Loading...
HomeMy WebLinkAboutSW3170601_Add Info Request_20170613Energy, Mineral & Land Resources ENVIRONMENTAL OUALITY June 13, 2017 Mr. John H. Ross, PE Eagle Engineering 2013-A Van Buren Ave. Indian Trail, NC 28079 Subject: Request for Additional Information Stormwater Permit No. SW3170601 Moore Farm Subdivision Union County Dear Mr. Ross: ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on June 6, 2017. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Revise the SCM access easements to extend to the nearest public right-of-way [General MDC 9]. These easements are not very legible on the plans. 2. Revise all pond plan views and sections to show the actual excavated depth including the 0.5' sediment storage. 3. Revise Basin #4 plans, calcs, and supplement to include the entire DA, not just the on-site area. Alternatively, the offsite area may be bypassed. 4. The side slopes on Basin #4 plan view are 2:1, but 3:1 on the section. Side slopes can be no steeper than 3:1, unless you demonstrate that soils and vegetation will remain stable on a 2:1 slope [General MDC 3]. 5. The PPE is incorrect on the riser front elevation on C-3.12. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 13, 2017, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Nothing Compares, SState of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 512 N. Salisbury Street 11612 Mail Service Center Raleigh, North Carolina 27699-1612 919 707 9200 If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number SW3170601 on all correspondence. If you have any questions concerning this matter please feel free to contact me at Robert.Pattersongncdenr.gov or (919) 807-6369. Sincerely, Robert D. Patterson, PE Environmental Engineer Stormwater Program ec: Mooresville Regional Office Melvin F. Graham — Graham Enterprises of the Carolinas, LLC Nothing Compares --,-,,- State of North Carolina Environmental Quality Energy, Mineral and land Resources 512N. Salisbury Street 1612 Mail Service Center Raleigh, North Carolina 27699-1612 919 707 9200