Loading...
HomeMy WebLinkAbout20171181 Ver 1_401 Application_201709150F 01 ATF'q 2 0 1 7 1 1 8 1 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing COURTESY 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑ Section 10 PeCOPY 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 14 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express N Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: N Yes ❑ No For the record only for Corps Permit: N Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes N No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes N No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes N No 2. Project Information 2a. Name of project: Lot 5 Twin Creeks Subdivision 2b. County: Franklin County 2c. Nearest municipality / town: Pilot 2d. Subdivision name: Twin Creeks Subdivision RECEIVED 2e. NCDOT only, T.I.P. or state project no: N/A 3. 3a. Owner Information Name(s) on Recorded Deed: Philip Cass STORMWATER PERMITTING 3b. Deed Book and Page No. 2099/407 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3541 Oneonta Ave. 3e. City, state, zip: Raleigh, NC, 27604 3f. Telephone no.: 919-696-8269 3g. Fax no.: N/A 3h. Email address: philipcass01 @gmail.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 030579 1 b. Site coordinates (in decimal degrees): Latitude:35.9017 Longitude: - 78.3025 1 c. Property size: 3.01 acres (within project area) 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Moccasin Creek 2b. Water Quality Classification of nearest receiving water: C, NSW 2c. River basin: Neuse River Basin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Residential forested lot in a subdivision. Rolling topography 3b. List the total estimated acreage of all existing wetlands on the property: +/- 0.2 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: +/- 930LF 3d. Explain the purpose of the proposed project: Build a driveway and install a culvert at creek crossing. To provide access to the lot. 3e. Describe the overall project in detail, including the type of equipment to be used: The project will involve the construction of a gravel driveway at a creek crossing. The driveway will intersect the creek at a 90 degree angle. A geotextile fabric will be used at the culvert site, for soil stabilization. A 36 inch by 20 foot HDPE pipe will be installed, backfilled, and compacted. An additional 12 to 24 inches of rip -rap will be installed on the upstream/inlet of the pipe. Total disturbance 22 feet. Typical construction equipment will be used, backhoe, compactor, hand tools. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary El Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams — tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number Type of impact Type of wetland Forested Corps (404, 10) or Area of impact Permanent (P) or (if known) DWQ (401, other) (acres) Temporary T - Choose One Choose one Yes/No - 0 2g. Total wetland impacts 0 2h. Comments: No wetland impacts are proposed for this project. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average stream Impact number (PER) or width length Permanent (P) or intermitte (feet) (linear Temporary (T) nt (INT)? feet) S1 P Culvert UT to Moccasin PER DWQ 3 22 Creek 3h. Total stream and tributary impacts 22 3i. Comments: Total impacts will result from the installation of a culvert and riprap within the proposed driveway crossing. Culvert length will be 20 feet. RipRap length will be 2 feet. Total linear impact 22 feet. See 4t' page of attachments. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number — waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Temporary T 01 Choose one Choose One Choose 0 4f. Total open water impacts 0 4g. Comments: There are no open waters within the project boundaries. Page 4 of 10 PCN Form — Version 1.4 January 2009 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 Choose One P2 Choose One 5f. Total 0 0 0 0 0 0 0 5g. Comments: This project does not propose Pond or Lake construction 5h. Is a dam high hazard permit required? ❑ Yes ®No If yes, permit ID no: 5i. Expected pond surface area (acres): N/A 5j. Size of pond watershed (acres): N/A 5k. Method of construction: N/A 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a.Project is in which protected basin? ® Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer mitigation required? Zone 1 impact Zone 2 impact Permanent (P) or for Stream name (square feet) (square feet) Temporary T im act P Road UT to Moccasin No 1500 1000 X-ing Creek 6h. Total buffer impacts 1500 1000 6i. Comments: Impacts are due to a proposed driveway crossing. Project lies in the Neuse River Basin. Total buffer impact will not exceed 2500 square feet. See 3rd page of attachments. Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Installing geotextile fabric for increased bank stabilization. Installing a rip -rap apron to prevent erosion. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Lot grading will be minimized to maintain the existing terrain and vegetation as much as possible. Silt fence will be installed where applicable. Re -seed after construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A 3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity N/A Type: Choose one Quantity N/A Type: Choose one Quantity N/A 3c. Comments: N/A 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: 0 linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): 0 square feet 4e. Riparian wetland mitigation requested: 0 acres 4f. Non -riparian wetland mitigation requested: 0 acres 4g. Coastal (tidal) wetland mitigation requested: 0 acres 4h. Comments: N/A 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. No mitigation is proposed because impacts have been minimized to impact only 22 LF of stream channel. Page 6 of 10 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). N/A 6h. Comments: No buffer mitigation is proposed because impacts are within the "allowable" limits within the table of uses. Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 1 % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The proposed impervious surface area is less than that requiring an approved stormwater plan. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Franklin County ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ® No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ® No Page 8 of 10 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Only building 1 driveway. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The single-family residential home will utilize a septic system. Page 9 of 10 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? http://ncnhde.natureserve.org/content/map Occurrence Element Tier 1 Layer. No Michaux Sumac or mussels listed (Dwarf Wedge, Tar River Spiny) in 1 mile search radius. 08/25/17. Field reconnaissance 08/26/17, No species found. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? www.habitat.noaa.gov/protection/efh/efhmapper/index.html 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? http://gis.ncdcr.gov/hpoweb/ *Records check at the State Historic Preservation Office or the Office of State Archeology were not performed. No structures were noted during a field reconnaissance of the project location. Utilizing the HPOWEB GIS mapping service, a 1 -mile radius search of the project center yielded two properties, the H.J.Gay Farm, HPO Site ID: FK0666. And "House", HPO Site ID: FK1015.The H.J. Gay Farm and "House" are classified by SHPO as a 'Surveyed Only' Structure. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? www.fris.nc.gov panel 2708 )DO ' -p r C,aSs qZl��17 Applicant/Agent's Si nature 9 Applicant/Agent's Printed Name (Agent's signature is valid only if an authorization letter from the applicant Date is provided.) Page 10 of 10 Franklin County, NC Parcel ID 030579 Owner Name CASS PHILIP Owner Mailing Address 3541 ONEONTA AVE RALEIGH, NC 27604 General Information Approximate Acres Land Value Zoning LAST SALE Date 6/9/2017 k owce� MGP Detailed Parcel Report Friday, September 1, 2017 000766 000766 ' 030578 030578 001615 030592 001615 030592 SP 2 h 030579 030579 030591 030591 a. i 030580 030580 „'f� 030590 030*0 030 8030588 030589 0305891 3.01 Map Reference $35,000.00 Building Value $0.00 R 40 Price Book Page $29,000.00 2099 407 WARNING: THIS IS NOT A SURVEY. I,F�a A i n Franklin County This map is prepared for the inventory of real property found within this jurisdiction, and is Tax/GIS compiled from recorded deeds, plats, and other public records and data. Users of this map Ounty 215 E. Nash Street are hereby notified that the aforementioned public primary information sources should be Louisburg, NC 27549 consulted for verification of the information contained on this map. The County and mapping A RtsearcbTriangieRrgion Community company assume no legal responsibility for the information contained on this map. N 0 GoMaps 2017 k1b 030577 000766 ��3 : 030593 ^�ti t1rM 'r' 6^ 3S� rv° 030578 030592 a 001615 Q l ��rGG e `030579 , M1 3 0591 `Ac a�a0Z 030580`W kN� 030590 001794 030589 001731 �e �.:` 030588, 030581 .- N ,�� 03 05 87 WE II 030586 s September 1, 2017 1:2,065 0 95 190 380 ft 0 25 50 100 m Sources: Esr4 HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCarU Esri JapanMETI, EsriCHna(Hang Kong), Esri Korea, Esri (Thaiand), Mapnriinda, NGCC, O OperG"etMap corsributors, and the GIS User Community 2017 ?3w)T6— AF Go gle Ear Lh Zo-le 1 = R e G z 0� z ��rerr�ne YC -11.L✓ Zo• ZoAle Z 3o " 30 100 zo, LoNC ZOA/C zw&- Z A