Loading...
HomeMy WebLinkAbout20160285 Ver 2_Approval Letter_20170915t V'Vatei Resources Calatlantic Group, Inc. Attn: Mr. Jason H. Rivenbark 1100 Perimeter Park Drive, Ste 112 Morrisville, NC 27560 ROY MIC HALL S. REGAN S. JAY ZIMMI-'RMAN WWR # 16-0285 v2 Wake County Subject: Approval of Individual 401 Water Quality Certification with Additiona- Conditions Oak Pointe Subdivision USACE Action ID. No. SAW -2016-00095 This approval and its conditions are final and binding unless contested. This �ertificaticj can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a writtem- petition for an administrative hearing to the Office of Administrative Hearings (here known as OAH) within sixty (60) calendar days. I A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling t OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed wh the original and one (1) copy along with any applicable OAH filing fee is received in t OAH during normal office hours (Monday through Friday between 8:00am and 5:00p excluding official state holidays). I State of North Carolina I Environmental Quality ; Water Resources 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919 807 6300 Calatlantic Group, Inc. DW R# 16-0285 v2 Individual Certification #4071 Page 2 of 9 The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This certification completes the review of the Division under section 401 of the Clean Water Act and 15A NCAC 02H .0500. Contact Jennifer Burdefte at 919-807-6364 or jennifer.burdette(o-)ncdenr.qov if you have any questions or concerns. Sincerely, Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: Jim Spangler, Spangler Environmental, Inc. (via jspangler@spanglerenvironmental.com) Dalton Cook, Spangler Environmental, Inc. (via dalton@spanglerenvironmental.com) Troy George, Calatlantic Group, Inc. 1100 Perimeter Park Drive, Ste 122, Morrisville, NC 27560 USACE Raleigh Regulatory Field Office Todd Bowers, EPA, Sam Nunn Federal Center, 61 Forsyth Street SW, Atlanta, GA 30303 DWR RRO 401 file Filename: 1602850akPointeSD(Wake)_401_IC—Mod.docx CoaUenUcGroup, Inc. DVVR#18-0285v2 Individual Certification #4071 Page 3ofQ CERTIFICATION #4071 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15A NCAC 02H .0500, to Mr. Jason H. Rivenbark and Calatlantic Group, Inc., who have authorization for the impacts listed below, as described within the application received by the N.C. Division of Water Resources (Division) on March 18, 2016 and subsequent information on June 27, 2016 and August 9, 2016, by Public Notice issued by the U. S. Army Corps of Engineers and received by the Division on March 23, 2016, and a modification request received on August 29, 2017 with subsequent information received on August 30, 2017 and September 15, 2017. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval requires you to follow the conditions listed in -the certification Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved provided that all of the conditions of the Certification are met. No other impacts are approved, including incidental impacts. Type of Impact Amount Approved Amount Approved (units) (units) Permanent Temporary Stream S1 (Bl) — 69 (linear feet) 0 (linear feet) S2 (Cl) - 151 (linear feet) 0 (linear feet) (E) - perennial 0 (linear feet) 20 (linear feet) _S4 Totals 335 (linear feet) 20 (linear feet) -Stream 404/401 Wetlands Calatlantic Group, Inc. DWR# 16-0285 v2 ..... . . . . . . . . WN11mize Type of Impact Amount Approved Amount Approved (units) (units) Permanent Temporary 404/401 115 (feet) 03030002 Wetlands 0.93 (acres) 0.02 (acres) Totals 1= Mitigation must be provided for the proposed impacts as specified in the table below - The Division has received an acceptance letter from the NC Division of Mitigation Services (DMS) to meet this mitigation requirement. Until DIVIS receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to DMS to meet the following compensatory mitigation requirement [1 5A NCAC 02H .0506 (b)(6)]: 3. Stormwater Management Plan You are required to provide a digital copy of the approved stormwater management plan (SMP), including plan details on full-sized plan sheets, with proof of the Town of Apex's approval. The approved SMP shall be submitted to Jennifer Burdette of the DWR 401 and Buffer Permitting Branch aennifer.burdette@ncdenr.gov) before any impacts authorized in this certification occur. After it is approved, the SMP may not be modified without prior written authorization from the Town of Apex. If modified, a digital copy of the approval letter and modified SMP shall again be submitted to the DWR 401 & Buffer Permitting Branch (at the email address above) prior to the commencement of the modifications. [1 5A NCAC 02H .0506(b)(5)] 4. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the application for this project. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes, or rules occur. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of this certification. [1 5A NCAC 02H .0501 and .0502] i. Sediment and Erosion Control Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and Compensatory River & Sub - Mitigation Required basin Number Cape Fear Stream 115 (feet) 03030002 3. Stormwater Management Plan You are required to provide a digital copy of the approved stormwater management plan (SMP), including plan details on full-sized plan sheets, with proof of the Town of Apex's approval. The approved SMP shall be submitted to Jennifer Burdette of the DWR 401 and Buffer Permitting Branch aennifer.burdette@ncdenr.gov) before any impacts authorized in this certification occur. After it is approved, the SMP may not be modified without prior written authorization from the Town of Apex. If modified, a digital copy of the approval letter and modified SMP shall again be submitted to the DWR 401 & Buffer Permitting Branch (at the email address above) prior to the commencement of the modifications. [1 5A NCAC 02H .0506(b)(5)] 4. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the application for this project. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes, or rules occur. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of this certification. [1 5A NCAC 02H .0501 and .0502] i. Sediment and Erosion Control Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and Calatlantic Group, Inc. DWR# 16-0285 v2 maintenance of such Best4lanagement Practices. If applicable, the project must comply with the specific conditions and requirements of the NPDES Construction Stormwater Permit issued to the site and the following requirements [1 5A NCAC 02H .0506(b)(3) and (c)(3)]: a. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. b� For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. C Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 6. Sediment and erosion control measures shall not be placed in wetlands or waters. Exceptions to this condition require application submittal to and written approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands, stream beds, or banks, adjacent to or upstream and downstream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Energy, Mineral and Land Resources (DEMLR) or locally delegated program has released the specific area within the project. [1 5A NCAC 02H .0501 and .0502] 7. Construction Stormwater Permit NCGO10000 An NPDES Construction Stormwater Permit is required for construction projects that disturb one (1) or more acres of land. This Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. If your project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self-monitoring, record keeping and reporting requirements is required. A copy of the general permit (NCGO1 0000), inspection logg sheets, and other information may be found at: http://r)ortal.ncdenr.org/web/wq/ws/su/npdessw#tab-w. [1 5A NCAC 02H .0506(b)(5) and (c)(5)] Calatlantic Group, Inc. DWR# 16-0285 v2 . . . . . . . ...... 8. TTork in the Dry All work in or adjacent to stream waters shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. [1 5A NCAC 02H .0506(b)(3) and (c)(3)] Si. If concrete is used during the construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state due to the potential for elevated pH and possible aquatic life/fish kills. [1 5A NCAC 02B .0200] 7FI�Placerneni 0T'VM7UrL7R=—*Y ricilres in T MITI n 717 .0506(b)(2) and (c)(2)] Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered and to allow for aquatic life movement during low flows. Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) must be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams must be below the elevation of the streambed by one (1) foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Additionally, when roadways, causeways, or other fill projects are constructed across FEMA - designated floodways or wetlands, openings such as culverts or bridges must be provided to maintain the natural hydrology of the system as well as prevent constriction of the floodway that may result in destabilization of streams or wetlands. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. 11. All temporary fill and culverts shall be removed and the impacted area returned to natural conditions, within 60 days of the determination that the temporary impact is no longer necessary. The impacted areas shall be restored to original grade, including each stream's original cross sectional dimensions, plan form pattern, and longitudinal bed and bed profile, and the various sites shall be stabilized with natural woody vegetation (except approved maintenance areas) and restored to prevent erosion. [1 5A NCAC 02 H .0506(b)(2) and (c)(2)] Calatlantic Group, Inc. DWR# 16-0285 v2 Qerfific?fi#,A X-4*71 Page 7 of 9 12.All temporary pipes/culverts/riprap pads etc, shall be installed in all streams as outlined in the most recent edition of the North Carolina Sediment and Erosion Contro! Planning and Design Manual so as not to restrict stream flow or cause dis-equilibrium. [1 5A NCAC 02 H .0506(b)(2) and (c)(2)] 13.Any riprap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All riprap shall be buried and/or "keyed in" such that the original stream elevation and streambank contours are restored and maintained. Placement of riprap or other approved materials shall not result in de -stabilization of the stream bed or banks upstream or downstream of the area. [1 5A NCAC 02H .0506(b)(2)] 14. Any riprap used for stream stabilization shall be of a size and density to prevent movement by wave action, current action, or stream flows and consist of clean rock or masonry material free of debris or toxic pollutants. Riprap shall not be installed in the streambed except in specific areas required for velocity control and to ensure integrity of bank stabilization measures. [1 5A NCAC 02H .0506(b)(2)] 15. A one-time application of fertilizer to re-establish vegetation is allowed in disturbed areas including riparian buffers, but is restricted to no closer than 10 feet from top of bank of streams. Any fertilizer application must comply with all other Federal, State and Local regulations. [1 5A NCAC 02B .0231 ] 16. Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers within the project boundaries in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the 401 &Buffer Permitting Branch website at http://portal.ncdenr.orq/web/wq/swp/ws/401/certsandpermits/apply-/`forms. Thetextof the sample deed notification may be modified as appropriate to suit to this project. Documentation of deed notifications shall be provided to the Division upon request. [1 5A NCAC 02H .0501 and .0502] 17. This Certification does not relieve the applicant of the responsibility to obtain all oth required Federal, State, or Local approvals. I 18. Continuing Compliance Mr. Jason H. Rivenbark and Calatlantic Group, Inc. shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. [1 5A NCAC 02B .0200] If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federa' Calatlantic Group, Inc. DW R# 16-0285 v2 Individual Certification #4071 Page 8 of 9 law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify Mr. Jason H. Rivenbark and Calatlantic Group, Inc. and the U.S. Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H .0503 and provide opportunity for public hearing in accordance with 15A NCAC 02H .0504. Any new or revised conditions shall be provided to Mr. Jason H. Rivenbark and Calatlantic Group, Inc. in writing, shall be provided to the U.S. Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 19. This approval is for the purpose and design described in your application and as described in the Public Notice. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name. [15A NCAC 02H .0501 and .0502] 20. The applicant and/or authorized agent shall provide a completed Certificate of Completion Form to the DWR 401 & Buffer Permitting Branch within ten days of project completion (available at: http://portal.ncdenr.org/web/wq/swp/ws/401/certsandpermits/apply/forms). [15A NCAC 02H .0502(f)] 21.This certification grants permission to the director, an authorized representative of the Director, or DEQ staff, upon the presentation of proper credentials, to enter the property during normal business hours. [15A NCAC 02H .0502(e)] This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H.0506] Non-compliance with or violation of the conditions herein set forth may result in revocation of this Certification and may also result in criminal and/or civil penalties. This the 15th day of September 2017 Karen Higgins, Supr 401 & Buffer Permitting Branch Calatlantic Group, Inc. DWR# 16-0285 v2 ndividual Certification 44071 Page 9 of 9 1"Ell "a ME 01