Loading...
HomeMy WebLinkAbout20171172 Ver 1_Wetland Impact Summary Sheet Revised September 2016_20170913Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 13+83 RT, LT Bank Stabilization 0.006 0.001 49.000 10.000 TOTALS*: *Rounded totals are sum of actual impacts NOTES: Revised 2016 09 09 SHEET 1 OF 1 WETLAND AND SURACE WATER IMPACTS SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS DIVISION OF HIGHWAYS 17BP.9.R.14 9/5/2017 Rowan NC DEPARTMENT OF TRANSPORTATION 17.BP.9.R.14 28 LF of Permanent Channel Impacts due to bank stabilization were deducted to account for the existing bridge abutment.