HomeMy WebLinkAbout20171172 Ver 1_Wetland Impact Summary Sheet Revised September 2016_20170913Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
1 13+83 RT, LT Bank Stabilization 0.006 0.001 49.000 10.000
TOTALS*:
*Rounded totals are sum of actual impacts
NOTES:
Revised 2016 09 09 SHEET 1 OF 1
WETLAND AND SURACE WATER IMPACTS SUMMARY
SURFACE WATER IMPACTSWETLAND IMPACTS
DIVISION OF HIGHWAYS
17BP.9.R.14
9/5/2017
Rowan
NC DEPARTMENT OF TRANSPORTATION
17.BP.9.R.14
28 LF of Permanent Channel Impacts due to bank stabilization were deducted to account for the existing bridge abutment.