HomeMy WebLinkAbout20161073 Ver 1_Compliance Evaluation Inspection_20170914Project Num: 20161073
Project Name: Riverside S/D - Phase 3
County: Guilford
Location: Riverside S/D - Phase 3
Latitude: +36° 10' 51"
SW Plan Location
Site Owner Name Brc Riverside LLC
Inspection Date: 9/14/2017
Reason for Inspection Routine
Inspection Type: Site Inspection (non -DOT)
Wetland Inspection Report
Version: 1 Status: Issued
Project Type: Residential Subdivision
Region: Winston-Salem
Longitude: -80° 01' 16"
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Sue L Homewood
Secondary Inspector(s):
Facility Compliance Status: ❑ Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
0 Permit (401 WQC)
Inspection Summary:
0 Not Compliant
Phone: 336-776-9694
page: 1
Site Number: 20161073 Owner: Arndt, Bill
Inspection Date: 9/14/2017 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Routine
Permit (401 WQC)
Yes
No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
❑
0
❑
❑
Are the culverts and/or filled areas installed properly?
❑
❑
❑
❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
❑
❑
❑
Comment: Impact approved was for permanent riprap pad below culvert. Temporary
sediment control measure has-
been installed within footprint. Unable to determine if impact length is the same without as-built/survey
data. Sediment loss has impacted about 500 feet of downstream channel with about 1/2" laver of
sediment present througout.
page: 2
M
ov
4 qK
1R
'I d0
k � a
Y'
rr
-'� Y fir'. t+---•�- �.1 ��p",C t, `"..
%V
• Yid
V
e•
_ r
fir
114
t\
j
y
A W,
a
Zi
t
f
I1
y�A
tP
J
.
`
{y F
�_
-f3.!
```ft AM A
t A
for A
molf
>. — I
A
jff
off-
r r�
r'
1
e �
I r
++tsy
s
a f
17:
3tli.: a
/•- - f��� _`� � �� > � �!. "ice ' '! . ' ?�.
T� � � rr.y. �.
17
z;Ye •r '` ! �i
271
r pi y -R �P ♦ ,,
4
_ ♦ .fir 4,
NIV
AN
a�•. ", trite �.�• }p�� ( ° ilk
t �Wkj'