HomeMy WebLinkAbout20171165 Ver 1_Build Maps_20170911(Version 2.06; Released June 2016)46084.1.1TIP No.:B-5369County(ies):Cabarrus Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future: Year:2025Existing: Year:Aquatic T&E Species?NoComments:Yes NoNoWetlands within Project Limits?NoneNoneSupplemental Classification: NoneForest, agricultural, and rural residentialCold Water Creek13-17-9-4-(1.5)0.70.179 MilesProject DescriptionProposed ProjectYadkin-Pee DeeRiver Basin(s): City/Town:1.1Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Nobzerman@ncdot.govAddress:8/7/2017CabarrusBill ZermanRaleigh, NC 27610WBS Element:Bridge ReplacementWBS Element:Reid B. Robol, PE - Ecological EngineeringNCDOT Contact:919-707-6755Suite 101Cary, NC 27518Contractor / Designer:919-557-09291151 SE Cary ParkwayNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:1020 Birch Ridge DriveAddress:General Project InformationB-536946084.1.1Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)State project B-5369 involves the replacement of the existing NCDOT Bridge #120053 on SR 2114 over Cold Water Creek. Bridge #120053 consists of 1@30'-3", 2@30'-0", 1@30'-3" steel plank deck on I-beams on steel caps and timber piles. Piped stormwater outfalls are proposed which will outlet a distance from the stream in order to minimize disturbance to the stream. Rip Rad pads will be utilized to dissipate the energy. No deck drains are required for the proposed bridge. Rip rap lined roadside ditches are proposed in order to aid in stabilization and to regulate velocity. Replacement bridge will be a 45" PSCG 1@80', 1@55' structure with no bents in the stream.N/ABuffer Rules in Effect:None27002 @ 12 ft lanes, 9.5 ft shoulders, with total bridge width of 43 ft and total bridge length of 135 ft.Waterbody Information2010NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Bodyac.2 @ 9.5 ft lanes, 2.5 ft shoulders, with a total bridge width of 24 ft and total bridge length of 121 ft.5000rrobol@ecologicaleng.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NoDeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)
WETLAND AND SURFACE WATER IMPACTS PERMIT
SHEET 1 OF 5
PERMIT DRAWING
25 50 10050
25 50 10050
5 10 2010
K
D
T
V
=
=
=
=
=
=
3,005
3,825
9
60
5
45
%
%
MPH
ADT
ADT
2018
2038
% *
DUAL =4%)
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
* (TTST =1%
FUNC CLASS =
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA
SIGNATURE:
SIGNATURE:
P.E.
P.E.
GRAPHIC SCALES PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
4:53:18 PMR:\Hydraulics\PERMITS_Environmental\Drawings\B-5369_Hyd_prm_TSH.dgnericbergerCONTRACT:TIP PROJECT:ARTMEN
N ASO
H
DEPT
O
F TRA SPORTTIONTATEOFNRTCAR
O
LI
NASUB-REGIONAL TIER
=
=
=0.179 MILES
0.026 MILES
0.153 MILESLENGTH OF ROADWAY TIP PROJECT B-5369
LENGTH OF STRUCTURE TIP PROJECT B-5369
TOTAL LENGTH OF TIP PROJECT B-5369
RIGHT OF WAY DATE:
LETTING DATE:
Prepared in the Office of:
DIVISION OF HIGHWAYS
2012 STANDARD SPECIFICATIONS
PROJECT ENGINEER
KC I
http://www.kci.com
NCDOT CONTACT:
Plans Prepared For:
Raleigh NC, 27610
1000 Birch Ridge Dr.
PROJECT DESIGN ENGINEER
Fax (919) 783-9266
Phone (919) 783-9214
Raleigh, NC 27609
Landmark Center II, Suite 220
4601 Six Forks Road
KCI Associates of N.C., P.A.
BARRY C. SMITH, P.E.
DEWAYNE L. SYKES, P.E.B-5369 See Sheet 1A For Index of Sheets
B-5369
46084.1.1 BRSTP-2114(1) P.E.
CABARRUS COUNTY
BRIDGE NO. 53 OVER COLD WATER CREEK
ON SR 2114 (CENTERGROVE ROAD)
GRADING, DRAINAGE, PAVING, AND STRUCTURE
4
VICINITY MAP
See Sheet 1C-1 for Survey Control Sheet
See Sheet 1B for Conventional Symbols
SITE
PROJECT
INTERSTATE
INTERSTATE
601
Julia Rd
Camp
Rd
Centergrove
Blvd
Earnhardt
Dale
Rd
Texas
Little
601
85
853
Ave.
Midlake
Dr.
Sunrise
Lake Rd
Hilton
Rd
Brantley
St
Lane
Rd
Grove
China
Concord Rd
Salisbury-
DETOUR ROUTE
-L- STA. 18+30.00
BEGIN BRIDGE
-L- POT STA. 14+25.00
BEGIN STATE TIP PROJECT B-5369
-L- STA. 19+65.00
END BRIDGE
-L-COLD WATER CREEK-L- POC STA. 23+70.00
END STATE TIP PROJECT B-5369
CENTERGROVE ROADSR 2114
TO MIDLAKE AVE.
TO CAMP JULIA RD
MARCH 17, 2017
MARCH 20, 2018
NOTE:
2. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD __.
1. THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE CITY OF KANNAPOLIS.
COLLECTOR
MAJOR
(919) 557-0929
Cary, NC 27518
Suite 101
1151 SE Cary Parkway
NC FIRM LICENSE No: F-1148
THAD DUNCAN, PE
PROJECT DESIGN ENGINEER - ROADWAY DESIGN
-DR2-
-DR3-
-DR4-
-DR5-
-DR2- STA. 11+25.00
END CONSTRUCTION
-DR3- STA. 11+08.00
END CONSTRUCTION -DR5- STA. 10+57.00
END CONSTRUCTION
-DR4- STA. 10+60.00
END CONSTRUCTION
25% APPROVED PLANS
Lake
Concord LakeFisherConcordLake3
.12.48
1.28.56.99.86.41.20ColdWaterCreek63
2119
2114
2198
2126
2154
2118
2116
2000 2180
2202
2114
1002
Cabarrus / Rowan County Line
City Limits
Kannapolis
N
A 2011
N
AD 83/
GRAPHIC SCALE
0'100'50'
SITE 1
SITE 1
0'50'25'
INSET GRAPHIC SCALE
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SHEET 2 OF 5
PERMIT DRAWING
A
A
SECTION A-A
152025TYPE-III
GRAU 350 TL-2
TYPE-III
TYPE-III
TYPE-III
GRAU 350 TL-2
EXIST.000102020201000102EXIST.TL-2
GRAU 350
050403020100EXIST.03
EXIST.
EXIST.
TL-2
GRAU 350 030405060703DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4B-5369 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Fax (919) 783-9266
KC I
Engineers Planners Scientists Construction Managers
4601 Six Forks Road, Landmark Center II, Suite 220
Raleigh, NC 27609-5210
Phone (919) 783-9214http://www.kci.com
RELATIONSHIP OF BRIDGE TO PROPOSED PAVEMENT (1" = 50')
-L- STA. 19+76.00
-L- STA. 18+19.00
N
AD 83/ N
A 2011
(919) 557-0929
Cary, NC 27518
Suite 101
1151 SE Cary Parkway
NC FIRM LICENSE No: F-1148
UNLESS OTHERWISE STATED.
NOTE: ALL DRIVEWAY RADII ARE 10'FOR -L- PROFILE, SEE SHEET 5
FOR STRUCTURE PLANS, SEE SHEETS S-1 TO S-?
FOR -DR2-, -DR3-, -DR4-, -DR5- PROFILE, SEE SHEET 6
END APPROACH SLAB
BEGIN APPROACH SLAB
-DR4--
D
R5-EXIST.01
+50
02R=5'
5'036'04
R=12'
04
03
16'+32
02
12'+42
01
EXIST.
10'I
N
C.
-DR4- & -DR5- DETAIL INSET (1" = 20')
10'I
N
C.
2
3
4
5
6
7
8
1
50'50'vv18" RCP
18" RCP
18" RCP
18" CMPRCP
24"
PVC 24" RCP18" RCP
18" RCP 18" RCP
36" CMP
18" RCPINV=655.66'
INV=658.00'
INV=657.94'
DI
15" RCP
ABAND
S
S
2 S F D
GR
2 S F D
1 S BK D
GR
GR
2 S F D 1 S F BUS
1 S F D
POLE
FLAG
3
9
10
11
13
14
15
16
17
19
21 22
24
25 26
2745
6 7
8
18
20 23
DISHSATELLITE
POND
CONCRETE PIERS
WDBST
C
O
NC
BS
TEXISTING R/W
EXISTING R/W
POND
-EL-
TOU ZER HANG
XIA VANG HANG and husband
DB 8657 PG 144
SANG PARK
DB 6724 PG 168
PHYLLIS P. COLEMAN
FELTON G. COLEMAN and wife
DB 8316 PG 321
ROSALYN LANHAM
WILL 03-E-430
DB 646 PG 212
DB 369 PG 145
EVELYN M. CAUBLE
RUFUS M. CAUBLE and wife
CHARLES WILLARD BOSTICK
WILL 92-E-793
DB 443 PG 370
MELISSA BOST KEEVER
DEAN ALFRED KEEVER and wife
DB 605 PG 811
22.0' PAVED ROADWAY
CENTERGROVE ROADSR 2114
CENTERGROVE ROAD
SR 2114
22.0' PAVED ROADWAY
60'100'BAPTIST CHURCH
CONCORD LAKE
DB 293 PG 80
+35
-L-
EXIST.0718" RCP
18" RCP
GR
25WD
C
O
NCREMOVERETAIN( Not to Scale)
SPECIAL LATERAL 'V' DITCH
D
d 2:1FROM STA. 22+15 TO STA. 24+00 -L- RT
FROM STA. 21+05 TO STA. 21+30 -L- RT
FROM STA. 20+00 TO STA. 20+50 -L- RT
DETAIL 5
Max. d= 1.5 Ft.
Min. D= 1.5 Ft.
Type of Liner= Class B Rip-Rap
Slope
Fill
Flatter3:1 or
Ground
Natural
Geotextile
SEE DETAIL 1
TOE PROTECTION
SEE DETAIL 2
LATERAL BASE DITCH
18" RCP-IV SEE DETAIL 3
EMBANKMENT
RIP RAP AT
18"
18"
2GI
2GI
W/ELBOWS
15" CSP
0401
0402
0403
0404
0405
0406
0407
0408
0409
0410 0411
0412
EST 14 SY GEOTEXTILE
EST 5 TONS
CLASS B RIP RAP
REMOVE
REMOVE REMOVE
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM STA. 18+91 TO STA. 19+10 -L- LT
FROM STA. 18+50 TO STA. 18+73 -L- LT
DETAIL 3
Grade
Ditch 2'
GEOTEXTILE
Geotextile= 48 sy
Type of Liner= 38 TONS,Class II Rip-Rap
10'min.
1.0'min.
18"
REMOVE REMOVE
RETAIN SYSTEM 2:12:1
D
( Not to Scale)
STANDARD 'V' DITCH
FROM STA. 15+62 TO STA. 16+06 -L- RT
Min. D= 1.0 FT
DETAIL 6
Ground
Natural
Ground
Natural
SLOPE = 0.3%
EST DDE = 9 CY
SEE DETAIL 6
STANDARD V DITCH
24"
SEE DETAIL 4
SPECIAL CUT BASE DITCH
24"
24"
2GI-D
2GI-D 15"
EST 5 SY GEOTEXTILE
EST 1 TONS
CLASS B RIP RAP
0413
0414
0415ELBELB
RCP-IV
15"
RCP-IV
15"
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM STA 15+25 TO STA 16+05 L LT
DETAIL 1
Geotextile = 60 SY
Type of Liner= 42 TONS, Class I Rip-Rap
d=1.5 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
( Not to Scale)
LATERAL BASE DITCH
2:1D
B
b
d
2:1 1"/Ft.
FROM STA 16+00 TO STA 18+50 L LT.
DETAIL 2
b=5.0 Ft.
B=3.0 Ft.
Max. d=1.0 Ft.
Min. D=1.5 Ft.
*When B is < 6.0'
Geotextile = 208 SY
Type of Liner= 147 TONS, Class I Rip-Rap
Ground
Natural
Slope
Fill
GEOTEXTILE
Est DDE = 165 TONS
d
2:
1
B
D
( Not to Scale)
SPECIAL CUT BASE DITCH
Flatter2:1 or
FROM STA. 19+10 TO STA. 24+00 -L- LT
DETAIL 4
B= 2.0 Ft.
Max. d= 1.5 Ft.
Min. D= 1.5 Ft.
Geotextile = 550 SY
Type of Liner= 390 TONS, Class I Rip-Rap
Ground
Natural
Ditch
Slope
Front
Geotextile
EST 45 SY GEOTEXTILE
EST 20 TONS
CLASS B RIP RAP
SEE DETAIL 5
'V' DITCH
SPECIAL LATERAL
EST 22 SY GEOTEXTILE
EST 10 TONS
CLASS B RIP RAP
SEE DETAIL 5
SPECIAL LATERAL 'V' DITCH
EST 166 SY GEOTEXTILE
EST 75 TONS
CLASS B RIP RAP
SEE DETAIL 5
SPECIAL LATERAL 'V' DITCH
TB 2GI
TYPE-III TYPE-III
EST 14 SY GEOTEXTILE
EST 5 TONS
CLASS B RIP RAP
CONCRETE PIERS
DETAIL 7
(NOT TO SCALE)
1.5:11.5:11.0'
CLASS B RIP RAP
CLASS II RIP RAP
TEMPORARY CAUSEWAY
GEOTEXTILE
SEE DETAIL 7
TEMPORARY CAUSEWAY
MIN ELEV=605.0'
STREAM
STREAM
F
C
F
F
F
F
F
C
C
F
CF
F
C
C
C
F
FF FF
F
F
F
F
F
F
F
C
C
FF
F
C
C
C
C
C
F
F
F
F
F
F
C
C
F
GRAPHIC SCALE
0'100'50'
SITE 1
SITE 1
0'50'25'
INSET GRAPHIC SCALE
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SHEET 3 OF 5
PERMIT DRAWING
A
A
SECTION A-A
600605605605605
605
6056106106106106106106156156156156156
1
5
6156156
1
5
6
2
0
620620620620
620
625
625625625625625625630630630630630
630
6
3
0 630630630635635635635635
6356
3
5 635635635
635
635
6406406406406
4
0
640640640640640640
645
645645645645645645645
645
645
650
6506506506506506506
5
0 650650650655655655655655655655
655655655655655
6606606606606606606606606606
6
0 660660
6656656656656656
6
5
665665670670 670670670
6
7
0
670
6756756756
7
5675675 675680680680680685685152025TYPE-III
GRAU 350 TL-2
TYPE-III
TYPE-III
TYPE-III
GRAU 350 TL-2
EXIST.000102020201000102EXIST.TL-2
GRAU 350
050403020100EXIST.03
EXIST.
EXIST.
TL-2
GRAU 350 030405060703DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4B-5369 8:17:42 AMR:\Hydraulics\PERMITS_Environmental\Drawings\B-5369_Hyd_prm_PSH04_con.dgnreidrobol8/17/99INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Fax (919) 783-9266
KC I
Engineers Planners Scientists Construction Managers
4601 Six Forks Road, Landmark Center II, Suite 220
Raleigh, NC 27609-5210
Phone (919) 783-9214http://www.kci.com
RELATIONSHIP OF BRIDGE TO PROPOSED PAVEMENT (1" = 50')
-L- STA. 19+76.00
-L- STA. 18+19.00
N
AD 83/ N
A 2011
(919) 557-0929
Cary, NC 27518
Suite 101
1151 SE Cary Parkway
NC FIRM LICENSE No: F-1148
UNLESS OTHERWISE STATED.
NOTE: ALL DRIVEWAY RADII ARE 10'FOR -L- PROFILE, SEE SHEET 5
FOR STRUCTURE PLANS, SEE SHEETS S-1 TO S-?
FOR -DR2-, -DR3-, -DR4-, -DR5- PROFILE, SEE SHEET 6
END APPROACH SLAB
BEGIN APPROACH SLAB
-DR4--
D
R5-EXIST.01
+50
02R=5'
5'036'04
R=12'
04
03
16'+32
02
12'+42
01
EXIST.
10'I
N
C.
-DR4- & -DR5- DETAIL INSET (1" = 20')
10'I
N
C.
2
3
4
5
6
7
8
1
50'50'vv18" RCP
18" RCP
18" RCP
18" CMPRCP
24"
PVC 24" RCP18" RCP
18" RCP 18" RCP
36" CMP
18" RCPINV=655.66'
INV=658.00'
INV=657.94'
DI
15" RCP
ABAND
S
S
2 S F D
GR
2 S F D
1 S BK D
GR
GR
2 S F D 1 S F BUS
1 S F D
POLE
FLAG
3
9
10
11
13
14
15
16
17
19
21 22
24
25 26
2745
6 7
8
18
20 23
DISHSATELLITE
POND
CONCRETE PIERS
WDBST
C
O
NC
BS
TEXISTING R/W
EXISTING R/W
POND
-EL-
TOU ZER HANG
XIA VANG HANG and husband
DB 8657 PG 144
SANG PARK
DB 6724 PG 168
PHYLLIS P. COLEMAN
FELTON G. COLEMAN and wife
DB 8316 PG 321
ROSALYN LANHAM
WILL 03-E-430
DB 646 PG 212
DB 369 PG 145
EVELYN M. CAUBLE
RUFUS M. CAUBLE and wife
CHARLES WILLARD BOSTICK
WILL 92-E-793
DB 443 PG 370
MELISSA BOST KEEVER
DEAN ALFRED KEEVER and wife
DB 605 PG 811
22.0' PAVED ROADWAY
CENTERGROVE ROADSR 2114
CENTERGROVE ROAD
SR 2114
22.0' PAVED ROADWAY
60'100'BAPTIST CHURCH
CONCORD LAKE
DB 293 PG 80
+35
-L-
EXIST.0718" RCP
18" RCP
GR
25WD
C
O
NC6
35635 640640REMOVERETAIN( Not to Scale)
SPECIAL LATERAL 'V' DITCH
D
d 2:1FROM STA. 22+15 TO STA. 24+00 -L- RT
FROM STA. 21+05 TO STA. 21+30 -L- RT
FROM STA. 20+00 TO STA. 20+50 -L- RT
DETAIL 5
Max. d= 1.5 Ft.
Min. D= 1.5 Ft.
Type of Liner= Class B Rip-Rap
Slope
Fill
Flatter3:1 or
Ground
Natural
Geotextile
SEE DETAIL 1
TOE PROTECTION
SEE DETAIL 2
LATERAL BASE DITCH
18" RCP-IV SEE DETAIL 3
EMBANKMENT
RIP RAP AT
18"
18"
2GI
2GI
W/ELBOWS
15" CSP
0401
0402
0403
0404
0405
0406
0407
0408
0409
0410 0411
0412
EST 14 SY GEOTEXTILE
EST 5 TONS
CLASS B RIP RAP
REMOVE
REMOVE REMOVE
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM STA. 18+91 TO STA. 19+10 -L- LT
FROM STA. 18+50 TO STA. 18+73 -L- LT
DETAIL 3
Grade
Ditch 2'
GEOTEXTILE
Geotextile= 48 sy
Type of Liner= 38 TONS,Class II Rip-Rap
10'min.
1.0'min.
18"
REMOVE REMOVE
RETAIN SYSTEM 2:12:1
D
( Not to Scale)
STANDARD 'V' DITCH
FROM STA. 15+62 TO STA. 16+06 -L- RT
Min. D= 1.0 FT
DETAIL 6
Ground
Natural
Ground
Natural
SLOPE = 0.3%
EST DDE = 9 CY
SEE DETAIL 6
STANDARD V DITCH
24"
SEE DETAIL 4
SPECIAL CUT BASE DITCH
24"
24"
2GI-D
2GI-D 15"
EST 5 SY GEOTEXTILE
EST 1 TONS
CLASS B RIP RAP
0413
0414
0415ELBELB
RCP-IV
15"
RCP-IV
15"
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM STA 15+25 TO STA 16+05 L LT
DETAIL 1
Geotextile = 60 SY
Type of Liner= 42 TONS, Class I Rip-Rap
d=1.5 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
( Not to Scale)
LATERAL BASE DITCH
2:1D
B
b
d
2:1 1"/Ft.
FROM STA 16+00 TO STA 18+50 L LT.
DETAIL 2
b=5.0 Ft.
B=3.0 Ft.
Max. d=1.0 Ft.
Min. D=1.5 Ft.
*When B is < 6.0'
Geotextile = 208 SY
Type of Liner= 147 TONS, Class I Rip-Rap
Ground
Natural
Slope
Fill
GEOTEXTILE
Est DDE = 165 TONS
d
2:
1
B
D
( Not to Scale)
SPECIAL CUT BASE DITCH
Flatter2:1 or
FROM STA. 19+10 TO STA. 24+00 -L- LT
DETAIL 4
B= 2.0 Ft.
Max. d= 1.5 Ft.
Min. D= 1.5 Ft.
Geotextile = 550 SY
Type of Liner= 390 TONS, Class I Rip-Rap
Ground
Natural
Ditch
Slope
Front
Geotextile
EST 45 SY GEOTEXTILE
EST 20 TONS
CLASS B RIP RAP
SEE DETAIL 5
'V' DITCH
SPECIAL LATERAL
EST 22 SY GEOTEXTILE
EST 10 TONS
CLASS B RIP RAP
SEE DETAIL 5
SPECIAL LATERAL 'V' DITCH
EST 166 SY GEOTEXTILE
EST 75 TONS
CLASS B RIP RAP
SEE DETAIL 5
SPECIAL LATERAL 'V' DITCH
TB 2GI
TYPE-III TYPE-III
EST 14 SY GEOTEXTILE
EST 5 TONS
CLASS B RIP RAP
CONCRETE PIERS
610615DETAIL 7
(NOT TO SCALE)
1.5:11.5:11.0'
CLASS B RIP RAP
CLASS II RIP RAP
TEMPORARY CAUSEWAY
GEOTEXTILE
SEE DETAIL 7
TEMPORARY CAUSEWAY
MIN ELEV=605.0'
STREAM
STREAM
F
C
F
F
F
F
F
C
C
F
CF
F
C
C
C
F
FF FF
F
F
F
F
F
F
F
C
C
FF
F
C
C
C
C
C
F
F
F
F
F
F
C
C
F
550
560
570
580
590
600
610
620
630
640
650
660
670
680
690
700
550
560
570
580
590
600
610
620
630
640
650
660
670
680
690
700
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION5/14/99SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
5 B-5369 4:52:27 PMR:\Hydraulics\PERMITS_Environmental\Drawings\B5369_Hyd_pfl_5_Permit.dgnericbergerDOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00
-L-
FOR -L- ALIGNMENT, SEE SHEET 4
FOR STRUCTURE PLANS, SEE SHEETS S-1 TO S-?
Fax (919) 783-9266
KC I
Engineers Planners Scientists Construction Managers
4601 Six Forks Road, Landmark Center II, Suite 220
Raleigh, NC 27609-5210
Phone (919) 783-9214http://www.kci.com
-L- STA. 17+65.75, 25.85' RT
EL = 618.97'
(919) 557-0929
Cary, NC 27518
Suite 101
1151 SE Cary Parkway
NC FIRM LICENSE No: F-1148
BM #2 - PP SPIKE SET IN BASE OF POWER POLE
CAUSEWAY
TEMPORARY
SHEET 4 OF 5
PERMIT DRAWING
AT ELEV=605.0'
FROM EXISTING BENT
EXTEND CAUSEWAY 5.0'
PI = 17+30.00
EL = 618.08'
(-
)7.8098%
(+)4.6339%
VC = 605'
K = 49
PI = 22+00.00
EL = 639.86'
(+)4.6339%
(+)9.8297%
VC = 335'
K = 65
BEGIN GRADE -L- STA 14+25.00DS = 35mph
DS = 40mph
ELEV. 641.90'ELEV. 656.57'END GRADE -L- STA 23+70.00BEGIN BRIDGE -L- STA 18+30.00END BRIDGE -L- STA 19+65.00LOW POINT -L- STA 18+07.20(TIES TO I-3802A GRADE)1.5:11.5:1PI = 18+00.00ELEV. = 621.80STA 16+00.00 BEGIN DITCH LTPI =16+50.00ELEV = 610.50ELEV = 618.00ELEV = 604.90STA 18+50.00END DITCH LT(-)
1
1.2
0
%(-)
5
.
0
0%
(-
) 7.60%ELEV = 607.90STA 19+10.00BEGIN DITCH LTELEV = 615.40ELEV = 622.50ELEV = 645.00ELEV = 648.00ELEV = 655.50PI = 19+50.00PI = 20+00.00PI = 22+50.00PI = 23+00.00PI = 23+70.00(+) 14.20%(+) 18.75%
(+) 4.00%ELEV = 622.80STA 20+00.00BEGIN DITCH RTELEV = 624.80STA 20+50.00 END DITCH RT(+) 10.40%ELEV = 629.40STA 21+05.00BEGIN DITCH RTELEV = 632.00STA 21+30.00END DITCH RTELEV = 642.40STA 22+15.00BEGIN DITCH RTELEV = 656.35STA 24+00.00END DITCH RT(+) 7.43%(+) 6.00%
(+) 10.71%(+) 2.83%
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YR
YR
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YR
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 2800
= 25
= 611.9
= 5400
= 100
= 615.17
= 19450
= 500+
= 627.3
= 1/12/2016
= 602.6 PI =20+50.000PI =21+00.000PI =22+00.000(+) 10.40%
(+) 7.00%
(+) 4.50%(+) 7.50%ELEV = 626.25ELEV = 628.50ELEV = 635.5018" RCP-IV
PI=23+50.000El.=649.55PI=23+70.000El.=651.25(+)8.85%
(+)8.50%(+)4.95%ELEV = 652.74STA 24+00.00END DITCH LTELEV = 640.70STA 22+50.00
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 18+61/18+96 -L- LT BANK STABILIZATION < 0.01 30 1 18+80/19+05 -L- TEMPORARY CAUSEWAY 0.02 52 TOTALS*: < 0.01 0.02 30 52 0*Rounded totals are sum of actual impactsNOTES:Revised 2016 09 09SHEET 5OF 5 WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTSCabarrus CountyB-536946084.1.1NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS08/07/2017