Loading...
HomeMy WebLinkAbout19960933 Ver 1_Staff Comments_2008120896-0933 Mylan Stormwater Ponds Subject: 96-0933 Mylan Stormwater Ponds From: Annette Lucas <Annette.Lucas@NCMail.net> Date: Mon, 08 Dec 2008 09:29:06 -0500 To: Sue Homewood <Sue.Homewood@ncmail.net> CC: Annette Lucas <Annette.Lucas@NCMail.net> Hey Sue, I just thought I would respond to you immediately about this one to keep this project moving. The submittal looks pretty good - however, the plan views of the ponds on C1.1A and C1.12 show the vegetated shelves at 5:1 slopes rather than 10:1 slopes. Thanks, Annette 1 of 1 12/8/2008 9:29 AM