HomeMy WebLinkAbout20171166 Ver 1_Impact Information_201709112
2
SITE 2
NA 2011NAD 83/SHEET 1 OF 9
PERMIT DRAWING
IMPACTS PERMIT
WETLAND AND SURFACE WATER
SITE 1
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA
SIGNATURE:
SIGNATURE:
P.E.
P.E.
GRAPHIC SCALES PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:09/08/99 DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
See Sheet 1-A For Index of Sheets
3/9/2017R:\Hydraulics\PERMITS_Environmental\Drawings\Edgecombe#45_HYD_PRM_TSH_WET.dgnFkeysCONTRACT:TIP PROJECT: ARTMEN
N ASO
H
DEPT
O
F TRA SPORTTIONTATEOFNRTCAR
O
LI
NARIGHT OF WAY DATE:
LETTING DATE:
2012 STANDARD SPECIFICATIONS
Prepared for:
XXXXX, XXXX
NCDOT CONTACT
ROADWAY PROJECT DESIGN ENGINEER
PROJECT MANAGER
Prepared by:
STEPHEN C. BROWDE, PE
-L-
FUNC CLASS =
LOCAL
SUB-REGIONAL TIER17BP.4.R.6617BP.4.R.66
EDGECOMBE COUNTY
DIVISION 4
HIGHWAY
Wilson, NC 27895
509 Ward Blvd.
L. KEVIN AUSTIN, PE
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
GRADING, DRAINAGE, PAVING AND STRUCTURE
ON SR 1428 (WHITE OAK SWAMP RD.)
REPLACEMENT OF BRIDGE 45 OVER WHITE OAK SWAMP
TO NC 33TO
S
R
14
0
9
S
P
EI
GHTS CHAP
EL RD.
ADT 2013 = 260
-L- STA. 20+25.00
END STATE PROJECT 17BP.4.R.66
-L- SR 1428
(WHITE OAK SWAMP RD.)
-L- STA. 18+04.00
END BRIDGE APPROACH SLAB
-L- STA. 17+92.00
END BRIDGE
= 0.138 MILESTOTAL LENGTH STATE PROJECT 17BP.4.R.66
= 0.019 MILES LENGTH STRUCTURES STATE PROJECT 17BP.4.R.66
= 0.119 MILESLENGTH ROADWAY STATE PROJECT 17BP.4.R.66
17BP.4.R.66 PE
-L- STA. 15+00.00
BEGIN STATE PROJECT 17BP.4.R.66
-L- STA. 17+10.00
BEGIN BRIDGE APPROACH SLAB
-L- STA. 17+22.00
BEGIN BRIDGE
FEBRUARY, 2017
50 1002550
50 25 50 100
10 20510
DESIGN EXCEPTION REQUIRED FOR DESIGN SPEED AND SUPERELEVATION.
VICINITY MAP
(NOT TO SCALE)
DETOUR ROUTE (APPROXIMATE LENGTH = 8 MILES)
(BRIDGE #45)
PROJECT LOCATION
1520(BRIDGE #45)
PROJECT LOCATION
1435
1407
1428
1408
1429
1566
1409
1428
Church
Speight
Cemetery
Bulluck
High School
North Edgecombe
School
Coker-Wimberly
Church
Mt. Moriah
Wrendale Leggett
Pop.109
33
33
97
97
33
WHIT
E
O
A
K S
WA
MP
WHI
T
E OAK
S
WAMP
3
22"x34"
50 Scale
Level Overrides=On
Canon Imgen.plt
NAMES AND ADDRESSES
ADDRESSESNAMES
PROPERTY OWNERS
REFERENCE NO.
DIVISION OF HIGHWAYS
NCDOT
1
PROJECT: 17BP.4.R.66
EDGECOMBE COUNTY
SR 1428 (WHITE OAK SWAMP RD.)
OVER WHITE OAK SWAMP ON
REPLACEMENT OF BRIDGE 45
SHEET 2 OF 9
PERMIT DRAWING
WHITAKERS, NC 27891
715 WHITE OAK SWAMP RD.
PLANTATIONS, LLC
SOUTHERN PINE
2
2
1
SOUTHERN PINE PLANTATIONS, LLC
DB 1625 PG 375
DB 1583 PG 830
FOXCROFT FARMS LLC
DUBCO LLC
DUBCO LLC
DB 1547 PG 1091
DB 1547 PG 1091
S
S SS
S
GUY
GUY
GUY
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
-BL-100
-BL-101
-BL-102
60.00’EXISTING R/W
EXISTING R/W
19’ BST19’ BST19’ BST
SR 1428 WHITE OAK S
WA
MP RD
SR 1428
W
HI
TE OAK SW
AM
P RD60.00’EXISTING
R/W
EXISTING R/W
E
XIS
TI
N
G
R/WCONC RAIL CONC FOOTING
WOOD POST(TYP)CONC
CUTOVER
W/ WOOD PILES
WOODS
WOODS
TO SR 1435 AND NC 33
SR 1428
WHITE OAK SWAMP RD.04WW/HW
WOOD.06.05.0 4.0 3.0 2.025.01.00.04.0 4.04SHEET 3 OF 9
PERMIT DRAWING
4
NA 2011NAD 83/BRIDGE / ROADWAY RELATIONSHIP
FOR STRUCTURE PLANS
SEE SHEET S-1 THRU S-
PARCEL
1
EASE.
DRAIN.
PERM.
AREA
TOTAL
LT.
REMAINING
AREA
EASE.
CONST.
RIGHT OF WAY AREA DATA
NO.
PROPERTY OWNERS NAMES
EASE.
DRAIN.
TEMP.
TAKEN
AREA
RT.
REMAINING
AREA
SOUTHERN PINE PLANTATIONS, LLC
NOTE: FOR -L- PROFILE SEE SHEET 5
-L-10’10’4’-0"4’-0"TANGENTIAL BRIDGE
CURVED ROADWAY ON
(3’-0.0" TO 4’-10.0")
VAR. BRIDGE SHLD. RIGHT
399 SF
(3’-7.8" TO 4’-2.2")
VAR. BRIDGE
SHLD. LEFT
RIGHT OF WAY AREA DATA
SVC SVC
17" RIVER BIRCH
R/R SPIKE IN BASE OF
ELEV=60.23’
O/S 96.52’ RT
-BL- STA. 10+52.62
BM#1
15" SWEET GUM
R/R SPIKE IN BASE OF
ELEV=63.83’
O/S 30.30’ RT
-BL- STA. 14+61.53
BM#2
F C
FF
F
F
F
F
F
F
C
F
CCF
F
C
F
F
TYPE III
TYPE III
TYPE III
TYPE III
GRAU-350
GRAU-350
GRAU-350
GRAU-350
-L-
-L-
10
1520TYPE III
TYPE III
TYPE III
TYPE III
GRAU-350
GRAU-350
GRAU-350
GRAU-350
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
17BP.4.R.66
3/9/2017R:\Hydraulics\PERMITS_Environmental\Drawings\Edgecombe#45_HYD_PRM_PSH04_WET.dgnFkeys8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
STA. 16+74-STA. 17+09
PROP. 35 LF SBG
S
S
IN SURFACE WATER
TEMP. & PERM. IMPACT
SITE 2
STS
TS
IN SURFACE WATER
TEMP. & PERM. IMPACT
SITE 1
SITE 1
30 LF
STREAM AND WETLAND IMPACTS
IMPACTS
WATER
SURFACE
PERMANENT
PERMANENT
IMPACTS
CHANNEL
EXISTING S S SURFACE WATER
DENOTES IMPACTS IN
<0.01 AC
<0.01 AC
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
TEMPORARY
IMPACTS
CHANNEL
EXISTING
18 LF
40 LF
IMPACTS
WATER
SURFACE
TEMPORARY
<0.01 AC
<0.01 AC
58 LF<0.01 AC38 LF<0.01 ACTOTAL
SITE 2
8 LF
STA. 16+74-STA. 17+09
PROP. 35 LF SBG WHIT
E
O
A
K S
WA
MP
WHI
T
E OAK
S
WAMP
31
5"EST. 5 SY GEOTEXTILE
EST. 1 TON
CL B RIP RAP
15" RCP-IV
TB 2GI
TB 2GI15"EST. 5 SY GEOTEXTILE
EST. 1 TON
CL B RIP RAP
15" RCP-IV
TB 2GI
TB 2GI
2
2
1
SOUTHERN PINE PLANTATIONS, LLC
DB 1625 PG 375
DB 1583 PG 830
FOXCROFT FARMS LLC
DUBCO LLC
DUBCO LLC
DB 1547 PG 1091
DB 1547 PG 1091
S
S SS
S
GUY
GUY
GUY
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
-BL-100
-BL-101
-BL-102
60.00’EXISTING R/W
EXISTING R/W
19’ BST19’ BST19’ BST
SR 1428 WHITE OAK S
WA
MP RD
SR 1428
W
HI
TE OAK SW
AM
P RD60.00’EXISTING
R/W
EXISTING R/W
E
XIS
TI
N
G
R/WCONC RAIL CONC FOOTING
WOOD POST(TYP)CONC
CUTOVER
W/ WOOD PILES
WOODS
WOODS
TO SR 1435 AND NC 33
SR 1428
WHITE OAK SWAMP RD
495151525252
53535353535353545454
5
4
5454545454565656
5
65656
5656565757575757575
7
575757575858585858585858585858585858585858 585858585858585
8
5959
595959
5
9
59595 9 59595959 59595959
5959595959 5959
59
595959
59 59595959595959595959595959595959
5959595959
5959
59595959
595959
5959616161616
1
616161
6161616161
616161 616161
61
61
6
161
616161616
1
616161
61
6161616161616
1
6
1
6
1
6161616161
61
61616161
61 6161 6161616161 61616161616161
6161
61
6
162
6262626
2626262
6262626
2
6262626262
62
626262 6262 6262626262
626262626262
6262 6262 62626
2
62
62
626262626
2
62626262626262
626262
6
263 6363
63
63
63
6363636363
63
63
63636363
63636363636
3 63636363636
363 63636363636363
63
63 63636363636
46464646464646464646464646464
64646464 6
4 64646464646
4 64666
66
666
6
66666666666666666666
6
66 6666676767676767676
7676767676
7 67686868
6868
6868686
8
68686868
6869
69
69696969
69696969
69
69
69 6971717171
7171717171 717
272727272727272
7272737373737373737373747474747474747
476
767676767777 7777777778
787878787879797979818150555555555
5
55
55
555
5
5
555
5555556060606060
60606060606060
60606
0
606060606060
60
60606
0
6
060
60606060
60
6060606
06060606060
60606060606060606060
60
60
6060606060606060
60
60
60 60606060606060606060606060606060 6060
60606060606060606
06
0 606060 606060
60
606060
60606060
60
606060606060606060606060
60606060606
0606565656565
65
6565656565
6565656565
6
5 6
5
6565
65656565
656
5
6565656565656565656565
707070 7070707070707070
70707
070707
0
7
070
7
075757575
7575757575
7580808080808080.04WW/HW
WOOD.06.05.0 4.0 3.0 2.025.01.00.04.0 4.04TOTAL
SITE 1 30 LF
30 LF
STREAM AND WETLAND IMPACTS
IMPACTS
WATER
SURFACE
PERMANENT
PERMANENT
IMPACTS
CHANNEL
EXISTING S S SURFACE WATER
DENOTES IMPACTS IN
<0.01 AC
<0.01 AC
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
TEMPORARY
IMPACTS
CHANNEL
EXISTING
40 LF
40 LF
IMPACTS
WATER
SURFACE
TEMPORARY
<0.01 AC
<0.01 AC
SHEET 4 OF 9
PERMIT DRAWING
4
NA 2011NAD 83/BRIDGE / ROADWAY RELATIONSHIP
FOR STRUCTURE PLANS
SEE SHEET S-1 THRU S-
PARCEL
1
EASE.
DRAIN.
PERM.
AREA
TOTAL
LT.
REMAINING
AREA
EASE.
CONST.
RIGHT OF WAY AREA DATA
NO.
PROPERTY OWNERS NAMES
EASE.
DRAIN.
TEMP.
TAKEN
AREA
RT.
REMAINING
AREA
SOUTHERN PINE PLANTATIONS, LLC
NOTE: FOR -L- PROFILE SEE SHEET 5
-L-10’10’4’-0"4’-0"TANGENTIAL BRIDGE
CURVED ROADWAY ON
(3’-0.0" TO 4’-10.0")
VAR. BRIDGE SHLD. RIGHT
399 SF
(3’-7.8" TO 4’-2.2")
VAR. BRIDGE
SHLD. LEFT
RIGHT OF WAY AREA DATA
SVC SVC
17" RIVER BIRCH
R/R SPIKE IN BASE OF
ELEV=60.23’
O/S 96.52’ RT
-BL- STA. 10+52.62
BM#1
15" SWEET GUM
R/R SPIKE IN BASE OF
ELEV=63.83’
O/S 30.30’ RT
-BL- STA. 14+61.53
BM#2
F C
FF
F
F
F
F
F
F
C
F
CCF
F
C
F
F
TYPE III
TYPE III
TYPE III
TYPE III
GRAU-350
GRAU-350
GRAU-350
GRAU-350
-L-
-L-
10
1520TYPE III
TYPE III
TYPE III
TYPE III
GRAU-350
GRAU-350
GRAU-350
GRAU-350
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
17BP.4.R.66
3/9/2017R:\Hydraulics\PERMITS_Environmental\Drawings\Edgecombe#45_HYD_PRM_PSH04_WET_W_CONT.dgnFkeys8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
STA. 16+74-STA. 17+09
PROP. 35 LF SBG
S
S
IN SURFACE WATER
TEMP. & PERM. IMPACT
SITE 2
STS
TS
IN SURFACE WATER
TEMP. & PERM. IMPACT
SITE 1
SITE 1
30 LF
STREAM AND WETLAND IMPACTS
IMPACTS
WATER
SURFACE
PERMANENT
PERMANENT
IMPACTS
CHANNEL
EXISTING S S SURFACE WATER
DENOTES IMPACTS IN
<0.01 AC
<0.01 AC
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
TEMPORARY
IMPACTS
CHANNEL
EXISTING
18 LF
40 LF
IMPACTS
WATER
SURFACE
TEMPORARY
<0.01 AC
<0.01 AC
58 LF<0.01 AC38 LF<0.01 ACTOTAL
SITE 2
8 LF
STA. 16+74-STA. 17+09
PROP. 35 LF SBG WHIT
E
O
A
K S
WA
MP
WHI
T
E OAK
S
WAMP
31
5"EST. 5 SY GEOTEXTILE
EST. 1 TON
CL B RIP RAP
15" RCP-IV
TB 2GI
TB 2GI15"EST. 5 SY GEOTEXTILE
EST. 1 TON
CL B RIP RAP
15" RCP-IV
TB 2GI
TB 2GI
2
2
SITE 1
NA 2011NAD 83/SHEET 5 OF 9
PERMIT DRAWING
BUFFER IMPACTS PERMIT
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA
SIGNATURE:
SIGNATURE:
P.E.
P.E.
GRAPHIC SCALES PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:09/08/99 DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
See Sheet 1-A For Index of Sheets
3/9/2017R:\Hydraulics\PERMITS_Environmental\Drawings\Edgecombe#45_HYD_PRM_TSH_BUF.dgnFkeysCONTRACT:TIP PROJECT: ARTMEN
N ASO
H
DEPT
O
F TRA SPORTTIONTATEOFNRTCAR
O
LI
NARIGHT OF WAY DATE:
LETTING DATE:
2012 STANDARD SPECIFICATIONS
Prepared for:
XXXXX, XXXX
NCDOT CONTACT
ROADWAY PROJECT DESIGN ENGINEER
PROJECT MANAGER
Prepared by:
STEPHEN C. BROWDE, PE
-L-
FUNC CLASS =
LOCAL
SUB-REGIONAL TIER17BP.4.R.6617BP.4.R.66
EDGECOMBE COUNTY
DIVISION 4
HIGHWAY
Wilson, NC 27895
509 Ward Blvd.
L. KEVIN AUSTIN, PE
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
GRADING, DRAINAGE, PAVING AND STRUCTURE
ON SR 1428 (WHITE OAK SWAMP RD.)
REPLACEMENT OF BRIDGE 45 OVER WHITE OAK SWAMP
TO NC 33TO
S
R
14
0
9
S
P
EI
GHTS CHAP
EL RD.
ADT 2013 = 260
-L- STA. 20+25.00
END STATE PROJECT 17BP.4.R.66
-L- SR 1428
(WHITE OAK SWAMP RD.)
-L- STA. 18+04.00
END BRIDGE APPROACH SLAB
-L- STA. 17+92.00
END BRIDGE
= 0.138 MILESTOTAL LENGTH STATE PROJECT 17BP.4.R.66
= 0.019 MILES LENGTH STRUCTURES STATE PROJECT 17BP.4.R.66
= 0.119 MILESLENGTH ROADWAY STATE PROJECT 17BP.4.R.66
17BP.4.R.66 PE
-L- STA. 15+00.00
BEGIN STATE PROJECT 17BP.4.R.66
-L- STA. 17+10.00
BEGIN BRIDGE APPROACH SLAB
-L- STA. 17+22.00
BEGIN BRIDGE
FEBRUARY, 2017
50 1002550
50 25 50 100
10 20510
DESIGN EXCEPTION REQUIRED FOR DESIGN SPEED AND SUPERELEVATION.
VICINITY MAP
(NOT TO SCALE)
DETOUR ROUTE (APPROXIMATE LENGTH = 8 MILES)
(BRIDGE #45)
PROJECT LOCATION
1520(BRIDGE #45)
PROJECT LOCATION
1435
1407
1428
1408
1429
1566
1409
1428
Church
Speight
Cemetery
Bulluck
High School
North Edgecombe
School
Coker-Wimberly
Church
Mt. Moriah
Wrendale Leggett
Pop.109
33
33
97
97
33
STA. 16+74-STA. 17+09
PROP. 35 LF SBG WHIT
E
O
A
K S
WA
MP
WHI
T
E OAK
S
WAMP
3
2
2
1
SOUTHERN PINE PLANTATIONS, LLC
DB 1625 PG 375
DB 1583 PG 830
FOXCROFT FARMS LLC
DUBCO LLC
DUBCO LLC
DB 1547 PG 1091
DB 1547 PG 1091
S
S SS
S
GUY
GUY
GUY
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
-BL-100
-BL-101
-BL-102
60.00’EXISTING R/W
EXISTING R/W
19’ BST19’ BST19’ BST
SR 1428 WHITE OAK S
WA
MP RD
SR 1428
W
HI
TE OAK SW
AM
P RD60.00’EXISTING
R/W
EXISTING R/W
E
XIS
TI
N
G
R/WCONC RAIL CONC FOOTING
WOOD POST(TYP)CONC
CUTOVER
W/ WOOD PILES
WOODS
WOODS
TO SR 1435 AND NC 33
SR 1428
WHITE OAK SWAMP RD
-L- STA. 17+92.00
END BRIDGE
-L- STA. 18+04.00
END APPROACH SLAB
-L- STA. 17+22.00
BEGIN BRIDGE
-L- STA. 17+10.00
BEGIN APPROACH SLAB
.04WW/HW
WOOD.06.05.0 4.0 3.0 2.025.01.00.04.0 4.04SHEET 6 OF 9
BUFFER DRAWING
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
TOTAL
SITE 1
IMPACTS
ZONE #1
BUFFER
1195 SF
IMPACTS
ZONE #2
BUFFER
1195 SF 629 SF
629 SF
BUFFER IMPACTS
4
NA 2011NAD 83/BRIDGE / ROADWAY RELATIONSHIP
FOR STRUCTURE PLANS
SEE SHEET S-1 THRU S-
PARCEL
1
EASE.
DRAIN.
PERM.
AREA
TOTAL
LT.
REMAINING
AREA
EASE.
CONST.
RIGHT OF WAY AREA DATA
NO.
PROPERTY OWNERS NAMES
EASE.
DRAIN.
TEMP.
TAKEN
AREA
RT.
REMAINING
AREA
SOUTHERN PINE PLANTATIONS, LLC
NOTE: FOR -L- PROFILE SEE SHEET 5
-L-10’10’4’-0"4’-0"TANGENTIAL BRIDGE
CURVED ROADWAY ON
(3’-0.0" TO 4’-10.0")
VAR. BRIDGE SHLD. RIGHT
399 SF
(3’-7.8" TO 4’-2.2")
VAR. BRIDGE
SHLD. LEFT
RIGHT OF WAY AREA DATA
SVC SVC
17" RIVER BIRCH
R/R SPIKE IN BASE OF
ELEV=60.23’
O/S 96.52’ RT
-BL- STA. 10+52.62
BM#1
15" SWEET GUM
R/R SPIKE IN BASE OF
ELEV=63.83’
O/S 30.30’ RT
-BL- STA. 14+61.53
BM#2
F C
FF
F
F
F
F
F
F
C
F
CCF
F
C
F
F
TYPE III
TYPE III
TYPE III
TYPE III
GRAU-350
GRAU-350
GRAU-350
GRAU-350
-L-
-L-
10
1520TYPE III
TYPE III
TYPE III
TYPE III
GRAU-350
GRAU-350
GRAU-350
GRAU-350
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
17BP.4.R.66
3/9/2017R:\Hydraulics\PERMITS_Environmental\Drawings\Edgecombe#45_HYD_PRM_PSH04_BUF.dgnFkeys8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
STA. 16+74-STA. 17+09
PROP. 35 LF SBG
BUFFER IMPACTS
SITE 1
STA. 16+74-STA. 17+09
PROP. 35 LF SBG WHIT
E
O
A
K S
WA
MP
WHI
T
E OAK
S
WAMP
31
5"EST. 5 SY GEOTEXTILE
EST. 1 TON
CL B RIP RAP
15" RCP-IV
TB 2GI
TB 2GI15"EST. 5 SY GEOTEXTILE
EST. 1 TON
CL B RIP RAP
15" RCP-IV
TB 2GI
TB 2GI
2
2
1
SOUTHERN PINE PLANTATIONS, LLC
DB 1625 PG 375
DB 1583 PG 830
FOXCROFT FARMS LLC
DUBCO LLC
DUBCO LLC
DB 1547 PG 1091
DB 1547 PG 1091
S
S SS
S
GUY
GUY
GUY
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
-BL-100
-BL-101
-BL-102
60.00’EXISTING R/W
EXISTING R/W
19’ BST19’ BST19’ BST
SR 1428 WHITE OAK S
WA
MP RD
SR 1428
W
HI
TE OAK SW
AM
P RD60.00’EXISTING
R/W
EXISTING R/W
E
XIS
TI
N
G
R/WCONC RAIL CONC FOOTING
WOOD POST(TYP)CONC
CUTOVER
W/ WOOD PILES
WOODS
WOODS
TO SR 1435 AND NC 33
SR 1428
WHITE OAK SWAMP RD
495151525252
53535353535353545454
5
4
5454545454565656
5
65656
5656565757575757575
7
575757575858585858585858585858585858585858 585858585858585
8
5959
595959
5
9
59595 9 59595959 59595959
5959595959 5959
59
595959
59 59595959595959595959595959595959
5959595959
5959
59595959
595959
5959616161616
1
616161
6161616161
616161 616161
61
61
6
161
616161616
1
616161
61
6161616161616
1
6
1
6
1
6161616161
61
61616161
61 6161 6161616161 61616161616161
6161
61
6
162
6262626
2626262
6262626
2
6262626262
62
626262 6262 6262626262
626262626262
6262 6262 62626
2
62
62
626262626
2
62626262626262
626262
6
263 6363
63
63
63
6363636363
63
63
63636363
63636363636
3 63636363636
363 63636363636363
63
63 63636363636
46464646464646464646464646464
64646464 6
4 64646464646
4 64666
66
666
6
66666666666666666666
6
66 6666676767676767676
7676767676
7 67686868
6868
6868686
8
68686868
6869
69
69696969
69696969
69
69
69 6971717171
7171717171 717
272727272727272
7272737373737373737373747474747474747
476
767676767777 7777777778
787878787879797979818150555555555
5
55
55
555
5
5
555
5555556060606060
60606060606060
60606
0
606060606060
60
60606
0
6
060
60606060
60
6060606
06060606060
60606060606060606060
60
60
6060606060606060
60
60
60 60606060606060606060606060606060 6060
60606060606060606
06
0 606060 606060
60
606060
60606060
60
606060606060606060606060
60606060606
0606565656565
65
6565656565
6565656565
6
5 6
5
6565
65656565
656
5
6565656565656565656565
707070 7070707070707070
70707
070707
0
7
070
7
075757575
7575757575
7580808080808080-L- STA. 17+92.00
END BRIDGE
-L- STA. 18+04.00
END APPROACH SLAB
-L- STA. 17+22.00
BEGIN BRIDGE
-L- STA. 17+10.00
BEGIN APPROACH SLAB
.04WW/HW
WOOD.06.05.0 4.0 3.0 2.025.01.00.04.0 4.04SHEET 7 OF 9
BUFFER DRAWING
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
TOTAL
SITE 1
IMPACTS
ZONE #1
BUFFER
1195 SF
IMPACTS
ZONE #2
BUFFER
1195 SF 629 SF
629 SF
BUFFER IMPACTS
4
NA 2011NAD 83/BRIDGE / ROADWAY RELATIONSHIP
FOR STRUCTURE PLANS
SEE SHEET S-1 THRU S-
PARCEL
1
EASE.
DRAIN.
PERM.
AREA
TOTAL
LT.
REMAINING
AREA
EASE.
CONST.
RIGHT OF WAY AREA DATA
NO.
PROPERTY OWNERS NAMES
EASE.
DRAIN.
TEMP.
TAKEN
AREA
RT.
REMAINING
AREA
SOUTHERN PINE PLANTATIONS, LLC
NOTE: FOR -L- PROFILE SEE SHEET 5
-L-10’10’4’-0"4’-0"TANGENTIAL BRIDGE
CURVED ROADWAY ON
(3’-0.0" TO 4’-10.0")
VAR. BRIDGE SHLD. RIGHT
399 SF
(3’-7.8" TO 4’-2.2")
VAR. BRIDGE
SHLD. LEFT
RIGHT OF WAY AREA DATA
SVC SVC
17" RIVER BIRCH
R/R SPIKE IN BASE OF
ELEV=60.23’
O/S 96.52’ RT
-BL- STA. 10+52.62
BM#1
15" SWEET GUM
R/R SPIKE IN BASE OF
ELEV=63.83’
O/S 30.30’ RT
-BL- STA. 14+61.53
BM#2
F C
FF
F
F
F
F
F
F
C
F
CCF
F
C
F
F
TYPE III
TYPE III
TYPE III
TYPE III
GRAU-350
GRAU-350
GRAU-350
GRAU-350
-L-
-L-
10
1520TYPE III
TYPE III
TYPE III
TYPE III
GRAU-350
GRAU-350
GRAU-350
GRAU-350
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
17BP.4.R.66
3/9/2017R:\Hydraulics\PERMITS_Environmental\Drawings\Edgecombe#45_HYD_PRM_PSH04_BUF_W_CONT.dgnFkeys8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
STA. 16+74-STA. 17+09
PROP. 35 LF SBG
BUFFER IMPACTS
SITE 1
STA. 16+74-STA. 17+09
PROP. 35 LF SBG WHIT
E
O
A
K S
WA
MP
WHI
T
E OAK
S
WAMP
31
5"EST. 5 SY GEOTEXTILE
EST. 1 TON
CL B RIP RAP
15" RCP-IV
TB 2GI
TB 2GI15"EST. 5 SY GEOTEXTILE
EST. 1 TON
CL B RIP RAP
15" RCP-IV
TB 2GI
TB 2GI
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural SiteStation Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo.(From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)SITE #1-L- 16+75 LT0.001 0.001 8.00 18.000SITE #2-L-17+570.001 0.010 30 40TOTALS*:0.00 0.00 0.00 0.00 0.00 38 58*Rounded totals are sum of actual impactsNOTES:Revised 2013 10 24SHEET 7 OF 93/10/2017EDGECOMBE COUNTYNC DEPARTMENT OF TRANSPORTATION17BP.4.R.66 (#45) WETLAND PERMIT IMPACT SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTSDIVISION OF HIGHWAYS15" RCP OutletClass B RipRap2 @ 35' - 21"Cored Slab Bridge
ROAD CROSSING BRIDGEPARALLEL IMPACTZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)SITE 1L 12+95 to 13+85X1195 629 1824TOTAL:1195 629 18242 @ 35' 21" CORED SLAB BRIDGE3/10/2017BUFFER IMPACTS SUMMARYTYPESITE NO.STRUCTURE SIZE / TYPESTATION (FROM/TO)DIVISION OF HIGHWAYSBUFFER REPLACEMENTIMPACT MITIGABLEEDGECOMBE COUNTYNC DEPARTMENT OF TRANSPORTATIONALLOWABLE3/10/2017 SHEET 9 OF 9 17BP.4.R.66 (#45)Rev May 2006