Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20140957 Ver 2_ACP_NC Raleigh Region SWPPP_Part 11_20170920
Ra Ra Ra Ra NoA NoA NoB GoA To To NoB NoA gai consultants© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADgai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 84MATCH LINESHEET 82 ToRa GoARa GoA Ra Ra NoB GoA Ra Ra Ra Ra Ly NoA GoA gai consultants© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADgai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 83MATCH LINE SHEET 85 RaGoA GoAGoA NoA NoBTn Ra LyNoB NnB Wt NnB Tn Bb NnD NoB NoB NoB LyFaB NnB AaA NnD MaB 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US6859(<)227&(175$/0(5,'$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDED PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLS1. &225',1$7(6<67(086(')250$33,1*$1'7232*5$3+<870:,7+1$''$780=21(866859(<)227&(175$/0(5,',$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.$&&(6652$'6+$9(%((1*5283(',172)285&$7(*25,(6¬(;,67,1*52$'612,03529(0(176(;,67,1*52$'60,125,03529(0(176(;,67,1*52$'60$-25,03529(0(176$1'1(:52$'6¬$335235,$7((526,21$1'6(',0(17&21752/6:,//%(3529,'(')2552$'6,1&$7(*25,(6$1'¬52$'6,1&$7(*25,(6$1'+$9($'(48$7((;,67,1*'5$,1$*('5$,1$*()($785(6:,//%(3529,'(')2552$'6,1CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. WtNnDMaB FaBToGoAGoA FaALyMaA Gr LyLyLyLyLyRaNuANoBFaBRaNoAMaB NoARaRaAaANoBGr 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US6859(<)227&(175$/0(5,'$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDED PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLS1. &225',1$7(6<67(086(')250$33,1*$1'7232*5$3+<870:,7+1$''$780=21(866859(<)227&(175$/0(5,',$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.$&&(6652$'6+$9(%((1*5283(',172)285&$7(*25,(6¬(;,67,1*52$'612,03529(0(176(;,67,1*52$'60,125,03529(0(176(;,67,1*52$'60$-25,03529(0(176$1'1(:52$'6¬$335235,$7((526,21$1'6(',0(17&21752/6:,//%(3529,'(')2552$'6,1&$7(*25,(6$1'¬52$'6,1&$7(*25,(6$1'+$9($'(48$7((;,67,1*'5$,1$*('5$,1$*()($785(6:,//%(3529,'(')2552$'6,1CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. NoARaRaRa RaRaAaAGoANoA LyLyGoANoB MaB GoA RaGoA MaB TnRaNoBNoB TnGoA RaNoA Ra GoA 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US6859(<)227&(175$/0(5,'$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDED PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLS1. &225',1$7(6<67(086(')250$33,1*$1'7232*5$3+<870:,7+1$''$780=21(866859(<)227&(175$/0(5,',$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.$&&(6652$'6+$9(%((1*5283(',172)285&$7(*25,(6¬(;,67,1*52$'612,03529(0(176(;,67,1*52$'60,125,03529(0(176(;,67,1*52$'60$-25,03529(0(176$1'1(:52$'6¬$335235,$7((526,21$1'6(',0(17&21752/6:,//%(3529,'(')2552$'6,1&$7(*25,(6$1'¬52$'6,1&$7(*25,(6$1'+$9($'(48$7((;,67,1*'5$,1$*('5$,1$*()($785(6:,//%(3529,'(')2552$'6,1CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. RaRaRaRa RaNoBNoB NoBTnGoAGoARaGoANoA GoABoA NnB StANnD NoARaNoBWt NnD 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US6859(<)227&(175$/0(5,'$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDED PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLS1. &225',1$7(6<67(086(')250$33,1*$1'7232*5$3+<870:,7+1$''$780=21(866859(<)227&(175$/0(5,',$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.$&&(6652$'6+$9(%((1*5283(',172)285&$7(*25,(6¬(;,67,1*52$'612,03529(0(176(;,67,1*52$'60,125,03529(0(176(;,67,1*52$'60$-25,03529(0(176$1'1(:52$'6¬$335235,$7((526,21$1'6(',0(17&21752/6:,//%(3529,'(')2552$'6,1&$7(*25,(6$1'¬52$'6,1&$7(*25,(6$1'+$9($'(48$7((;,67,1*'5$,1$*('5$,1$*()($785(6:,//%(3529,'(')2552$'6,1CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. 2016 GAI Consultants, Inc. 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US6859(<)227&(175$/0(5,'$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADPROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDED PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLS1. &225',1$7(6<67(086(')250$33,1*$1'7232*5$3+<870:,7+1$''$780=21(866859(<)227&(175$/0(5,',$1:2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.$&&(6652$'6+$9(%((1*5283(',172)285&$7(*25,(6¬(;,67,1*52$'612,03529(0(176(;,67,1*52$'60,125,03529(0(176(;,67,1*52$'60$-25,03529(0(176$1'1(:52$'6¬$335235,$7((526,21$1'6(',0(17&21752/6:,//%(3529,'(')2552$'6,1&$7(*25,(6$1'¬52$'6,1&$7(*25,(6$1'+$9($'(48$7((;,67,1*'5$,1$*('5$,1$*()($785(6:,//%(3529,'(')2552$'6,1CATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET. NoBNoB NoANnD NnD GoA Ra Ra Ra Ra Ra Ly Ly NoB Ra GoA GoA GoA GoA GoA NoB NoB NoB Ly Ly Ly GoA Tn gai consultants© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADgai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 89MATCH LINESHEET 91 RaGoAGoANoBLyTnTnNoAGoAGrLyGoAGoARaLyLyLyLyLyRaRaGrGoARaRaGoAGoATnGoAgai consultants© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADgai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 90MATCH LINESHEET 92 LyLyRaGoALyGoAGoAGoAMmARaGoAGoAGoAGoANoAGrNoAGrGrNoAGrNaLyBbRaRaRaRaGoAGoANoAGoAGoAgai consultants© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADgai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 91MATCH LINESHEET 93 RaRaGoAGoAGoANoA NoANoAGoARaRaRa Ra NoAGoARaGoA GoA GoA Gr NoA GoA Ra Ra Ra NoA GoA GoA MmA gai consultants© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADgai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 92MATCH LINESHEET 94 Ra RaRa Ra Ra GoAGoALy Ly Gr Ly MmA MmA DoA GoA GoA GoA Ra Gr GoA gai consultants© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADgai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 93MATCH LINESHEET 95 GoA GrGoAGr LyLy GoA GoA GoA GoA GoA Gr Gr MmA Ra GoA Bb Ra UcB gai consultants© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADgai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 94MATCH LINESHEET 96 GoARaGoABbUcBGoANoARaBbGrGrGrGoARaGoARaGrGoALygai consultants© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADgai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 95MATCH LINESHEET 97 UGC UGC RaGr Gr GoALyGoARa GoA LyGoA Ra GoA Gr GoA Gr Gr Na Na Na Na Na Bb Ly GoA Ly UGCUGCUGCgai consultants© 2017 GAI Consultants, Inc.1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDAN 81° W2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED BY AN ON THE GROUND SURVEY PERFORMED BYTHE THRASHER GROUP, INC. ON 06-25-2014 THRU 08-26-2014 GPS SUB-METER ACCURACY.3.AERIAL IMAGERY IS TAKEN FROM A SPRING 2015 FLIGHT BY KUCERA INTERNATIONAL INC.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSEMENT RECORDS (PROVIDED BY OTHERS). GAI &THE THRASHER GROUP MAKE NO GUARANTEE EITHER EXPRESSED OR IMPLIED AS TO THE ACCURACY OF THERECORDS AS SHOWN ON THESE DRAWINGS.5.WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY NRG.6.THESE DRAWINGS ARE NOT INTENDED TO PROVIDE EROSION AND SEDIMENTATION CONTROL REQUIREMENTS.SEE EROSION AND SEDIMENTATION CONTROL PLANS FOR COMPLETE REQUIREMENTS AND BMP LOCATIONS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.EXTRA WORK SPACEPROPOSED TEMPORARY R.O.W.TOPSOIL SEGREGATION AREAWETLAND(COLOR SHOWN TO PROVIDE CLARITY ONLY)PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEPROPOSED GAS PIPELINE (NO GROUND SURVEY)PROPOSED ACCESS ROADgai consultants - NC, inc.PROPERTY LINEFENCESTREAMEXISTING GAS PIPELINEOVERHEAD UTILITY LINESPROPOSED GAS PIPELINESTORM SEWERWATER LINESANITARY SEWEREDGE OF GRAVELPROPOSED PERMANENT EASEMENTUTILITY POLEEXTRA WORK SPACEAREA OF NO DISTURBANCEWETLANDTOPSOIL SEGREGATION AREAPROPOSED TEMPORARY R.O.W.PROPOSED GAS PIPELINE (NO GROUND SURVEY)(COLOR SHOWN TO PROVIDE CLARITY ONLY)ACCESS ROADUNDERGROUND ELECTRICNOTE: THE PE SEAL AND SIGNATURE APPLIES ONLY TO THEE&S CONTROL DESIGN COMPLETED BY ERM (SEE NOTE 10).STREAM CROSSINGCONSTRUCTION ENTRANCE WITH DITCHCULVERT AS NEEDEDCULVERT/ WATERBAR PERMANENT WATERBAR/SLOPE BREAKERTRENCH BREAKER/PLUG TEMPORARY WATERBAR/SLOPE BREAKERUSFWS STREAM CROSSINGWITH ENHANCED CONTROLSBELTED SILT RETENTIONFENCE (BSRF)LIMIT OF DISTURBANCESOIL TYPEORANGE SAFETY FENCEROADSIDE DITCHCOIR LOG1. COORDINATE SYSTEM USED FOR MAPPING AND TOPOGRAPHY - UTM WITH NAD83 DATUM, ZONE 17, US SURVEY FOOT, CENTRAL MERIDIAN 81° W.2.CONTOURS AND TOPOGRAPHIC FEATURES WERE DERIVED FROM LIDAR DATA AND GPS SUB-METER GROUND SURVEY PERFORMED BY GAI CONSULTANTS, INCFROM 11-03-2014 THRU 11-07-2014.3.IMAGERY TAKEN FROM GOOGLE EARTH.4.THE PROPERTY LINES SHOWN ARE BASED ON GIS & TAX ASSESSMENT RECORDS (PROVIDED BY OTHERS). GAI CONSULTANTS MAKE NO GUARANTEE EITHEREXPRESSED OR IMPLIED AS TO THE ACCURACY OF THE RECORDS AS SHOWN ON THESE DRAWINGS.5.STREAM AND WETLAND DATA SHOWN ON THE DRAWINGS WAS PROVIDED BY ERM.6.EROSION AND SEDIMENTATION CONTROL ELEMENTS MAY BE SHOWN OUTSIDE OF THE WORK AREAS FOR CLARITY ONLY. ACTUAL INSTALLATION SHALL BEWITHIN THE WORK AREAS.7.ALL STATIONING SHOWN IS SLOPE STATIONING.8.SILT FENCE AND FILTER SOCK SHALL BE INSTALLED PARALLEL TO CONTOUR TO EXTENT PRACTICABLE IN ACCORDANCE WITH STANDARD DETAIL9.ACCESS ROADS HAVE BEEN GROUPED INTO FOUR CATEGORIES - 1) EXISTING ROADS NO IMPROVEMENTS, 2) EXISTING ROADS MINOR IMPROVEMENTS, 3) EXISTING ROADS MAJOR IMPROVEMENTS AND 4) NEW ROADS. APPROPRIATE EROSION AND SEDIMENT CONTROLS WILL BE PROVIDED FOR ROADS INCATEGORIES 2, 3 AND 4. ROADS IN CATEGORIES 1 AND 2 HAVE ADEQUATE EXISTING DRAINAGE; DRAINAGE FEATURES WILL BE PROVIDED FOR ROADS INCATEGORIES 3 AND 4.10.*ERM IS SOLELY RESPONSIBLE FOR THE NATURE AND LOCATION OF THE DEPICTED BMPS AS OF THE DATE SIGNED AND SEALED BASED ON THE SOURCE DATAPROVIDED AND AS DESCRIBED IN THE NOTES SECTION OF THE INDEX SHEET OF THIS PLAN SET.COMPOST FILTER SOCKMATCH LINESHEET 96MATCH LINESHEET 98