HomeMy WebLinkAbout20171166 Ver 1_Approval Letter_20170919Environmentul
QuQlrty
A
ROY COOPER
Uor.'im,r
MICHAEL S. REGAN
,c�cr�v<a�r
5. JAY ZIMMERMAN
n�,,.�„�,
Seprember 19, 2017
Edgecombe County
NCDWR Project No. 20171166
6rid�e �15 on SR 1428
State Project No. 17BP.4.R.66
APPROVAL of 401 WATF.R QU.4LITY CERTIFICATION and TAR-PAMLICO BUFFER
AUTHORIZ.4TION, with ADDITIONAL CONDITIONS
Mr. Ronnie Keeter, PE., Division Engineer
NCDOT, Division 4
PO Box 3165
Wilson,NC 2789i
Dear Mc Kee[er:
You have our approval, in accordance with [he conditions listed beloa', for the following impac[s for Ihe purpose of
replacing Bridge 45 in Ed�ecombe County:
Stream Im acts in [he Tar-Pamlico River Basin
Riprap Fill in Intermittent Temporary Impact to Temporary Impact to
Stream (linear R) In[ermitCent Stream (linear ft) Perennial Stream pinear
R 18 IConcurrenU 0
,�,
Total I 8 I IS
Total Stream Impact for ProjecL• 5g linear feet.
Site Zone 1 Impact
s ft
Tatals 1195
Zone 1 Buffer Mitiga[ion
N/A
` n.ia = Total for Site is less than I/3 acre and I50 lin
Total Buffer Impact for Project: 1824 square feet.
40
ao
�pacts
Zone 2 Impact
(sq ft)
629
impact, no mi[i�
Total Stream
Impact (linear
IS
40
SS
Zone 2 Buffer Mi[igation
:euuired lusine 1.5:1 ratic
reyuired
N/A
The project shall be constructed in accordance with }'our application received September 13, 2017. After reviewing
your application, we have decided that these impacts are covered by General Water Qualify Certification Number
408>. This certifica[ion corresponds to the Nationwide Pemiit 3 issued by the Corps of Engineers. This approval is
also valid for the Tar-Pamlico Riparian Buffer Rules (1 iA NCAC 2B.0?59). In addition, you should acquire any
other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and
Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the
accompanying 404 permit.
Stam ofNonh Camhna I Enurtonmental Quality
1617 Mail Service Centzr I Raingh. North Carohna 27699-I617
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the
new owner must lie given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total
impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation
as described in 15A NCAC 2B.0259. For this approval to remain valid, you must adhere to the conditions listed in
the General Certification and any additional conditions listed below.
Conditions of Certification:
1. The post-construction removal of any temporary bridge structures must return the project site to its
preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species.
[15A NCAC 02H .0506(b)(2)]
2. As a condition of this 401 Water Quality Certification, the bridge demolition and construction must be
accomplished in strict compliance with the most recent version of NCDOT's Best Management Practices for
Construction and Maintenance Activities. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)]
3 Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and
pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before
entering the stream. To meet the requirements of NCDOT's NPDES permit NCS0000250 [delete if non-DOT
project], please refer to the most recent version of the North Carolina Department of Transportation Stormwater
Best Management Practices Toolbox manual for approved measures. [15A NCAC 02H .0507(d)(2) and 15A NCAC
02H .0506(b)(5)]
4. Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft construction
methods. More specifically, jetting or other methods of pile driving are prohibited without prior written approval from
the NCDWR first. [15A NCAC 02H.0506(b)(2)]
5. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters.
This water shall be captured, treated, and disposed of properly. [15A NCAC 02H .0506(b)(3) ]
6. A turbidity curtain will be installed in the stream if driving or drilling activities occur within the stream channel,
on the stream bank, or within 5 feet of the top of bank. This condition can be waived with prior approval from the
NCDWR. [15A NCAC 02H .0506(b)(3) ]
7. All stormwater runoff shall be directed as sheetflow through stream buffers at non-erosive velocities, unless
otherwise approved by this certification. [ 15A NCAC 2B.0259]
8. All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the
preconstruction contours and revegetated. Maintained buffers shall be permanently revegetated with non-woody
species by the end of the growing season following completion of construction. For the purpose of this condition,
maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular NCDOT
maintenance activities including mowing. The area with non-maintained buffers shall be permanently revegetated with
native woody species before the next growing season following completion of construction. [15A NCAC 2B.0259]
9. Pursuant to 15A NCAC 2B.0259(6), sediment and erosion control devices shall not be placed in Zone 1 of any Tar-
Pamlico Buffer without prior approval by the NCDWR. At this time, the NCDWR has approved no sediment and
erosion control devices in Zone 1, outside of the approved project impacts, anywhere on this project. Moreover,
sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not
compromised and that discharge is released as diffuse flow. �
10. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between
curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to
surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200]
11. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or
protected riparian buffers. [15A NCAC 02H.0506(b)(2)]
12. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed
floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)]
13. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15A
NCAC 02H.0506(b)(2)]
14. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approval. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
15. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from
the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms,
cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A NCAC
02H.0506(b)(3) and (c)(3)]
16. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)]
17. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC
02H.0506(b)(3)]
18. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certification. [15A NCAC 02H.0506(b)(3)]
19. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters
is prohibited. [15A NCAC 02H.0506(b)(3)]
20. The permittee and its authori�ed agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirerttents resulting from compliance with §303(d) of the Clean Water Act) and any other
appropriate requirements of State.and Federal law. If the NCDWR determines that such standards or laws are not being
met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that
further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A
NCAC 02B.0200]
21. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the
Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and
the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
22. The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization, including all non-commercial borrow and waste sites associated with the project, shall be clearly marked
by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless
otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502]
23. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation control requirements, etc.
24. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of
discovery. [15A NCAC 02B.0506'(b)(2)]
25. Upon completion of the projeot (including any impacts at associated borrow or waste sites), the NCDOT Division
Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all
work included in the 401 Certification has been completed. [15A NCAC 02H.0502( fl]
26. Native riparian vegetation (ex. list herbaceous, trees, and shrubs native to your geographic region) must be
reestablished in the riparian areas within the construction limits of the project by the end of the growing season following
completion of construction. [15A NCAC 02B.0259(10)] &[15A NCAC 02B.0506(b)(2)]
27. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be
located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road
construction activities. [15A NCAC 02H.0506(b)(3) and (c)(3)]
;�
28. Erosion and sediment control p'tactices must be in full compliance with all specifications governing the proper design,
installation and operation and maintenance of such Best Management Practices in order to protect surface waters
standards [15A NCAC 02H.0506(b)(3) and (c)(3)]:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must
be such that they equal, or exceed, the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
29. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this
Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through,Friday between the hours of 8:OOam and S:OOpm, except
for official state holidays. The original and one (1) copy of the petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center . `
Raleigh, NC 27699-6714 '
Telephone: (919) 431-3000, Facsimile: (919) 431-3100
A copy of the petition must also be served on DEQ as follows:
Mr. Bill F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
This letter completes the review af the Division of Water Resources under Section 401 of the Clean Water Act. If you
have any questions, please wntact Rob Ridings at 919-707-8786.
Sincerely,
�°�
S. Jay Zimmerman, Director
Division of Water Resources
Electroaic copy only distribution:.
Tom Steffens, US Army Corps of Engineers, Washing[on Field Office
Chad Coggins, Division 4 Environmental Officer
File Copy
Environmenlul
Qualiry
NCDWR Project No.:
Applican[:
Project Name:
Date of Issuance of 301 Water Qualih� Cer[ifica[ion:
Counry:
ROY COOPER
i r„���-,�,��„�
MICHAEL S. REGAN
�. �,�. «��,�
S. JAY ZIMMERMAN
n���, � �<„�
Certificate of Completion
Upon completion of all work approved widiin the 401 Water Quality Certification or applicable Buffer Rules, and
any subseyuent modifications, the applicant is required to retum this certificate to the 401 Transportation Pennitting
Unit. NotYh Carolina Division of Water Resources, 1617 Mail Service Cen[er, Ralei,�h, NC, 27699-16U. This form
may be returned to NCDWR hy the applicant, the applicant's authorized agen[, or the project engineer. It is no[
necessary to send certiticates from all of �hese.
ApplicnnYs Cerlificatian
I, , hereby state tliat, to the best of my ahilities, due care and dili�ence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Qualiry Certification and Bul'fer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Date:
Agent's Certifrcntioi�
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observa[ion of [he construction such that the cons[ruc[ion was observed to be built within subs[anlial
compliance and in[ent ofthe 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supportin�_ materials.
Signamre: Da[e:
Engi�teer's Cer(ificnrroii
Partial Final
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been au[horized to observe (periodically, weekly, full [ime) the construction of the project for [he
Perniittee hereby state that, to the best of my abili[ies, due care and dili;ence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and inrent of the 401
Water Quality Certifica[ion and Buffer Rules, the approved plans and specitications. and other supporting materials.
Signature
Date
Re�istration No.
Slatc ol Nonh Carnlina I Environmental Qualny
1617 Mad Servim Center I Raleieh. North Carohna?7699-I617