Loading...
HomeMy WebLinkAbout20140957 Ver 2_ACP_NC Raleigh Region SWPPP_Part 16_20170920TITLEDRAWING NO.CONTRACTOR SHALL CONTROL AND MONITOR ALL CONSTRUCTIONACTIVITIES ON THE SITE TO ASSURE THAT NO ENVIRONMENTALRELEASES TO OFFSITE AIR AND WATER RESOURCES OCCURS; ANYRELEASES SHALL IMMEDIATELY BE REPORTED TO THE OWNER,ENGINEER AND APPROPRIATE REGULATORY AGENCIES.CONTRACTOR SHALL INSTALL TEMPORARY, AS REQUIRED, ANDTHREE PERMANENT BENCHMARKS PRIOR TO CONSTRUCTION. THELOCATION OF ALL BENCHMARKS SHALL BE FIELD DETERMINED BYTHE ENGINEER. ALL BENCHMARKS SHALL BE PROTECTED AND/ORRELOCATED IF A BENCHMARK MUST BE DISTURBED DURINGCONSTRUCTION. BENCHMARKS SHALL BE REFERENCED TO THENATIONAL GEODETIC VERTICAL DATUM (NGVD).CONTRACTOR SHALL MANAGE STORMWATER THROUGHOUTCONSTRUCTION ACTIVITIES AND PREVENT THE MIGRATION OFSEDIMENTS FROM THE SITE.CONTRACTOR SHALL NOTIFY NORTH CAROLINA "DIG SAFE"(1-800-632-4949) AT LEAST 3 DAYS PRIOR TO SUBSURFACEDISTURBANCE. CONTRACTOR SHALL BE RESPONSIBLE FORVERIFYING THE LOCATION OF ALL SITE UTILITIES PRIOR TO THEINITIATION OF ANY EXPLORATORY OR CONSTRUCTION ACTIVITIES.EXISTING CONTOURS REPRESENT THE TOPOGRAPHY OF THE SITE INNOVEMBER 2015; TOPOGRAPHY PROVIDED BY DON F. CHANDLER.CONTOUR LINES ARE INDICATED AT 2-FOOT INTERVALS WITHELEVATIONS MEASURED ABOVE MEAN SEAL LEVEL (MSL) DATUM,UNLESS OTHERWISE INDICATED.SCALES AS ARE INDICATED ON EACH DRAWING.THESE DRAWINGS ARE INTENDED FOR APPLICATION PURPOSESONLY, AND ARE NOT RELEASED FOR CONSTRUCTION.THE GENERAL NOTES AND LEGEND PROVIDED ON THIS SHEET APPLYTO ALL DRAWINGS, UNLESS OTHERWISE INDICATED.LIST OF DRAWINGSGENERAL NOTESNORTHAMPTON COMPRESSOR STATIONEROSION AND SEDIMENT CONTROL PLAN9.8.7.6.5.3.4.2.1.NORTH CAROLINA10.PROJECT IS LOCATED IN THE ROANOKE RIVER BASIN.NORTHAMPTONNotification of Combined Self-Monitoring and Self-Inspection Form:The Sedimentation Pollution Control Act was amended in 2006 to require that persons responsiblefor land-disturbing activities inspect a project after each phase of the project to make sure that theapproved erosion and sedimentation control plan is being followed. Rules detailing thedocumentation of these inspections took effect October 1, 2010.To simplify documentation of Self-Inspection reports and NPDES Self-Monitoring Reports, DWQand DEMLR developed a combined form. The self-inspection program is separate from the weeklyself-monitoring program of the NPDES Stormwater Permit for Construction Activities. The focus of theself-inspection report is the installation and maintenance of erosion and sedimentation control measuresaccording to the approved plan. The inspections should be conducted after each phase of the project,and continued until permanent ground cover is established. The form can be accessed at:http://portal.ncdenr.org/web/lr/erosionIf you have questions or cannot access the form, please contact the Raleigh Regional Office at(919) 791-4200.APPROXIMATEPROPERTYBOUNDARYSITE LAYOUT MAPNVIRGINIANORTH CAROLINAAPP. FOR CONST.:SCALE:APP. FOR BID:DRAWN:CHECKED:PROJECT/TASK:925 White Oaks Blvd., Bridgeport, West Virginia 26330 / Phone: (681) 842-3681Atlantic Coast Pipeline, LLCDIR/FILE:TOWN:TITLE:FOR:COUNTY:DWG. NO.GROUPREV.SYM.DATEBYREVISION INFORMATIONPROJECT/TASKAPP.SEAL 002/15/17TSISSUED FOR CONSTRUCTION0345197SLE9931KCOVER SHEETE9931KAEROSION & SEDIMENTATION CONTROL PLANE9931KBEROSION & SEDIMENTATIONCONTROL DETAILS LEV / FEVPARKINGONLYVANLEV / FEVPARKINGONLYNORTH HAMPTON COUNTY NORTH CAROLINATPMC35L2302NC112984VIRGINIAGREENSVILLE COUNTYTPCONTOUR INTERVAL : 2 FEETSURVEY DATUMUTM ZONE 17, US FEETSITE LOCATIONLAT 36° 32' 39.48''LONG 77° 30' 30.97''Atlantic Coast Pipeline, LLC NOTES:1.DISCHARGE TO STABILIZED AREA.2.INSPECT AFTER EVERY RUNOFF EVENT.3.REPAIR/STABILIZE DOWNSTREAM AREA AS NECESSARY.24" MIN.18" MIN.FLOWAREA OFDISTURBANCESOIL DIVERSION BERMUNDISTURBEDAREA36" SILT-SAVERPRIORITY 2 FABRIC26"22"24"6' MAX O.C.Black BandTRENCHFRONT ELEVATION4' LONG WOOD POST (OAK)SPACED AT 6'-0"26"22"24"8"4"10' TO TOEOF SLOPEFABRIC TO BE 24" ABOVE GROUNDWITH "J" IN TRENCHFLOW4" x 8"TrenchSIDE VIEWTOE IN AND COMPACT BACKFILL4 STAPLES(1" x 134")BONDING STRIP(1" x 38" x 24")POST (OAK)(1 18" x 1 18" x 48")(OR EQUAL DENSITY)GROUND LINEBOTTOM OFTRENCH LINEREPAIR DETAILATTACHING TWO SILT FENCESWHEN TRENCHING IS USEDPLAN VIEWAtlantic Coast Pipeline, LLC TITLEDRAWING NO.CONTRACTOR SHALL CONTROL AND MONITOR ALL CONSTRUCTIONACTIVITIES ON THE SITE TO ASSURE THAT NO ENVIRONMENTALRELEASES TO OFFSITE AIR AND WATER RESOURCES OCCURS; ANYRELEASES SHALL IMMEDIATELY BE REPORTED TO THE OWNER,ENGINEER AND APPROPRIATE REGULATORY AGENCIES.CONTRACTOR SHALL INSTALL TEMPORARY, AS REQUIRED, ANDTHREE PERMANENT BENCHMARKS PRIOR TO CONSTRUCTION. THELOCATION OF ALL BENCHMARKS SHALL BE FIELD DETERMINED BYTHE ENGINEER. ALL BENCHMARKS SHALL BE PROTECTED AND/ORRELOCATED IF A BENCHMARK MUST BE DISTURBED DURINGCONSTRUCTION. BENCHMARKS SHALL BE REFERENCED TO THENATIONAL GEODETIC VERTICAL DATUM (NGVD).CONTRACTOR SHALL MANAGE STORMWATER THROUGHOUTCONSTRUCTION ACTIVITIES AND PREVENT THE MIGRATION OFSEDIMENTS FROM THE SITE.CONTRACTOR SHALL NOTIFY NORTH CAROLINA "DIG SAFE"(1-800-632-4949) AT LEAST 3 DAYS PRIOR TO SUBSURFACEDISTURBANCE. CONTRACTOR SHALL BE RESPONSIBLE FORVERIFYING THE LOCATION OF ALL SITE UTILITIES PRIOR TO THEINITIATION OF ANY EXPLORATORY OR CONSTRUCTION ACTIVITIES.CONTOUR LINES ARE INDICATED AT 1-FOOT INTERVALSWITH ELEVATIONS MEASURED ABOVE MEAN SEAL LEVEL(MSL) DATUM, UNLESS OTHERWISE INDICATED.SCALES AS ARE INDICATED ON EACH DRAWING.THESE DRAWINGS ARE INTENDED FOR APPLICATION PURPOSESONLY, AND ARE NOT RELEASED FOR CONSTRUCTION.THE GENERAL NOTES AND LEGEND PROVIDED ON THIS SHEETAPPLY TO ALL DRAWINGS, UNLESS OTHERWISE INDICATED.LIST OF DRAWINGSGENERAL NOTESSMITHFIELD M&R STATIONEROSION AND SEDIMENT CONTROL PLAN8.7.6.5.3.4.2.1.PD-E9938FPD-E9938FAPD-E9938FBNORTH CAROLINAPROJECT IS LOCATED IN THE NEUSE RIVER BASIN.9.SMITHFIELDNotification of Combined Self-Monitoring and Self-Inspection Form:The Sedimentation Pollution Control Act was amended in 2006 to require that personsresponsible for land-disturbing activities inspect a project after each phase of the projectto make sure that the approved erosion and sedimentation control plan is being followed.Rules detailing the documentation of these inspections took effect October 1, 2010.To simplify documentation of Self-Inspection reports and NPDES Self-Monitoring Reports,DWQ and DEMLR developed a combined form. The self-inspection program is separatefrom the weeklyself-monitoring program of the NPDES Stormwater Permit for Construction Activities. Thefocus of the self-inspection report is the installation and maintenance of erosion andsedimentation control measures according to the approved plan. The inspections should beconducted after each phase of the project, and continued until permanent ground cover isestablished. The form can be accessed at:http://portal.ncdenr.org/web/lr/erosionIf you have questions or cannot access the form, please contact the Raleigh RegionalOffice at (919) 791-4200. EROSION AND SEDIMENT CONTROLS LEGEND101101TEMPORATY GRAVEL CONSTRUCTION ENTRANCEWITH DITCH CULVERT AS NEEDEDSILT FENCELIMIT OF DISTURBANCEPROPERTY BOUNDARYEXISTING CONTOURSPROPOSED CONTOURSCOVER SHEETEROSION & SEDIMENT CONTROL SITE PLANEROSION & SEDIMENT CONTROL DETAILSSYM.DATEBYREVISION INFORMATIONPROJECT/TASKAPP.012/20/16TSISSUED FOR CONSTRUCTION0345197.1001SLORIGINAL CONSTRUCTION INFORMATIONAPP. FOR CONST.:SCALE:APP. FOR BID:CHECKED:DRAWN:PROJECT/TASK:925 White Oaks Blvd. Bridgeport, West Virginia 26330 / Phone: (681) 842-3681Atlantic Coast Pipeline, LLC.DIR/FILE:TOWN:TITLE:FOR:COUNTY:DWG. NO.GROUPREV.SMITHFIELD M&R STATIONEROSION AND SEDIMENT CONTROLCOVER SHEETSMITHFIELD, NCJOHNSTONPDE9938F00345197.1001--------AS NOTEDSEAL 1701 7 0 1701701691691691691701691 6 9 169 169168 168 169 168169 Atlantic Coast Pipeline, LLC.EROSION AND SEDIMENT CONTROL LEGENDTEMPORARY GRAVEL CONSTRUCTION ENTRANCEWITH DITCH CULVERT AS NEEDEDSILT FENCELIMIT OF DISTURBANCEPROPERTY BOUNDARYEXISTING CONTOURSPROPOSED CONTOURSWETLAND AREAYARD STONE169169SILT FENCEISSUED FORCONSTRUCTION12/20/16 Atlantic Coast Pipeline, LLC. STREAM CROSSING PROFILE 100'50'050' 100'50'050' GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV. .. STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV. .. STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC AS SHOWN 7/13/15RVS / DLM 7/13/15RRC /RLR DDOM/ACP/Site Specific/Neuse River JOHNSTON NEUSE RIVER AP-2 SITE SPECIFIC PLAN FOR NC ISSUED FOR REVIEWRRC7/13/15A REFERENCE ELEVATION DATA FROM THE USGS GIS DATA CLEARING HOUSE. PIPELINE SURVEY INFORMATION PROVIDED BY GAI CONSULTANTS. STREAM AND WETLAND DATA COLLECTED BY NATIONAL RESOURCE GROUP, LLC. MAPPING DATUM-NC STATE PLANE - NAD 83 CONTOUR INTERVAL - 5 FEET REVISED PER CLIENT COMMENTSRRC8/18/15B REVISED PER CLIENT COMMENTSRRC11/18/15C REVISED RIGHT-OF-WAYS & ROUTINGRLR4/8/16D