Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20140957 Ver 2_NA AP-3 Sheets_20170920
SCALE: 1" = 5000' 5000'0 10000'5000' PROPOSED GAS PIPELINE (NO GROUND SURVEY) PROPOSED ACCESS ROAD PROPOSED GAS PIPELINE ALIGNMENT SHEET NUMBER COUNTY LINES USGS 7.5 MINUTE TOPOGRAPHICAL BOUNDARIES ACCESS ROAD SHEET NUMBER 1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US 6859(<)227&(175$/0(5,',$1: 2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 7-23-2014 TO 10-16-2014. 3.IMAGERY DERIVED FROM GOOGLE MAPS. 4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS. 5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM. 6.ALL STATIONING SHOWN IS SLOPE STATIONING. 7.ERM AND SCOTT ROBINSON, NC P. E. NO. 025947 (HEREAFTER COLLECTIVELY REFERRED TO AS ERM) HAVE DEPICTED EROSION AND SEDIMENTATION CONTROL (E&SC) BEST MANAGEMENT PRACTICES (BMPS) ON THESE ALIGNMENT PLAN SHEETS PREPARED BY GAI CONSULTANTS, INC. FOR USE BY CONTRACTOR TO CONTROL EROSION AND SEDIMENTATION DURING CONSTRUCTION OF THIS PROJECT. ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THE GENERAL NOTES SECTION OF THIS PLAN SET. NO RESPONSIBILITY IS ASSUMED FOR INACCURACIES OF SOURCE DATA PROVIDED BY OTHERS. ERM RETAINS NO RESPONSIBILITY OR LIABILITY FOR INFORMATION DEVELOPED, PREPARED OR OTHERWISE PROVIDED BY OTHERS, OR FOR INACCURACIES OF SOURCE DATA PROVIDED BY OTHERS. ERM ASSUMES NO RESPONSIBILITY OR LIABILITY FOR DESIGNS OR WORK PRODUCTS OF ANY TYPE TO THE EXTENT THAT THEY ARE BASED UPON OR DERIVED FROM SUCH INCORRECT INFORMATION OR DATA. 2017 GAI Consultants, Inc. 25B10B336B10C3RaBoCGyB2BoBCaBCrCCaAGxBGyB2BoBBoCWtEBoCBoCRaGxBMATCHLIN E SHEET 005 © 2017 GAI Consultants, Inc.gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADSMAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS INCATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDEDBASED ON CONDITIONS OBSERVED AT TIME OF CONSTRUCTIONS. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENTWATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT ACCESS ROAD WATERBARSLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)ROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW) MATCHLINESHEET 004MATCHLINESHEET 006 2017 GAI Consultants, Inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. &225',1$7(6<67(086(')250$33,1*$1'7232*5$3+<870:,7+1$''$780=21(866859(<)227&(175$/0(5,',$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.$&&(6652$'6+$9(%((1*5283(',172)285&$7(*25,(6¬(;,67,1*52$'612,03529(0(176(;,67,1*52$'60,125,03529(0(176(;,67,1*52$'60$-25,03529(0(176$1'1(:52$'6¬$335235,$7((526,21$1'6(',0(17&21752/6:,//%(3529,'(')2552$'6,1&$7(*25,(6$1'¬52$'6,1CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.:$7(5%$5&21),*85$7,21,6'(3,&7(',13/$19,(:%$6('21,1)250$7,21&855(17/<$9$,/$%/(¬:$7(5%$5&21),*85$7,210$<%(),(/'$'-867('$61(('('%$6('21&21',7,2162%6(59('$77,0(2)&216758&7,216¬7+(&21),*85$7,21'(3,&7(',13/$19,(:$33/,(672%27+7(0325$5<$1'3(50$1(17WATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDED PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)USFWS STREAM CROSSINGWITH ENHANCED CONTROLS RaNoBGxBRaCaBBoBOcAGxCBoBMATCHLINESHEET 005MATCHLINESHEET 007© 2017 GAI Consultants, Inc.gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADSMAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS INCATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDEDBASED ON CONDITIONS OBSERVED AT TIME OF CONSTRUCTIONS. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENTWATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT ACCESS ROAD WATERBARSLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)ROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW) MATCHLINESHEET 006MATCHLINESHEET 008 2017 GAI Consultants, Inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. &225',1$7(6<67(086(')250$33,1*$1'7232*5$3+<870:,7+1$''$780=21(866859(<)227&(175$/0(5,',$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.$&&(6652$'6+$9(%((1*5283(',172)285&$7(*25,(6¬(;,67,1*52$'612,03529(0(176(;,67,1*52$'60,125,03529(0(176(;,67,1*52$'60$-25,03529(0(176$1'1(:52$'6¬$335235,$7((526,21$1'6(',0(17&21752/6:,//%(3529,'(')2552$'6,1&$7(*25,(6$1'¬52$'6,1CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.:$7(5%$5&21),*85$7,21,6'(3,&7(',13/$19,(:%$6('21,1)250$7,21&855(17/<$9$,/$%/(¬:$7(5%$5&21),*85$7,210$<%(),(/'$'-867('$61(('('%$6('21&21',7,2162%6(59('$77,0(2)&216758&7,216¬7+(&21),*85$7,21'(3,&7(',13/$19,(:$33/,(672%27+7(0325$5<$1'3(50$1(17WATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDED PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)USFWS STREAM CROSSINGWITH ENHANCED CONTROLS MATCHLINESHEET 007MATCHLINESHEET 009 2017 GAI Consultants, Inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. &225',1$7(6<67(086(')250$33,1*$1'7232*5$3+<870:,7+1$''$780=21(866859(<)227&(175$/0(5,',$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.$&&(6652$'6+$9(%((1*5283(',172)285&$7(*25,(6¬(;,67,1*52$'612,03529(0(176(;,67,1*52$'60,125,03529(0(176(;,67,1*52$'60$-25,03529(0(176$1'1(:52$'6¬$335235,$7((526,21$1'6(',0(17&21752/6:,//%(3529,'(')2552$'6,1&$7(*25,(6$1'¬52$'6,1CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.:$7(5%$5&21),*85$7,21,6'(3,&7(',13/$19,(:%$6('21,1)250$7,21&855(17/<$9$,/$%/(¬:$7(5%$5&21),*85$7,210$<%(),(/'$'-867('$61(('('%$6('21&21',7,2162%6(59('$77,0(2)&216758&7,216¬7+(&21),*85$7,21'(3,&7(',13/$19,(:$33/,(672%27+7(0325$5<$1'3(50$1(17WATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDED PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)USFWS STREAM CROSSINGWITH ENHANCED CONTROLS GoAMATCHLINESHEET 008MATCHLINESHEET 010© 2017 GAI Consultants, Inc.gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADSMAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS INCATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDEDBASED ON CONDITIONS OBSERVED AT TIME OF CONSTRUCTIONS. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENTWATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT ACCESS ROAD WATERBARSLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)ROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW) AuAOcAGoANoCGoABoBGoANoBMATCHLINESHEET 009MATCHLINESHEET 011© 2017 GAI Consultants, Inc.gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADSMAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS INCATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDEDBASED ON CONDITIONS OBSERVED AT TIME OF CONSTRUCTIONS. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENTWATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT ACCESS ROAD WATERBARSLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)ROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)MATCHLINESHEET AR-100 CnBNoCSeUdGoATeGoANoBNoBWWtEBoBBoBNoAPtAMATCHLINESHEET 010MATCHLINESHEET 012© 2017 GAI Consultants, Inc.gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADSMAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS INCATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDEDBASED ON CONDITIONS OBSERVED AT TIME OF CONSTRUCTIONS. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENTWATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT ACCESS ROAD WATERBARSLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)ROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)MATCHLINESHEET AR-100 MATCHLINESHEET 011MATCHLINESHEET 013 2017 GAI Consultants, Inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. &225',1$7(6<67(086(')250$33,1*$1'7232*5$3+<870:,7+1$''$780=21(866859(<)227&(175$/0(5,',$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.$&&(6652$'6+$9(%((1*5283(',172)285&$7(*25,(6¬(;,67,1*52$'612,03529(0(176(;,67,1*52$'60,125,03529(0(176(;,67,1*52$'60$-25,03529(0(176$1'1(:52$'6¬$335235,$7((526,21$1'6(',0(17&21752/6:,//%(3529,'(')2552$'6,1&$7(*25,(6$1'¬52$'6,1CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.:$7(5%$5&21),*85$7,21,6'(3,&7(',13/$19,(:%$6('21,1)250$7,21&855(17/<$9$,/$%/(¬:$7(5%$5&21),*85$7,210$<%(),(/'$'-867('$61(('('%$6('21&21',7,2162%6(59('$77,0(2)&216758&7,216¬7+(&21),*85$7,21'(3,&7(',13/$19,(:$33/,(672%27+7(0325$5<$1'3(50$1(17WATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDED PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)USFWS STREAM CROSSINGWITH ENHANCED CONTROLS AtATaBStARoBoBBoBAtATaBNoATeNoBAtAMATCHLINESHEET 012MATCHLINESHEET 014© 2017 GAI Consultants, Inc.gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADSMAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS INCATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDEDBASED ON CONDITIONS OBSERVED AT TIME OF CONSTRUCTIONS. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENTWATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT ACCESS ROAD WATERBARSLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)ROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW) WkAStATaBCnBRoTeAtATeAtAAtAMATCHLINESHEET 013MATCHLINESHEET 015MATCHLINESHEET AR-100MATCHLINESHEET AR-100© 2017 GAI Consultants, Inc.gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADSMAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS INCATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDEDBASED ON CONDITIONS OBSERVED AT TIME OF CONSTRUCTIONS. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENTWATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT ACCESS ROAD WATERBARSLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)ROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW) 32A3A31AWWkBCnBCnBAtAWkBTaBChTaBUdAtAUdWkAStARoCnBMATCHLINESHEET 014MATCHLINESHEET 016© 2017 GAI Consultants, Inc.gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADSMAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS INCATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDEDBASED ON CONDITIONS OBSERVED AT TIME OF CONSTRUCTIONS. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENTWATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT ACCESS ROAD WATERBARSLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)ROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW) MATCHLINESHEET 4MATCHLINESHEET 10MATCHLINESHEET 11© 2017 GAI Consultants, Inc.gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED ORIMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORKAREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADSMAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS INCATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED ANDAS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDEDBASED ON CONDITIONS OBSERVED AT TIME OF CONSTRUCTIONS. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENTWATERBARS, AS APPROPRIATE.STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDBELTED SILT RETENTIONFENCE (BSRF)CULVERT ACCESS ROAD WATERBARSLIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCE PERMANENT WATERBAR/SLOPE BREAKER(PROFILE VIEW)TRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKER(PROFILE VIEW)ROADSIDE DITCHUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)