Loading...
HomeMy WebLinkAbout20171018 Ver 1_B-5239 revised Wetland Permit Impact Summary Sheet_20170913 (2)WETLAND PERMIT IMPACT SUMMARY WETLANDIMPACTS SURFACE WATERIMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 15+53 TO 16+38 -L- TEMPORARY CAUSEWAY 0.07 82 1 15+67 TO 15+81 -L- BANK STABLIZATION < 0.01 < 0.01 10 10 2 18+05 TO 18+58 -L- ROADWAY FILL/RIP RAP PAD 0.01 < 0.01 2 18+79 TO 19+44 -L- BENCHING UNDER BRIDGE 0.01 97 2 19+44 TO 19+60 -L- BANK STABILIZATION 18 5 1 15+43 TO 16+18 -DET- TEMPORARY CAUSEWAY 0.07 53 1 16+34 TO 16+48 -DET- BANK STABILIZATION < 0.01 9 1 16+67 TO 17+16 -DET- TEMP 18" CSP 0.02 < 0.01 2 17+87 TO 18+70 -DET- TEMP ROADWAY FILL 0.04 2 19+54 TO 19+69 -DET- BANK STABILIZATION < 0.01 23 TOTALS": 0.08 < 0.01 < 0.01 < 0.01 0.15 28 279 0 *Rounded totals are sum of actual impacts NOTES: Per the Structures Unit, impacts due to proposed drilled piers = 20 sq. ft. Site 1- Total Stream Impacts Less than 150' Site 2- Total Stream Impacts Less than 150' Y3iL�i�iY:i