Loading...
HomeMy WebLinkAbout20050697 Ver 1_DCM Permit_20081203Permit Class Permit Number RENEWAL U Gj 115-05 STATE OF NORTH CAROLINA ? , ?? Department of Environment and Natural Resources pu and ; , , Coastal Resources Commission DEC -3 2008 er m t t DENR -1NATER QUAL1n' for WETLANDS AND STORMWATER BRANCH X Major Development in an Area of Environmental Concern pursuant to NC GS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to H.E. Whichard, Jr., P.O. Box 1863, Greenville, NC 27835-1863 Authorizing development in Hyde County at Pungo River, end of SR 1150, Durants Point , as requested in the permittee's letter dated received in Morehead City on 10/6/08 This permit, issued on November 20, 2008 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to the original Permit No. 115-05, which was issued on 7/20/05 and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2010 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. - )VL'James H. Gregson, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee MEMORANDUM TO: Doug Huggett P FROM: Steve Trowell?/ THROUGH• T M '?``'`' ?` 'I V erry oore t? _ b - k, DATE: 1 October 20081 , r "d J SUBJECT: H.E. Whichard CAMA/Dredge and Fill Permit No. 115-05' ` ''y '' =1 This memo is in regards to a request to renew Major CAMA/Dredge and Fill Permit No. 115- 05 issued on 20 July 2005 to Mr. H. E. "Woody" Whichard for excavation of a highground boat basin, access channel, riprap shoreline, riprap groins, a pier and boathouse onsite Mr. Whichard's property located on the east side of the Pungo River off SR 1150 in Hyde County near Scranton, North Carolina. This is the first renewal of this permit. Mr. Whichard has undertaken the permitted shoreline stabilization and repair to the existing pier. This work was completed in November 2005. The boat basin with associated amenities and additional pier with a boathouse have not been built. I recommend that the permit be renewed. The $100 check to cover the cost of the permit renewal has been deposited. CANNIA Mr. Steve Trowell 943 Washington Square Mall Washington, NC 27889 t-li Steve, Permit Number 115-05 expires on December 31, 2008. Please find enclosed a check in the amount of $100.00 made payable to CAMA for its renewal. The bulkhead is completed and repairs have been made to the existing pier. However, construction of the new pier, the boat basin or finger pier additions to the existing piCr remain to be completed. If there is anything you need from me please call me at 252-916-9028 or if you prefer you can send me an email at twoo?dwwhichnrd,ni hotmail.coui Thanks, Woody Whichard