Loading...
HomeMy WebLinkAboutNC0087556_Authorization to Construct_20170919Water Resources ENVIRONMENTAL QUALITY September 19, 2017 Greg Costanzo and Les Norman Association President and Vice President Ledgestone Property Owners' Association, Inc. P.O. Box 21 Fairview, North Carolina 28730 Dear Mr. Costanzo and Norman: ROY COOPER Governor MICHAEL S. REGAN Sect etmy S JAY ZIMMERMAN Dry ector SUBJECT: Authorization to Construct A to C No. 087556A02 Ledgestone Property Owners' Association, Inc. Ledgestone Subdivision WWTP NPDES Permit No. NCO087556 A letter of request for an Authorization to Construct was received September 15, 2017, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.027 MGD Ledgestone Subdivision WWTP, with discharge of treated wastewater into the Cane Creek in the French Broad River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Relocation of the discharge location; installation of 6 inches PVC pipes; installation of clean out boxes and covers; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO087556 issued effective February 1, 2016, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0087556. It is the Owner's responsibility to ensure that the as -constructed project meets the requirements of all applicable regulations and statutes, the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute § 143-215.6A through § 143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. State of North Carolina I Environmental Quality I Water Resources 512 N Salisbury Street 11612 Mad service Center I Raleigh, North Carolina 27699-1612 Phone 919 807 6464 Greg Costanzo and Les Norman, President and Vice President September 19, 2017 Page 2 of 3 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Asheville Regional Office, telephone number 828-296-4500, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T I 5A: 8 G. 0202. A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Greg Costanzo and Les Norman, President and Vice President September 19, 2017 Page 3 of 3 The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Bing Bai at telephone number (919) 807-6389. Sincerely, pew &YV S. Jay Zimmerman, P.G. Director, Division of Water Resources With Engineer's Certificate attached: cc: DWR Asheville Regional Office, Water Quality Programs Central Files ecopy: David D. Smith, P.E. David D. Smith and Company, PLLC Email: dsmith@ddsmithco.com NPDES File Without Engineer's Certificate attached: cc: Buncombe County Health Ledgestone Property Owner's Association, Inc. Ledgestone Subdivision WWTP Authorization to Construct No. 087556A02 Issued September 19, 2017 NPDES Permit No. NC0087556 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Ledgestone Subdivision Wastewater Treatment Plant, located in Buncombe County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Relocation of the discharge location; installation of 6 inches PVC pipes; installation of clean out boxes and covers; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Date Registration No. Mail this Certification to: Attn: Ron Berry Complex Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617