Loading...
HomeMy WebLinkAbout20070231 Ver 1_Certification of Completion_20081125Alks .. Engineering & Energy Baker and Associates A Unit of Michael Baker Corporation 7800 Airport Center Drive, Suite 100 Greensboro, NC 27409 (336) 931-1500 FAX (336) 931-1501 NOV 2` 5 2008 WETL ,rio 4*0s0twW is Letter of Transmittal To: NCDENR S.O. No.: 1650 Mail Service Center Project: Ballinger Road Extension Raleigh, NC 27699-1650 Attn: 401 Oversight/Express Permitting Unit Date: 11/24/08 We are forwarding the following: ® Attached ? Under Separate Cover ? Other DWG. NO. NO. COPIES TITLE OR DESCRIPTION COMMENTS 1 401 Permit Certificate of Completion for culvert work associated with the extension of Ballinger Road. DWQ Project No 07-0231 THESE ARE TRANSMITTED as checked below: ® As requested ? For review and comment ® For your information ? No exception taken ? Rejected - See remarks ? Proceed subject to corrections noted ? Revise and resubmit ? Submit specified items ? Other GENERAL COMMENTS: cc: Lisa Elmore, Mickie Elmore, Chad Huffines, Richard Darling Organization By: Chris Arrington Title: Environmental Associate Pam 1 of Challenge , EL Certification of Completion e [4 M NOV 25 2008 DWQ Project No.. 0qA 131 Coun CuAbYA MR-VVATERUUAUTY ty: aunt AND SIORMWATER BRANCH ? Applicant: -? e mom T , a ? _4.,,R0-Y4 A"4.-/44 Project Name: ! ??no,cy Road ?Xif?ISio?I Date of Issuance of Wetland Permit: 3l r? Lo Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in. the observation- of the construction such that the construction was observed to be built within. substantial compliance and intent of the 401'Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, C H,4b WI r-k- 6. 14 V FI uE'-S , as a duly registered Professional 51NGI U ,. i.e., Engineet, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification• and Buffer Rules, the approved plans and speeifications, and other supporting materials. Signature: a::!?& Registration No. 27 4+8 Date l ?z`1' d 9 Piedmont Triad Airport Authority Ballinger Road Extension DWQ Project No. 07-0231 Guilford County t'. `'AV1 r.? 1r, n ?d e J `. Y ?I f iY.. TT y Air ?•? av a4a:? ?.f' Figure 1. Downstream end of culvert. rigure L. Upstream end of culvert.