Center Raleigh, North Carolina 27699-1612 919 707 9200 4. Provide supporting calculations for the SCM water quality designs to demonstrate that all MDC are met (ex. WQV, drawdown time of WQV, SA size, anti -floatation, etc.). See the General MDC and the SCM specific MDC. 5. Show on the plans the required access and maintenance easement around each SCM to the public r/w. 6. Add the impervious area in square feet to the SCM DA map (sht. APP -B). 7. Due to the nature of the above comments, additional comments may be forthcoming once revisions are submitted. 8. Please provide revisions both in hard copy (2 sets of revised plan sheets) and pdf (email, ftp, cd, or flash drive). Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to August 14, 2017, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number SW3170604 on all correspondence. If you have any questions concerning this matter please feel free to contact me at Robert.Pattersonkncdenr.gov or (919) 807-6369. Sincerely, P Robert D. Patterson, PE Environmental Engineer Stormwater Program ec: Mooresville Regional Office Cameron Helms — Deal Road Ventures, LLC Nothing Compares --,-,,- State of North Carolina Environmental Quality Energy, Mineral and land Resources 512N. Salisbury Street 1612 Mail Service Center Raleigh, North Carolina 27699-1612 919 707 9200