Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20140957 Ver 2_AR-100 and AR-111_20170920
N MATCH LINESHEET 6© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSN MATCH LINESHEET 15MATCH LINESHEET 100-1MATCH LINESHEET 100-2 N MATCH LINESHEET 16© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSMATCH LINESHEET 15MATCH LINESHEET 101-3MATCH LINESHEET 101-3 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSN MATCH LINESHEET 16MATCH LINESHEET 16MATCH LINESHEET 102-4MATCH LINESHEET 102-4 NMATCH LINESHEET 21© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSNMATCH LINESHEET 26MATCH LINESHEET 103-5MATCH LINESHEET 103-6 N MATCH LINESHEET 30© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSNMATCH LINESHEET 35MATCH LINESHEET 104-8MATCH LINESHEET 104-7 N MATCH LINESHEET 35© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSN MATCH LINESHEET 39MATCH LINESHEET 105-9MATCH LINESHEET 105-10 NMATCH LINESHEET 47© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSN MATCH LINESHEET 59MATCH LINESHEET 106-12MATCH LINESHEET 106-11 © 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSN MATCH LINESHEET 61MATCH LINESHEET 107-13 RaRa GaO NoA NoB NoB Ra Ra Ra NoB MATCH LINESHEET 68© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSMATCH LINESHEET 68MATCH LINESHEET 108-16MATCH LINESHEET 108-15 Ra Ra Ra Ra NoA GoA AuB NoB MATCH LINESHEET 71© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSMATCH LINESHEET 104MATCH LINESHEET 109-18MATCH LINESHEET 109-17 WwWwChGeB GeB GeB GeB GeB NoA UcB LeMATCH LINESHEET 112© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSMATCH LINESHEET 104AMATCH LINESHEET 104 MATCH LINESHEET 110-20MATCH LINESHEET 110-19MATCH LINESHEET 110-19 NoANoANoANoAMATCH LINESHEET 121© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEAREA OF NO DISTURBANCEPROPOSED TEMPORARY R.O.W.WETLANDTOPSOIL SEGREGATION AREAPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)gai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 12).1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INC FROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THEACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BE WITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTSAND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS IN CATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTINGDRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS IN CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATA PROVIDED AND AS DESCRIBED IN THENOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.11.WATERBAR CONFIGURATION IS DEPICTED IN PLAN VIEW BASED ON INFORMATION CURRENTLY AVAILABLE. WATERBAR CONFIGURATION MAY BE FIELD ADJUSTED AS NEEDED BASED ON CONDITIONSOBSERVED AT THE TIME OF CONSTRUCTION. THE CONFIGURATION DEPICTED IN PLAN VIEW APPLIES TO BOTH TEMPORARY AND PERMANENT WATERBARS, AS APPROPRIATE.BELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOGCOMPOST FILTER SOCKGENERALIZED SURFACE WATER FLOWSURFACE WATER FLOW WITHIN ROWWATERBAR (PLAN VIEW)WATERBAR OUTLET (PLAN VIEW)STREAM CROSSING PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ACCESS ROAD WATERBARSMA T C H L I N E S H E E T 1 2 9MA T C H L I N E S H E E T 1 1 1 - 2 2 MATCH LINESHEET 111-21