Loading...
HomeMy WebLinkAbout20160502 Ver 1_ICA issued on Bridge 40 Bishop Rd in Guilford County_20170913 Carpenter,Kristi From:Norton, April R Sent:Thursday, September 14, 2017 7:45 AM To:Carpenter,Kristi Subject:FW: ICA issued on Bridge 40, Bishop Rd, in Guilford County Attachments:InspectionReport_17BP.7.R.81_9-13-2017.pdf Follow Up Flag:Follow up Flag Status:Flagged Thanks, April From: Harper, Aaron A Sent: Wednesday, September 13, 2017 5:24 PM To: Gantt, Matt <matt.gantt@ncdenr.gov>; Latham, Tim <tim.latham@ncdenr.gov>; Norton, April R <april.norton@ncdenr.gov>; david.e.bailey2@usace.army.mil Cc: Kirkman, Christopher D <cdkirkman@ncdot.gov>; Robinson, Stephen J <sjrobinson@ncdot.gov>; Parker, Jerry A <jparker@ncdot.gov>; Thomson, Nicole J <njthomson2@ncdot.gov> Subject: ICA issued on Bridge 40, Bishop Rd, in Guilford County Attached is the Inspection Report for the following Project: InspectionReport_17BP.7.R.81_9-13-2017.pdf Guilford County: Repl. Bridge #40 on SR-1116 Project Location (Bishop Rd) over Hickory Creek Description: This email was generated by the NCDOT ErCon (Erosion Control Management) system. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 North Carolina Department of Transportation Roadside Environmental Unit Erosion & Sedimentation / Stormwater Report �CQ Immediate Corrective Action This project does not comply with the North Carolina Erosion and Sedimentation Control laws. Immediaie Corrective Action is needed to reso/ve the situafion to ful! compliance with the Law: (T15A: 046.0000). Proiect Information Inspection Date: 09/13/2017 Project #: 17BP.7.R.81 Division #: 7 Evaluator TIP #: County: Aaron Harper Guilford Project Type: Contract Engineer: Greensboro Resident1 (CKirkman) Project Length: 0.10 Disturbed Acres: 0.4 River Basin: Cape Fear HQW Zone: NO Trout Zone: NO Location Repl. Bridge #40 on SR-1116 (Bishop Rd) over Hickory Creek Description: Proiect Evaluation Report Type: ❑Routine ✓❑ICA ❑ICA Ex 1st ❑ICA Ex 2nd ❑CICA - SWO ❑ PCN ❑ ECPAR Installation Maintenance Effectiveness Plan Overall Project Length Section of BMPs of BMPs of BMPs Implementation Evaluation 0.1 Permitted Area(s) 8 7 6 6 6 Grading Scale: 0- 6= Immediate Corrective Action Required, 7= Fair, 8= Good, 9= Very Good, 10 = Excellent Remarks and Recommendations: Project is out of compliance due to failure to provide adequate installation of bypass pipe with substantial sand bags for impervious dikes. Project was re-reviewed by Roadside Environmental Field Operations Technician Kim Whitley. Also Roadside Environmental Field Operations Engineers Ben Dewit and Aaron Harper, NCDOT Res. Engineer Chris Kirkman, Asst. Res. Engineer Stephen Robinson, Michael Williams, Vance Patton, PI-Derrick Hill, CEI, Corp. of Engineers David Bailey, DWR April Norton DEO's office Jerry Parker and Nicole Thomson The project received rainfall the weekend of September 2nd causing the impervious dikes and diversion pipe to fail. The project was issued a Temporary Suspension of Work by the Resident Engineers Office on September 5th. The project was reviewed on September 6th and an EC deficiencies list was sent to the contractor that same day. The project was re-inspected today, September 13th. At the time of review, impervious dikes and diversion pipe had not yet been re-installed to provide containment of the work area. See corrective actions needed below: Note corrective actions: - Install new 48 inch bypass pipe with substantial sand bags for impervious dikes. - Install diversion across the grade at approximate Sta 16+/- to divert runoff to the Rt side of the project. Slope drain should be installed at the end of the diversion to convey runoff down the slope to a dissipator pad. SSCF 9/13/2017 5:21 PM Page 1 of 2 outlet should be installed in the SF at the outlet of the slope drain. - Clean up oil spill in the center of the roadway immediately down slope of the conex. - Clean up oil spill on the shoulder vicinity Sta 17+35 Rt. Dispose of contaminated soil at an approved site. - Sta 15+40+/- Rt. - Filter stone at top of slope needs pulled back, so it does not enter the Jurisdictional waters. - Sta 15+85+/- - Improve ground coverage on slope prior to culvert. - Sta 15+75+/- - Bare area below coir fiber mat needs stabilized with seed/coir fiber mat. - Ensure to apply additional ground coverage to other areas damaged by foot traffic throughout. NPDES paperwork was reviewed. Corrections have been made. Continue with NPDES inspections and document once every 7 days or within 24 hours of 0.5 inches of rainfall in a 24 hour period, per the NCG01 Permit Requirements. Mark and date as built e. c. plans, as to what measures are on the ground. The project will be re-inspected within 5 working days. 9/13/2017 5:21 PM Page 2 of 2