Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20140957 Ver 2_Fayetteville Region AP-2 Cover Sheets_20170920
8/18/2017 4:05 PM© 2017 GAI Consultants, Inc.8/18/2017 4:05 PMATLANTIC COAST PIPELINE PROJECT - 36" AP-2 PIPELINE EXTRA WORK SPACE WETLAND PROPOSED TEMPORARY R.O.W. PROPERTY LINE FENCE STREAM EXISTING GAS PIPELINE OVERHEAD UTILITY LINES PROPOSED GAS PIPELINE (NO GROUND SURVEY) CULVERT EDGE OF GRAVEL PROPOSED PERMANENT EASEMENT PROPOSED ACCESS ROAD EDGE OF PAVEMENT WELL TANK SCALE: 1" = 6000' 6000'0 12000'6000' PROPOSED GAS PIPELINE DITCH ℄ ROAD UTILITY POLE GAS MARKER TEST STATION COUNTY LINE MINGO QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) STEDMAN QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) CEDAR CREEK QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) HOPE MILLS QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) VANDER QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) SLOCOMB QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) WADE QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) DUART QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) AUTRYVILLE QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) 08/04/17 gai consultants - NC, inc. DUNN CROSSROADS QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W 2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BY THE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY. 3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC. 4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI & THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6.ALL STATIONING SHOWN IS SLOPE STATIONING. 7.ERM AND SCOTT A. ROBINSON, NC P. E. NO. 025947 (HEREAFTER COLLECTIVELY REFERRED TO AS ERM) HAVE DEPICTED EROSION AND SEDIMENTATION CONTROL (E&SC) BEST MANAGEMENT PRACTICES (BMPS) ON THIS ALIGNMENT PLAN SHEET PREPARED BY GAI CONSULTANTS, INC. FOR USE BY CONTRACTOR TO CONTROL EROSION AND SEDIMENTATION DURING CONSTRUCTION OF THIS PROJECT. ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE GENERAL NOTES SECTION OF THIS PLAN SET. NO RESPONSIBILITY IS ASSUMED FOR INACCURACIES OF SOURCE DATA PROVIDED BY OTHERS. ERM RETAINS NO RESPONSIBILITY OR LIABILITY FOR INFORMATION DEVELOPED, PREPARED OR OTHERWISE PROVIDED BY OTHERS, OR FOR INACCURACIES OF SOURCE DATA PROVIDED BY OTHERS. ERM ASSUMES NO RESPONSIBILITY OR LIABILITY FOR DESIGNS OR WORK PRODUCTS OF ANY TYPE TO THE EXTENT THAT THEY ARE BASED UPON OR DERIVED FROM SUCH INCORRECT INFORMATION OR DATA. 8/18/2017 4:06 PM© 2017 GAI Consultants, Inc.8/18/2017 4:06 PMATLANTIC COAST PIPELINE PROJECT - 36" AP-2 PIPELINE EXTRA WORK SPACE WETLAND PROPOSED TEMPORARY R.O.W. PROPERTY LINE FENCE STREAM EXISTING GAS PIPELINE OVERHEAD UTILITY LINES PROPOSED GAS PIPELINE (NO GROUND SURVEY) CULVERT EDGE OF GRAVEL PROPOSED PERMANENT EASEMENT PROPOSED ACCESS ROAD EDGE OF PAVEMENT WELL TANK SCALE: 1" = 6000' 6000'0 12000'6000' PROPOSED GAS PIPELINE DITCH ℄ ROAD UTILITY POLE GAS MARKER TEST STATION COUNTY LINE DUART QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) ST PAULS QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) PEMBROKE QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) RENNERT QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC) HOPE MILLS QUADRANGLE NORTH CAROLINA (2013) 7.5 MINUTE SERIES (TOPOGRAPHIC)END 36" AP-2 PIPELINE 08/04/17 gai consultants - NC, inc. 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W 2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BY THE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY. 3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC. 4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI & THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6.ALL STATIONING SHOWN IS SLOPE STATIONING. 7.ERM AND SCOTT A. ROBINSON, NC P. E. NO. 025947 (HEREAFTER COLLECTIVELY REFERRED TO AS ERM) HAVE DEPICTED EROSION AND SEDIMENTATION CONTROL (E&SC) BEST MANAGEMENT PRACTICES (BMPS) ON THIS ALIGNMENT PLAN SHEET PREPARED BY GAI CONSULTANTS, INC. FOR USE BY CONTRACTOR TO CONTROL EROSION AND SEDIMENTATION DURING CONSTRUCTION OF THIS PROJECT. ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE GENERAL NOTES SECTION OF THIS PLAN SET. NO RESPONSIBILITY IS ASSUMED FOR INACCURACIES OF SOURCE DATA PROVIDED BY OTHERS. ERM RETAINS NO RESPONSIBILITY OR LIABILITY FOR INFORMATION DEVELOPED, PREPARED OR OTHERWISE PROVIDED BY OTHERS, OR FOR INACCURACIES OF SOURCE DATA PROVIDED BY OTHERS. ERM ASSUMES NO RESPONSIBILITY OR LIABILITY FOR DESIGNS OR WORK PRODUCTS OF ANY TYPE TO THE EXTENT THAT THEY ARE BASED UPON OR DERIVED FROM SUCH INCORRECT INFORMATION OR DATA.