HomeMy WebLinkAbout20051071 Ver 1_Emails_20050901[Fwd: [Fwd: B/S/H Logistics]]
Subject: [Fwd: [Fwd: B/S/H Logistics]]
From: Scott Vinson <Scott.Vinson@ncmail.net>
Date: Thu, O1 Sep 2005 12:23:07 -0400
To: John.Dorney@ncmail.net
CC: Al Hodge <A1.Hodge@ncmail.net>
John,
as per your email request to Al Hodge regarding the B/S/H Logistics Site I offer the
following:
The State Stormwater requirements for this site have been meet in the SW application
and
was permitted. In addition, the nutrient removal rate for the BMPs proposed
have more than met the 30~ minimum removal requirement for this project.
Scott Vinson
Subject: [Fwd: B/S/H Logistics]
From: Al Hodge <A1.Hodge@ncmail.net>
Date: Tue, 30 Aug 2005 14:02:10 -0400
To: Scott Vinson <scott.vinson@ncmail.net>
please handle
Al Hodge
Division of Water Quality
Surface Water Protection
Washington Regional Office
Regional Office 252-946-6481
Direct 252-948-3844
fax- 252-946-9215
Subject: B/S/H Logistics
From: John Dorney <John.Dorney@ncmail.net>
Date: Tue, 30 Aug 2005 13:51:34 -0400
To: "Hodge » Al Hodge" <A1.Hodge@ncmail.net>
please have your staff confirm that the modified Stormwater plan outlined in the
August 16 letter from Michael Rice from Bob Chiles and Associates meets the
Stormwater treatment conditions for the 401 Certification as we discussed several
weeks ago. An email will suffice. Once that occurs, i'll modify the 401. thankx
~ __
I, Content-Type: message/rfc822
[Fwd: B/S/H Logistics]
Content-Encoding: 7bit
................._........
.............._......._..... .
1 of 2 9/2/2005 3:20 PM
[Fwd: [Fwd: B/S/H Logistics]]
Content-Type: message/rfc822
B/S/H Logistics
Content-Encoding: 7bit
2 of 2 9/2/2005 3:20 PM