Loading...
HomeMy WebLinkAboutNC0038377_Wasteload Allocation_19970114PERMIT NO.: NCO038377 NPDES WASTE LOAD ALLOCATION Modeler Date Rec. # PERMITTEE NAME: Carolina Power & Light Company FACILITY NAME: Mayo Steam Electric Plant Facility Status: Existing Permit Status: Renewal Major Pipe No.: 002 Minor Design Capacity: No Flow Limit Domestic (% of Flow) Industrial (% of Flow) 0.2% Comments: Refer to application for flow data Flow not limited See description of outfall 002. RECEIVING STREAM: the Mayo Reservoir Class: C Sub -Basin: 03-02-05 Reference USGS Quad: A 23 SW (please attach) County: Person Regional Office: Raleigh Regional Office Previous Exp. Date: 6/30/97 Treatment Plant Class: Class 2 Classification changes within three miles: none 'tO F SII i I Requested by: Jeff; Myhra Date: 1/14/97 Prepared _- --=��� Date: s Arpu i tj Reviewed by: Dom; Drainage Area (mi); n/a s7Q10 (cfs): Lake Instream Monitoring: not required Acute (Fathead Minnow 24 hr) Toxicity Test - No Significant Mortality at 90% February, May, August, and November Monthly Daily Average Maximum Wasteflow (mgd): Oil & Grease (mg/1): 15 20 Total Suspended Solids (mg/1): 30 100 Total Selenium (lbs/d): 3.8 pH (Si): 6 - 9 Arsenic (µg/1): monitor Copper (µg/1): monitor Iron (mg/1): monitor Effluent sample location prior to mixing with other waste streams. No chemical metal cleaning waste may be discharged to the ash pond. There shall be no discharge of polychlorinated biphenyl compounds such as those commonly used for transformer fluid. There shall be no discharge of floating solids or visible foam in other than trace amounts outside an area of 5 meters from the discharge. FOR APPROPRIATE DISCHARGES, LIST COMPLETE GUIDELINE LIMITATIONS BELOW 1 2 to 3U.0 in 15.0 in nee 0.20 m ts2 No Detectablf 0.20 in 1.0 mi The ash pond receives ash transport water, coal pile runoff, stormwater runoff, cooling tower blowdown, and various low- volume wastes such as boiler blowdown, oily waste treatment, wastes/backwash from the water treatment processes, plant area wash down water, and equipment heat exchanger water. The sewage treatment plant effluent is also routed to the ash pond. These parameters are monitored at outfall 001. Outfall 001 discharges into the ash pond. The ash pond discharges into the Mayo Reservoir through outfall 002. See attached flow diagram for clarification. tlectncity (tne taculty is an electric 143 411 UrK ran 41-3 - ,)team hiectnC rower generating plant using coal-fired boilers to Generating Point Source Category produce steam for turbine generators with a combined net cavacity of 745 MWe. z 4047 r p DISCHARGE LOCATION tk; CAROLINA POWER & LIGHT COMPANY MAYO STEAM ELECTRIC PLANT OUTFALL 002 NCO038377 MAYO RESERVOIR le.� lcr, r Nv. 17 - r 77� 4?� C _,7 W kv� cr WIR 17 < 0 5A -ep 7 . . . . . . . .... -7 95- 4", V N M - j 7K L) 4046 32'30 4045 101000 LN. C.) 4044 4043 zto�w_ 4042m, N. —36'30' 0 ;%,fP:0A—GE0L0G:CA, SUR�-C,.RESTC% 78 52'30 r GKEX88/MP 10/30/96 COMPLIANCE EVALUATION ANALYSIS REPORT PAGE 1 PERMIT--NC0038377 PIPE --002 REPORT PERIOD: 9509-9608 LOC ---E FACILITY--CP&L MAYO S.E. (PWR PLT) DESIGN FLOW-- 21.0000 CLASS --2 LOCATION --RALEIGH REGION/COUNTY--05 PERSON 50050 00530 00400 00556 01002 01042 01045 01147 MONTH Q/MGD RES/TSS PH OIL-GRSE ARSENIC COPPER IRON SELENIUM LIMIT NOL F 30.0 9.0 6.0 F 15.000 NOL F 1.0000 F 1.0000 F 3.8000 95/09 3.7475 .0 8.1-7.8 .000 4.0000 .0000 .0000 95/10 5.5400 .0 7.2-7.2 .000 5.7500 115.0000 .0925 95/11 5.4500 3.5 7.4-7.1 .000 7.2000 124.0000 .1168 95/12 5.2625 15.0 7.5-7.3 .000 .0170 9.5000 142.5000 .1667 96/01 6.3180 16.0 7.6-7.5 3.000 .0242 10.0000 206.0000 .2198 96/02 5.2000 22.0 7.7-7.7 .000 .2266 96/03 3.8425 11.5 7.8-7.7 .000 .1745 96/04 .8650 4.0 7.9-7.9 .000 .0400 96/05 .9240 .0 7.8-7.6 .000 .0180 96/06 2.8900 .0 8.3-7.7 .000 .0500 96/07 6.1240 .0 7.4-7.4 .000 .1920 96/08 6.3150 .0 8.3-7.3 .000 .2270 AVERAGE 4.3732 6.0 .250 .0206 7.2900 117.5000 .1269 MAXIMUM 7.8800 25.0 8.300 6.000 .0260 11.0000 460.0000 .3170 MINIMUM .4600 10.0 7.100 .0170 3.0000 .0120 UNIT MGD MG/L SU MG/L MG/L UG/L UG/L LBS/DAY r . G`KEX88/MP 10/30/96 COMPLIANCE EVALUATION ANALYSIS REPORT PAGE 1 PERMIT--NC0038377 PIPE --002 REPORT PERIOD: 9409-9508 LOC ---E FACILITY--CP&L MAYO S.E. (PWR PLT) DESIGN FLOW-- 21.0000 CLASS --2 LOCATION --RALEIGH REGION/COUN'T'Y--05 PERSON 50050 00530 00400 00556 01002 01042 01045 01147 MONTH Q/MGD RES/TSS PH OIL-GRSE ARSENIC COPPER IRON SELENIUM LIMIT NOL F 30.0 9.0 6.0 F 15.000 NOL F 1.0000 F 1.0000 F 3.8000 94/09 7.7900 5.5 7.9-7.6 3.200 .0000 .0000 .1300 94/10 8.0100 5.5 7.2-7.1 .000 .0000 .0000 .2002 94/11 6.5120 4.5 7.6-7.1 .000 .0000 .0000 .1336 94/12 2.0850 4.0 7.1-7.0 .000 .0107 .0000 .0000 .0412 95/01 6.6280 3.5 7.7-7.2 .000 .0138 .0000 74.0000 .1340 95/02 8.7900 11.0 7.7-7.6 .000 10.0000 292.5000 .2800 95/03 8.4500 11.0 7.7-7.6 .000 .0000 178.0000 .2740 95/04 6.6225 7.5 7.9-7.4 .000 .0142 5.0000 100.0000 .2750 95/05 6.9520 5.0 7.6-7.3 .000 .0000 146.0000 .1760 95/06 7.9475 6.0 7.5-7.5 .000 5.0000 120.0000 .3167 95/07 7.7025 5.0 8.9-7.4 .000 .0185 .0000 72.5000 .2302 95/08 6.0720 7.5 8.8-8.6 .000 20.0000 50.0000 .0910 AVERAGE 6.9634 6.3 .266 .0143 3.3333 86.0833 .1901 MAXIMUM 13.2400 12.0 8.900 4.300 .0210 50.0000 620.0000 .4400 MINIMUM 1.0000 3.0 7.000 2.100 .0090 50.0000 .0050 UNIT MGD MG/L SU MG/L MG/L UG/L UG/L LBS/DAY CKEX88/MP 10/30/96 COMPLIANCE EVALUATION ANALYSIS REPORT PAGE 1 PERMIT--NC0038377 PIPE --003 REPORT PERIOD: 9509-9608 LOC ---E FACILITY--CP&L MAYO S.E. (PWR PLT) DESIGN FLOW-- 21.0000 CLASS --2 LOCATION --RALEIGH REGION/COUNTY--05 PERSON 50050 00310 00530 31616 50060 00400 MONTH Q/MGD BOD RES/TSS FEC COLI CHLORINE PH LIMIT F .0125 F 30.00 F 30.0 F 1000.0 NOL 9.0 6.0 95/09 .0012 4.275 7.4-7.1 95/10 .0011 4.50 12.0 95/11 .0011 95/12 .0012 96/01 .0015 AVERAGE .0012 4.50 MAXIMUM .0015 4.50 MINIMUM .0011 4.50 UNIT MGD MG/L 0 2.175 7.1-6.6 1.760 7.6-7.2 2.900 7.7-7.1 2.040 7.4-6.3 12.0 .0 2.630 12.0 6.300 7.700 12.0 .500 6.300 MG/L #/100ML MG/L SU GKEX88/MP 10/30/96 COMPLIANCE EVALUATION ANALYSIS REPORT PAGE 1 PERMIT--NC0038377 PIPE --003 REPORT PERIOD: 9409-9508 LOC ---E FACILITY--CP&L MAYO S.E. (PWR PLT) DESIGN FLOW-- 21.0000 CLASS --2 LOCATION --RALEIGH REGION/COUNTY--05 PERSON 50050 00310 00530 31616 50060 00400 MONTH Q/MGD BOD RES/TSS FEC COLI CHLORINE PH LIMIT F .0125 F 30.00 F 30.0 F 1000.0 NOL 9.0 6.0 94/09 .0014 .982 7.2-7.0 94/10 .0010 .940 7.1-6.9 94/11 .0020 1.944 7.0-6.9 94/12 .0010 5.90 19.0 .0 1.535 7.1-6.7 95/01 .0030 .00 .0 .0 3.600 7.6-6.9 95/02 .0010 10.025 7.4-6.9 95/03 .0018 4.840 7.3-7.1 95/04 .0010 10.0 2.125 7.2-7.1 95/05 .0010 4.50 7.7 5.385 7.4-6.9 95/06 .0015 5.300 7.7-7.0 95/07 .0014 2.000 7.0-6.4 95/08 .0014 1.60 6.0 .0 1.620 7.1-6.7 AVERAGE .0014 3.00 8.7 1.9 3.358 MAXIMUM .0030 5.90 19.0 3500.0 22.500 7.700 MINIMUM .0010 LESSTHAN LESSTHAN .560 6.400 UNIT MGD MG/L MG/L #/100ML MG/L SU NPDES WASTE LOAD ALLOCATION PERMIT NO.: NCO038377 PERMITTEE NAME: Carolina Power & Light Company FACILITY NAME: Mayo Steam Electric Plant Facility Status: Existing Permit Status: Renewal Major _V Minor Pipe No.: 001 Design Capacity: No Flow Limit Domestic (% of Flow): Industrial (% of Flow): 100% Comments: Flow not limited. See description of outfall 001. RECEIVING STREAM: the Mayo Reservoir Class: C Sub -Basin: 03-02-05 Reference USGS Quad: A 23 SW (please attach) County: Person Regional Office: Raleigh Regional Office Previous Exp. Date: 6/30/97 Treatment Plant Class: Class 2 Classification changes within three miles: none Requested by: Prepared Reviewed by: Date: 1/14/97 Date-. 6 Amt.. Date: C Modeler Date Rec. I # - 1iI css�A Drainage Area (mi2): n/a s7Q10 (cfs): Lake Instream Monitoring: not required Monthly Daily Average Maximum Wasteflow (mgd): Free Available Chlorine (µg/1): 200 * 500 Time of Chlorine Addition: * 2 hours Total Chromium (mg/1): 0.2 ** 0.2 ** Total Zinc (mg/1): 1.0 ** 1.0 ** pH (SU). 6 - 9 The 126 priority pollutants (40 CFR 423) exclusive of Zinc and Chromium ** Effluent sample location after mixing with fly and bottom ash, but prior to ash pond. * Neither free available chlorine nor total residual chlorine may be discharged from any single generating unit for more than two hours per day, unless the permittee demonstrates to the Division of Water Quality that discharge for more than two hours is required for macroinvertebrate control. The 500 µg/1 limitation is an instantaneous maximum and is to be measured during the chlorine release period. The 200 µg/1 limitation is an average during the chlorine release period. Simultaneous multi -unit chlorination is permitted. ** Limits and monitoring are only applicable if maintenance chemicals containing this parameter are added to the cooling towers. There shall be no detectable discharge of the 126 Priority Pollutants contained in chemicals added for cooling tower maintenance, except for chromium and zinc. Compliance with this limitation may be determined by engineering calculations which demonstrate that the regulated pollutants are not detectable in the final discharge by methods in 40 CFR 136. This permit does not authorize a discharge directly to the Mayo Reservoir except during times in which the cooling tower(s) are drained. The permittee shall notify the Division of Water Quality, Raleigh Regional Office, prior to draining the cooling tower(s), except during non -office hour emergencies when notification must be made the next working day. The above listed limitations for the pollutants shall apply during the draining of the cooling tower(s). Sampling shall be conducted during the time of the event at the cooling tower blowdown area. The above listed effluent characteristics and pH shall be sampled daily while draining the cooling tower(s). FOR APPROPRIATE DISCHARGES, LIST COMPLETE GUIDELINE LIMITATIONS BELOW l Cooling tower blowdown. This water is usually directly mixed with the ash sluice water. Occasionally (once per year maximum (if ever)) it is not mixed with bottom and fly ash and is discharged directly into the ash pond. Heat exchanger water (low volume waste) is almost continuously discharged out 001. Approximately once every two years the cooling towers are drained completely for maintenance. This discharge goes directly to the Mayo Reservoir. The established permit limits still have to be met with this discharge (see attached flow chart for further clarification). 2 This provision applies to outfall 001 since low volume wastewater is discharged through this outfall. I believe these limits were v not applied to this outfall in the last renewal because these parameters are monitored at outfall 002. Outfall 001 discharges into ► jR"` '-� the ash pond and the ash pond then discharges into the Mayo Reservoir through outfall 002. The limits are being met at outfall 002 so it would not make sense to monitor there parameters at outfall 001. See attached flow diagram for clarification. Electricity (the facility is an electric 1 745 4U CPR Part 423 - Steam Plectnc Power generating plant using coal-fired boilers to Generating Point Source Category produce steam for turbine generators with a combined net capacity of 745 MWe. cent :....haractersEtc:.:...;': ::.:.. ...... nflI ::.::....;:.> atl :x�mu[m .<<:»:.:":m,ents ............ ::_:: ........:.....::.: Aa...:;: ;::Y..::: H Shall be in the ran e of 6.0 to 9.0.40 CFR 423.12 (b)(1) BPT TSS2 30.0 m 100.0 m40 CFR 423.12 (b)(3) BPT Oil and Grease2 15.0 m 20.0 m40 CFR 423.12 (b)(3) BPT Free Available Chlorine 0.20 m 0.50 mrd 40 CFR 423.13 (d)(1) BAT 126 Priority Pollutants No Detectable Amount 40 CFR 423.13 (d)(1) BAT Chromium, Total 0.20 m 0.20 m 40 CFR 423.13 (d)(1) BAT Zinc, Total 1.0 m 1.0 m 40 CFR 423.13 (d)(1) BAT 40 CFR 423.13 (d)(2) BAT 40 CFR 423.13 (d)(3) BAT l Cooling tower blowdown. This water is usually directly mixed with the ash sluice water. Occasionally (once per year maximum (if ever)) it is not mixed with bottom and fly ash and is discharged directly into the ash pond. Heat exchanger water (low volume waste) is almost continuously discharged out 001. Approximately once every two years the cooling towers are drained completely for maintenance. This discharge goes directly to the Mayo Reservoir. The established permit limits still have to be met with this discharge (see attached flow chart for further clarification). 2 This provision applies to outfall 001 since low volume wastewater is discharged through this outfall. I believe these limits were v not applied to this outfall in the last renewal because these parameters are monitored at outfall 002. Outfall 001 discharges into ► jR"` '-� the ash pond and the ash pond then discharges into the Mayo Reservoir through outfall 002. The limits are being met at outfall 002 so it would not make sense to monitor there parameters at outfall 001. See attached flow diagram for clarification. Electricity (the facility is an electric 1 745 4U CPR Part 423 - Steam Plectnc Power generating plant using coal-fired boilers to Generating Point Source Category produce steam for turbine generators with a combined net capacity of 745 MWe. r ' GKEX88/MP 10/30/96 COMPLIANCE EVALUATION ANALYSIS REPORT PAGE 1 PERMIT --N00038377 PIPE --001 REPORT PERIOD: 9509-9608 LOC ---E FACILITY--CP&L MAYO S.E. (PWR PLT) DESIGN FLOW-- 21.0000 CLASS --2 LOCATION --RALEIGH REGION/COUNTY--05 PERSON 50050 00400 00665 50064 MONTH Q/MGD PH PHOS -TOT CHLORINE LIMIT F21.0000 9.0 6.0 NOL F .200 95/09 4.1294 7.7-7.7 .000 95/10 3.1461 7.3-7.3 .000 95/11 3.8793 7.9-7.9 .000 95/12 4.5545 7.7-7.6 .000 96/01 4.3216 7.8-7.8 .000 96/02 3.8953 10.000F 96/03 4.3664 9.500F 96/04 7.6-7.4 .000 �a 96/05 96/06 96/07 1.8841 .021 96/08 1.5790 .000 AVERAGE 3.5284 1.952 MAXIMUM 6.2500 7.900 10.000 MINIMUM .0000 7.300 .000 UNIT MGD SU MG/L MG/L GK�FY.88/MP 10/30/96 COMPLIANCE EVALUATION ANALYSIS REPORT PAGE 1 PERMIT--NC0038377 PIPE --001 REPORT PERIOD: 9409-9508 LOC ---E FACILITY--CP&L MAYO S.E. (PWR PLT) DESIGN FLOW-- 21.0000 CLASS --2 LOCATION --RALEIGH REGION/COUNTY--05 PERSON 50050 00400 00665 50064 MONTH Q/MGD PH PHOS -TOT CHLORINE LIMIT F21.0000 9.0 6.0 NOL F .200 94/09 3.8653 7.9-7.9 .000 94/10 3.8858 7.8-7.4 .000 94/11 3.8939 7.5-7.2 .000 94/12 3.7853 6.9-6.9 .000 95/01 3.9483 7.3-7.3 .000 95/02 3.9407 7.7-7.7 .000 95/03 3.9258 7.7-7.7 .000 95/04 3.9370 7.7-7.7 .000 95/05 3.8983 7.7-7.2 .000 95/06 3.8880 7.3-7.2 .000 95/07 4.4854 7.8-7.2 .000 95/08 4.8854 7.8-7.1 .000 AVERAGE 4.0282 .000 MAXIMUM 6.5600 7.900 MINIMUM 3.6000 6.900 .000 UNIT MGD SU MG/L MG/L