Loading...
HomeMy WebLinkAboutPark Place Commons at Franklin Park - Lot 4 - SSW-SWU-101-Application-DEMLR-SPU Oct 2013 (2)DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules:  Coastal SW – 1995  Coastal SW – 2008  Ph II - Post Construction (select all that apply)  Non-Coastal SW- HQW/ORW Waters  Universal Stormwater Management Plan  Other WQ Mgmt Plan: Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Park Place Commons at Franklin Park - Lot 4 2. Location of Project (street address): Park Avenue City:Youngsville County:Franklin Zip:27596 3. Directions to project (from nearest major intersection): Head north on Park Ave from intersection at Wheaton Ave. Project site is on the west before intersection with Franklin Park. 4. Latitude:36° 02’ 17.6” N Longitude:78° 29’ 08.8” W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): New Modification Renewal w/ Modification† †Renewals with modifications also requires SWU-102 – Renewal Application Form b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: Not Started Partially Completed* Completed* *provide a designer’s certification 2. Specify the type of project (check one): Low Density High Density Drains to an Offsite Stormwater System Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, . 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): CAMA Major Sedimentation/Erosion Control: 2.86 ac of Disturbed Area NPDES Industrial Stormwater 404/401 Permit: Proposed Impacts b. If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? No Yes If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/lr/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 2 of 7 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official’s name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:J.C. Crabtree Investments, LLC. Signing Official & Title:Jeremy Crabtree, Owner b. Contact information for person listed in item 1a above: Street Address: City: State: Zip: Mailing Address (if applicable):P.O. Box 652 City:Creedmoor State:NC Zip:27522 Phone: (919 ) 427-6907 Fax: ( ) Email:jcrabtreeinc@yahoo.com c. Please check the appropriate box. The applicant listed above is: The property owner (Skip to Contact Information, item 3a) Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner’s name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3. a. (Optional) Print the name and title of another contact such as the project’s construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits: Town of Youngsville Point of Contact:Bob Clark Phone #: (919 ) 556-5073 Form SWU-101 Version Oct. 31, 2013 Page 3 of 7 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The proposed building site has been graded so that the majority of the stormwater runoff from the parking lot, drive aisles, landscaped areas and building (approx. 66,929 SF of impervious) is conveyed to a constructed wetland. This is done through the use of sheet flow, vegetated swales, and storm pipes. The remainder of the stormwater runoff bypasses the constructed wetland and enters the roadside ditch along Park Avenue (1,242 SF of impervious). 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: Approval of a Site Specific Development Plan or PUD Approval Date: Valid Building Permit Issued Date: Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: Coastal SW – 1995 Ph II – Post Construction 3. Stormwater runoff from this project drains to the Tar-Pamlico River basin. 4. Total Property Area: 5.6 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) – Total Coastal Wetlands Area (5) – Total Surface Water Area (6) = Total Project Area+: 5.6 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non-coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 27.9 % 9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Form SWU-101 Version Oct. 31, 2013 Page 6 of 7 VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Chris Oliver, PE Consulting Firm: Summit Design & Engineering Services Mailing Address:504 Meadowlands Dr. City:Hillsborough State:NC Zip:27278 Phone: (919 ) 732-3883 Fax: (919 ) 732-6676 Email:chris.oliver@summitde.net IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, _____________________________________, a Notary Public for the State of ____________________, County of ____________________, do hereby certify that ______________________________________ personally appeared before me this day of _________________, _______, and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, _________________________________________________ SEAL My commission expires