Loading...
HomeMy WebLinkAbout20081394 Ver 1_More Info Received_20081210vM`KIT`a&cREsD TO: NCDWQ Wetlands/401 Certification Unit 1650 Mail Service Center Raleigh, NC 27699-1650 ATTENTION: Ian McMillan LETTER OF TRANSMITTAL DATE: December 9, 2008 PROJECT NO: 1517-0178 TASK NO: RE: State Employees' Credit Union - Madison TRANSMITTAL NO: PAGE 1 OF 1 WE ARE SENDING: ? Originals ® Prints ? Shop Drawings ? Samples ? Specifications ® Calculations ® Other Quantity Drawing No. Rev Description Status 1 Revised copy of the Stormwater Narrative & Calculations 1 Revised copy of the Construction Plans 1 Response to Comments REMARKS: Please find the enclosed revised Stormwater Management Plan Submittal for the proposed State Employees' Credit Union in Madison. Please feel free to call me with any questions or comments. Thanks, 1730 Varsity Dr., Suite 500, Raleigh, NC 27606 919/233-8091 Fax 919/233-8031 Cc: Sue Homewood, DWQ Winston Salem McKIM & CREED, PA Regional Office Signed 1 0 2008 Ja on C. Allen, PE, LEED AP DENR - WATER QUALITY WETLANDS AND STORMWATER BRAK" Response to Comments Dated 11/19/08 Please remove the layer of mulch that was specified above the engineered soil media. Mulch is not needed for grassed bioretention cells. Response: The layer of mulch has been removed. 2. Please provide fertilizer and watering specifications to establish the Bermuda grass. Response: Notes regarding fertilizer application and watering have been added to the permanent seeding schedule on sheet C1203. Please reconfigure the underdrains so that they run the entire length of the bioretention cell. Response: The bioretention underdrains have been reconfigured to run the entire length of the cells. 4. Please provide details of the flow splitting device that conveys stormwater drainage to the two proposed bioretention cells as well as the calculations that support the design of this device. Response: Per telephone conversation, there is no flow splitting device in this project. 5. Please provide a construction sequence. The required items checklist states that there is a construction sequence on C 1203; however, this is not present on the plans that were submitted. Response: A phased construction sequence has been provided on sheets C1201 through C 1203. STORMWATER AND EROSION CONTROL ' NARRATIVE AND CALCULATIONS NC State Employees' Credit Union Madison Rockingham County, North Carolina Prepared for: State Employees' Credit Union ' c/o O'Brien Atkins Architects PO BOX 12037 RTP, NC 27709 ' (919) 941-9000 ' Date: 4/9/2008 ' Revised: 9/19/2008 Revised: 11/3/2008 Revised: 12/4/2008 ' Prepared by: ' McKim & Creed, PA 1730,Varsity Drive Suite 500 0 P@ROWM n ' Raleigh, NC 27606 it DEC 1 0 2008 ' DENR • WATER DUALITY WETLANDS AND STORMWATER BRANCH v MCMM&CREED v 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 TABLE OF CONTENTS- NARRATIVE FIGURES SITE AERIAL PHOTO USDA SOIL SURVEY MAP PRE-DEVELOPMENT DRAINAGE AREA MAP POST-DEVELOPMENT DRAINAGE AREA MAP WATER QUALITY BIORETENTION AREA DESIGN SUMMARY SHEETS WATER QUANTITY PRE- vs. POST-DEVELOPMENT WATER QUANTITY SUMMARY EROSION CONTROL CALCULATIONS SEDIMENT TRAP CALCULATIONS SWALE & DIVERSION DITCH DESIGN CALCULATIONS RIP RAP APRON SIZING PRE-DEVELOPMENT STORMWATER CALCULATIONS POST-DEVELOPMENT STORMWATER CALCULATIONS STORM DRAINAGE CALCULATIONS DESIGN NARRATIVE 1. GENERAL The project site is located on Chief Martin Street approximately 1115 feet from the intersection ' of Highway Street and Chief Martin Street in Rockingham County, North Carolina. The total area of the parcel is 6.99 acres. The total disturbed area for site construction is 2.96 acres. The intent of this project is to construct a new State Employees Credit Union and all associated parking required to serve the facility. The bank will incorporate a four lane drive-up teller bay area that will be serviced from the interior parking drives. The site will be served by public ' water and public sewer systems. Stormwater and erosion control devices will be designed and constructed in accordance with ' the NCDENR Division of Land Quality and Division of Water Quality requirements. 2. EXISTING SITE DESCRIPTION ' The existing topography of the site is slight to moderate slopes (4% - 6%) with a high point generally in the northeast property corner around elevation 637. The site drains east to west to an existing stream. ' The point of interest used for stormwater calculations is the existing creek immediately downstream of the site. Pre-construction runoff at the point of interest is 4.51 cfs for the 1-yr, 24-hour storm. The water body downstream from the site is Big Beaver Island Creek, which is considered class C water. Existing vegetation consists primarily of trees, and existing soils on the site are, per USGS soils survey, SvB (Stoneville Loam, 2-8% slopes) and SwC (Stoneville- urban land complex, 2-10% slopes). The soils are classified as hydrologic soil type B. 3. PROPOSED IMPROVEMENTS ' An existing 36" corrugated metal pipe currently enters the site from the east and outlets stormwater from the adjacent site into the existing stream mentioned above. The corrugated ' metal pipe will be shortened and rerouted around the site to bypass offsite runoff. The offsite drainage area to this pipe was estimated using aerial photographs to have 10.02 acres of impervious surface and 2.90 acres of pervious surface. There is also a 12" CMP at the ' southeast corner of the site that discharges stormwater from the same adjacent property. The offsite drainage area to this pipe was estimated to be 1.42 acres of impervious surface and 2.57 acres of pervious surface. This drainage will also bypass the proposed site. ' Onsite stormwater controls were designed for 85% TSS removal and control of the first 1" of runoff per NCDWQ requirements. Two grassed bioretention areas are proposed to meet these requirements. Pre-development runoff for the 1-yr, 24-hour storm is 4.51 cfs while post- development runoff is 3.68 cfs. Offsite areas where there was no change in runoff between pre- and post-development were not included in these calculations. ' Stormwater runoff will be conveyed to the proposed bioretention areas through a system of reinforced concrete pipes, catch basins, drop inlets, flared end sections and manholes. Rip-rap aprons will serve to reduce exit velocities at proposed flared end sections. 4. EROSION AND SEDIMENTATION CONTOL Erosion control measures have been designed per NCDENR Division of Land Quality requirements. Temporary diversion ditches, silt fence, inlet protection and sediment traps have all been implemented to reduce sediment laden runoff from the site. A temporary construction t entrance will be constructed on Chief Martin Rd. 1 1 11 1 1 FIGURES r 9 ry1J 1 $ 0.. I . i x ,y4 , 4-1 tit kxq?'?F 44, y? 1?? A?6 ,?iaF.?yw. ,qa 45 p`k. IM9F # C' x Z `??py? ?i 0ll? ? 04 ?° wry '?+kF -?, p'??„ w?, ,? ?}"?.? t,? ?'.2 •?F ` ?*afs Y*•,6 ?y? 4 w t" # i* 1C #jR t Y ?s xSl . p ! l 'y?p(c o ?4 ri. $S ac '?, `!.. i:yP ?'?fi,."'nF ? ?,y„ .? q ? a,`?'? .e ?y? 'D`?t # •:,?g, ?+3?.-" .i"J'.?Y? vt? ?t ? r..? &;?? t, v ? - ?M .,m 4 ? L, t "mgr •K '.?{? ?!ti y. °.? 4?.' y -.?? ? i rt .+? ? 4:,F °Ki ? ? '_i? ??41?, Si ???i "!„" r'??a* s yr ?°"°???? wA [. ,?? r=y. a *xwf > tea=. ,??w COY lale?LuijOno 111JON `uosipLw g ,/I1M'SG'a1111a laaa-f[Z 61a 3131 a, ,¦im-moruaw w+,w.rw++?o a0azz YNnow3 muoN 1o"a S 11T < < r Z H d o a: 0aG 3LM'3MUO A16aYA au ]aall Ug1B 1a.4lJ4S9 231jo uos!puw L a z Nenaa?a+na? ? t ? 8w ???' Y WJI..b? R .......... ?a uoiu 11at saar?o dui ajuj s 4 D sulliduBlJ8o Il p l I s w ?? z 0 3 ,. a I i U 'o ?I /000 cn 1 ILI N X .• F? d r -r U r 1 ' l l „11 1 ' l; , p:,l I . _ .n ul fl `c\ I I ? oq ?. a 1II? a-=-- I I I ? 8a ,t • Q I 1 1 I I I r . . . . . . . r..ww... NW-OMw m e M J I - uxi !y Ico9-ffd (BtBi InJ m [.T y? y??7T C.U 10JUD tjjjoN 7? SUOSTPUW w? IfR1 A00 M- W 1 tluWm11Y1MYA W>?YIWMIYwI ...... , `uJ7T IfiOB-ffZ `616 W tl U VNnDW BOBS • laait5 U!>RLH Ja!4J 4S9 n a w ° ^' lOlfignygtlp'?IpKdnplryalrfil?ri?tlpMN111 - S aa qg 8 a Yf 15 A im OOL IlN6 3 'A1W0 ll?6?tlYA ? OILO[[I ??r ?V?+s a Q JWQ uOSIpC[A1 -AIL- ,, i ' $ " < z a Q 0 \ V C b SuIAfi.180 uotun jipazD,saaXotduzg ajujS s , ` l • a a o? fa? a ? " a O ? ?iA 1 a ? 1 CU 40 1 m I y p I rs. F Pi fA ,N 7° F Mo F 1 1 1 ._.? j .. Yl y. Zi l 17 17 1 1 i (I / /Jv 1 U r I n / j n _ ?! / i iK ! Jlhlh i ,11{ ee?? z \ I ; I 1 I III. i;e, / ' '1 .. _ ?..... i ?O I i 1 "IW F roll h i ?` A '??• A III I' 1 t ro'S '-' ! I ? ?o PC .III p ..? $ I 1 ? J? t Gy p, y II ! ,11;' fat` ?! fi` , 1 / FF++ I? '')r?? I ] 1 X11 ?L 00 All ?il ifl ` ®ryl l ' 4jic f? ?s\ 1 Ilij' 1 r f ? ,!I '. ?. ? ` , ' ?? ? ; ?m ?? \n ? % `? I " t Ili, !• ? ? 1 :ear o.xu 1 pill x ?p29 6 / ?IJ +?. .. m INI T / I I I ? ' 1 I I I i m = m = = = m i L 11 WATER QUALITY NORTH BIORETENTION AREA Project Information: Project Name: SECU - Madison McKim & Creed Project #: 01517-0178 Designed by: JCA Date: 9/23/2008 Revised by: Date: Revised by: Date: Checked by: Date: Site Information: Sub Area Location: Post-1 Drainage Area (DA) = 1.31 Acres Impervious Area (IA) = 0.73 Acres Percent Impervious (I) = 55.7 % Required Storage Volume: Design Storm = 1.0 inch Determine Rv Value = 0.05 + .009 (1) = 0.55 Storage Volume Required = 2,623 cf Surface Area: Ponding Depth = Surface Area = Elevations: Top Elevation = Temporary Pool Elevation = Bottom Elevation = 10 in. 3,147 sf 624.00 ft 622.83 ft (Riser Elev.) 622.00 ft Areas/Volumes: Area @ Top of Temporary Pool = 3,756 sf Bottom Surface Area = 3,174 sf Volume of Temporary Storage = 2,923 cf Bioretention Area Side Slopes = 3 : 1 Volume of Storage for 1" Storm = 2,923 (Elev = 622.83) (Elev = 622.00) Bottom Elev. (622') to Riser Elev. (622.83')) Yes ( 2923 > 2623 ) cf k NORTH BIORETENTION AREA Find Time Drawdown of Water Through Bio-Retention Soil Laver A. Rate of Drawdown Qd = (2.3e-5) * k * SA * H / L H / L Approximatley = 1 Qd= 0.1448 cf B. Find Time to Drawdown Water from Inundation to Saturation at Surface: Volume to Drawdown: Vi-s = SA *Depth Vi-s = 2,623 Time to Remove Volume of Water at Flowrate Qd: Ti-s = Vi-s / Qd = 18,116 sec. 5 hr. C. Find Time to Drawdown Water from Saturation at Surface to 2 feet Below Surface: Porosity (n) = 0.45 Volume to Drawdown: Vi-s = 2 feet * SA * n Vs-2 = 2,832 Time to Remove Volume of Water at Flowrate Qd: Ts-2 = Vs-2 / Qd = 19,565 sec. = 5 hrs D. Total Time to Draw Water Through Soil: T= 10 hrs NORTH BIORETENTION AREA Underdrain Pipe Sizing Note: Underdrain pipes are to be used when existing soil is clay. NxD=16*(10*Qd*nISA0.5)^(3/8) N (Numbr of Underdrain Pipes ) D (Pipe Diameter) = 6 in s (Internal Slope of Pipe) = 0.50% n (Mannings Roughness Coefficient) = 0.011 N x D = 9.15 N = 1.52 = 2 Pipes Pipe Type and Diameter Manning Roughness Coeff. 4" Single Wall Corrugated Plastic 0.014 - 0.015 4" Smooth Wall Plastic 0.010 - 0.011 6" Single Wall Corrugated Plastic 0.014 - 0.015 6" Smooth Wall Plastic 0.010 - 0.011 8" Single Wall Corrugated Plastic 0.015 - 0.016 Gravel Envelope: Underdrain pipe should have 2 inches gravel cover. The minimum depth for the gravel envelope should be 6 inches. Depth = 8 in 1 1 1 1 1 1 1 1 1 1 1 1 1 1 SOUTH BIORETENTION AREA Project Information: Site Information: Project Name: McKim & Creed Project #: Designed by Revised by: Revised by: Checked by: Sub Area Location Drainage Area (DA) _ Impervious Area (IA) _ Percent Impervious (I) _ Required Storage Volume: SECU - Madison 015-17-0178 JCA Date: 9/23/2008 Date: Date: Date: Post-2 0.94 Acres 0.50 Acres 53.2 % Design Storm = 1.0 inch Determine Rv Value = 0.05 +.00 9 (1) 0.53 Storage Volume Required = 1,804 cf Surface Area: Ponding Depth = 10 in. Surface Area = 2,165 sf Elevations: Top Elevation = 623.00 ft Temporary Pool Elevation = 621.83 ft (Riser Elev.) Bottom Elevation = 621.00 ft AreaslVolumes: Area @ Top of Temporary Pool = 2,763 sf Bottom Surface Area = 2,298 sf Volume of Temporary Storage = 2,137 cf Bioretention Area Side Slopes = 3 : 1 Volume of Storage for 1" Storm = 2,137 (Elev = 621.83) (Elev = 621.00) Bottom Elev. (621') to Riser Elev. (621.83')) Yes ( 2137 > 1804 ) cf SOUTH BIORETENTION AREA Find Time Drawdown of Water Through Bio-Retention Soil Laver A. Rate of Drawdown Qd = (2.3e-5) * k * SA * H / L H / L Approximatley = 1 Qd= 0.0996 cf B. Find Time to Drawdown Water from Inundation to Saturation at Surface: Volume to Drawdown: Vi-s = SA *Depth Vi-s = 1,804 Time to Remove Volume of Water at Flowrate Qd: Ti-s = Vi-s / Qd = 18,116 sec. 5 hr. C. Find Time to Drawdown Water from Saturation at Surface to 2 feet Below Surface: Porosity (n) = 0.45 Volume to Drawdown: Vi-s = 2 feet * SA * n Vs-2 = 1,948 Time to Remove Volume of Water at Flowrate Qd: Ts-2 = Vs-2 / Qd = 19,565 sec. = 5 hrs D. Total Time to Draw Water Through Soil: T= 10 hrs 1 1 1 1 1 1 1 1 1 1 SOUTH BIORETENTION AREA Underdrain Pipe Sizing Note: Underdrain pipes are to be used when existing soil is clay. N x D = 16*( 10*Qd*n/s^0.5)^(3/8) N (Numbr of Underdrain Pipes ) D (Pipe Diameter) = 6 in s (Internal Slope of Pipe) = 0.50% n (Mannings Roughness Coefficient) = 0.011 N x D = 7.95 N = 1.33 2 Pipes Pipe Type and Diameter Manning Roughness Coeff. 4" Single Wall Corrugated Plastic 0.014 - 0.015 4" Smooth Wall Plastic 0.010 - 0.011 6" Single Wall Corrugated Plastic 0.014 - 0.015 6" Smooth Wall Plastic 0.010 - 0.011 8" Single Wall Corrugated Plastic 0.015 - 0.016 Gravel Envelope: Underdrain pipe should have 2 inches gravel cover. The minimum depth for the gravel envelope should be 6 inches. Depth = 8 in 11 C 1 WATER QUANTITY 1 co 0 O Q J fY) r m 'f3 a) ?. N U D te ° a) a) 06 " Q U E a) Y ? 'c R C O R U ca ? o E z ° E c U ? O L T 'o o r+ m z 2 - :3 c C) W M N ? U to 0 10 ? M (D (P > co o a. m E 7 cn C 7 U L i+ w U + O (0 N LL M f6 a- O 01 a) O U (ff a 0 U } O LO U- (1f 0-0 _O F- a) N U p fo a) d Q Fu a) r) o `- Q d w c O C6 ? a) 3 ? U 7 m U U c 'D c a) a) L (D U ? «) c a) a) a) > v fa v O ) E a O a O N O 0 ? O = a C c CL U U) c c a) O a) a) c N O 0 O c an O = U r 0 a) ? N ? c C N m c a) U a c 0-0 Y -0 N c (Q a) m O O to O c>f (n 0) O N M U In CM '- W I13 U ?L O a) L In a) - 4- - .cn ?QO.C t- IV M iii O Z 1 EROSION CONTROL CALCULATIONS u 1 1 i 1 1 1 i 1 1 1 1 1 1 1 1 1 1 Project Information Project Name: McKim & Creed Project #: Designed by: Revised by: Checked by: SKIMMER BASIN #1 SECU - Madison 01517-0178 JCA JCA GML Date: 9/16/2008 Date: 10/27/2008 Date: 9/18/2008 Drainage Area Total, AT= 2.38 Ac Disturbed, AD= 1.56 Ac 10-year Runoff (Q10) C = 0.60 Tc = 5.00 min 110 = 6.85 in/hr Q10 = 9.78 cfs Surface Area Required SA = 325 sf X Q10 SA = 3,179 sf (At Storage Elevation) Non-Rectangular Areas Surface = 3,180 sf (At Storage Elevation) Bottom = 1,932 sf Volume Required VR = 1800 cf/Ac x AD VR = 2,808 cf (At Spillway Elevation) Side Slopes = 3 :1 Depth = 2 .0 ft Elevations Description Elevation Top of Berm 624.00 Riser Elevation 622.83 Storage Elevation 622.00 Cleanout Mark 621.00 (Half of storage height) Bottom 620.00 Provided SAP= 3,180 sf > VP = 5,112 cf > Skimmer Sizing 1.5" 3,179 2,808 1 1 1 1 1 r SKIMMER BASIN #2 Project Information Project Name: SECU - Madison McKim & Creed Project #: 01517-0178 Designed by: JCA Revised by: JCA Checked by: GML Date: 9/16/2008 Date: 10/27/2008 Date: 9/18/2008 Drainage Area Total, AT= 0.91 Ac Disturbed, AD= 0.91 Ac 10-year Runoff (Q10) C = 0.60 Tr = 5.00 min 110 = 6.85 in/hr Q10 = 3.74 cfs Surface Area Required SA = 325 sf X Q10 SA = 1,216 sf (At Storage Elevation) Non-Rectangular Areas Surface = 2,298 sf (At Storage Elevation) Bottom = 1,339 sf Volume Required VR = 1800 cf/Ac x AD VR = 1,638 cf (At Storage Elevation) Side Slopes = 3 :1 Depth = 2.0 ft Elevations Description Elevation Top of Berm 623.00 Riser Elevation 621.83 Storage Elevation 621.00 Cleanout Mark 620.00 (Half of sto rage height) Bottom 619.00 Provided SAP= 2,298 sf > 1,216 VP = 3,637 cf > 1,638 Skimmer Sizing 1.5" t 1 SEDIMENT ROCK DAM #3 Project Information Project Name: SECU - Madison McKim & Creed Project #: 01517-0178 Designed by: JCA Date: 10/30/2008 Revised by: JCA Date: 12/3/2008 Checked by: GML Date: 10/30/2008 Drainage Area Total, AT= 1.98 Ac Disturbed, AD= 1.77 Ac 10-year Runoff (Q10) C = 0.35 Tc = 5.00 min 110 = 6.85 in/hr Q90 = 4.75 cfs Surface Area Required SA = 435 sf X Q10 SA = 2,065 sf (At Weir Elev.) Non-Rectangular Areas Surface = 2,150 sf (At Weir Elev.) Bottom = 611 sf Volume Required VR = 3600 cf/Ac x AD VR = 6,372 cf (At Weir Elev.) Side Slopes = 2 :1 Depth = 5.0 ft Elevations Description Elevation Top of Rock Abutment 626.00 Weir Elevation 624.00 Bottom 619.00 Provided SAP= 2,150 sf > 2,065 VP = 6,903 cf > 6,372 Stone Spillway - Q10 110 = 6.85 in/hr Q10 = 4.75 cfs Cw = 3.0 h = 0.5 ft Lmin = 4.48 ft SEDCAD 4.0 f nnvrin hf 1 O°R P-1. 1 Gh?uoh 1 Swale #1 Permanent Lining Material: Grass mixture Trapezoidal Channel Left Right nce R Bottom Freeboard Freeboard Freeboard Limiting Sideslope Sideslope Slope Classes (%) Classes Width (ft) i R ti Mult. x Depth (ft) % of Depth Velocity (fps) a o Rat o (VxD) 3.50 3.0:1 3.0:1 3.9 D, B 0.50 5.0 Stability Stability j Capacity Capacity Class D w/o Class D w/ Class B w/o Class B w/ Freeboard Freeboard Freeboard Freeboard Design Discharge: 1.67 cfs _ 1.67 cfs Depth: 0.28 ft 0.78 ft 0.61 ft 1.11 ft Top Width: 5.21 ft 8.21ft, 7.15 ft 10.15 ft Velocity: 1.35 fps 0.52 fps X-Section Area: 1.24 sq ft 3.24 sq ft Hydraulic Radius: 0.234 0.441 Froude Number: 0.49 0.14 Roughness Coefficient: 0.0830 0.3296 SEDCAD Utility Run Printed 09-17-2008 ' SEDCAD 4.0 Cnnurinht IOQQ P-1. I ftnh-.h 1 Swale #2 Permanent Lining Material: Grass Mixture Trapezoidal Channel Bottom Left Right Retardance Freeboard Freeboard Freeboard Limiting Width (ft) Sideslope Sideslope Slope (%) Classes Ratio Ratio o Mult, x Depth (ft) /o of Depth Velocity (fps) (VxD) 3.00 3.0:1 3.0:1 2.8 D, B 0.50 5.0 Stability Class D w/o Freeboard Stability Class D w/ Freeboard Capacity Class B w/o Freeboard Capacity Class B w/ Freeboard Design Discharge: 0.68 cfs 0.68 cfs Depth: 0.23 ft 0.73 ft 0.54 ft 1.04 ft Top Width: 4.39 ft 7.39 ft 6.26 ft 9.26 ft Velocity: 0.80 fps 0.27 fps X-Section Area: 0.85 sq ft 2.51 sq ft Hydraulic Radius: 0.191 0.391 Froude Number: 0.32 0.08 Roughness Coefficient: 0.1036 0.4933 SEDCAD Utility Run Printed 10-31-2008 SEDCAD 4.0 Cnrorrinh4 'IOOR Pomola I Gh?u?h 1 Swale #3 Permanent Lining Material: Grass Mixture Trapezoidal Channel Left Right Retardance Bottom Freeboard Freeboard Freeboard Limiting Sideslope Sideslope Slope (%) Classes Width (ft) R ti R ti Mult. x Velocity Depth (ft) % of Depth s) (f a a o o p (VXD) 3.00 3.0:1 3.0:1 2.5 D, B 0.50 5.0 Stability Class D w/o Freeboard Stability Class D w/ Freeboard Capacity Class B w/o Freeboard Capacity Class B w/ Freeboard Design Discharge: 13.65 cfs 13.65 cfs Depth: 0.80 ft 1.30 ft 1.31 ft 1.81 ft Top Width: 7.81 ft 10.81 ft 10.87 ft 13.87 ft Velocity: 3.15 fps 1.50 fps X-Section Area: 4.33 sq ft 9.09 sq ft Hydraulic Radius: 0.537 0.805 Froude Number: 0.75 0.29 Roughness Coefficient: 0.0497 0.1368 SEDCAD Utility Run Printed 10-31-2008 SEDCAD 4.0 r-,rinht 100A P-1. I Ghuroh 1 Swale #4 Permanent Lining Material: Grass Mixture Trapezoidal Channel Left Ri ht Bottom g Retardance Freeboard Freeboard Freeboard Limitin g Width (ft) Sideslope Sideslope Slope (%) Classes Ratio Ratio Depth (ft) /o o of Mult. x Depth Velocity s) (f (VxD) p 4.00 3.0:1 3.0:1 0.8 D, B 0.50 5.0 Stability Stability Capacity Capacity Class D w/o Class D w/ Class B w/o Class B w/ Freeboard Freeboard Freeboard Freeboard Design Discharge: 0.47 cfs 0.47 cfs Depth: 0.25 ft 0.75 ft 0.64 ft 1.14 ft Top Width: 5.51 ft 8.51 ft 7.87 ft 10.87 ft Velocity: 0.39 fps - ----- 0.12 fps - - -- - X-Section Area: 1.20 sq ft 3.83 sq ft Hydraulic Radius: 0.214 0.474 Froude Number: 0.15 0.03 Roughness Coefficient: 0.1242 0.6754 SEDCAD Utility Run Printed 10-31-2008 1 1 1 1 r 1 1 1 1 S EDCAD 4.0 r........-M 10011 o-1., , Swale #1 Temporary Lining Material: Straw w/Net Trapezoidal Channel Left Right Bottom Freeboard Freeboard Freeboard Sideslopa Sideslopa Slope (%) Mannings n Width (ft) Mult. x Ratio Ratio Dept O ft % of Depth (Vx VxD) 3.50 3.0:1 3.0:1 3.9 0.0330 w/o Freeboard w/ Freeboard Design Discharge: 1.67 cfs Depth: 0.17 ft Top Width: 4.51 ft Velocity: 2.49 fps X-Section Area: 0.67 sq ft Hydraulic Radius: 0.147 Froude Number: 1.14 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T=yxdxs Where: 7 = 62.4 d=0.17 s =0.039 62.4 x 0.17 x 0.039 = 0.41 T < Tmax 0.41 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 11-18-2008 SEDCAD 4.0 r.. n.ninh? loos D-I 1 C.-L... k 1 Swale #2 Temporary Lining Material: Straw w/Net Trapezoidal Channel Left Right Bottom Freeboard Freeboard Freeboard Sideslope Sideslope Slope (%) Manning's n Width (ft) Depth (ft) % of Depth Mult. x Ratio Ratio (VxD) 3.00 3.0:1 3.0:1 2.8 0.0330 w/o Freeboard w/ Freeboard Design Discharge: 0.68 ds Depth: 0.12 ft Top Width: 3.71 ft Velocity: 1.70 fps X-Section Area: 0.40 sq ft Hydraulic Radius: 0.106 Froude Number: 0.91 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T=yxdxs Where: Y = 62.4 d = 0.12 s =0.028 62.4 x 0.12 x 0.028 = 0.21 T < Tmax 0.21 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 11-18-2008 t 1 1 1 r SEDCAD 4.0 (`nn..r;-k+ 400R Demme 1 C..L....e F. 1 Swale #3 Temporary Lining Material: Straw w/Net Trapezoidal Channel Left Right Bottom Freeboard Freeboard Freeboard Sideslo a Sideslo a Slope % Mannings n Width (ft) p ( ) x Mult. Depth (ft) % of Depth Ratio Ratio (Vx VxD) 3.00 3.0:1 3.0:1 2.5 0.0330 w/o Freeboard w/ Freeboard Design Discharge: 13.65 cfs Depth: 0.65 ft Top Width: 6.92 ft Velocity: 4.22 fps X-Section Area: 3.24 sq ft Hydraulic Radius: 0.454 Froude Number: 1.09 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T-yxdxs Where: y = 62.4 d = 0.65 s =0.025 62.4 x 0.65 x 0.025 = 1.01 T < Tmax 1.01 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 11-18-2008 1 1 1 1 1 1 1 1 1 1 1 SEDCAD 4.0 1 Swale #4 Temporary Lining Material: Straw w/Net Trapezoidal Channel Left Right Bottom Freeboard Freeboard Freeboard Sideslope Sideslope Slope (%) Manning's n Width (ft) Mult. x Ratio Ratio Depth (ft) % of Depth (VxD) 4.00 3.0:1 3.0:1 0.8 0.0330 w/o Freeboard w/ Freeboard Design Discharge: 0.47 cfs Depth: 0.12 ft Top Width: 4.71 ft Velocity: 0.92 fps X-Section Area: 0.51 sq ft Hydraulic Radius: 0.108 Froude Number: 0.49 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T-7x dxs Where: 7 = 62.4 d=0.12 s =0.008 62.4 x 0.12 x 0.008 = 0.06 T < Tmax 0.06 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 11-18-2008 1 1 1 ?J 1 1 SEDCAD 4.0 r .---inM loop o-I i 1 Diversion Ditch #1 Temporary Lining Material: Straw w/ Net Trapezoidal Channel Bottom Left Right Freeboard Freeboard Freeboard Sideslope Sideslope Slope (%) Manning 's n Width (ft) Depth (ft) % of Mult. x Depth Ratio Ratio (VxD) 0.50 3.0:1 3.0:1 4.1 0.0330 0.30 w/o Freeboard w/ Freeboard Design Discharge: 1.05 cfs Depth: 0.28 ft 0.58 ft Top Width: 2.20 ft 4.00 ft Velocity: 2.75 fps X-Section Area: 0.38 sq ft Hydraulic Radius: 0.167 Froude Number: 1.16 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T-7x dxs Where: Y = 62.4 d = 0.28 s =0.041 62.4 x 0.28 x 0.041 = 0.72 T < Tmax 0.72 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 10-31-2008 SEDCAD 4.0 r .m ti. loop os vim i c,ti...?k 1 Diversion Ditch #1A Temporary Lining Material: Straw w/ Net Trapezoidal Channel Left Right Bottom Freeboard Freeboard Freeboard Sideslope Sideslope Slope (%) Manning's n Width (ft) Mult. x Ratio Ratio Depth (ft) % of Depth (VxD) 0.50 3.0:1 3.0:1 1.7 0.0330 0.30 w/o Freeboard w/ Freeboard Design Discharge: 0.55 cfs Depth: 0.26 ft 0.56 ft Top Width: 2.04 ft 3.84 ft' Velocity: 1.68 fps X-Section Area: 0.33 sq ft Hydraulic Radius: 0.154 Froude Number: 0.74 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 ti=yxdxs Where: Y = 62.4 d = 0.26 s =0.017 62.4 x 0.26 x 0.017 = 0.28 T < Tmax 0.28 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 12-04-2008 11 1 1 1 1 SEDCAD 4.0 r nnevin4d 1002 D-Id I C,k. K 1 Diversion Ditch #1B Temporary Lining Material: Straw w/ Net Trapezoidal Channel Bottom Left Right Freeboard Freeboard Freeboard Width (ft) Sideslope Sideslope Slope (%) Manning's n Depth (ft) % of Depth Mult. x (VxD) Ratio Ratio 0.50 3.0:1 3.0:1 1.5 0.0330 0.30 w/o Freeboard w/ Freeboard Design Discharge: 1.88 cfs Depth: 0.46 ft 0.76 ft Top Width: 3.24 ft 5.04 ft Velocity: 2.21 fps X-Section Area: 0.85 sq ft Hydraulic Radius: 0.252 Froude Number: 0.76 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T=yxdxs Where: 7 = 62.4 d = 0.46 s =0.015 62.4 x 0.46 x 0.015 = 0.43 T < Tmax 0.43 < 1.45 .% Straw w/ Net is acceptable SEDCAD Utility Run Printed 12-04-2008 1 1 1 1 1 1 1 1 1 SEDCAD 4.0 r'-...inM 1OOQ o.,. 1, i c.-k,.-k 1 Diversion Ditch #2 Temporary Lining Material: Straw W/Net Trapezoidal Channel Bottom Left Right Freeboard Freeboard Freeboard Sideslope Sideslope Slope (%) Manning 's n Width (ft) Mult. x Ratio Ratio Depth (ft) % of Depth (VxD) 0.50 3.0:1 3.0:1 1.0 0.0330 0.30 w/o Freeboard w/ Freeboard Design Discharge: 1.33 cfs Depth: 0.43 ft 0.73 ft Top Width: 3.07 ft 4.87 ft Velocity: 1.74 fps X-Section Area: 0.77 sq ft Hydraulic Radius: 0.238 Froude Number: 0.61 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T-7x dxs Where: 7 = 62.4 d = 0.43 S =0.010 62.4 x 0.43 x 0.010 = 0.27 T < Tmax 0.27 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 12-04-2008 1 1 I' SEDCAD 4.0 rnn,rrinh? loop D-I 1 Crb,..ro4, 1 Diversion Ditch #2A Temporary Lining Material: Straw W/Net Trapezoidal Channel Bottom Left Right Freeboard Freeboard Freeboard Width (ft) Sideslope Sideslope Slope (%) Manning's n Ratio Ratio Depth O ft % of Depth Mult. x (VxD ) 0.50 3.0:1 3.0:1 1.0 0.0330 0.30 w/o Freeboard w/ Freeboard Design Discharge: 1.10 cfs Depth: 0.39 ft 0.69 ft Top Width: 2.87 ft 4.67 ft Velocity: 1.65 fps X-Section Area: 0.66 sq ft Hydraulic Radius: 0.222 Froude Number: 0.61 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T=yxdxs Where: Y = 62.4 d = 0.39 S =0.010 62.4 x 0.39 x 0.010 = 0.24 T < Tmax 0.24 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 12-04-2008 SEDCAD 4.0 r....,..?..r.? loop 0-e , 1 Diversion Ditch #3 Temporary Lining Material: Straw W/Net Trapezoidal Channel Bottom Left Right Freeboard Freeboard Freeboard Sideslope Sideslope Slope (%) Manning's n Width (ft) Ratio Ratio Depth (ft) % of Depth Mult. x (VxD) 0.50 3.0:1 3.0:1 1.0 0.0330 0.30 w/o Freeboard w/ Freeboard Design Discharge: 5.86 cfs Depth: 0.80 ft 1.10 ft Top Width: 5.30 ft 7.10 ft Velocity: 2.52 fps X-Section Area: 2.32 sq ft Hydraulic Radius: 0.418 Froude Number: 0.67 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T-yxdxs Where: Y = 62.4 d = 0.80 S =0.010 62.4 x 0.80 x 0.010 = 0.50 T < Tmax 0.50 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 12-04-2008 1 1 1 1 1 1 1 1 1 1 1 1 1 1 SEDCAD 4.0 r..nsinhf 9000 D-I I C,k--L. 1 Diversion Ditch #3A Temporary Lim Material: Straw W/Net Trapezoidal Channel Bottom Left Right Freeboard Freeboard Freeboard Width (ft) Sideslope Sideslope Slope (%) Manning's n Depth (ft) % of Depth Mult. x (VxD ) Ratio Ratio 0.50 3.0:1 3.0:1 1.0 0.0330 0.30 w/o Freeboard w/ Freeboard Design Discharge: 5.41 cfs Depth: 0.77 ft 1.07 ft Top Width: 5.15 It 6.95 ft Velocity: 2,47 fps X-Section Area: 2.19 sq ft Hydraulic Radius: 0.405 Froude Number: 0.67 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T-yxdxs Where: 7 = 62.4 d = 0.77 S =0.010 62.4 x 0.77 x 0.010 = 0.48 T < Tmax 0.48 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 12-04-2008 1 1 1 1 1 1 SEDCAD 4.0 1 Diversion Ditch #4 Temporary Lining Material: Straw W/Net Trapezoidal Channel Bottom Left Right Freeboard Freeboard Freeboard Sideslope Sideslope Slope (%) Manning's n Width (ft) Depth (ft) % of Depth Mult. x (VxD) Ratio Ratio 0.50 3.0:1 3.0:1 2.8 0.0330 0.30 w/o Freeboard w/ Freeboard Design Discharge: 1.07 cfs Depth: 0.31 ft 0.61 ft Top Width: 2.35 ft 4.15 ft Velocity: 2.41 fps X-Section Area: 0.44 sq ft Hydraulic Radius: 0.180 Froude Number: 0.98 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 't=yxdxs Where: 7 = 62.4 d = 0.31 s =0.028 62.4x0.31 x0.028=0.54 T < Tmax 0.54 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 12-03-2008 SEDCAD 4.0 1 Diversion Ditch #5 Temporary Lining Material: Straw W/Net Trapezoidal Channel Bottom Left Right Freeboard Freeboard Freeboard Sideslope Sideslope Slope (%) Manning's n Width (ft) Ratio Ratio Depth (ft) % of Depth Mult. x (VxD) 0.50 3.0:1 3.0:1 1.9 0.0330 0.30 w/o Freeboard w/ Freeboard Design Discharge: 0.95 cfs Depth: 0.32 ft 0.62 ft Top Width: 2.42 ft 4.22 ft Velocity: 2.03 fps X-Section Area: 0.47 sq ft Hydraulic Radius: 0.185 Froude Number: 0.82 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T-7xdxs Where: 7 = 62.4 d = 0.32 S =0.019 62.4 x 0.32 x 0.019 = 0.38 T < Tmax 0.38 < 1.45 .•. Straw w/ Net is acceptable SEDCAD Utility Run Printed 12-03-2008 SEDCAD 4.0 fnn...:n1+1 ?OOG De..+ele I Cni....e.. 1 Diversion Ditch #6 Temporary Lining Material: Straw W/Net Trapezoidal Channel Bottom Left Right Freeboard Freeboard Freeboard Sideslope Sideslope Slope (%) Manning's n Width (ft) Ratio Ratio Depth (ft) % of Depth Mult. x (VxD) 0.50 3.0:1 3.0:1 1.0 0.0330 0.30 w/o Freeboard w/ Freeboard Design Discharge: 1.54 cfs Depth: 0.46 ft 0.76 ft Top Width: 3.24 ft 5.04 ft Velocity: 1.80 fps X-Section Area: 0.86 sq ft Hydraulic Radius: 0.252 Froude Number: 0.62 Check that T < Tmax for Straw w/ Net For Straw w/ Net, Tmax =1.45 T=7xdxs Where: Y = 62.4 d = 0.46 S =0.010 62.4 x 0.46 x 0.010 = 0.29 T < Tmax 0.29 < 1.45 Straw w/ Net is acceptable SEDCAD Utility Run Printed 12-03-2008 h 11 J t s " • s PROJECT NAME: SECU -Madison PROJECT LOCATION: Madison, NC DATE: 9/16/08 PROJECT NO: 1517-0178 1 DESIGNED BY: JCA CHECKED BY IGML Storm Outlet Structure Structure= FES-5 Q10/Qfull = 0.73 Size= 48 in V/Vfull = 1.090 Q10 = 74.18 cfs V = 8.8 fps Qfull = 101.40 cfs Vfull = 8.07 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D50 = 10 in DMAx = 15 in --? r- a Riprap Class = 1 a -_ Apron Thickness = 24 in Apron Length = 32.0 ft ' Apron Width = 3 x Dia = 12.0 ft - Length Storm Outlet Structure Structure= FES-20 Q10/Qfull = 0.60 Size= 18 in V/Vfull = 1.045 Q10 = 8.00 cfs V = 7.8 fps Qfull = 13.26 cfs Vfull = 7.51 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DmAx = 12 in Riprap Class = B Apron Thickness = 22 in Apron Length = 9.0 ft r, Aron Width = 3 x Dia = 5.0 ft 1 ` ' • PROJECT NAME: SECU - Madison PROJECT LOCATION: Madison, NC DATE: 9/16/08 PROJECT NO: 1517-0178 DESIGNED BY: JCA CHECKED BY GML Storm Outlet Structure Structure= FES-13 Q10/Qfull = 1.03 Size= 15 in V/Vfull = 1.139 Q10= 5.93 cfs V = 5.4 fps Qfull = 5.77 cfs Vfull = 4.70 fps From Fig. 8.06.b.1: Zone = 1 From Fig. 8.06.b.2: D50 = 4 in DMAx = 6 in Riprap Class = A ? Apron Thickness = 12 in ? - Apron Length = 5.0 ft Length Apron Width = 3 x Dia = 4.0 ft Storm Outlet Structure Structure= FES-18 Q10/Qfull = 0.64 Size= 15 in V/Vfull = 1.055 Q10 = 3.68 cfs V = 4.9 fps Qfull = 5.73 cfs Vfull = 4.67 fps From Fig. 8.06.b.1: Zone = 1 From Fig. 8.06.b.2: D50 = 4 in DMAx = 6 in -T Riprap Class = A N - Y N ?? r 71 Apron Thickness - - 12 in Apron Length = 5.0 ft L Length Apron Wdth = 3 x Dia = 4.0 ft DATE: 9/16/08 DESIGNED BY: ?.. M JCA I NAME: PROJECT SECIJ - Madison PROJECT NO: CHECKED BY PROJECT LOCATION: Madison, NC 1517-0178 GML tl St O t St t orm u e ruc ure Structure= EXISTING PIPE SOUTH OF SITE Q10/Qfull = 1.00 Size= 15 in VNfull = 1.140 Q10 = 13.25 cfs V= 12.3 fps Qfull = 13.25 cfs Vfull = 10 80 fps . From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DmAx = 12 in Riprap Class B ' s Apron Thickness 22 in i Apron Length = 7.5 ft Apron Width = 3 x Dia = 4.0 ft Length i Storm Outlet Structure Structure= EXISTING PIPE EAST OF SITE Q10/Qfull = 1.00 Size= 12 in VNfull = 1.140 Q10 = 1.20 cfs V= 1.7 fps Qfull = 1.20 cfs Vfull = 1.53 fps From Fi 8 06 b 1 Z g. . . . : one = 1 From Fig. 8.06.b.2: D50 4 in ' DMAx 6 in Riprap Class = A i Apron Thickness Apron Length = 12 4.0 in ft Length Apron Width = 3 x Dia = 3.0 ft PRE-DEVELOPMENT STORMWATER CALCULATIONS •Y? 1 , ?1 1 1?1 Pre-1 pre,1 POA #1 `1 ?E?11 ?f1 Off site-1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Type.... Master Network Summary Page 2.01 Name.... Watershed File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Prede MASTER DESIGN STORM SUMMARY Network Storm Collection: Raleigh, NC Total Depth Rainfall Return Event in Type RNF ID ------- Pre ----- 1 ------ 3.0000 ---------------- Synthetic Curve ---------------- TypeII 24hr Pre 2 3.6000 Synthetic Curve TypeII 24hr Pre 10 5.3800 Synthetic Curve TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage NodeID -------------- Type --- --- Event ------ ---cu?ft Trun -- -- hrs --------- - cfs--- ---ft -- ---cu?ft --- OFFSITE-1 AREA 1 9647 11.9000 3.64 OFFSITE-1 AREA 2 11730 11.9000 4.39 OFFSITE-1 AREA 10 17921 11.9000 6.59 *POA #1 JCT 1 23062 11.9500 4.51 44-- ?" ?-f r S`?f nn *POA #1 JCT 2 30584 11.9500 5.83 *POA #1 JCT 10 54796 12.0000 10.17 PRE-1 AREA 1 13415 12.2000 2.78 PRE-1 AREA 2 18853 12.2000 4.03 PRE-1 AREA 10 36875 12.2000 8.11 SIN: 2BYXYWHCPK58 Bentley Systems, Inc. Bentley PondPack (10.00.023.00) 10:27 AM 9/22/2008 1 Type.... Design Storms Name.... Raleigh, NC Page 4.01 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Prede Title... Project Date: 7/9/2008 Project Engineer: Nick Lutzweiler Project Title: SECU-Madison Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Raleigh, NC ' Storm Tag Name --- -- _ Pre --1 ---------- Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs ' Storm Tag Name = Pre 2 ---------- ------------------------------- ---------------------- Data Type, File, ID = ------- Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Name Storm Tag -_ -Pre 10---------- ----- - - Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.3800 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs r Storm Tag Name = Pre100 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 8.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: 2BYXYWHCPK58 Bentley Systems, Inc. Bentley PondPack (10.00.023.00) 10:27 AM 9/22/2008 1 1 Type.... Tc Calcs Name.... OFFSITE-1 Page 6.01 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Prede TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: TR-55 Sheet Mannings n .0110 Hydraulic Length 100.00 ft 2yr, 24hr P 3.6000 in Slope .040000 ft/ft Avg.Velocity 1.93 ft/sec Segment #1 Time: .0144 hrs Segment #2: Tc: TR-55 Shallow Hydraulic Length 251.00 ft Slope .051000 ft/ft Unpaved Avg.Velocity 3.64 ft/sec segment #2 Time: .0191 hrs ----------------------------------------------------------------------- Segment #3: Tc: TR-55 Channel Flow Area 2.5000 sq.ft Wetted Perimeter 5.91 ft Hydraulic Radius .42 ft Slope .048000 ft/ft Mannings n .0500 Hydraulic Length 272.00 ft Avg.Velocity 3.68 ft/sec Segment #3-Time_-----_0205-hrs --------------------------------------------------- --- Total Tc: .0541 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc- ---_-_0833-hrs SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:28 AM Bentley Systems, Inc. 9/22/2008 1 1 n Type.... Tc Calcs Name.... PRE-1 Page 6.04 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Prede TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: TR-55 Sheet ' Mannings n .8000 Hydraulic Length 100.00 ft 2yr, 24hr P 3.6000 in ' Slope .027000 ft/ft Avg.Velocity .05 ft/sec 1 1 1 1 Segment #1 Time: .5210 hrs Segment #2: Tc: TR-55 Shallow Hydraulic Length 440.00 ft Slope .063000 ft/ft Unpaved Avg.Velocity 4.05 ft/sec Segment #2 Time: .0302 hrs ------------------------------------------------------------------------ Total Tc: .5512 hrs SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:28 AM Bentley Systems, Inc. 9/22/2008 Type.... Runoff CN-Area Name.... OFFSITE-1 Page 7.01 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Prede RUNOFF CURVE NUMBER DATA -------------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ---- --------- ----- ----- ------ Impervious 98 .960 98.00 COMPOSITE AREA & WEIGHTED CN ---> .960 98.00 (98) SIN: 2BYXYWHCPK58 Bentley Systems, Inc. Bentley PondPack (10.00.023.00) 10:28 AM 9/22/2008 1] Type.... Runoff CN-Area Name.... PRE-1 Page 7.02 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Prede RUNOFF CURVE NUMBER DATA ------------------------------------ ---- ---------- ------------ Impervious ------------ Area Adjustment Adjusted Soil/Surface Description CN acres %C RUC CN - -------------------------------- - Open space (Lawns,parks etc.) - Goo --- 61 --------- .220 ----- ----- ---- - 61.00 Impervious Areas - Paved; open ditc 89 .090 89.00 Newly graded area (pervious only - 86 2.270 86.00 Woods - good 55 .870 55.00 COMPOSITE AREA & WEIGHTED CN ---> 3.450 76.67 (77) SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:28 AM Bentley Systems, Inc. 9/22/2008 POST-DEVELOPMENT STORMWATER CALCULATIONS 0 1 0 0 Off site-1 Untreated-2 Untreated-1 O ?nt r?,atea North Pond Routing North Post-1 North Bio POA #1 I South pond w ' Post-2 South Bio L Type.... Master Network Summary Page 2.01 Name.... Watershed File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd MASTER DESIGN STORM SUMMARY 1 1 Network Storm Collection: Raleigh, NC Total Depth Rainfal l Return Event in Type RNF ID ----- ------- Dev ----- 1 ------ 3.0000 ---------- Synthetic ------ Curve -------- TypeII --- 24hr Dev 2 3.6000 Synthetic Curve TypeII 24hr Dev 10 5.3800 Synthetic Curve TypeII 24hr Dev100 8.0000 Synthetic Curve TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun hrs cfs ---- ft -------- cu.ft ------------ ------------ NORTH BIO ----- IN ---- POND ------ 1 ---------- -- 6556 --------- 11.9500 ---- 2.72 NORTH BIO IN POND 2 8870 11.9000 3.68 NORTH BIO IN POND 10 16267 11.9000 6.77 NORTH BIO IN POND 100 27863 11.9000 11.43 NORTH BIO OUT POND 1 3683 12.1500 .51 622.88 3067 NORTH BIO OUT POND 2 5997 12.0500 2.09 623.02 3602 NORTH BIO OUT POND 10 13394 12.0000 6.04 623.22 4411 NORTH BIO OUT POND 100 24990 11.9500 10.57 623.40 5141 OFFSITE-1 AREA 1 9647 11.9000 3.64 OFFSITE-1 AREA 2 11730 11.9000 4.39 OFFSITE-1 AREA 10 17921 11.9000 6.59 OFFSITE-1 AREA 100 27043 11.9000 9.83 SIN: 2BYXYWHCPK58 Bentley Systems, Inc. Bentley PondPack (10.00.023.00) 10:29 AM 9/24/2008 u U L 1 1 Type.... Master Network Summary Page 2.01 Name.... Watershed File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ------ -- -- ------------- *PDA #1 ---- ---- JCT ------ 1 - 16948 *PDA #1 JCT 2 23988 *PDA #1 JCT 10 46982 *PDA #1 JCT 100 84120 POST-1 AREA 1 6556 POST-1 AREA 2 8870 POST-1 AREA 10 16267 POST-1 AREA 100 27863 POST-2 AREA 1 4481 POST-2 AREA 2 6106 POST-2 AREA 10 11339 POST-2 AREA 100 19592 SOUTH BID IN POND 1 4481 SOUTH BID IN POND 2 6106 SOUTH BID IN POND 10 11339 SOUTH BID IN POND 100 19592 SOUTH BID OUT POND 1 2383 SOUTH BID OUT POND 2 4009 SOUTH BID OUT POND 10 9241 SOUTH BID OUT POND 100 17495 UNTREATED-1 AREA 1 1063 UNTREATED-1 AREA 2 1960 UNTREATED-1 AREA 10 5670 UNTREATED-1 AREA 100 12967 UNTREATED-2 AREA 1 172 UNTREATED-2 AREA 2 292 UNTREATED-2 AREA 10 756 UNTREATED-2 AREA 100 1625 Max Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft cu.ft --------- 11.9000 -------- -------- 3.67 E-- ' ------------ 'f 12.0500 5.97 `f / D r w. S 11.9500 16.93 11.9500 29.13 11.9500 2.72 11.9000 3.68 11.9000 6.77 11.9000 11.43 11.9500 1.86 11.9500 2.53 11.9000 4.72 11.9000 8.06 11.9500 1.86 11.9500 2.53 11.9000 4.72 11.9000 8.06 12.3000 .27 621.86 2173 12.0500 1.35 621.97 2480 11.9500 4.33 622.14 2971 11.9500 7.61 622.30 3449 12.3500 .10 12.3000 .26 12.2500 1.06 12.2500 2.71 12.0000 .06 12.0000 .11 11.9500 .31 11.9500 .67 S/N: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:29 AM Bentley Systems, Inc. 9/24/2008 D Type.... Design Storms Name.... Raleigh, NC Page 4.01 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd Title... Project Date: 7/9/2008 Project Engineer: Nick Lutzweiler Project Title: SECU-Madison Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Raleigh, NC Storm Tag Name Dev 1 ----- - ------ Data Type, File, ID = ----- Synthetic Storm TypeII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 2 ------------- ------------------------------- ---------------------- Data Type, File, ID = ---- Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs ' Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs ' Storm Tag Name Dev 10 ------ ----_ Data Type, File, ID = ----- Synthetic Storm TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.3800 in ' Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs ' Storm Tag Name = Dev100 ------------- -------------------------------- --------------------- Data Type, File, ID = ---- Synthetic Storm TypeII 24hr ' Storm Frequency = 100 yr Total Rainfall Depth= 8.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs ' Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs G u 1 SIN: 2BYXYWHCPK58 Bentley Systems, Inc. Bentley PondPack (10.00.023.00) 10:33 AM 9/22/2008 Type.... Tc Calcs Name.... OFFSITE-1 Page 6.01 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: TR-55 Sheet Mannings n .0110 Hydraulic Length 100.00 ft 2yr, 24hr P 3.6000 in Slope .040000 ft/ft Avg.Velocity 1.93 ft/sec Segment #1 Time: .0144 hrs Segment #2: Tc: TR-55 Shallow Hydraulic Length 130.00 ft Slope .035000 ft/ft Paved Avg.Velocity 3.80 ft/sec Segment #2 Time: .0095 hrs ----------------------------------------------------------------------- Segment #3: Tc: TR-55 Channel Flow Area .6200 sq.ft Wetted Perimeter 1.97 ft Hydraulic Radius .31 ft Slope .018000 ft/ft Mannings n .0130 Hydraulic Length 28.00 ft Avg.Velocity 7.11 ft/sec Segment #3 Time: .0011 hrs ------------------------------------------------------------------------ S/N: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:33 AM Bentley Systems, Inc. 9/22/2008 Type.... Tc Calcs Name.... OFFSITE-1 Page 6.01 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd Segment #4: Tc: TR-55 Channel Flow Area 3.5300 sq.ft Wetted Perimeter 4.71 ft Hydraulic Radius .75 ft Slope .020000 ft/ft Mannings n .0130 Hydraulic Length 349.00 ft Avg.Velocity 13.37 ft/sec Segment #4 Time: .0072 hrs ----------------------------------------------------------------------- Segment #5: Tc: TR-55 Channel Flow Area 6.2800 Wetted Perimeter 6.28 Hydraulic Radius 1.00 Slope .005000 Mannings n .0130 Hydraulic Length 36.00 sq.ft ft ft ft/ft ft Avg.Velocity 8.10 ft/sec Segment #5 Time: .0012 hrs ----------------------------------------------------------------------- Segment #6: Tc: TR-55 Channel Flow Area 2.5000 sq.ft Wetted Perimeter 5.91 ft Hydraulic Radius .42 ft Slope .042000 ft/ft Mannings n .0500 Hydraulic Length 111.00 ft Avg.Velocity 3.44 ft/sec Segment #6 Time: .0090 hrs ------------------------------------------------------------------------ ------------------------- ------------------------- Total Tc: .0425 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- ------------------------- S/N: 2BYXYWHCPK58 Bentley Systems, Inc. Bentley PondPack (10.00.023.00) 10:33 AM 9/22/2008 11 Type.... Tc Calcs Name.... POST-1 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR Segment #l: Tc: User Defined ------- -- - ------------------- ---------_---- -0833 - hrs Segment #1 Time Page 6.05 -Total -Tc_-----_0833-hrs SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:33 AM Bentley Systems, Inc. 9/22/2008 n t Type.... Tc Calcs Name.... POST-2 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: User Defined Segment #1 Time ------------------------------------------- -----0833 - hrs ------------------------- -Total-Tc_-----0833-hrs- Page 6.07 SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:33 AM Bentley Systems, Inc. 9/22/2008 t Type.... Tc Calcs Name.... UNTREATED-1 Page 6.09 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: TR-55 Sheet Mannings n .8000 Hydraulic Length 100.00 ft 2yr, 24hr P 3.6000 in Slope .027000 ft/ft Avg.Velocity .05 ft/sec Segment #1 Time: .5210 hrs Segment #2: Tc: TR-55 Shallow Hydraulic Length 142.00 ft Slope .050000 ft/ft Unpaved Avg.Velocity 3.61 ft/sec Segment #2 Time: .0109 hrs ----------------------------------------------------------------------- Segment #3: Tc: TR-55 Channel Flow Area 3.7500 sq.ft Wetted Perimeter 9.16 ft Hydraulic Radius .41 ft Slope .038000 ft/ft Mannings n .0300 Hydraulic Length 236.00 ft Avg.Velocity 5.34 ft/sec --------------------------------------------------- Segment #3 Time 0123 hrs S/N: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:34 AM Bentley Systems, Inc. 9/22/2006 Type.... Tc Calcs Name.... UNTREATED-1 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd Segment #4: Tc: TR-55 Shallow Hydraulic Length 142.00 ft Slope .132000 ft/ft Unpaved Avg.Velocity 5.86 ft/sec Page 6.09 Segment #4 Time: .0067 hrs ----------------- --------- ---------------------------------------------- Segment #5: Tc: TR-55 Channel Flow Area 2.5000 sq.ft Wetted Perimeter 5.91 ft Hydraulic Radius .42 ft Slope .036000 ft/ft Mannings n .0500 ' Hydraulic Length 59.00 ft Avg.Velocity 3.19 ft/sec ' ----------------- --------- Segment #5 Time: .0051 hrs ---------------------------------------------- ------------------------- ------------------------- Total Tc: .5561 hrs ------------------------- ------------------------- S/N: 2BYXYWHCPK58 Bentley Systems, Inc. Bentley PondPack (10.00.023.00) 10:34 AM 9/22/2008 Type.... Tc Calcs Page 6.13 Name.... UNTREATED-2 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ Total Tc: .0833 hrs SIN: 2BYXYWHCPK58 Bentley Systems, Inc. Bentley PondPack (10.00.023.00) 10:34 AM 9/22/2008 Type.... Runoff CN-Area Name.... OFFSITE-1 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd RUNOFF CURVE NUMBER DATA -------------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ---- --------- ----- ----- ------ Impervious 98 .960 98.00 Page 7.01 COMPOSITE AREA & WEIGHTED CN ---> .960 98.00 (98) SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:34 AM Bentley Systems, Inc. 9/22/2008 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Type.... Runoff CN-Area Name.... POST-1 Page 7.02 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd RUNOFF CURVE NUMBER DATA -------------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ---- --------- ----- ----- ------ Impervious Areas - Paved parking to 98 .730 98.00 Open space (Lawns,parks etc.) - Goo 61 .580 61.00 COMPOSITE AREA & WEIGHTED CN ---> 1.310 81.62 (82) ........................................................................... S/N: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:34 AM Bentley Systems, Inc. 9/22/2008 1 1 1 1 1 1 1 1 fl Type.... Runoff CN-Area Name.... POST-2 Page 7.03 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd RUNOFF CURVE NUMBER DATA -------------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC %UC CN -------------------------------- ---- --------- ----- ----- ------ Open space (Lawns,parks etc.) - Goo 61 .440 61.00 Impervious Areas - Paved parking to 98 .500 98.00 COMPOSITE AREA & WEIGHTED CN ---> .940 80.68 (81) ........................................................................... SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:34 AM Bentley Systems, Inc. 9/22/2008 Type.... Runoff CN-Area Name.... UNTREATED-1 Page 7.04 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd RUNOFF CURVE NUMBER DATA -------------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ---- --------- ----- ----- ------ Woods - good 55 .760 55.00 Open space (Lawns,parks etc.) - Goo 61 .430 61.00 COMPOSITE AREA & WEIGHTED CN ---> 1.190 57.17 (57) SIN: 2BYXYWHCPK58 Bentley Systems, Inc. Bentley PondPack (10.00.023.00) 10:35 AM 9/22/2008 1 1 1 1 1 1 1 1 1 1 L Type.... Runoff CN-Area Name.... UNTREATED-2 Page 7.05 File.... S:\1517\0178-Madison\20-Tech\29b-Civil,Site,Hydraulic\Stormwater Management\Postd RUNOFF CURVE NUMBER DATA -------------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ---- --------- ----- ----- ------ Open space (Lawns,parks etc.) - Goo 61 .130 61.00 COMPOSITE AREA & WEIGHTED CN ---> .130 61.00 (61) SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:35 AM Bentley Systems, Inc. 9/22/2008 Type.... Vol: Elev-Area Name.... NORTH BIO Page 12.01 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (sq.ft) -- ------ (sq.ft) --------------- (cu.ft) ---------- (cu.ft) ------------- ------------ 622.00 ----------- - ----- 3174 - 0 0 0 623.00 ----- 3880 10563 3521 3521 624.00 ----- 4642 12766 4255 7776 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + 3q.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: 2BYXYWHCPK58 Bentley Systems, Inc. Bentley PondPack (10.00.023.00) 10:30 AM 9/24/2008 1 1 1 1 1 1 1 1 1 1 1 1 1 Type.... Vol: Elev-Area Name.... SOUTH BIO Page 12.02 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum ----(ft)---- --(sq.in)-----(sq.ft) ----- (sq.ft) ----------------- (cu.ft)-- ------- ---(cu?ft) --- 621.00 ----- 2298 0 0 0 622.00 ----- 2862 7725 2575 2575 623.00 ----- 3483 9502 3167 5742 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Areal + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for ELI, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:31 AM Bentley Systems, Inc. 9/24/2008 rill Type.... Outlet Input Data Name.... North Outfall Page 13.01 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd REQUESTED POND WS ELEVATIONS: Min. Elev.= 622.00 ft Increment = .25 ft Max. Elev.= 624.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Inlet Box R ---> C 622.830 624.000 Culvert-Circular C ---> TW 617.250 624.000 TW SETUP, DS Channel SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:31 AM Bentley Systems, Inc. 9/24/2008 1 1 1 1 1 Type.... Outlet Input Data Name.... North Outfall Page 13.01 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd OUTLET STRUCTURE INPUT DATA Structure ID = R Structure Type ----= ----------- -Inlet -Box ------- # of Openings = 1 Invert Elev. = 622.83 ft Orifice Area = 4.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 8.00 ft Weir Coeff. = 3.000 K. Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:31 AM Bentley Systems, Inc. 9/24/2008 1 1 Type.... Outlet Input Data Name.... North Outfall Page 13.02 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd OUTLET STRUCTURE INPUT DATA 11 Structure ID = C Structure Type = Culvert-Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 1.2500 ft Upstream Invert = 617.25 ft Dnstream Invert = 616.00 ft Horiz. Length = 70.00 ft Barrel Length = 70.01 ft Barrel Slope = .01786 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .2000 (forward entrance loss) Kb = .023225 (per ft of full flow) Kr = .2000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0045 Inlet Control M = 2.0000 Inlet Control c = .03170 Inlet Control Y = .6900 T1 ratio (HW/D) = 1.086 T2 ratio (HW/D) = 1.188 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 618.61 ft ---> Flow = 4.80 cfs At T2 Elev = 618.74 ft ---> Flow = 5.49 cfs SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:31 AM Bentley Systems, Inc. 9/24/2008 1 1 1 11 1 Type.... Outlet Input Data Name.... South Outfall Page 13.07 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd REQUESTED POND WS ELEVATIONS: Min. Elev.= 621.00 ft_ Increment = .25 ft Max. Elev.= 623.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Inlet Box R ---> C 621.830 623.000 Culvert-Circular C ---> TW 616.250 623.000 TW SETUP, DS Channel SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:32 AM Bentley Systems, Inc. 9/24/2008 1 1 1 1 1 1 1 1 1 1 1 1 Type.... Outlet Input Data Name.... South Outfall Page 13.07 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd OUTLET STRUCTURE INPUT DATA Structure ID = R Structure Type ----= ----------- -Inlet -Box ------- # of Openings = 1 Invert Elev. = 621.83 ft Orifice Area = 4.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 8.00 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:32 AM Bentley Systems, Inc. 9/24/2008 1 1 1 1 1 1 1 1 1 1 Type.... Outlet Input Data Name.... South Outfall Page 13.08 File.... S:\1517\0178-Madison\20-Tech\24b-Civil,Site,Hydraulic\Stormwater Management\Postd OUTLET STRUCTURE INPUT DATA Structure ID = C Structure Type = Culvert-Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 1.2500 ft Upstream Invert = 616.25 ft Dnstream Invert = 616.00 ft Horiz. Length = 92.00 ft Barrel Length = 92.00 ft Barrel Slope = .00272 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .2000 (forward entrance loss) Kb = .023225 (per ft of full flow) Kr = .2000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0045 Inlet Control M = 2.0000 Inlet Control c = .03170 Inlet Control Y = .6900 T1 ratio (HW/D) = 1.094 T2 ratio (HW/D) = 1.196 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at Tl & T2... At T1 Elev = 617.62 ft ---> Flow = 4.80 cfs At T2 Elev = 617.74 ft ---> Flow = 5.49 cfs SIN: 2BYXYWHCPK58 Bentley PondPack (10.00.023.00) 10:32 AM Bentley Systems, Inc. 9/24/2008 1 1 STORM DRAINAGE CALCULATIONS 1 P-2 } ?i I r j I = ? it V - ? s -1 - i Yli' k' CI-16 Title: State Employees' Credit Union Project Engineer: Don Bataille s:\...\stormcad\secu-madison.stm StormCAD v5.6 [05.06.012.00] 09122/08 10:39:589i? kntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 t O CL d w m 13 O Z m 'a E O U .O O O W UO 0 0 CO UO O N 0 0 0 O N O o O n 0 M M 7 7 O n CO V: UO (D CO a) O 0 .- e- .- - .-- - - O ? O ` Q Oo C v O U c O y ' L L L L L L L L L L L L L L L V N U U U U U U U U U U U U U U U N Cn C C C C C C C C C C C C C C G Cn UO' LO UO LO UO U() UO U0 CD UC) CO 0 W U0 LO M - CO M V CA CP U) n (O CD (D n O O) N (D V N L O O M N o UO N 0 N M V M n m 0) ' s- m " ? fD O N N fA V CP CO V M n O M V V CD N O o O CA CD V n M (0 V C9 Nw CD O 0 O V n n m 0 M 0 0 0 :3 LL O. U o 0 0 cc m U 3 (D M (n o rn n rn V a o M ao V M n O n O UO (D 0 o V 0 OR O M ° 0 M M Un 0 0 -- M M M cM M V 0 V LL N o co co n f6 ? O H to O N 0?2 N 0 Q V o Q Q o 0 h m 3 M rn o V o O O n ( Z Z Z C O 0 N O N O O O N O O co O LL N UC w O C U am (n o o (o (n (n LO 0 Q o O Q Q O O a? - c rn o M n N Ch Oo OR o o q O 0 0 0 0 0 0 0 0 Z 0 0 Z Z 0 0 - m m E r 'u m O ? l4 N N LL' O CL U N n M V n 0 n V Q 0 O Q Q o 0 E v co o Z Z Z a ) ° n m U) _ ? ( ( n M v M CDa?Q^ V T o y C V t N 2 O O V o 0 0 0 0 0 0 0 0 0 0 0 E M V M n n q V CA N UO O O O O C m 'O 0 (O OO CD V n n n 0 0 O w (O 0 0 LO y C N O N .-. N N N N N N N N N M N N N N CD O (D (D CD CD (D CD (D CO CO O (D (D (D o > 0 LLI 0 O O O V 0 o 0 o 0 o 0 o o M M C M V `- 0 V n o UO UO N O O 0 CO m C O O M M 0 o O N Ih 0 0 0 0 0 N T _ N j M N N N N N N N N CO CO N N N N N p T lD CD CD O (O 0 0 0 co W (O (D 0 co (O CL. U S W N Un O O O O O O O n 0 0 0 0 E O O U0 O O O N o 0 o CC9 O 0 O UO C U') V N N V V M O CD O LO N (D Un N N N N N N N N N N N ( C > ; (D D (D (D fO (D O CO (D (D O 0 0 CD O C O W E C O N 0 O O O O n 0 0 0 M 0 0 O CO V M V UO Op M O LO LO O N N N cc t? .2 N a) 8 . o V V N 0 UCi m o O M N N_ n 0 N N N N N N N N N N N v O CD CD CD [D CO O CD O CD (D (D O 0 O N C > CL ? W E m ° ° Cl) co M N UO C 3Z o N i O o n S S S 2 2 2 O 7 7 7 7 W 0 0 w 0 0 U U L L U U U LL LL (n w E m ° o N 7 M Oo n aZ z: 0)° ? r (O (p u) U D 2 2 x 5 - : 0 0 T 5 5 5 (n r (n cn (n 0 0 0 m p O m O m O) C (6 O O m 0 h LL L O CD CD. c U) m > c 0 W U U A) E O` O 0. to O O n Ch O N U) Z) UO (A n O O I- U c 00 r m c m U c O 3 O U) N O L N m N a) m x U C E (D V K N C N m O E D N 0 N N U m ayi E a T O O M aw CO E N W N E 0 ?o o co U O co N O w o S Lr; 0 N E Z `_ to N O t0 O N CO O O N o c o O) > c 0 LU Q ?j CU N E o a?5 CD u> i y >- co O 4-- O a) i V U) 0 O L6 N r M O N Q D N O r O O F- L) c 00 a? m c N U O O N 0 N m N N m 2 U C N E 0 N T T N c 0 co 0 N C O c E ?.. ., w N O U v C?a U O y M EvN lL ? N E O co Gl M H N O y o '' C. o N C O m O N C ' co 0 o 0 a (1) ? o w ?co m> ' c p W Q CD C) C0 C0 C) C0 oo v U Iu E CO 0 °- ;n co co C O o ' 0 co 00'ZZ9 :dwnS 110£'tiZ9 :wld 1100'ZZ9 :UI nul c 4 09+Z :elS o c? LO ' £ L-S3j M 4 S£'ZZ9 :dwnS N + 11 W9 :W!H In o ' 11 S£'ZZ9 0 nUl ' DL ? II Q D ZZ9 :UI nUl 4 SS 11 £Z Z :e1S / n ZL-10 0 U i p c OC U) c N m V b G .0 o U co CIO .2 u Zt*tZ9 :dwnS d 4 oV8Z9 :wla ' U ) ' L- tZ9 :an0 nUl u Zt o y.. 11 Z9'bZ9 :Ul nUl Q N 81+1:e1S L U l L-IJ? - 4 L8'tZ9 :dwnS m u 0£'8Z9 :Wla 4 L8W9 :1n0 nUl C> S ' u LO'SZ9 :UI nUl r. o° d •- N 4 66+0 :e1S 11 g p @ r w ' T N N I C C I 1 C) a c 'o c / ? r- T I1 C `) O N U) U ' O ?Ea 1100 Z9 :dwnS 110 '0£9:W!8 I ? ? a N 1100'9 9:+n0eUl C7) E 00+0 aS 00 o o 9 M 4 00' LZ9 :dwnS 4 OV*9Z9 :wla 4 00' 0 :Ul nUl 98+L •elS 8L-S33 -\ O 0 M co 4 0£'LZ9 :dwa S 8 00'LZ9 :wld 4 0£'LZ9 :}n0 UI 4 OZ'£Z9 :UI Ml 469+L *S LHO 4 08'£Z9 :dwnS 4 9L'LZ9 Ad r 4 08'£Z9 :1n0 AUI (0 4 00'VZ9 :UI nUl 4 00'tZ9 :UI nUI 4 80+ L TIS .. O 9HO 4- C O v /? U) / z C O CD W O O Lci N CO Cl? a CaJ 4 05'SZ9 :dwnS 4 WK9 :wla 4 05'SZ9 :In0 nUl 4 00+0 :elS WIA Z o T I 0 00 If co O O N GO N 9 0 r LO T V ?? CL T t CO T_ CC O O O T O O O 0) F- -C-9 0 0 R N M O m 0 O N -0 t6 d •O N ? C ? p > W< U 0 E o EL Ln co w n M 0 N Q LO m r- 0 0 U 3 0 r a? U c 0 0 U) N 0 v N N l6 U C N E N N T N C a? m 0 c 0 C ? E .. IA C N y U ?Ea T N U M N E 'p N ui N E 0 o co m ? o N O ' U L T U) w o ?.. co m O L a O ? U ^^11 W L co ' •- 4- O C v ' ? !! ^^ vJ z C O cu N LLI 4 00' 29 4 OVE 4 00' 29 4 £0{ 8 4 0£' lZ9 :dwml S 4 Oo.tZ9 :wia_ - - - - 4 0£' lZ9 :In0 ul 4 oz'£Z9 :ul UI 4 LL+O :e S Ll- - 0 0 0 N CO O O N o o 0 T '\ c -C: V J ? I U T- a 'T u CO 4 08'£Z9 :dwnS J C 4 SL'LZ9 :wld ? d ' 4 08'£Z9 :jn0 nUl O It 4 00'tZ9 :UI nUl 4 00'VZ9 :Ul nUl 4 9Z+0 :els ? 9HO ' hoc SZ9 :dwnS 4 OV 4 98'8Z9 :wla j? 4 0t'SZ9 :}n0 nUl ? 4 00+0 :e}S Q' C-b_ o CO N O l6 ? CO O a> O) O O N p O a ?(D c ui rn > w *6 U A) E `O a v; L6 Lo N) O N D N O O O U 3 U o O c U) N O m a> U V7 E U) a m 0 c 0 E = N C N W U m E a. O (OD EN w3N o m o co 05 M F- N 2 Co o° o Lf) M N CO co