Loading...
HomeMy WebLinkAboutSW6170901 - Oak Hill Living Center (5)DRAINAGE CALCULATI®NS 1 1 a=; x - I 150 LF SHALLOW — CONCENTRATED FLOW 2% SLOPE I \ 6 / 319—_ 319— 32� SWALE MAP 0 50 100 200 300 KN' 1"=100'@11X17 OAK HILL LIVING CENTER 9767 NC 210 n n�niMo ninoru CARn11n1A /o1N project#:1463-0479 BOBBITT DESIGN BUILD, INC B00 GERMAWOWN ROAD RALEIGH, 27807 PH (BiB)851-7880 SWJ BOBBITT FX (910) 851-1882 E-MAbobhbtmm IL tlesl8n® @ WWW BOBBITT COM Fbm U. C D-0181 COPYRIGHT &2017 BOBBITT DESIGN BUILD, INC. ALL RIGHTS RESERVED. STORM DRAINAGE CALCULATIONS DESIGN STORM FREQUENCY — 10 YR. C — AS NOTED n — 0.012 RCP) RCP — REINFORCED CONCRETE PIPE C.B. — CATCH BASIN J.B. — JUNCTION BOX n — 0.010 HDPE) HDPE— HIGH DENSITY POLYEfHELENE SMOOTH CORE, DOUBLE WALLED PIPE D I — DROP INLET STRUCTURE INCREMENTADESIGN INLET AREA FLOW STORM SEWER DESIGN STORM PIPE GRATE HEADWATER COMMENTS INVERTS FROM TO TYPE 'C' AREA C AREAL I �� �(n) LENGTH DSA. SCOPE CAPACITY INV. IN INV. OUT REQ'D AVAIL. 4 — DI mow AFH cFELOCITY crr"� _°5 — — — — 7.2 — 363 1.0 — — — 3 — FES — — — — _ _ _ _ BIORETENTION SCM _ _ _ _ _ _ _ — — — — — IDISCHARGE TO BIORETENTION 2 — RISER — — — _ _ 2 _ 1315.001-— — — — — — — — 26 1.0 — — — 1 — FES — — — — — — SWALE CALCULATIONS OakHillil/ Living Center 976 � 9767 NC 210 Angier, NC Date: 12-Jul-17 600 German town Road I Raleigh, North Carolina 27607 Ph (919) 851.1980 I Fx (919) 851-1982 I design@bobbrU wm Rev. - AKLA = U.4/ (AC.) C = 0.70 WIDTH = 1 = 7.22 (in/hr) FLOW = 2.38 (cfs) N = 0.025 (Mannings 'n') SLOPE= 0.010 (ft/ft) Z REQUID= 0.40 M = 3 :1 (sideslope) CHANNEL DIMENSIONS DEPTH = 1.00 (ft) WIDTH = 1 (ft) Bottom Width Z ACTUAL AREA = 4.00 (sq/ft) WP = 7.32 (ft) R = 0.55 Z ACTUAL 267 MUST BE > THAN Z REQ'D. = 0.40 V = 3.98 (ft/sec) OakHillill Living Center 976 9767 NC 210 Angier, NC Date: 12 -Jul -17 600 Germatown Road I Raleigh, North Carolina 27607 Ph (919)851.1 980 ( Fx (919) 851-1982 I design@bobbdt oom Rev: - AKtA = 1.1 U (AC.) C = 0.70 WIDTH = 1 = 7.22 (in/hr) FLOW = 5.56 (cfs) N = 0.025 (Mannings 'n') SLOPE= 0.016 (ft/ft) Z REQUID= 0.74 M = 3 :1 (sidesiope) CHANNEL DIMENSIONS DEPTH = 1.50 (ft) WIDTH = 1 (ft) Bottom Width Z ACTUAL AREA = 8.25 (sq/ft) WP = 10.49 (ft) R = 0.79 Z ACTUAL 7.03 MUST BE > THAN Z REQ'D. = 0.74 V = 6.42 (ft/sec)