Loading...
HomeMy WebLinkAbout20160052 Ver 3_PCN Form Submission_20170918Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 9/18/2017 12:52:47 PM (Start Event) Accept by Carpenter,Kristi 9/19/2017 11:13:44 AM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: September 21, 2017 5:00 PM 9/18/2017 12:53 PM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 28, 2017 Ver 1.8 * Please note: fields marked with a red asterisk below are required. You will not be ab/e to submit the form until all mandatory questions are ans�red. Below is a link to the DRAFT online help file. http://edocs.deq.nc.gov/WaterResources/0/doc/549884/Page1.aspx A. Processing Information County (or Counties) where the project is located:* Carte ret Is this a NCDOT Project?* C� Yes �' No (NCDOT only) T.I.P. or state project number: WBS # 2.101611 (for NCDOT use only) � 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 13 - Bank Stabilization 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular � Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: I For the record only for Corps Permit: 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? * l" Yes C•' No C' Yes C•' No If so, attach the acceptance letter from rritigation bank or in-lieu fee program C' Yes C•' No 1f. Is the project located in any of NC's twenty coastal counties?* C� Yes l" No 1g. Is the project located within a NC DCM Area of Environmental Concern (AEC)?* C� Yes �' No C' Unknown B. Applicant Information 1a. Who is the Primary Contact?* Bill Brame Jr 1b. Primary Contact Email:* bbrame@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (252)439-2800 1d. Who is applying for the permit? fJ Owner �J Applicant (other than owner) r Agent/Consultant (Check all that apply) � 2. Owner I nformation 2a. Name(s) on recorded deed: North Carolina Department of Transportation 2b. Deed book and page no.: f�UA 2c. Responsible party: (for Corporations) � wa 2d.Address Street Address 105 Pactolus Highway Address Line 2 �� Greenville Fbstal / Zip Code 27835 2e. Telephone Number: (xxx)xxx-xxxx (252)439-2800 2f. Fax Number: (252)830-3341 (xxx)xxx-xxxx 2g. Email Address:* bbrame@ncdot.gov 3. Applicant Information (if different from owner) 3a. Applicant is: State / Rovince / F�gion NC Country USA C' Agent C� Other If other please specify. 3b. Name: Bill Brame Jr 3c. Business Name: (if applicable) 3d.Address Street Address P.O. Box 1587 Address Line 2 �� Greenville Fbstal / Zip Code 27835 3e. Telephone Number: (252)439-2800 (xxx)xxx-xxxx 3f. Fax Number: (xxx)xxx-xxxx 3g. Email Address:* bbrame@ncdot.gov State / FYovince / F�gion NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* US 70 Shoulder Reconstruction 1b. Subdivision name: (if appropriate) f�UA 1c. Nearest municipality/town:* i Davis 1d. Driving directions* If it is a new project and can not easily be found in a C� rrapping system Rease provide directions. From Beaufort, proceed east on US 70 towards the community of Davis. Sites are before and after the community on US 70. 2. Project Identification 2a. Property Identification Number: (tax RNor parcel ID) US 70 Shoulder Reconstruction 2b. Propertysize: (in acres) wa 2c. Project Address Street Address Address Line 2 �� Fbstal / Zip Code 2d. Site coordinates in decimal degrees State / R-ovince / F�gion Country Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For e�mple, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) I Latitude:* Longitude:� 34.798842 -76.497823 ex:34208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Core Sound 3b. Water Resources Classification of nearest receiving water:* SA; ORW Surface Water Lookup 3c. What river basin(s) is your project located in?* White Oak RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* US 70 is a paved primary highway. Coastal marsh and residences dominate the landscape. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent I US 70 Site 2 G-L quad.pdf 4.06MB Fle type rrust be pdF 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) aick the upload button or drag and drop files here to attach docurrent US 70 Site 2 G-L soils.pdf 257.07KB Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 0.03 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 890 4f. Explain the purpose of the proposed project: The e�asting roadside shoulder has been compromised and is collapsing. The shoulder reconstruction will keep the roadway from collapsing. 4g. Describe the overall project in detail, including the type of equipment to be used: The existing roadside shoulder will be reconstructed with granite riprap. 4h. Please upload project drawins for the proposed project. aick the upload button or drag and drop files here to attach docurrent I US 70 Sites G_L_psh.pdf 996.56KB Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* �' Yes C' No f Unknown Comments: Coastal wetlands on site 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary C' Approved r Unknown Corps AID Number: Exarrple: SAVw2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Sd. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload Gick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C� Yes C' No C' Unknown 6b. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). DWR 20160052 SAW-2016-00085 Project History Upload C7ick the upload button or drag and drop files here to attach docurrent 20160052-01192016182853.pdf 6.57M6 � US 70 Stabilization-Repairs NWP 13.pdf 164.81 KB Fle type rrust be FDF 7. Future Project Plans 7a. Is this a phased project?* C' Yes �' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed I m pacts I nventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r Streams-tributaries r Buffers I7 Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Site #- Reason for 4b. Impact 4c. Name of waterbody , impact type G-L P (if applicable) N�p label (e.g. Id�ad Q'ossing 1) F2rrrenent (� or Terrporary (� 4g. Total temporary open water Impacts: 0.00 4g. Total permanent open water impacts: 0.00 4g. Total open water impacts: 0.00 4h. Comments: There are 315 cubic yards of impacts for 6 sites. 5. Pond or Lake Construction If pond or lake construction is proposed, then complete the chart below. 4d. Activity 4e. Waterbody4f. Impact area type type Stabilization Other (acres) 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Only repairing areas that are eroding/slumping. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Rip rap under NWL is less than 1 cubic foot per linear foot. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes �' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1a. Does this project require a Stormwater Management Plan? C' Yes �' No 1e. If this project DOES NOT require a Stormwater Management Plan, explain why: Permit for maintenance to ebsting transportation facility. 2. Diffuse Flow Plan 2a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes G No If no, explain why: Permit for maintenance to e�asting transportation facility. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* C� Yes �' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes C•' No Comments:* I f�UA 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes C•' No 2b. Is this an after-the-fact permit application?* C' Yes C•' No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes �' No 3b. If you answered "no," provide a short narrative description. I �llA 4. Sewage Disposal (DWR Requirement) 4a. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* �' Yes �' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes �' No Sc. If yes, indicate the USFWS Field Office you have contacted. 5d. Is this a DOT project located within Division's 1-8?* �' Yes C' No 5i. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* Onsite review 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* �' Yes C' No Are there submerged aquatic vegetation (SA� around the project vicinity?* C' Yes C' No C•' Unknown 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Onsite review 7. Historic or Prehistoric Cultural Resources (Corps Requirement) i Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Onsite review 7c. Historic or Prehistoric Information Upload qick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C� Yes �' No 8b. If yes, explain how project meets FEMA requirements: Maintenance of existing transportation facility. 8c. What source(s) did you use to make the floodplain determination?* FEMA FIRM Maps Miscellaneous attachments not previously requested. C7ick the upload button or drag and drop files here to attach docurrent Fle rrust be FDF Signature * rJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* William C Brame Jr Signature i Date 9/18/2017 Initial Review Is this project a public transportation project? C� Yes C' No Only change this if the project has been reassigned. Has this project met the requirements for acceptance in to the review process?* r Yes C' No BIMS # Assigned* 20160052 Version#* 3 Reviewing Office * Washington Regional Office - (252) 946-6481 Select Project Reviewer* Garcy Ward:eads\gpward