Loading...
HomeMy WebLinkAbout20081230 Ver 1_Triage Comments_200812081 DWQ# Triaged By: Reviewer 1 Reviewer 2 Reviewer 3 Use this form instead of writing inside the folder Triage Comment Sheet Date: Date: Cr? Date: P Issue with conditions (Reviewer 2) lt. ?,t,??,Ca-tr ,??z-et•- ? More Information (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 1) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 1) ? Send to Regions (Reviewer 2) SATriage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) 08-1230 Watkins Glen AML comments December 8, 2008 1. As requested in Item 2 of the Required Items Checklist, please provide a partial plan (1" = 30' or larger) and details for the infiltration trench showing: • Bypass structure, • Maintenance access, • Basin bottom dimensions, • Basin cross-section with benchmark for sediment cleanout, • Flow distribution detail for inflow, • Vegetated filter, and • Pretreatment device.