Loading...
HomeMy WebLinkAbout19951044 Ver 1_Other Agency Comments_20081203Pew; nit Class 3rd RENEWAL MAINTENANCE-5 `OoA Permit Number 146-95 STATE OF NORTH CAROLINA U Department of Environment and Natural Resources = ? and ` OW Coastal Resources Commission DEC 3 2008 Permit r E lk - WATER. QUALM Y V,''E, .ANDS AND STORMWATER BRANCH for X_ Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Shinn Point Homeowners Association, 821 Shinn Point Road, Wilmington, NC 28409 Authorizing development in New Hanover County at Man-made canal adjacent to Shinn Creek as requested in the permittee's letter dated 9/4/08 This permit, issued on November 20, 2008 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to the original of Permit No. 146-95, which was issued on 12/1/95, as well as all subsequent renewals, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. Maintenance Clause 3) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any maintenance work authorized by this permit and that notification include: A. The number of the original permit B. A statement that no dimensional changes are proposed C. A copy of the original permit plan(s) with cross-hatching indicating the area to be maintained and the area to be used for dredge spoil, and the estimated amount of material to be removed. D. The date of plan revision and the permittee's signature shown anew on the original plan This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2013 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. ?' kv i 1;t,(_lames H. Gregson, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee 1 ` September 4, 2008 NCDENR Mr. Jason Dail 127 Cardinal Drive Wilmington, NC 28405 Re: Permit Renewal Permit # 146-95 Dear Mr. Dail, Shim Poinc Homeowners Association hereby request that the Maintenance Permit for dredging of the man made canal adjacent to Shinn Creek be renewed. This permit expires December 31, 2008. Enclosed please find a check for $100 payable to NCDENR to complete this request. Thank you in advance for your assistance in this matter. If you have any questions, don't hesitate to contact me at 910-262-8288. Sincerely, r ickson Bridger President-Shinn Point Homeowners Association 825 Shinn Point Rd Wilmington, NC 28409