Loading...
HomeMy WebLinkAbout20051071 Ver 1_Emails_20050901[Fwd: [Fwd: B/S/H Logistics]] Subject: [Fwd: [Fwd: B/S/H Logistics]] From: Scott Vinson <Scott.Vinson@ncmail.net> Date: Thu, O1 Sep 2005 12:23:07 -0400 To: John.Dorney@ncmail.net CC: Al Hodge <A1.Hodge@ncmail.net> John, as per your email request to Al Hodge regarding the B/S/H Logistics Site I offer the following: The State Stormwater requirements for this site have been meet in the SW application and was permitted. In addition, the nutrient removal rate for the BMPs proposed have more than met the 30~ minimum removal requirement for this project. Scott Vinson Subject: [Fwd: B/S/H Logistics] From: Al Hodge <A1.Hodge@ncmail.net> Date: Tue, 30 Aug 2005 14:02:10 -0400 To: Scott Vinson <scott.vinson@ncmail.net> please handle Al Hodge Division of Water Quality Surface Water Protection Washington Regional Office Regional Office 252-946-6481 Direct 252-948-3844 fax- 252-946-9215 Subject: B/S/H Logistics From: John Dorney <John.Dorney@ncmail.net> Date: Tue, 30 Aug 2005 13:51:34 -0400 To: "Hodge » Al Hodge" <A1.Hodge@ncmail.net> please have your staff confirm that the modified Stormwater plan outlined in the August 16 letter from Michael Rice from Bob Chiles and Associates meets the Stormwater treatment conditions for the 401 Certification as we discussed several weeks ago. An email will suffice. Once that occurs, i'll modify the 401. thankx ~ __ I, Content-Type: message/rfc822 [Fwd: B/S/H Logistics] Content-Encoding: 7bit ................._........ .............._......._..... . 1 of 2 9/2/2005 3:20 PM [Fwd: [Fwd: B/S/H Logistics]] Content-Type: message/rfc822 B/S/H Logistics Content-Encoding: 7bit 2 of 2 9/2/2005 3:20 PM