Loading...
HomeMy WebLinkAbout20070453 Ver 2_NOV Response_2008120113 L- 8 l a-o 01 Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 www.SandEC.com November 26, 2008 S&EC Project No. 10336.PI Ms. Lauren Witherspoon Mr. Danny Smith NCDENR-DWQ NCDENR-DWQ Raleigh Regional Office NPS Assistance and Compliance Oversight 3800 Barrett Drive, Suite 101 1617 Mail Service Center Raleigh, NC 27609 Raleigh, NC 27699-1617 Reference: Panther Rock Subdivision (Cheswick) D y Notice of Violation Response DEC 1 2008 USACE Action ID SAW-2007-03283 NOV-2008-PC-0689 DENR - WATER QUALITY DWQ Project No. 07-0453, Ver. 2 WET LANDS AND STORMWATER BRANCH Wake County, NC Dear Ms. Witherspoon and Mr. Smith: As requested in your October 13, 2008 Notice of Violation (NOV), Soil & Environmental Consultants, PA (S&EC) has been engaged by Panther Rock, LLC to prepare a Stream Restoration Plan for the referenced project site. In addition, further discussions between S&EC, Panther Rock, LLC, the US Army Corps of Engineers and yourself has led to S&EC preparing this NOV response. Within the October 13, 2008 NOV, the following violations were listed and identified: 1) 401 Water Quality Certification Condition Violation 2) Other Waste (In-stream sediment) 3) Stormwater General Permit - NCGO10000 Violation The remainder of this letter will respond to each item individually; the original request will be in italics followed by our response: 1. Documentation depicting all jurisdictional features (e.g. steams and wetlands). A description and quantification of the impacts to those jurisdictional features and your plans to avoid further stream and wetland area impacts on the site. The original, complete application was submitted to the USACE and NC DWQ on August 23, 2007 with supplemental stormwater management plan approval from the Town of Knightdale on September 10, 2007. The extent of jurisdictional features and impacts to those features was detailed in that submittal package. The impacts Panther Rock Subdivision (Cheswick) Soil & Environmental Consultants, PA November 26, 2008 Project No. 10336.P 1 approved by NC DWQ on September 19, 2007 (statutorily approved by the USACE on October 11, 2007 via e-mail correspondence) included 113 linear feet of permanent and 30 linear feet of temporary impacts to streams and 0.046 acres of temporary wetland impact. These impact details were quantified and illustrated in the initial permit submittal. There was no Jurisdictional Determination issued for the project, although the USACE did conduct a site visit in November 2006 to approve the wetland and stream delineation map. Mr. Eric Kulz of the NC DWQ also conducted a stream-determination site visit in November 2006. On October 21, 2008, S&EC staff met with Ms. Crystal Amschler (USACE) to conduct a site inspection. Field observations made by S&EC staff and Ms. Amschler on October 21, 2008 are as follows: Impact No. 1 (Sewer Crossing): Permitted in 2007: Permitted impacts included 30 LF of temporary channel, 2,000 sq. ft. of Zone 1 buffer impact (of which 1,700 sq. ft. was wetlands) and 1,200 sq. ft. of Zone 2 buffer impact (of which 310 sq. ft. was wetlands); Observed in October 2008: Approximately 55 linear feet of rip rap and earthen fill in the channel. There is approximately an additional 3 linear feet of sediment from the end of the rip rap (downstream end) to the silt fence that was installed across the stream. The clearing limits measured approximately 40 LF on either side of the stream area. . Impact No. 2 (Aerial Sewer Crossing): Permitted in 2007: Permitted impacts included 2,600 sq. ft. of Zone 1 buffer impact and 1,500 sq. ft. of Zone 2 buffer impact. No proposed stream channel impact; Observed in October 2008: Approximately 23 linear feet of rip rap in the channel under the aerial sewer line. There is also approximately 13 linear feet of earthen fill in the stream channel associated with a temporary road crossing. No channel excavation (as cited in the NOV) was evident at the aerial crossing. Impact No. 3 (Road Crossing): Permitted in 2007: Permitted activities included 113 linear feet of channel, 7,750 sq. ft. of Zone 1 Buffer impact and 5,000 sq. ft. of Zone 2 Buffer impact; Observed in October 2008: Approximately 113 linear feet of channel impact. The pipes are 100 LF in length as described in the permit application. One notable change is that the plans called for one, 60" RCP pipe. The applicant chose to install two, 48" RCP pipes instead. The NOV cited erosion around the headwalls on both the upstream and downstream ends of this crossing. As of our field visit, this erosion had been corrected and stabilized. Additionally, the NOV cited that the culverts were perched approximately 8 to 10 inches above the substrate of the stream channel. This was not evident during our site inspection visit with the USACE. One floodplain culvert was noted as well as one low or normal flow culvert which was installed at the appropriate elevations (i.e. buried the required 1 foot). The NOV also cited sediment deposition both upstream and downstream of the crossing. This was not evident Page 2 of 4 Panther Rock Subdivision (Cheswick) Soil & Environmental Consultants, PA November 26, 2008 Project No. 10336.P1 during the October site visit. The sediment that is present in the stream channel is of the same type, texture and composition as that of the sandy fines found in stream channel (i.e. it is not the clay-loam soils evident on the subject site). The NOV also cited rip-rap both upstream and downstream of the culvert. During our site visit we noted approximately 15 pieces of rip-rap on the upstream end of the crossing that appeared to have been thrown into the stream by recent trespassers and vandals. There was also rip-rap noted at the downstream end of the culvert that appears to have fallen in from the banks of the channel. Ms. Amschler of the USACE concurred with the summary of our findings in an email correspondence dated October 22, 2008. There are no additional impacts anticipated for this project. 2. Stream Restoration Plan (sediment impacts) -Sediment impacts to the stream must be removed. Asa part of this plan, you should provide the amount (depth) of material that has been deposited in the stream. This information should be depicted on a map you provide. It is recommended that you use hand labor (buckets, shovels and wheelbarrows) to remove deposited sediment from the stream. The sediment should be removed from the stream and taken to high ground and stabilized. Also, the plan must address the measures that will be used for temporary stabilization/sediment control while this work is under way. S&EC has been engaged by Panther Rock, LLC to provide the NC DWQ and the USACE with a Stream Stabilization and Repair Plan for the streams associated with Impact Nos. 1 and 2. This will include a stream restoration plan, removal of the rip- rap and in stream sediment and stream bank stabilization. Additionally, S&EC will be removing the minor rip-rap amounts that have been tossed and/or have fallen into the stream channel (by hand) and will be suggesting additional stream bank stabilization measures on both the upstream and downstream ends of Impact No. 3 (road crossing). The Stream Stabilization and Repair Plan is currently being developed and will be submitted to both the USACE and the NC DWQ for approval under separate cover within the next 60 days. The Stream Stabilization and Repair Plan will include a detailed implementation schedule and the necessary 3-year monitoring plan for the repaired stream channels. 3. Please explain in your response when and how you anticipate achieving compliance with the 401 Water Quality Certification. As discussed previously, S&EC has been engaged by Panther Rock, LLC to develop a Stream Stabilization and Repair Plan for the stream channel impacts noted during the October 21, 2008 site visit. We anticipate having this Plan submitted to both the USACE and the NC DWQ for approval under separate cover within the next 60 days. Page 3 of 4 Panther Rock Subdivision (Cheswick) November 26, 2008 Soil & Environmental Consultants, PA Project No. 10336.P1 This plan will have a detailed implementation and construction schedule for completion. 4. A rain gauge must be properly installed as required by the Construction Stormwater (NCG010000) permit. Provide a statement documenting the location of the rain gauge. The site NPDES monitoring box and rain gauge are located just to the right of the traffic circle on the berm of sediment basin No. 4. All copies of the monitoring reports and the approved Erosion and Sedimentation Control Plan are within the box. 5. Provide all rain gauge data collected to include the past four months of monitoring through the date of your written response to this letter. If you do not have this date, explain why. Please see the attached monitoring reports for the subject property. 6. Provide inspection records to include the past four months of monitoring records through the date of your written response to this letter. If you do not have data, explain why. Please see the attached monitoring reports for the subject property. We anticipate that this addresses all of the DWQ's concerns. If you have any further questions or any additional explanation is needed, please don't hesitate to call. Sincerely, 9 Nicole J. Thomson Regulatory Specialist Cc: Ms. Crystal Amschler, USACE, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Ms. Cyndi Karoly, DWQ, 2321 Crabtree Blvd., Suite 250, Raleigh, NC 27604 Mr. Pablo Reiter, Panther Rock, LLC, 6736 Falls of Neuse Road, Suite 201, Raleigh, NC 27615 Page 4 of 4 STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 12/2/07 Rainfall Date Amount Initials 11/25/07 .2" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 12/04/07 OK Device functioning properly. Sediment Basin 2 12/04/07 OK Device functioning properly. Sediment Basin 3 12/04/07 OK Basin is functioning properly Sediment Basin 4 12104/07 OK Basin is functioning properly Sediment Basin 5 12/04/07 OK Basin is functioning properly Riser Basin # 71 12/04/07 OK Device functioning properly. Entrance ad 12/04/07 OK Device functioning properly. Diversions Ditches 12/04/07 OK Devices functioning properly. Silt Fence 12/04/07 OK Devices functioning properly. Silt Fence Outlet Structures 12/04/07 OK Devices functioning properly. Inlet protection 12/04/07 NA Devices not installed et. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 12/04/07 1 1 1 N N FES # 23 12/04/07 0 0 0 N N Not constructed et SB # 2 12/04/07 1 1 1 N N FES # 26 12/04/07 0 0 0 N N Not constructed et SB # 3 12/04/07 1 1 1 N N FES # 34 12/04/07 0 0 0 N N Not constructed et SB # 4 12/04/07 1 1 1 N N FES # 20 12/04/07 0 0 0 N N Not constructed et SB # 5 12/04/07 1 1 1 N N SB # 6 12/04/07 1 1 1 N N FES # 19 12/04/07 0 0 0 N N Not constructed et RB # 16 12/04/07 1 1 1 N N FES # RB 7 12/04/07 0 0 0 N N Not constructed et Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: NPDES new inspection box set up at SB # 4. Sediment basis are functioning properly. Site looks good. Utilities are being installed. Make sure all road drainage is diverted to a sediment basin. A drainage ditch has been cut thru road fill at SB # 2 which is running around basin. Suggest moving this so site drainage goes to basin. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 12/02/07 Rainfall Date Amount Initials 11/25/07 .2" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: W least nnce ner seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 12/08/07 OK Device functioning properly. Sediment Basin 2 12/08/07 OK Device functioning properly. Sediment Basin 3 12/08/07 OK Basin is functioning properly Sediment Basin 4 12/08/07 OK Basin is functioning properly Sediment Basin 5 12/08/07 OK Basin is functioning properly Riser Basin # 71 12/08/07 OK Device functioning properly. Entrance ad 12/08/07 OK Device functioning properly. Diversions Ditches 12/08/07 OK Devices functioning properly. Silt Fence 12/08/07 OK Devices functioning properly. Silt Fence Outlet Structures 12/08/07 OK Devices functioning properly. Inlet protection 12/08/07 NA Devices not installed et. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity. suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 12/08/07 1 1 1 N N FES # 23 12/08/07 0 0 0 N N Not constructed et SB # 2 12/08/07 1 1 1 N N FES # 26 12/08/07 0 0 0 N N Not constructed et S13#3 12/08/07 1 1 1 N N FES # 34 12/08/07 0 0 0 N N Not constructed et S13#4 12/08/07 1 1 1 N N FES # 20 12/08/07 0 0 0 N N Not constructed et S13#5 12/08/07 1 1 1 N N S13#6 12/08/07 1 1 1 N N FES # 19 12/08/07 0 0 0 N N Not constructed et RB # 16 12/08/07 1 1 1 N N FES # RB 7 12/08/07 0 0 0 N N Not constructed et Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: Sediment basis are functioning properly. Site looks good. Utilities are being installed. Make sure all road drainage is diverted to a sediment basin. A drainage ditch has been cut thru road fill at SB # 2 which is running around basin. Suggest moving this so road drainage in this area goes to basin. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 12/16/07 Rainfall Date Amount Initials 12/15/07 1.3" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5 per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 12/16/07 OK Device functioning properly. Sediment Basin 2 12/16/07 OK Device functioning properly. Sediment Basin 3 12/16/07 OK Basin is functioning properly Sediment Basin 4 12/16/07 OK Basin is functioning properly Sediment Basin 5 12/16/07 OK Basin is functioning properly Riser Basin # 71 12/16/07 OK Device functioning properly. Entrance ad 12/16/07 OK Device functioning properly. Diversions Ditches 12/16/07 OK Devices functioning properly. Silt Fence 12/16/07 OK Devices functioning properly. Silt Fence Outlet Structures 12/16/07 OK Devices functioning properly. Inlet protection 12/16/07 NA Devices not installed et. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5' per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids (1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 12/16/07 2 2 3 N N FES # 23 12/16/07 0 0 0 N N Not constructed et SB # 2 12/16/07 3 2 4 N N FES # 26 12/16/07 0 0 0 N N Not constructed et SB # 3 12/16/07 4 2 4 N N FES # 34 12/16/07 0 0 0 N N Not constructed et SB # 4 12/16/07 3 2 3 N N FES # 20 12/16/07 0 0 0 N N Not constructed et SB # 5 12/16/07 3 3 3 N N S13#6 12/16/07 4 3 5 N N FES # 19 12/16/07 0 0 0 N N Not constructed et RB # 16 12/16/07 3 4 4 N N FES # RB 7 12/16/07 0 0 0 N N Not constructed et Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: Started inspections on scheduled date of 12/15/07, but rain event started. Delayed inspections until rain event ended. Sediment basis are functioning properly. Site looks good. Utilities are being installed. Make sure all road drainage is diverted to a sediment basins as road reaches grade and utilities are installed. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 12/23/07 Rainfall Date Amount Initials 12/19/07 trace JT 12/23/07 .2" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Proper) Corrective Actions Taken / Field Notes Sediment Basin 1 12/23/07 OK Device functioning properly. Sediment Basin 2 12/23/07 OK Device functioning properly. Sediment Basin 3 12/23/07 OK Basin is functioning properly Sediment Basin 4 12/23/07 OK Basin is functioning properly Sediment Basin 5 12/23/07 OK Basin is functioning properly Sediment Basin 6 12/23/07 OK Basin is functioning properly Riser Basin # 7 12/23/07 OK Device functioning properly. Entrance ad 12/23/07 OK Device functioning properly. Diversions Ditches 12/23/07 OK Devices functioning properly. Silt Fence 12/23/07 OK Devices functioning properly. Silt Fence Outlet Structures 12/23/07 OK Devices functioning properly. Inlet protection 12/23/07 OK Devices installed as storm water piping and inlets are put in. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 12/23/07 2 2 2 N N FES # 23 12/23/07 0 0 0 N N Not constructed et SB # 2 12/23/07 2 2 2 N N FES # 26 12/23/07 0 0 0 N N Not constructed et SB # 3 12/23/07 2 2 2 N N FES # 34 12/23/07 0 0 0 N N Not constructed et S13#4 12/23/07 2 2 2 N N FES # 20 12/23/07 0 0 0 N N Not constructed et SB # 5 12/23/07 2 2 3 N N SB # 6 12/23/07 3 2 3 N N FES # 19 12/23/07 0 0 0 N N Not constructed et RB # 7 12/23/07 2 2 3 N N FES # RB 7 12/23/07 0 0 0 N N Not constructed et Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: Storm water piping system is being installed. Inlet protection installed as inlets are put in place. Sediment basis are functioning properly. Site looks good. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 12/23107 Rainfall Date Amount Initials 12/26/07 1.2" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken I Field Notes Sediment Basin 1 12/27/07 OK Device functioning properly. Sediment Basin 2 12/27/07 OK Device functioning properly. Sediment Basin 3 12/27/07 OK Basin is functioning properly Sediment Basin 4 12/27/07 OK Basin is functioning properly Sediment Basin 5 12/27/07 OK Basin is functioning properly Sediment Basin 6 12/27/07 OK Basin is functioning properly Riser Basin # 7 12/27/07 OK Device functioning properly. Entrance ad 12/27/07 OK Device functioning properly. Diversions Ditches 12/27/07 OK Devices functioning properly. Silt Fence 12/27/07 OK Devices functioning properly. Silt Fence Outlet Structures 12/27/07 OK Devices functioning properly. Inlet protection 12/27/07 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 12/27/07 2 2 3 N N FES # 23 12/27/07 1 1 1 N N SB # 2 12/27/07 2 2 2 N N FES # 26 12/27/07 1 1 1 N N SB # 3 12/27/07 2 2 2 N N FES # 34 12/27/07 1 1 1 N N SB # 4 12/27/07 2 2 2 N N FES # 20 12/27/07 1 1 1 N N SB # 5 12/27/07 2 2 3 N N SB # 6 12/27/07 3 2 3 N N FES # 19 12/27/07 1 1 1 N N RB # 7 12/27/07 3 2 4 N N FES # RB 7 12/27/07 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: Inspection due to over.5" rain event. Most of the storm water piping system has been installed. Inlet protection devices are in place. Sediment basis are functioning properly. Site looks good. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 12/30107 Rainfall Date Amount Initials 12/30/07 1.8" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 12/31/07 OK Device functioning properly. Sediment Basin 2 12/31/07 OK Device functioning properly. Sediment Basin 3 12/31/07 OK Basin is functioning properly Sediment Basin 4 12/31/07 OK Basin is functioning properly Sediment Basin 5 12/31/07 OK Basin is functioning properly Sediment Basin 6 12/31/07 OK Basin is functioning properly Riser Basin # 7 12/31/07 OK Device functioning properly. Entrance ad 12/31/07 OK Device functioning properly. Diversions Ditches 12/31/07 OK Devices functioning properly. Silt Fence 12/31/07 OK Devices functioning properly. Silt Fence Outlet Structures 12/31/07 OK Devices functioning properly. Inlet protection 12/31/07 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 12/31/07 3 2 4 N N FES # 23 12/31/07 1 1 1 N N SB # 2 12/31/07 3 2 3 N N FES # 26 12/31/07 1 1 1 N N SB # 3 12/31/07 3 2 3 N N FES # 34 12/31/07 1 1 1 N N SB # 4 12/31/07 4 2 4 N N FES # 20 12/31/07 1 1 1 N N S13#5 12/31/07 4 2 5 N N SB # 6 12/31/07 4 2 5 N N FES # 19 12/31/07 1 1 1 N N RB # 7 12/31/07 4 2 5 N N FES # RB 7 12/31/07 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: Inspection due to over.5" rain event. Most of the storm water piping system has been installed. Inlet protection devices are in place. Sediment basis are functioning properly. Watch diversion ditch to Riser Basin # 7 as it is starting to fill in between the stockpiles and may breach. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 01/06108 Rainfall Date Amount Initials No rain event JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Pro erl Corrective Actions Taken / Field Notes Sediment Basin 1 01/07/08 OK Device functioning properly. Sediment Basin 2 01/07/08 OK Device functioning properly. Sediment Basin 3 01/07/08 OK Basin is functioning properly Sediment Basin 4 01/07/08 OK Basin is functioning properly Sediment Basin 5 01/07/08 OK Basin is functioning properly Sediment Basin 6 01/07/08 OK Basin is functioning properly Riser Basin # 7 01/07/08 OK Device functioning properly. Entrance ad 01/07/08 OK Device functioning properly. Diversions Ditches 01/07/08 OK Devices functioning properly. Silt Fence 01/07/08 OK Devices functioning properly. Silt Fence Outlet Structures 01/07/08 OK Devices functioning properly. Inlet protection 01/07/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainaael Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 01/07/08 1 1 1 N N FES # 23 01/07/08 1 1 1 N N S13#2 01/07/08 1 1 1 N N FES # 26 01/07/08 1 1 1 N N S13#3 01/07/08 1 1 1 N N FES # 34 01/07/08 1 1 1 N N S13#4 01/07/08 1 1 1 N N FES # 20 01/07/08 1 1 1 N N S13#5 01/07/08 1 1 1 N N SB # 6 01/07/08 1 1 1 N N FES # 19 01/07/08 1 1 1 N N RB # 7 01/07/08 1 1 1 N N FES # RB 7 01/07/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfal I ID Releases up Sediment Outside Disturbed Limits COMMENTS: Sewer outfall is being cleared. Sediment transport potential is high with land disturbance in the stream channel. A bypass channel has been installed at the stream crossing below the end of construction at back of project. Suggest laying slopes back on by pass channel, installing silt fence on channel edge and armoring area. A stockpile of wood mulch is adjacent to area and should be used to stabilize the area and prevent erosion and sediment transport. Most of the storm water piping system has been installed. Inlet protection devices are in place. Sediment basis are functioning properly. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 01/13/08 Rainfall Date Amount Initials 01/13/08 trace JT 01/11/08 .1" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 01/14/08 OK Device functioning properly. Sediment Basin 2 01/14/08 OK Device functioning properly. Sediment Basin 3 01/14/08 OK Basin is functioning properly Sediment Basin 4 01/14/08 OK Basin is functioning properly Sediment Basin 5 01/14/08 OK Basin is functioning properly Sediment Basin 6 01/14/08 OK Basin is functioning properly Riser Basin # 7 01/14/08 OK Device functioning properly. Entrance ad 01/14/08 OK Device functioning properly. Diversions Ditches 01/14/08 OK Devices functioning properly. Silt Fence 01/14/08 OK Devices functioning properly. Silt Fence Outlet Structures 01/14/08 OK Devices functioning properly. Inlet protection 01/14/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 01/14/08 1 1 1 N N FES # 23 01/14/08 1 1 1 N N SB # 2 01/14/08 1 1 1 N N FES # 26 01/14/08 1 1 1 N N SB # 3 01/14/08 1 1 1 N N FES # 34 01/14/08 1 1 1 N N SB # 4 01/14/08 1 1 1 N N FES # 20 01/14/08 1 1 1 N N S13#5 01/14/08 1 1 1 N N SB # 6 01/14/08 1 1 1 N N FES # 19 01/14/08 1 1 1 N N R13#7 01/14/08 1 1 1 N N FES # RB 7 01/14/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The culvert is being installed at the stream crossing at the back of the project. Suggest diversion ditches at the slope above diverting storm water flows to sediment basins. Sediment transport potential is high with land disturbance in the stream channel. A bypass channel has been installed at the stream crossing below the end of construction at back of project with a stone filter berm installed. Suggest as soon as culvert fill in place that silt fence be placed above the pipe inverts continuing down the fill slope and filtered outlet structures (hardware cloth (91/4' wire mesh and washed filter stone))be placed at the low points. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities GINNING / 1 MONITORING FOR WEEK BE . 012008 Rainfall Date Amount Initials 01/17/08 .45" JT 01/19/08 .25" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken I Field Notes Sediment Basin 1 01/21/08 OK Device functioning properly. Sediment Basin 2 01/21/08 OK Device functioning properly. Sediment Basin 3 01/21/08 OK Basin is functioning properly Sediment Basin 4 01/21/08 OK Basin is functioning properly Sediment Basin 5 01/21/08 OK Basin is functioning properly Sediment Basin 6 01/21/08 OK Basin is functioning properly Riser Basin # 7 01/21/08 OK Device functioning properly. Entrance ad 01/21/08 OK Device functioning properly. Diversions Ditches 01/21/08 OK Devices functioning properly. Silt Fence 01/21/08 OK Devices functioning properly. Silt Fence Outlet Structures 01/21/08 OK Devices functioning properly. Inlet protection 01/21/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 01/21/08 3 2 3 N N FES # 23 01/21/08 1 1 1 N N SB # 2 01/21108 3 2 3 N N FES # 26 01/21/08 1 1 1 N N SB # 3 01/21/08 3 2 3 N N FES # 34 01/21/08 1 1 1 N N SB # 4 01/21/08 3 3 4 N N FES # 20 01/21/08 1 1 1 N N S13#5 01/21/08 1 1 1 N N S13#6 01/21/08 3 2 3 N N FES # 19 01/21/08 1 1 1 N N RB # 7 01 /21 /08 4 3 5 N N FES # RB 7 01/21/08 1 1 1 N N 54" RCP FES # X 01/21/08 0 0 0 N N Flows not diverted to pipe et Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The culvert and headwalls have been installed at the stream crossing at the back of the project. Diversion ditches have been installed above diverting storm water flows to sediment basin # 7. Sediment transport potential is high with land disturbance in the stream channel. A bypass channel/ temporary cross drainage pipe has been installed at the stream. Silt fence has been placed above both pipe inverts. Suggest diverting normal channel flow to the main culverts as soon as possible as the temporary pipe is too small for heavy stormwater flows. Watch this area as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. Minor sediment has flushed into the stream below this area with some deposition during the pipe installation process. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 01/27108 Rainfall Date Amount Initials No rain event JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 01/28/08 OK Device functioning properly. Sediment Basin 2 01/28/08 OK Device functioning properly. Sediment Basin 3 01/28/08 OK Basin is functioning properly Sediment Basin 4 01/28/08 OK Basin is functioning properly Sediment Basin 5 01/28/08 OK Basin is functioning properly Sediment Basin 6 01/28/08 OK Basin is functioning properly Riser Basin # 7 01/28/08 OK Device functioning properly. Entrance ad 01/28/08 OK Device functioning properly. Diversions Ditches 01/28/08 OK Devices functioning properly. Silt Fence 01/28/08 OK Devices functioning properly. Silt Fence Outlet Structures 01/28/08 OK Devices functioning properly. Inlet protection 01/28/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 01/28/08 1 1 1 N N FES # 23 01/28/08 1 1 1 N N SB # 2 01/28/08 1 1 1 N N FES # 26 01/28/08 1 1 1 N N SB # 3 01/28/08 1 1 1 N N FES # 34 01/28/08 1 1 1 N N SB # 4 01/28/08 1 1 1 N N FES # 20 01/28/08 1 1 1 N N SB # 5 01/28/08 1 1 1 N N SB # 6 01/28/08 1 1 1 N N FES # 19 01/28/08 1 1 1 N N RB # 7 01/28/08 1 1 1 N N FES # RB 7 01/28/08 1 1 1 N N 54" RCP FES#X 01/28108 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The culvert and headwalls have been installed at the stream crossing at the back of the project. The stream flow has been not channeled thru the pipe with the velocity dissipater installed. Silt fence has been installed above both inverts. Diversion ditches have been installed above diverting storm water flows to sediment basin # 7. Watch this area as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 01127/08 Rainfall Date Amount Initials 02/01/08 .7" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 02/02/08 OK Device functioning properly. Sediment Basin 2 02/02/08 OK Device functioning properly. Sediment Basin 3 02/02/08 OK Basin is functioning properly Sediment Basin 4 02/02/08 OK Basin is functioning properly Sediment Basin 5 02/02/08 OK Basin is functioning properly Sediment Basin 6 02/02/08 OK Basin is functioning properly Riser Basin # 7 02/02/08 OK Device functioning properly. Entrance ad 02/02/08 OK Device functioning properly. Diversions Ditches 02/02/08 OK Devices functioning properly. Silt Fence 02/02/08 OK Devices functioning properly. Silt Fence Outlet Structures 02/02/08 OK Devices functioning properly. Inlet protection 02/02/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there Is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 02/02/08 2 1 2 N N FES # 23 02/02/08 1 1 1 N N S13#2 02/02/08 3 1 3 N N FES # 26 02/02/08 1 1 1 N N SB # 3 02/02/08 3 1 4 N N FES # 34 02/02/08 1 1 1 N N S13#4 02/02/08 2 1 3 N N FES # 20 02/02/08 1 1 1 N N SB # 5 02/02/08 3 1 4 N N S13#6 02/02/08 1 1 1 N N FES # 19 02/02/08 1 1 1 N N RB # 7 02/02/08 3 1 4 N N FES # RB 7 02/02/08 1 1 1 N N 54" RCP FES # X 02/02/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits CUMMEN Is: The culvert and headwalls have been installed at the stream crossing at the back of the project. The stream flow has been not channeled thru the pipe with the velocity dissipater installed. Silt fence has been installed above both inverts. Diversion ditches have been installed above diverting storm water flows to sediment basin # 7. Watch this area as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 02/03/08 Rainfall Date Amount Initials No rain event JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 02/06/08 OK Device functioning properly. Sediment Basin 2 02/06/08 OK Device functioning properly. Sediment Basin 3 02/06/08 OK Basin is functioning properly Sediment Basin 4 02/06/08 OK Basin is functioning properly Sediment Basin 5 02/06/08 OK Basin is functioning properly Sediment Basin 6 02/06/08 OK Basin is functioning properly Riser Basin # 7 02/06/08 OK Device functioning properly. Entrance ad 02/06/08 OK Device functioning properly. Diversions Ditches 02/06/08 OK Devices functioning properly. Silt Fence 02/06/08 OK Devices functioning properly. Silt Fence Outlet Structures 02/06/08 OK Devices functioning properly. Inlet protection 02/06/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there Is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 02/06108 1 1 1 N N FES # 23 02/06/08 1 1 1 N N S13#2 02/06/08 1 1 1 N N FES # 26 02/06/08 1 1 1 N N SB # 3 02/06/08 1 1 1 N N FES # 34 02/06/08 1 1 1 N N SB # 4 02/06/08 1 1 1 N N FES # 20 02/06/08 1 1 1 N N SB # 5 02/06/08 1 1 1 N N SB # 6 02/06/08 1 1 1 N N FES # 19 02/06/08 1 1 1 N N RB # 7 02/06/08 1 1 1 N N FES # RB 7 02/06/08 1 1 1 N N 54" RCP FES # X 02/06/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The culvert and headwalls have been installed at the stream crossing at the back of the project. The stream flow has been channeled thru the pipe with the velocity dissipater installed. Silt fence has been installed above both inverts. Diversion ditches have been installed above diverting storm water flows to sediment basin # 7. Watch this area as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 02/10/08 Rainfall Date Amount Initials 02/12/08-02/13/08 .8" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 02/14/08 OK Device functioning properly. Sediment Basin 2 02/14/08 OK Device functioning properly. Sediment Basin 3 02/14/08 OK Basin is functioning properly Sediment Basin 4 02/14/08 OK Basin is functioning properly Sediment Basin 5 02/14/08 OK Basin is functioning properly Sediment Basin 6 02/14/08 OK Basin is functioning properly Riser Basin # 7 02/14/08 OK Device functioning properly. Entrance ad 02/14/08 OK Device functioning properly. Diversions Ditches 02/14/08 OK Devices functioning properly. Silt Fence 02/14/08 OK Devices functioning properly. Silt Fence Outlet Structures 02/14/08 OK Devices functioning properly. Inlet protection 02/14/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 02/14/08 2 1 2 N N FES # 23 02/14/08 1 1 1 N N SB # 2 02114/08 2 1 2 N N FES # 26 02/14/08 1 1 1 N N SB # 3 02/14/08 2 1 2 N N FES # 34 02/14/08 1 1 1 N N SB # 4 02/14/08 2 1 2 N N FES # 20 02/14/08 1 1 1 N N S13#5 02/14/08 2 1 2 N N SB # 6 02/14/08 2 1 3 N N FES # 19 02/14/08 1 1 1 N N RB # 7 02/14/08 2 1 3 N N FES # RB 7 02/14/08 1 1 1 N N 54" RCP FES # X 02/14/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The culvert and headwalls have been installed at the stream crossing at the back of the project. Silt fence has been installed above both inverts. Sediment is building up on the lower side. Suggest watching and installing additional sediment control if needed. Suggest reinstalling diversion ditches to diverting storm water flows to sediment basin # 7. Watch this area as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 02/17/08 Rainfall Date Amount Initials 02/18/08 .45" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken I Field Notes Sediment Basin 1 02/21/08 OK Device functioning properly. Sediment Basin 2 02/21/08 OK Device functioning properly. Sediment Basin 3 02/21/08 OK Basin is functioning properly Sediment Basin 4 02/21/08 OK Basin is functioning properly Sediment Basin 5 02/21/08 OK Basin is functioning properly Sediment Basin 6 02/21/08 OK Basin is functioning properly Riser Basin # 7 02/21/08 OK Device functioning properly. Entrance ad 02/21/08 OK Device functioning properly. Diversions Ditches 02/21/08 OK Devices functioning properly. Silt Fence 02/21/08 OK Devices functioning properly. Silt Fence Outlet Structures 02/21/08 OK Devices functioning properly. Inlet protection 02/21/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 02/21/08 1 1 1 N N FES # 23 02/21/08 1 1 1 N N SB # 2 02/21/08 1 1 1 N N FES # 26 02/21/08 1 1 1 N N S13#3 02/21/08 1 1 1 N N FES # 34 02/21/08 1 1 1 N N S13#4 02/21/08 2 1 2 N N FES # 20 02/21/08 1 1 1 N N SB # 5 02/21/08 1 1 1 N N S13#6 02/21/08 2 1 3 N N FES # 19 02/21/08 1 1 1 N N RB # 7 02/21/08 2 1 3 N N FES # RB 7 02/21/08 1 1 1 N N 54" RCP FES X 02/21/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The culvert and headwalls have been installed at the stream crossing at the back of the project. Silt fence has been installed above both inverts. Sediment is building up on the lower side. Suggest watching and installing additional sediment control if needed. Diversion ditch has been reinstalled to divert to divert storm water flows from the south side of the crossing to sediment basin # 7. Watch this area and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 02/24/08 Rainfall Date Amount Initials 02/25/08 trace JT 02/26/08 1.2" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" oer 24 hours) Facility ID Date Operating Properly Corrective Actions Taken I Field Notes Sediment Basin 1 02/27/08 OK Device functioning properly. Sediment Basin 2 02/27/08 OK Device functioning properly. Sediment Basin 3 02/27/08 OK Basin is functioning properly Sediment Basin 4 02/27/08 OK Basin is functioning properly Sediment Basin 5 02/27/08 OK Basin is functioning properly Sediment Basin 6 02/27/08 OK Basin is functioning properly Riser Basin # 7 02/27/08 OK Device functioning properly. Entrance ad 02/27/08 OK Device functioning properly. Diversions Ditches 02/27/08 OK Devices functioning properly. Silt Fence 02/27/08 OK Devices functioning properly. Silt Fence Outlet Structures 02/27/08 OK Devices functioning properly. Inlet protection 02/27/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatina solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 02/27/08 2 1 3 N N FES # 23 02/27/08 1 1 1 N N SB # 2 02/27/08 2 1 3 N N FES # 26 02/27/08 1 1 1 N N SB # 3 02/27/08 2 1 3 N N FES # 34 02/27/08 1 1 1 N N SB # 4 02/27/08 2 1 3 N N FES # 20 02/27/08 1 1 1 N N SB # 5 02/27/08 1 1 1 N N S13#6 02/27/08 3 1 3 N N FES # 19 02/27/08 1 1 1 N N RB # 7 02/27/08 3 1 4 N N FES # RB 7 02/27/08 1 1 1 N N 54" RCP FES X 02/27/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits p CONI EN M ne culvert and headwalls have been installed at the stream crossing at the back of the project. Silt fence has been installed above both inverts. Sediment is building up on the lower side. Suggest watching and installing additional sediment control if needed. Diversion ditch has been reinstalled to divert storm water flows from the south side of the crossing to sediment basin # 7 . Watch this area and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 03/02/08 Rainfall Date Amount Initials 03/04/08-03/05/08 .8" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 03/05/08 OK Device functioning properly. Sediment Basin 2 03/05/08 OK Device functioning properly. Sediment Basin 3 03/05/08 OK Basin is functioning properly Sediment Basin 4 03/05/08 OK Basin is functioning properly Sediment Basin 5 03/05/08 OK Basin is functioning properly Sediment Basin 6 03/05/08 OK Basin is functioning properly Riser Basin # 7 03/05/08 OK Device functioning properly. Entrance ad 03/05/08 OK Device functioning properly. Diversions Ditches 03/05/08 OK Devices functioning properly. Silt Fence 03/05/08 OK Devices functioning properly. Silt Fence Outlet Structures 03/05/08 OK Devices functioning properly. Inlet protection 03/05/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 03/05/08 2 1 3 N N FES # 23 03/05/08 1 1 1 N N SB # 2 03/05/08 2 1 3 N N FES # 26 03/05/08 1 1 1 N N SB # 3 03/05/08 2 1 3 N N FES # 34 03/05/08 1 1 1 N N SB # 4 03/05/08 2 1 3 N N FES # 20 03/05/08 1 1 1 N N SB # 5 03/05/08 1 1 1 N N SB # 6 03/05/08 3 1 3 N N FES # 19 03/05/08 1 1 1 N N R13#7 03/05/08 3 1 4 N N FES # RB 7 03/05/08 1 1 1 N N 54" RCP FES X 03/05/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The culvert and headwalls have been installed at the stream crossing at the back of the project. A new filtered heck dam has been added to address potential sediment discharge. Diversion ditch has been reinstalled to divert storm water flows from the south side of the crossing to sediment basin # 7. Watch this area and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 03/09/08 Rainfall Date Amount Initials 03/07/08-03/08/08 1.4" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar davs and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 03/09/08 OK Device functioning properly. Sediment Basin 2 03/09/08 OK Device functioning properly. Sediment Basin 3 03/09/08 OK Basin is functioning properly Sediment Basin 4 03/09/08 OK Basin is functioning properly Sediment Basin 5 03/09/08 OK Basin is functioning properly Sediment Basin 6 03/09/08 OK Basin is functioning properly Riser Basin # 7 03/09/08 OK Device functioning properly. Entrance ad 03/09/08 OK Device functioning properly. Diversions Ditches 03/09/08 OK Devices functioning properly. Silt Fence 03/09/08 OK Devices functioning properly. Silt Fence Outlet Structures 03/09/08 OK Devices functioning properly. Inlet protection 03/09/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 03/09/08 2 1 3 N N FES # 23 03/09/08 1 1 1 N N S13#2 03/09/08 2 1 3 N N FES # 26 03/09/08 1 1 1 N N SB # 3 03/09/08 2 1 3 N N FES # 34 03/09/08 1 1 1 N N SB # 4 03/09/08 2 1 3 N N FES # 20 03/09/08 1 1 1 N N S13#5 03/09/08 1 1 1 N N SB # 6 03/09/08 3 1 3 N N FES # 19 03/09/08 1 1 1 N N R13#7 03/09/08 3 1 4 N N FES # RB 7 03/09/08 1 1 1 N N 54" RCP FES X 03/09/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: A diversion ditch has been reinstalled to divert storm water flows from the south side of the stream crossing to sediment basin # 7 . Watch this area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. The site looks good. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 03/16/08 Rainfall Date Amount Initials 03/15/08 .8 JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCGO10000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 03/16/08 OK Device functioning properly. Sediment Basin 2 03/16/08 OK Device functioning properly. Sediment Basin 3 03/16/08 OK Basin is functioning properly Sediment Basin 4 03/16/08 OK Basin is functioning properly Sediment Basin 5 03/16/08 OK Basin is functioning properly Sediment Basin 6 03/16/08 OK Basin is functioning properly Riser Basin # 7 03/16/08 OK Device functioning properly. Entrance ad 03/16/08 OK Device functioning properly. Diversions Ditches 03/16/08 OK Devices functioning properly. Silt Fence 03/16/08 OK Devices functioning properly. Silt Fence Outlet Structures 03/16/08 OK Devices functioning properly. Inlet protection 03/16/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatin solids are listed as 1 if clear or there is no drains e Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 03/16/08 2 1 2 N N FES # 23 03/16/08 1 1 1 N N SB # 2 03/16/08 2 1 2 N N FES # 26 03/16/08 1 1 1 N N SB # 3 03/16/08 2 1 3 N N FES # 34 03/16/08 1 1 1 N N SB # 4 03/16/08 2 1 3 N N FES # 20 03/16/08 1 1 1 N N SB # 5 03/16/08 1 1 1 N N SB # 6 03/16/08 3 1 3 N N FES # 19 03/16/08 1 1 1 N N RB # 7 03/16/08 3 1 3 N N FES # RB 7 03/16/08 1 1 1 N N 54" RCP FES X 03/16/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: A diversion ditch has been reinstalled to divert storm water flows from the south side of the stream crossing to sediment basin # 7 . This diversion ditch was not reinstalled before the last rain event. Water is ponded at the low point above the culvert crossing, but no discharge occurred. Watch this area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. The site looks good. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 03/23/08 Rainfall Date Amount Initials 03/19/08 .2" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 03/23/08 OK Device functioning properly. Sediment Basin 2 03/23/08 OK Device functioning properly. Sediment Basin 3 03/23/08 OK Basin is functioning properly Sediment Basin 4 03/23/08 OK Basin is functioning properly Sediment Basin 5 03/23/08 OK Basin is functioning properly Sediment Basin 6 03/23/08 OK Basin is functioning properly Riser Basin # 7 03/23/08 OK Device functioning properly. Entrance ad 03/23/08 OK Device functioning properly. Diversions Ditches 03/23/08 OK Devices functioning properly. Silt Fence 03/23/08 OK Devices functioning properly. Silt Fence Outlet Structures 03/23/08 OK Devices functioning properly. Inlet protection 03/23/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatin solids are listed as 1 if clear or there is no draina e Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 03/23/08 1 1 1 N N FES # 23 03/23/08 1 1 1 N N SB # 2 03/23/08 1 1 1 N N FES # 26 03/23/08 1 1 1 N N SB # 3 03/23/08 1 1 1 N N FES # 34 03/23/08 1 1 1 N N SB # 4 03/23/08 1 1 1 N N FES # 20 03/23/08 1 1 1 N N SB # 5 03/23/08 1 1 1 N N SB # 6 03/23/08 1 1 1 N N FES # 19 03/23/08 1 1 1 N N RB # 7 03/23/08 1 1 1 N N FES # RB 7 03/23/08 1 1 1 N N 54" RCP FES X 03/23/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: Watch sewer outfall until vegetation established. Watch this area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. The site looks good. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 03/30/08 Rainfall Date Amount Initials 03/29/08 .35" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 03/30/08 OK Device functioning properly. Sediment Basin 2 03/30/08 OK Device functioning properly. Sediment Basin 3 03/30/08 OK Basin is functioning properly Sediment Basin 4 03/30/08 OK Basin is functioning properly Sediment Basin 5 03/30/08 OK Basin is functioning properly Sediment Basin 6 03/30/08 OK Basin is functioning properly Riser Basin # 7 03/30/08 OK Device functioning properly. Entrance ad 03/30/08 OK Device functioning properly. Diversions Ditches 03/30/08 OK Devices functioning properly. Silt Fence 03/30/08 OK Devices functioning properly. Silt Fence Outlet Structures 03/30/08 OK Devices functioning properly. Inlet protection 03/30/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments S13#1 03/30/08 1 1 1 N N FES # 23 03/30/08 1 1 1 N N S13#2 03/30/08 1 1 1 N N FES # 26 03/30/08 1 1 1 N N SB # 3 03/30/08 1 1 1 N N FES # 34 03/30/08 1 1 1 N N SB # 4 03/30/08 2 1 2 N N FES # 20 03/30/08 1 1 1 N N SB # 5 03/30/08 2 1 2 N N SB # 6 03/30/08 1 1 1 N N FES # 19 03/30/08 1 1 1 N N RB # 7 03/30/08 3 1 4 N N FES # RB 7 03/30/08 1 1 1 N N 54" RCP FES X 03/30/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The front section of roadway paved and the majority of the rest is graveled for paving except that that drains to RB # 7 at the back of the project. Watch sewer outfall until vegetation established. Watch this area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. The site looks good. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 03/30/08 Rainfall Date Amount Initials 03/30/08 - 04/01/08 1.2" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 04/01/08 OK Device functioning properly. Sediment Basin 2 04/01/08 OK Device functioning properly. Sediment Basin 3 04/01/08 OK Basin is functioning properly Sediment Basin 4 04/01/08 OK Basin is functioning properly Sediment Basin 5 04/01/08 OK Basin is functioning properly Sediment Basin 6 04/01/08 OK Basin is functioning properly Riser Basin # 7 04/01/08 OK Device functioning properly. Entrance ad 04/01/08 OK Device functioning properly. Diversions Ditches 04/01/08 OK Devices functioning properly. Silt Fence 04/01/08 OK Devices functioning properly. Silt Fence Outlet Structures 04/01/08 OK Devices functioning properly. Inlet protection 04/01/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 04/01/08 2 1 2 N N FES # 23 04/01/08 1 1 1 N N S B# 2 04/01/08 2 1 2 N N FES # 26 04/01/08 2 1 2 N N SB # 3 04/01/08 2 1 2 N N FES # 34 04/01/08 1 1 1 N N SB # 4 04/01/08 3 1 4 N N FES # 20 04/01/08 1 1 1 N N S B# 5 04/01/08 3 1 3 N N SB # 6 04/01/08 3 1 3 N N FES # 19 04/01/08 2 1 2 N N RB # 7 04/01/08 4 1 5 N N FES # RB 7 04/01/08 2 1 2 N N 54" RCP FES X 04/01/08 2 1 2 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The front section of roadway paved and the majority of the rest is graveled for paving except that that drains to RB # 7 at the back of the project. Watch sewer outfall until vegetation established. Watch this area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. The site looks good. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 04/06/08 Rainfall Date Amount Initials 04/03/08 .4" JT 04/05/08-04/06/08 1.1" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar davs and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 04/07/08 OK Device functioning properly. Sediment Basin 2 04/07/08 OK Device functioning properly. Sediment Basin 3 04/07/08 OK Basin is functioning properly Sediment Basin 4 04/07/08 OK Basin is functioning properly Sediment Basin 5 04/07/08 OK Basin is functioning properly Sediment Basin 6 04/07/08 OK Basin is functioning properly Riser Basin # 7 04/07/08 OK Device functioning properly. Entrance ad 04/07/08 OK Device functioning properly. Diversions Ditches 04/07/08 OK Devices functioning properly. Silt Fence 04/07/08 OK Devices functioning properly. Silt Fence Outlet Structures 04/07/08 OK Devices functioning properly. Inlet protection 04/07/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatin solids are listed as 1 if clear or there is no draina e Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 04/07/08 2 1 2 N N FES # 23 04/07/08 1 1 1 N N SB # 2 04/07/08 2 1 2 N N FES # 26 04/07/08 2 1 2 N N SB # 3 04/07/08 2 1 2 N N FES # 34 04/07/08 1 1 1 N N SB # 4 04/07/08 3 1 4 N N FES # 20 04/07/08 1 1 1 N N SB # 5 04/07/08 3 1 3 N N S13#6 04/07/08 3 1 3 N N FES # 19 04/07/08 2 1 2 N N RB # 7 04/07/08 5 1 6 N N FES # R137 04/07/08 2 1 2 N N 54" RCP FES X 04/07/08 2 1 2 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The front section of roadway paved and the majority of the rest is graveled for paving except that that drains to RB # 7 at the back of the project. Watch sewer outfall until vegetation established. Watch this area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. Potential issues with Stub Street C at lot #1. When road C (south of traffic circle) is paved runoff will drain to the edge of pavement at an erosive velocity. Recommend installing lined rip rap on the fill slope below edge of pavement to slow the storm water discharge from the impervious surface to a non erosive velocity. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 04/13/08 Rainfall Date Amount Initials 04/12/08 Trace JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5 per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 04/14/08 OK Device functioning properly. Sediment Basin 2 04/14/08 OK Device functioning properly. Sediment Basin 3 04/14/08 OK Basin is functioning properly Sediment Basin 4 04/14/08 OK Basin is functioning properly Sediment Basin 5 04/14/08 OK Basin is functioning properly Sediment Basin 6 04/14/08 OK Basin is functioning properly Riser Basin # 7 04/14/08 OK Device functioning properly. Entrance ad 04/14/08 OK Device functioning properly. Diversions Ditches 04/14/08 OK Devices functioning properly. Silt Fence 04/14/08 OK Devices functioning properly. Silt Fence Outlet Structures 04/14/08 OK Devices functioning properly. Inlet protection 04/14/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 04/14/08 1 1 1 N N FES # 23 04/14/08 1 1 1 N N SB # 2 04/14/08 1 1 1 N N FES # 26 04/14/08 1 1 1 N N SB # 3 04/14/08 1 1 1 N N FES # 34 04/14/08 1 1 1 N N SB # 4 04/14/08 1 1 1 N N FES # 20 04/14/08 1 1 1 N N S13#5 04/14/08 1 1 1 N N S13#6 04/14/08 1 1 1 N N FES # 19 04/14/08 1 1 1 N N R13#7 04/14/08 1 1 1 N N FES # RB 7 04/14/08 1 1 1 N N 54" RCP FES X 04/14108 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The front section of roadway paved and the majority of the rest is graveled for paving except that area that drains to RB # 7 at the back of the project. Road shoulders need seeding in areas where paving and utilities are in place. Suggest seeding and mulching the sewer outfall immediately. Watch sewer outfall until vegetation established. Watch this area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. Potential issues with Stub Street C at lot #1. When road C (south of traffic circle) is paved runoff will drain to the edge of pavement at an erosive velocity. Recommend installing lined rip rap on the fill slope below edge of pavement to slow the storm water discharge from the impervious surface to a non erosive velocity. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities FO WEEK BEGINNING MONITORING R . o412oio0 Rainfall Date Amount Initials 04/19/08 Trace JT 04/20/08-04/21/08 .45" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCGO10000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 04/21/08 OK Device functioning properly. Sediment Basin 2 04/21/08 OK Device functioning properly. Sediment Basin 3 04/21/08 OK Basin is functioning properly Sediment Basin 4 04/21/08 OK Basin is functioning properly Sediment Basin 5 04/21/08 OK Basin is functioning properly Sediment Basin 6 04/21/08 OK Basin is functioning properly Riser Basin # 7 04/21/08 OK Device functioning properly. Entrance ad 04/21/08 OK Device functioning properly. Diversions Ditches 04/21/08 OK Devices functioning properly. Silt Fence 04/21/08 OK Devices functioning properly. Silt Fence Outlet Structures 04/21/08 OK Devices functioning properly. Inlet protection 04/21/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 04/21/08 2 1 2 N N FES # 23 04/21/08 1 1 1 N N SB # 2 04/21/08 2 1 2 N N FES # 26 04/21/08 1 1 1 N N SB # 3 04/21/08 2 1 2 N N FES # 34 04/21/08 2 1 2 N N SB # 4 04/21/08 2 1 3 N N FES # 20 04/21/08 2 1 2 N N SB # 5 04/21/08 2 1 3 N N SB # 6 04/21/08 3 1 3 N N FES # 19 04/21/08 2 1 2 N N RB # 7 04/21/08 3 1 3 N N FES # RB 7 04/21/08 2 1 2 N N 54" RCP FES X 04121/08 2 1 2 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: Clearing has started on the lots south of Streets B and D and the Recreation site. Diversion berms to basins # 5 and 6 have been altered to capture drainage from the lots behind streets B and D. Silt fence has been installed around the perimeter of the recreation site. Suggest a small sediment trap at the low point of that area. Draiange and steep slope appear to be too much for silt fence alone to handle. Road shoulders need seeding in areas where paving and utilities are in place. Suggest seeding and mulching the sewer outfall immediately. Watch sewer outfall until vegetation established. Watch this area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. Potential issues with Stub Street C at lot #1. Road C (south of traffic circle) is paved now. Suggest a rip rap berm at the end to this stub street to slow runoff to a non erosive velocity. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities R WEEK BEGINNING MONITORING FO . 04127/08 Rainfall Date Amount Initials 04-22-08 A" JT 04-27-08 2.3" JT 04-28-08 .5" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken I Field Notes Sediment Basin 1 04/29/08 OK Device functioning properly. Sediment Basin 2 04/29/08 OK Device functioning properly. Sediment Basin 3 04/29/08 OK Basin is functioning properly Sediment Basin 4 04/29/08 OK Basin is functioning properly Sediment Basin 5 04/29/08 OK Basin is functioning properly Sediment Basin 6 04/29/08 OK Basin is functioning properly Riser Basin # 7 04/29/08 OK Device functioning properly. Entrance ad 04/29/08 OK Device functioning properly. Diversions Ditches 04/29/08 OK Devices functioning properly. Silt Fence 04/29/08 OK Devices functioning properly. Silt Fence Outlet Structures 04/29/08 OK Devices functioning properly. Inlet protection 04/29/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments S13#1 04/29/08 2 1 2 N N _ FES # 23 04/29/08 1 1 1 N N S13#2 04/29/08 2 1 2 N N _ FES # 26 04/29/08 1 1 1 N N _S13#3 04/29/08 2 1 2 N N FES # 34 04/29/08 2 1 2 N N SB # 4 04/29/08 2 1 3 N N FES # 20 04/29/08 2 1 2 N N SB # 5 04/29/08 4 3 5 N N SB # 6 04/29/08 4 4 5 N N FES # 19 04/29/08 2 1 2 N N RB # 7 04/29/08 5 3 6 N N FES # RB 7 04/29/08 2 1 2 N N 54" RCP FES X 04/29/08 2 1 3 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: Clearing has started on the lots south of Streets B and D and the Recreation site. Diversion berms to basins # 5 and 6 have been altered to capture drainage from the lots behind streets B and D. Silt fence has been installed around the perimeter of the recreation site. Suggest a small sediment trap at the low point of that area. Drainage and steep slope may be too much for silt fence alone to handle. Road shoulders need seeding in areas where paving and utilities are in place. Suggest seeding and mulching the sewer outfall immediately. Watch sewer outfall until vegetation established. Watch this area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm waterlsediment drainage down the roadway. Potential issues with Stub Street C at lot #1. Road C (south of traffic circle) is paved now. Suggest a rip rap berm at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Inspection was delayed by one day due to heavy rain event on scheduled inspection date. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 05/04/08 Rainfall Date Amount Initials 05/04/08 Trace JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 05/06/08 OK Device functioning properly. Sediment Basin 2 05/06/08 OK Device functioning properly. Sediment Basin 3 05/06/08 OK Basin is functioning properly Sediment Basin 4 05/06/08 OK Basin is functioning properly Sediment Basin 5 05/06/08 OK Basin is functioning properly Sediment Basin 6 05/06/08 OK Basin is functioning properly Riser Basin # 7 05/06/08 OK Device functioning properly. Entrance ad 05/06/08 OK Device functioning properly. Diversions Ditches 05/06/08 OK Devices functioning properly. Silt Fence 05/06/08 OK Devices functioning properly. Silt Fence Outlet Structures 05/06/08 OK Devices functioning properly. Inlet protection 05/06/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity (1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 05/06/08 1 1 1 N N FES # 23 05/06/08 1 1 1 N N _S13#2 05/06/08 1 1 1 N N FES # 26 05/06/08 1 1 1 N N SB # 3 05/06/08 1 1 1 N N FES # 34 05/06/08 1 1 1 N N SB # 4 05/06/08 1 1 1 N N FES # 20 05/06/08 1 1 1 N N SB # 5 05/06/08 1 1 1 N N S13#6 05/06/08 1 1 1 N N FES # 19 05/06/08 1 1 1 N N RB # 7 05/06/08 1 1 1 N N FES # RB 7 05/06/08 1 1 1 N N 54" RCP FES X 05/06/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: Clearing has started on the lots south of Streets B and D and the Recreation site. Diversion berms to basins # 5 and #6 have been altered to capture drainage from the lots behind streets B and D. The storage area in these basins is being reduced as the lots are filled. Make sure the basins are not completely filled until the lots above this area are stabilized with vegetation. Silt fence has been installed around the perimeter of the recreation site. Suggest a small sediment trap at the low point of that area. Drainage and steep slope may be too much for silt fence alone to handle. Road shoulders need seeding in areas where paving and utilities are in place. Sewer outfall has been seeded and mulched. Watch sewer outfall until vegetation established. Watch this area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. Potential issues with Stub Street C at lot #1. Road C (south of traffic circle) is paved now. Suggest a rip rap berm at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING 05/1 1/08 Rainfall Date Amount Initials 05/09/08 .25" JT 05/10/08 .2" JT 05/11/08 .6" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 05/12/08 OK Device functioning properly. Sediment Basin 2 05/12/08 OK Device functioning properly. Sediment Basin 3 05/12/08 OK Basin is functioning properly Sediment Basin 4 05/12/08 OK Basin is functioning properly Sediment Basin 5 05/12/08 OK Basin is functioning properly Sediment Basin 6 05/12/08 OK Basin is functioning properly Riser Basin # 7 05/12/08 OK Device functioning properly. Entrance ad 05/12/08 OK Device functioning properly. Diversions Ditches 05/12/08 OK Devices functioning properly. Silt Fence 05/12/08 OK Devices functioning properly. Silt Fence Outlet Structures 05/12/08 OK Devices functioning properly. Inlet protection 05/12/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage Stormwater Discharge Outfall ID Date Clarity (1-10 Floating Solids 1-10) Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 05/12/08 2 1 2 N N FES # 23 05/12/08 1 1 1 N N SB # 2 05/12/08 2 1 3 N N FES # 26 05/12/08 1 1 1 N N SB # 3 05/12/08 2 1 3 N N FES # 34 05/12/08 1 1 1 N N S13#4 05/12/08 3 1 3 N N FES # 20 05/12/08 1 1 1 N N SB # 5 05/12/08 2 3 2 N N S13#6 05/12/08 3 5 4 N N FES # 19 05/12/08 1 1 1 N N RB # 7 05/12/08 4 2 4 N N FES # RB 7 05/12/08 1 1 1 N N 54" RCP FES X 05/12/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: Clearing has started on the lots south of Streets B and D and the Recreation site. Diversion berms to basins # 5 and #6 have been altered to capture drainage from the lots behind streets B and D. Almost no drainage now goes to SB # 5 with most of that area now graded so drainage goes to SB # 6. The storage area in these basins is being reduced as the lots are filled. Make sure the basins are not completely filled until the lots above this area are stabilized with vegetation. Silt fence has been installed around the perimeter of the recreation site. Suggest a small sediment trap at the low point of that area. Drainage and steep slope may be too much for silt fence alone to handle. Road shoulders need seeding in areas where paving and utilities are in place. Watch the area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. Potential issues with Stub Street C at lot #1. Road C (south of traffic circle) is paved now. Suggest a rip rap berm at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 05/18/08 Rainfall Date Amount Initials 05/15/08 .3" JT 05/16/08 .15" JT 05/18/08 .5" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 05/19/08 OK Device functioning properly. Sediment Basin 2 05/19/08 OK Device functioning properly. Sediment Basin 3 05/19/08 OK Device functioning properly. Sediment Basin 4 05/19/08 OK Device functioning properly. Sediment Basin 5 05/19/08 OK Device functioning properly. Sediment Basin 6 05/19/08 OK Device functioning properly. Riser Basin # 7 05/19/08 OK Device functioning properly. Entrance ad 05/19/08 OK Device functioning properly. Diversions Ditches 05/19/08 OK Devices functioning properly. Silt Fence 05/19/08 OK Devices functioning properly. Silt Fence Outlet Structures 05/19/08 OK Devices functioning properly. Inlet protection 05/19/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids (1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 05/19/08 3 1 4 N N FES # 23 05/19/08 2 1 2 N N S13#2 05/19/08 3 1 3 N N FES # 26 05/19/08 1 1 1 N N SB # 3 05/19/08 3 1 3 N N FES # 34 05/19/08 1 1 1 N N S13#4 05/19/08 3 1 3 N N FES # 20 05/19/08 1 1 1 N N S13#5 05/19/08 2 3 2 N N S13#6 05/19/08 4 5 4 N N FES # 19 05/19/08 2 1 2 N N R13#7 05/19/08 4 2 5 N N FES # RB 7 05/19/08 1 1 1 N N 54" RCP FES X 05/19/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The grading is almost complete on the lots south of Streets B and D and the Recreation site. Diversion berms to basins # 5 and #6 have been altered to capture drainage from the lots behind streets B and D. Almost no drainage now goes to SB # 5 with most of that area now graded so drainage goes to SB # 6. The storage area in these basins is being reduced as the lots are filled. Make sure the basins are not completely filled until the lots above this area are stabilized with vegetation. Silt fence has been installed around the perimeter of the recreation site. Watch this area as drainage and steep slope may be too much for silt fence alone to handle. Watch the area at the stream crossing and reinstall diversion ditches before each rain event, as construction traffic across this area will form a conduit for storm water/sediment drainage down the roadway. Potential issues with Stub Street C at lot #1. Road C (south of traffic circle) is paved now. Suggest a rip rap berm at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Silt fence and a filtered outlet have been installed and are holding up fine. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 05/25/08 Rainfall Date Amount Initials 05/20/08 .4" JT 05/24/08 Trace JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 05/26/08 OK Device functioning properly. Sediment Basin 2 05/26/08 OK Device functioning properly. Sediment Basin 3 05/26/08 OK Device functioning properly. Sediment Basin 4 05/26/08 OK Device functioning properly. Sediment Basin 5 05/26/08 OK Device functioning properly. Sediment Basin 6 05/26/08 OK Device functioning properly. Riser Basin # 7 05/26/08 OK Device functioning properly. Entrance ad 05/26/08 OK Device functioning properly. Diversions Ditches 05/26/08 OK Devices functioning properly. Silt Fence 05/26/08 OK Devices functioning properly. Silt Fence Outlet Structures 05/26/08 OK Devices functioning properly. Inlet protection 05/26/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatinq solids are listed as 1 if clear or there is no drainaqe) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10) Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 05/26/08 1 1 1 N N FES # 23 05/26/08 1 1 1 N N S13#2 05/26/08 1 1 1 N N FES # 26 05/26/08 1 1 1 N N SB # 3 05/26/08 1 1 1 N N FES # 34 05/26/08 1 1 1 N N S13#4 05/26/08 1 1 1 N N FES # 20 05/26/08 1 1 1 N N SB # 5 05/26/08 1 1 1 N N S13#6 05/26/08 1 1 1 N N FES # 19 05/26/08 1 1 1 N N RB # 7 05/26/08 1 1 1 N N FES # RB 7 05/26/08 1 1 1 N N 54" RCP FES X 05/26/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The grading is almost complete on the lots south of Streets B and D and the Recreation site. Diversion berms to basins # 5 and #6 have been altered to capture drainage from the lots behind streets B and D. Almost no drainage now goes to SB # 5 with most of that area now graded so drainage goes to SB # 6. The storage area in these basins is being reduced as the lots are filled. Make sure the basins are not completely filled until the lots above this area are stabilized with vegetation. Silt fence has been installed around the perimeter of the recreation site. Watch this area as drainage and steep slope may be too much for silt fence alone to handle. Potential issues with Stub Street C at lot #1. Road C (south of traffic circle) is paved now. Suggest a rip rap berm at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Silt fence and a filtered outlet have been installed at this location and are holding up temporarily. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 06/01/08 Rainfall Date Amount Initials 05/28/08 .3" JT 06/01/08 .2" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 06/02/08 OK Device functioning properly. Sediment Basin 2 06/02/08 OK Device functioning properly. Sediment Basin 3 06/02/08 OK Device functioning properly. Sediment Basin 4 06/02/08 OK Device functioning properly. Sediment Basin 5 06/02/08 OK Device functioning properly. Sediment Basin 6 06/02/08 OK Device functioning properly. Riser Basin # 7 06/02/08 OK Device functioning properly. Diversions Ditches 06/02/08 OK Devices functioning properly. Silt Fence 06/02/08 OK Devices functioning properly. Silt Fence Outlet Structures 06/02/08 OK Devices functioning properly. Inlet protection 06/02/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments S13#1 06/02/08 1 1 1 N N FES # 23 06/02/08 1 1 1 N N S13#2 06/02/08 1 1 1 N N FES # 26 06/02/08 1 1 1 N N S13#3 06/02/08 1 1 1 N N FES # 34 06/02/08 1 1 1 N N SB # 4 06/02/08 2 1 2 N N FES # 20 06/02/08 1 1 1 N N S13#5 06/02/08 1 1 1 N N S13#6 06/02/08 2 1 2 N N FES # 19 06/02/08 1 1 1 N N R13#7 06/02/08 2 1 3 N N FES # RB 7 06/02/08 1 1 1 N N 54" RCP FES X 06/02/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The grading is almost complete on the lots south of Streets B and D and the Recreation site. Diversion berms to basins # 5 and #6 have been altered to capture drainage from the lots behind streets B and D. Almost no drainage now goes to SB # 5 with most of that area now graded so drainage goes to SB # 6. The storage area in these basins is being reduced as the lots are filled. Make sure the basins are not completely filled until the lots above this area are stabilized with vegetation. Silt fence has been installed around the perimeter of the recreation site. Watch this area as drainage and steep slope may be too much for silt fence alone to handle. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 06/08/08 Rainfall Date Amount Initials No rain event JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 06/09/08 OK Device functioning properly. Sediment Basin 2 06/09/08 OK Device functioning properly. Sediment Basin 3 06/09/08 OK Device functioning properly. Sediment Basin 4 06/09/08 OK Device functioning properly. Sediment Basin 5 06/09/08 OK Device functioning properly. Sediment Basin 6 06/09/08 OK Device functioning properly. Riser Basin # 7 06/09/08 OK Device functioning properly. Diversions Ditches 06/09/08 OK Devices functioning properly. Silt Fence 06/09/08 OK Devices functioning properly. Silt Fence Outlet Structures 06/09/08 OK Devices functioning properly. Inlet protection 06/09/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainaael Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 06/09/08 1 1 1 N N FES # 23 06/09/08 1 1 1 N N SB # 2 06/09/08 1 1 1 N N FES # 26 06/09/08 1 1 1 N N SB # 3 06/09/08 1 1 1 N N FES # 34 06/09/08 1 1 1 N N SB # 4 06109/08 1 1 1 N N FES # 20 06/09/08 1 1 1 N N S13#5 06/09/08 1 1 1 N N S13#6 06/09/08 1 1 1 N N FES # 19 06/09/08 1 1 1 N N RB # 7 06/09/08 1 1 1 N N FES # RB 7 06/09/08 1 1 1 N N 54" RCP FES X 06/09/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMEN I5: 1 he grading is complete on the lots south of Streets B and D and the Recreation site. Seeding has taken place on the majority of the site. The site looks good. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 06/15/08 Rainfall Date Amount Initials 06/15/08 .65" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken 1 Field Notes Sediment Basin 1 06/16/08 OK Device functioning properly. Sediment Basin 2 06/16/08 OK Device functioning properly. Sediment Basin 3 06/16/08 OK Device functioning properly. Sediment Basin 4 06/16/08 OK Device functioning properly. Sediment Basin 5 06/16/08 OK Device functioning properly. Sediment Basin 6 06/16/08 OK Device functioning properly. Riser Basin # 7 06/16/08 OK Device functioning properly. Diversions Ditches 06/16/08 OK Devices functioning properly. Silt Fence 06/16/08 OK Devices functioning properly. Silt Fence Outlet Structures 06/16/08 OK Devices functioning properly. Inlet protection 06/16/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatin solids are listed as 1 if clear or there is no drains e Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 06/16/08 1 1 1 N N FES # 23 06/16/08 1 1 1 N N SB # 2 06/16/08 1 1 1 N N FES # 26 06/16/08 1 1 1 N N SB # 3 06/16/08 1 1 1 N N FES # 34 06/16/08 1 1 1 N N SB # 4 06/16/08 2 1 2 N N FES # 20 06/16/08 1 1 1 N N SB # 5 06/16/08 2 1 2 N N SB # 6 06/16/08 2 1 3 N N FES # 19 06/16/08 1 1 1 N N RB # 7 06/16/08 3 2 3 N N FES # RB 7 06/16/08 1 1 1 N N 54" RCP FES X 06/16/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The entire site has been seeded and mulched. The skimmer in Riser basin # 7 is being held down with accumulated sediment deposition in the basin. Suggest removing the sediment over the pvc drain pipe the next time the basin is dry. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 06/22/08 Rainfall Date Amount Initials 06/20/08 .1" JT 06/21/08 .3" JT 06/22/08 .4" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 06/23/08 OK Device functioning properly. Sediment Basin 2 06/23/08 OK Device functioning properly. Sediment Basin 3 06/23/08 OK Device functioning properly. Sediment Basin 4 06/23/08 OK Device functioning properly. Sediment Basin 5 06/23/08 OK Device functioning properly. Sediment Basin 6 06/23/08 OK Device functioning properly. Riser Basin # 7 06/23/08 OK Device functioning properly. Diversions Ditches 06/23/08 OK Devices functioning properly. Silt Fence 06/23/08 NO See area at stub street south of traffic circle Silt Fence Outlet Structures 06/23/08 NO See area at stub street south of traffic circle Inlet protection 06/23/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatin solids are listed as 1 if clear or there is no drains e Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 06/23/08 2 1 2 N N FES # 23 06/23/08 1 1 1 N N SB # 2 06/23/08 2 1 2 N N FES # 26 06/23/08 1 1 1 N N SB # 3 06/23/08 1 1 1 N N FES # 34 06/23/08 1 1 1 N N SB # 4 06/23/08 2 1 2 N N FES # 20 06/23/08 1 1 1 N N S13#5 06/23/08 2 1 2 N N SB # 6 06/23/08 3 1 4 N N FES # 19 06/23/08 1 1 1 N N R13#7 06/23/08 4 2 4 N N FES # RB 7 06/23/08 1 1 1 N N 54" RCP FES X 06/23/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The entire site has been seeded and mulched. The skimmer in Riser basin # 7 is being held down with accumulated sediment deposition in the basin. Suggest removing the sediment over the pvc drain pipe the next time the basin is dry. Issues with Stub Street C at lot #1. Road C (south of traffic circle) is paved now. The silt fence and filtered outlet structure have filled and sediment has washed into the wooded area below this area. Concrete trucks have washed out at this point and filtered outlet structure is concreted in place. Concrete washout should be in a designated area away from any drainage as this is washing to the stream below. This is a violation of the NPDES requirements and should cease immediately. Suggest a rip rap filter berm be installed at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Suggest installing a designated concrete washout area (contained in silt fence on 3 sides. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 06/29/08 Rainfall Date Amount Initials 06/27108 .1" JT 06/29/08-06/30/08 .4" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 06/30/08 OK Device functioning properly. Sediment Basin 2 06/30/08 OK Device functioning properly. Sediment Basin 3 06/30/08 OK Device functioning properly. Sediment Basin 4 06/30/08 OK Device functioning properly. Sediment Basin 5 06/30/08 OK Device functioning properly. Sediment Basin 6 06/30/08 OK Device functioning properly. Riser Basin # 7 06/30/08 OK Device functioning properly. Diversions Ditches 06/30/08 OK Devices functioning properly. Silt Fence 06/30/08 NO See area at stub street south of traffic circle Silt Fence Outlet Structures 06/30/08 NO See area at stub street south of traffic circle Inlet protection 06/30/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 06/30/08 2 1 2 N N FES # 23 06/30/08 1 1 1 N N SB # 2 06/30/08 2 1 2 N N FES # 26 06/30/08 1 1 1 N N SB # 3 06/30/08 1 1 1 N N FES # 34 06/30/08 1 1 1 N N SB # 4 06/30/08 2 1 2 N N FES # 20 06130/08 1 1 1 N N SB # 5 06/30/08 2 1 2 N N SB # 6 06/30/08 3 2 4 N N FES # 19 06/30/08 1 1 1 N N RB # 7 06/30/08 4 3 5 N N FES # RB 7 06/30/08 1 1 1 N N 54" RCP FES X 06/30/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The entire site has been seeded and mulched. The skimmer in Riser basin # 7 is being held down with accumulated sediment deposition in the basin. Suggest removing the sediment over the pvc drain pipe the next time the basin is dry. Issues the with Stub Street C at lot #1. Road C (south of traffic circle) is paved now. The silt fence and filtered outlet structure have filled and sediment has washed into the wooded area below this area. Concrete trucks have washed out at this point and filtered outlet structure is concreted in place. Concrete washout should be in a designated area away from any drainage as this is washing to the stream below. This is a violation of the NPDES requirements and should cease immediately. Suggest a rip rap filter berm be installed at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Suggest installing a designated concrete washout area (contained in silt fence on 3 sides. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 07/06/08 Rainfall Date Amount Initials 07/04/08 .2" JT 07/05/08 .4" JT 07/06/08 .5" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCGO10000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 07/07/08 OK Device functioning properly. Sediment Basin 2 07/07/08 OK Device functioning properly. Sediment Basin 3 07/07/08 OK Device functioning properly. Sediment Basin 4 07/07/08 OK Device functioning properly. Sediment Basin 5 07/07/08 OK Device functioning properly. Sediment Basin 6 07/07/08 OK Device functioning properly. Riser Basin # 7 07/07/08 OK Device functioning properly. Diversions Ditches 07/07/08 OK Devices functioning properly. Silt Fence 07107/08 OK? See comments about area at stub street Silt Fence Outlet Structures 07/07/08 OK? See comments about area at stub street Inlet protection 07/07/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 07/07/08 2 1 2 N N FES # 23 07/07/08 1 1 1 N N SB # 2 07/07/08 2 1 2 N N FES # 26 07/07/08 1 1 1 N N SB # 3 07/07/08 1 1 1 N N FES # 34 07/07/08 1 1 1 N N SB # 4 07/07/08 2 1 2 N N FES # 20 07/07/08 1 1 1 N N SB # 5 07/07/08 2 1 2 N N SB # 6 07/07/08 3 2 4 N N FES # 19 07/07/08 1 1 1 N N RB # 7 07/07/08 4 3 5 N N FES # RB 7 07/07/08 1 1 1 N N 54" RCP FES X 07/07/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfal I ID Releases up Sediment Outside Disturbed Limits COMMENTS: The entire site has been seeded and mulched. The skimmer in Riser basin # 7 is being held down with accumulated sediment deposition in the basin. Suggest removing the sediment over the pvc drain pipe the next time the basin is dry. Issues the with Stub Street C at lot #1. Road C (south of traffic circle) is paved now. The silt fence and filtered outlet structure have been repaired but will have problems as there is too much flow to the area. Suggest a rip rap filter berm be installed at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Suggest installing a designated concrete washout area (contained in silt fence on 3 sides. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 07/13/08 Rainfall Date Amount Initials 07/07/08 trace JT 07/08/08 .2" JT 07/09/08 .2" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 07/14/08 OK Device functioning properly. Sediment Basin 2 07/14/08 OK Device functioning properly. Sediment Basin 3 07/14/08 OK Device functioning properly. Sediment Basin 4 07/14/08 OK Device functioning properly. Sediment Basin 5 07/14/08 OK Device functioning properly. Sediment Basin 6 07/14/08 OK Device functioning properly. Riser Basin # 7 07/14/08 OK Device functioning properly. Diversions Ditches 07/14/08 OK Devices functioning properly. Silt Fence 07/14/08 OK? See comments about area at stub street Silt Fence Outlet Structures 07/14/08 OK? See comments about area at stub street Inlet protection 07/14/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatin solids are listed as 1 if clear or there is no drains e Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 07/14/08 2 1 2 N N FES # 23 07/14/08 1 1 1 N N SB # 2 07/14/08 2 1 2 N N FES # 26 07/14/08 1 1 1 N N S13#3 07/14/08 1 1 1 N N FES # 34 07/14/08 1 1 1 N N S13#4 07/14/08 2 1 2 N N FES # 20 07/14/08 1 1 1 N N S13#5 07/14/08 2 1 2 N N S13#6 07/14/08 3 2 4 N N FES # 19 07/14/08 1 1 1 N N R13#7 07/14/08 4 3 5 N N FES # RB 7 07/14/08 1 1 1 N N 54" RCP FES X 07/14/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The entire site has been seeded and mulched. The skimmer in Riser basin # 7 is being held down with accumulated sediment deposition in the basin. Suggest removing the sediment over the pvc drain pipe the next time the basin is dry. Watch stub Street C at lot #1. Road C (south of traffic circle) is paved now. The silt fence and filtered outlet structure have been repaired but will have problems as there is too much flow to the area. Suggest a rip rap filter berm be installed at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Suggest installing a designated concrete washout area (contained in silt fence on 3 sides in a relatively flat area out of any concentrated storm water flow. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 07/20/08 Rainfall Date Amount Initials 07/18/08 .3" JT 07/19/08 .4" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar davs and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 07/21/08 OK Device functioning properly. Sediment Basin 2 07/21/08 OK Device functioning properly. Sediment Basin 3 07/21/08 OK Device functioning properly. Sediment Basin 4 07/21/08 OK Device functioning properly. Sediment Basin 5 07/21/08 OK Device functioning properly. Sediment Basin 6 07/21/08 OK Device functioning properly. Riser Basin # 7 07/21/08 OK Device functioning properly. Diversions Ditches 07/21/08 OK Devices functioning properly. Silt Fence 07/21/08 OK? See comments about area at stub street Silt Fence Outlet Structures 07/21/08 OK? See comments about area at stub street Inlet protection 07/21/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatin solids are listed as 1 if clear or there is no drains e Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 07/21/08 2 1 2 N N FES # 23 07/21/08 1 1 1 N N SB # 2 07/21/08 2 1 2 N N FES # 26 07/21/08 1 1 1 N N SB # 3 07/21/08 1 1 1 N N FES # 34 07/21/08 1 1 1 N N SB # 4 07/21/08 2 1 2 N N FES # 20 07/21/08 1 1 1 N N SB # 5 07/21/08 2 1 2 N N S13#6 07/21/08 3 2 4 N N FES # 19 07/21/08 1 1 1 N N R13#7 07/21/08 4 3 5 N N FES # RB 7 07/21/08 1 1 1 N N 54" RCP FES X 07/21/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfal I ID Releases up Sediment Outside Disturbed Limits COMMENTS: The entire site has been seeded and mulched. The skimmer in Riser basin # 7 is being held down with accumulated sediment deposition in the basin. Suggest removing the sediment over the pvc drain pipe the next time the basin is dry. Watch stub Street C at lot #1. Road C (south of traffic circle) is paved now. The silt fence and filtered outlet structure have been repaired but will have problems as there is too much flow to the area. Suggest a rip rap filter berm be installed at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Suggest installing a designated concrete washout area (contained in silt fence on 3 sides) in a relatively flat area out of any concentrated storm water flow. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 07/27/08 Rainfall Date Amount Initials 07/22/08 .45" JT 07/23/08 A" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 07/28/08 OK Device functioning properly. Sediment Basin 2 07/28/08 OK Device functioning properly. Sediment Basin 3 07/28/08 OK Device functioning properly. Sediment Basin 4 07/28/08 OK Device functioning properly. Sediment Basin 5 07/28/08 OK Device functioning properly. Sediment Basin 6 07/28/08 OK Device functioning properly. Riser Basin # 7 07/28/08 OK Device functioning properly. Diversions Ditches 07/28/08 OK Devices functionin properly. Silt Fence 07/28/08 OK? See comments about area at stub street Silt Fence Outlet Structures 07/28/08 OK? See comments about area at stub street inlet protection 07/28/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatin solids are listed as 1 if clear or there is no drains e Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 07/28/08 2 1 2 N N FES # 23 07/28/08 1 1 1 N N S13#2 07/28/08 2 1 2 N N FES # 26 07/28/08 1 1 1 N N S13#3 07/28/08 1 1 1 N N FES # 34 07/28/08 1 1 1 N N SB # 4 07/28/08 2 1 2 N N FES # 20 07/28/08 1 1 1 N N SB # 5 07/28/08 2 1 2 N N S13#6 07/28/08 3 2 4 N N FES # 19 07/28/08 1 1 1 N N R13#7 07/28/08 4 3 5 N N FES # RB 7 07/28/08 1 1 1 N N 54" RCP FES X 07/28/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The entire site has been seeded and mulched. The skimmer in Riser basin # 7 is being held down with accumulated sediment deposition in the basin. Suggest removing the sediment over the pvc drain pipe the next time the basin is dry. Watch stub Street C at lot #1. Road C (south of traffic circle) is paved now. The silt fence and filtered outlet structure have been repaired but will have problems as there is too much flow to the area. Suggest a rip rap filter berm be installed at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Suggest installing a designated concrete washout area (contained in silt fence on 3 sides) in a relatively flat area out of any concentrated storm water flow. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities 8/03/08 MONITORING FOR WEEK BEGINNING. 0 Rainfall Date Amount Initials 07/28/08 trace JT 08/02/08 .4" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 08/04/08 OK Device functioning properly. Sediment Basin 2 08/04/08 OK Device functioning properly. Sediment Basin 3 08/04108 NO The tar on the spillway is torn and needs repair. Sediment Basin 4 08/04/08 OK Device functioning properly. Sediment Basin 5 08/04/08 OK Device functioning properly. Sediment Basin 6 08/04/08 OK Device functioning properly. Riser Basin # 7 08/04/08 OK Device functioning properly. Diversions Ditches 08/04/08 OK Devices functioning properly. Silt Fence 08/04/08 NO Silt fence at the toe of slope of the rec center location is full and needs stored sediment removed. The silt fence at the stub street south of the traffic circle needs maintenance. Silt Fence Outlet Structures 08/04/08 OK? See comments about area at stub street Inlet protection 08/04/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatin solids are listed as 1 if clear or there is no drainage Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 08/04/08 1 1 1 N N FES # 23 08/04/08 1 1 1 N N SB # 2 08/04/08 1 1 1 N N FES # 26 08/04/08 1 1 1 N N SB # 3 08/04/08 1 1 1 N N FES # 34 08/04/08 1 1 1 N N SB # 4 08/04/08 1 1 1 N N FES # 20 08/04/08 1 1 1 N N SB # 5 08/04/08 1 1 1 N N SB # 6 08/04/08 1 1 1 N N FES # 19 08/04/08 1 1 1 N N RB # 7 08/04/08 1 1 1 N N FES # RB 7 08/04/08 1 1 1 N N 54" RCP FES X 08/04/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The silt fence at the toe of slope sat the proposed recreation center location is in need of maintenance. The slope above this area is starting to erode. This area is just above a stream so it needs to be addressed as soon as possible. The area at the end of pavement at stub Street C at lot #1 is starting to scour out and the silt fence and filtered outlet at the edge of disturbance needs repair. This will be a continuous problem as the storm water velocity off the paved street is too high. Suggest a lined rip rap filter berm be installed at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Suggest installing a designated concrete washout area (contained in silt fence on 3 sides) in a relatively flat area out of any concentrated storm water flow. The spillway tarp on basin # 3 is torn and needs replacing. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 08/10/08 Rainfall Date Amount Initials 08/09/08 .1" JT 08/10/08 .2" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once oar seven calendar davs and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 08/11/08 OK Device functioning properly. Sediment Basin 2 08/11/08 OK Device functioning properly. Sediment Basin 3 08/11/08 NO The tar on the spillway is torn and needs repair. Sediment Basin 4 08/11/08 OK Device functioning properly. Sediment Basin 5 08/11/08 OK Device functioning properly. Sediment Basin 6 08/11/08 OK Device functioning properly. Riser Basin # 7 08/11/08 OK Device functioning properly. Diversions Ditches 08/11/08 OK Devices functioning properly. Silt Fence 08/11108 NO Silt fence at the toe of slope of the rec center location is full and needs stored sediment removed. The silt fence at the stub street south of the traffic circle needs maintenance. Silt Fence Outlet Structures 08/11/08 OK? See comments about area at stub street inlet protection 08/11/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity. suspended and floatina solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 08/11/08 1 1 1 N N FES # 23 08/11/08 1 1 1 N N SB # 2 08/11/08 1 1 1 N N FES # 26 08/11/08 1 1 1 N N S13#3 08/11/08 1 1 1 N N _ FES # 34 08/11/08 1 1 1 N N SB # 4 08/11/08 1 1 1 N N FES # 20 08/11/08 1 1 1 N N S13#5 08/11/08 1 1 1 N N SB # 6 08/11/08 1 1 1 N N FES # 19 08/11/08 1 1 1 N N RB # 7 08/11/08 1 1 1 N N FES # RB 7 08/11/08 1 1 1 N N 54" RCP FES X 08/11/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The silt fence at the toe of slope sat the proposed recreation center location is in need of maintenance. The slope above this area is starting to erode. This area is just above a stream so it needs to be addressed as soon as possible. The area at the end of pavement at stub Street C at lot #1 is starting to scour out and the silt fence and filtered outlet at the edge of disturbance needs repair. This will be a continuous problem as the storm water velocity off the paved street is too high. Suggest a lined rip rap filter berm be installed at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Suggest installing a designated concrete washout area (contained in slit fence on 3 sides) in a relatively flat area out of any concentrated storm water flow. The spillway tarp on basin # 3 is torn and needs replacing. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 08/17/08 Rainfall Date Amount Initials 08/13/08 .1" JT 08/15/08 .45" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 08/18/08 OK Device functioning properly. Sediment Basin 2 08/18/08 NO The tar on the spillway is torn and needs repair. Sediment Basin 3 08/18/08 NO The tar on the spillway is torn and needs repair. Sediment Basin 4 08/18/08 NO The tar on the spillway is torn and needs repair. Sediment Basin 5 08/18/08 OK Device functioning properly. Sediment Basin 6 08/18/08 OK Device functioning properly. Riser Basin # 7 08/18/08 OK Device functioning properly. Diversions Ditches 08/18/08 OK Devices functioning properly. Silt Fence 08/18/08 NO Silt fence at the toe of slope of the rec center location is full and needs stored sediment removed. The silt fence at the stub street south of the traffic circle needs maintenance. Silt Fence Outlet Structures 08/18/08 OK? See comments about area at stub street inlet protection 08/18/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 08/18/08 1 1 1 N N FES # 23 08/18/08 1 1 1 N N SB # 2 08/18/08 1 1 1 N N FES # 26 08/18/08 1 1 1 N N SB # 3 08/18/08 1 1 1 N N FES # 34 08/18/08 1 1 1 N N SB # 4 08/18/08 1 1 1 N N FES # 20 08/18/08 1 1 1 N N SB # 5 08/18/08 1 1 1 N N S13#6 08/18/08 1 1 1 N N FES # 19 08/18/08 1 1 1 N N R13#7 08/18/08 1 1 1 N N FES # RB 7 08/18/08 1 1 1 N N 54" RCP FES X 08/18/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The silt fence at the toe of slope sat the proposed recreation center location is in need of maintenance. The slope above this area is starting to erode. This area is just above a stream so it needs to be addressed as soon as possible. The area at the end of pavement at stub Street C at lot #1 is starting to scour out and the silt fence and filtered outlet at the edge of disturbance needs repair. This will be a continuous problem as the storm water velocity off the paved street is too high. Suggest a lined rip rap filter berm be installed at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Suggest installing a designated concrete washout area (contained in silt fence on 3 sides) in a relatively flat area out of any concentrated storm water flow. The spillway tarps on multiple basins are starting to deteriorate and need repair STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING. 08/24/08 Rainfall Date Amount Initials 08/19/08 .2" JT 08/20/08 3" By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 08/25/08 OK Device functioning properly. Sediment Basin 2 08/25/08 NO The tar on the spillway is torn and needs repair. Sediment Basin 3 08/25/08 NO The tar on the spillway is torn and needs repair. Sediment Basin 4 08/25/08 NO The tar on the spillway is torn and needs repair. Sediment Basin 5 08/25/08 OK Device functioning properly. Sediment Basin 6 08/25/08 OK Device functioning properly. Riser Basin # 7 08/25/08 OK Device functioning properly. Diversions Ditches 08/25/08 OK Devices functioning properly. Silt Fence 08/25/08 NO Silt fence at the toe of slope of the rec center location is full and needs stored sediment removed. The silt fence at the stub street south of the traffic circle needs maintenance. Silt Fence Outlet Structures 08/25/08 OK? See comments about area at stub street Inlet protection 08/25/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 08/25/08 1 1 1 N N FES #23 08/25/08 1 1 1 N N S13#2 08/25/08 1 1 1 N N FES # 26 08/25/08 1 1 1 N N SB # 3 08/25/08 1 1 1 N N FES # 34 08/25/08 1 1 1 N N SB # 4 08/25/08 1 1 1 N N FES # 20 08/25/08 1 1 1 N N SB # 5 08/25/08 1 1 1 N N S13#6 08/25/08 1 1 1 N N FES # 19 08/25/08 1 1 1 N N RB # 7 08/25/08 1 1 1 N N FES # RB 7 08/25/08 1 1 1 N N 54" RCP FES X 08/25/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The silt fence at the toe of slope sat the proposed recreation center location is in need of maintenance (washed stone added on top of sediment above filtered outlet structures which was a waste of time). Sediment needs removal and filtered outlet structur4es replaced. Slope needs to be stabilized as it is eroding. This area is just above a stream so it needs to be addressed as soon as possible. The area at the end of pavement at stub Street C at lot #1 is starting to scour out and the silt fence and filtered outlet at the edge of disturbance needs repair. This will be a continuous problem as the storm water velocity off the paved street is too high. Suggest a lined rip rap filter berm be installed at the end to this stub street to slow runoff to a non erosive velocity where pavement ends. Suggest installing a designated concrete washout area (contained in silt fence on 3 sides) in a relatively flat area out of any concentrated storm water flow. The spillway tarps on multiple basins are starting to deteriorate and need repair STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING. 08/24/08 Rainfall Date Amount Initials 08/27/08 2.4" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once ner seven calendar davs and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 08/28/08 OK Device functioning properly. Sediment Basin 2 08/28/08 OK The tar on the spillway has been repaired. Sediment Basin 3 08/28/08 OK The tar on the spillway has been repaired. Sediment Basin 4 08/28/08 Ok The tar on the spillway has been repaired. Sediment Basin 5 08/28/08 OK Device functioning properly. Sediment Basin 6 08/28/08 OK Device functioning properly. Riser Basin # 7 08/28/08 OK Device functioning properly. Diversions Ditches 08/28/08 OK Devices functioning properly. Slope drains 08/28/08 OK New devices installed at Rec Center location to address slope erosion.. Silt Fence 08/28/08 OK Devices functioning properly. Silt Fence Outlet Structures 08/28/08 OK Devices functioning properly. Inlet protection 08/28/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 08/28/08 2 1 2 N N FES # 23 08/28/08 1 1 1 N N S13#2 08/28/08 2 1 2 N N FES # 26 08/28/08 1 1 1 N N S13#3 08/28/08 2 1 3 N N FES # 34 08/28/08 1 1 1 N N S[3#4 08/28/08 2 1 2 N N FES # 20 08/28/08 1 1 1 N N S13#5 08/28/08 2 1 3 N N SB # 6 08/28/08 2 1 3 N N FES # 19 08/28/08 1 1 1 N N RB # 7 08/28/08 3 2 4 N N FES # RB 7 08/28/08 1 1 1 N N 54" RCP FES X 08/28/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The problem at the Rec Center location has been addressed by placing a diversion berm at the top of slope with slope drains added to keep the water off the fill slope. The silt fence and filtered outlets at the toe of slope have been repaired. Suggest angling the slope drains at the bottom of the slope to slow the water velocity exiting the smooth pipe to a non erosive velocity. Slope has been seeded and mulched.. The area at the end of pavement at stub Street C at lot #1 has had lined rip rap added to slow the water velocity off the road surface and the filtered outlet structures below this area have been repaired. The spillway tarps on multiple basins have been repaired. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 08/31/08 Rainfall Date Amount Initials 08/30/08 Z' JT 08/29/08 .15" By this signature, I certify (in accordance with Part II Section B, 10 of the NCGO10000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Tavlor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 09/04/08 OK Device functioning properly. Sediment Basin 2 09/04/08 OK Device functioning properly. Sediment Basin 3 09/04/08 OK Device functioning properly. Sediment Basin 4 09/04/08 Ok Device functioning properly. Sediment Basin 5 09/04/08 OK Device functioning properly. Sediment Basin 6 09/04/08 OK Device functioning properly. Riser Basin # 7 09/04/08 OK Device functioning properly. Diversions Ditches 09/04/08 OK Devices functioning properly. Slope drains 09/04/08 OK See comments below Silt Fence 09/04/08 OK Devices functioning properly. Silt Fence Outlet Structures 09/04/08 OK Devices functioning properly. Inlet protection 09/04/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainaael Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10) Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 09/04/08 2 1 2 N N FES # 23 09/04/08 1 1 1 N N SB # 2 09/04/08 2 1 2 N N FES # 26 09/04/08 1 1 1 N N SB # 3 09/04/08 2 1 2 N N FES # 34 09/04/08 1 1 1 N N SB # 4 09/04/08 2 1 2 N N FES # 20 09/04/08 1 1 1 N N SB # 5 09/04/08 2 1 2 N N S13#6 09/04/08 2 1 2 N N FES # 19 09/04/08 1 1 1 N N RB # 7 09/04/08 3 2 3 N N FES # RB 7 09/04/08 1 1 1 N N 54" RCP FES X 09/04/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The problem at the Rec Center location has been addressed by placing a diversion berm at the top of slope with slope drains added to keep the water off the fill slope. Suggest angling the slope drains at the bottom of the slope to slow the water velocity exiting the smooth pipe to a non erosive velocity. Slope has been seeded and mulched. The area at the end of pavement at stub Street C at lot #1 has had lined rip rap added to slow the water velocity off the road surface and the filtered outlet structures below this area have been repaired. The spillway tarps on multiple basins have been repaired. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 09/07/08 Rainfall Date Amount Initials 09/06/08 4.5" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 09/07/08 OK Device functioning properly. Sediment Basin 2 09/07/08 OK Device functioning properly. Sediment Basin 3 09/07/08 NO Spillway tar has rips and needs to be replaced. Sediment Basin 4 09/07/08 OK Device functioning properly. Sediment Basin 5 09/07/08 OK Device functioning properly. Sediment Basin 6 09/07/08 NO Spillway berm is starting to undermine (small hole in tarp). Riser Basin # 7 09/07/08 OK Device functioning properly. Diversions Ditches 09/07/08 OK Devices functioning properly. Slope drains 09/07/08 OK See comments below Silt Fence 09/07/08 NO See silt fence at toe of slope at Rec Center and south of street D on perimeter of property Fence Outlet Structures 09/07/08 NO See silt fence at toe of slope at Rec Center and south of street D on perimeter of property Inlet protection 09/07/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatin solids are listed as 1 if clear or there is no drainage Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 09/07/08 2 1 2 N N FES # 23 09/07/08 1 1 1 N N SB # 2 09/07/08 2 1 2 N N FES # 26 09/07/08 1 1 1 N N SB # 3 09/07/08 2 1 2 N N FES # 34 09/07/08 1 1 1 N N SB # 4 09/07/08 2 1 2 N N FES # 20 09/07/08 1 1 1 N N SB # 5 09/07/08 2 1 2 N N SB # 6 09/07/08 4 2 4 N N FES # 19 09/07/08 1 1 1 N N RB # 7 09/07/08 6 2 7 N N FES # RB 7 09/07/08 1 1 1 N N 54" RCP FES X 09/07/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The slope drains at the rec center are protecting the slope from erosion but sediment is being flushed down the pipes from lot erosion above. Suggest scour holes and a horseshoe filter berm at entrance of pipes. Make sure these are lower than berm at top of slope. The silt fence at the toe of slope need sediment removed as the sediment that flushed down the slope drains is filling the silt fence. (These slope drains prevented massive slope failure during this heavy rain event and even with the minor sediment were a huge benefit to preventing sediment discharge into the stream below. Suggest angling the slope drains at the bottom of the slope to slow the water velocity exiting the smooth pipe to a non erosive velocity. Basin # 6 is staring to have the spillway berm undermine from a small hole in the tarp. Multiple spillway tarps had been temporarily repaired weeks ago with tape over the small rips in the tarps. This repair will be short lived as the tarps are aging out and will continue to deteriorate. Basin # 3 has huge rips now and will need replacing (it was repaired with tape several weeks ago). Highly recommend that "Dura Skrim " be used as the liner instead of the silver tarps as it will last twice as long as the silver tarps. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING 09/07/08 Rainfall Date Amount Initials 09/09/08 JT 09/10/08 JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 09/11/08 OK Device functioning properly. Sediment Basin 2 09/11/08 OK Device functioning properly. Sediment Basin 3 09/11/08 NO Spillway tar has rips and needs to be replaced. Sediment Basin 4 09/11/08 OK Device functioning properly. Sediment Basin 5 09/11/08 OK Device functioning properly. Sediment Basin 6 09/11/08 NO Spillway berm is starting to undermine (small hole in tarp). Riser Basin # 7 09/11/08 OK Device functioning properly. Diversions Ditches 09/11/08 OK Devices functioning properly. Slope drains 09/11/08 OK See comments below Silt Fence 09/11/08 NO See silt fence at toe of slope at Rec Center and south of street D on perimeter of property Silt Fence Outlet Structures 09/11/08 NO See silt fence at toe of slope at Rec Center and south of street D on perimeter of property Inlet protection 09/11/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids (1-10 Suspended Solids (1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If yes, see Comments SB # 1 09/11/08 2 1 2 N N FES # 23 09/11/08 1 1 1 N N SB # 2 09/11/08 2 1 2 N N FES # 26 09/11/08 1 1 1 N N SB # 3 09/11/08 2 1 2 N N FES # 34 09/11/08 1 1 1 N N SB # 4 09/11/08 2 1 2 N N FES # 20 09/11/08 1 1 1 N N SB # 5 09/11/08 2 1 2 N N SB # 6 09/11/08 2 2 3 N N FES # 19 09/11/08 1 1 1 N N RB # 7 09/11/08 6 2 6 N N FES # RB 7 09/11/08 1 1 1 N N 54" RCP FES X 09/11/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The Silt fence south of road D about lot # 20 has breached with sediment flushed past the protected area. The diversion berm needs to be re-established and the lots just above this area reseeded as they are starting to erode on the fill slope. The slope drains at the rec center are protecting the slope from erosion but sediment is being flushed down the pipes from lot erosion above. Suggest scour holes and a horseshoe filter berm at entrance of slope drain pipes. Make sure these are lower than berm at top of slope. The silt fence at the toe of slope need sediment removed as the sediment that flushed down the slope drains is filling the silt fence. (These slope drains prevented massive slope failure during this heavy rain event and even with the minor sediment were a huge benefit to preventing sediment discharge into the stream below. Suggest angling the slope drains at the bottom of the slope to slow the water velocity exiting the smooth pipe to a non erosive velocity. Basin # 6 is staring to have the spillway berm undermine from a small hole in the tarp. Multiple spillway tarps had been temporarily repaired weeks ago with tape over the small rips in the tarps. Several of these tarps now have additional rips. The tarps are aging out and will continue to deteriorate. Basin # 3 has huge rips now and will need replacing (it was repaired with tape several weeks ago). Highly recommend that "Dura Skrim " be used as the liner instead of the silver tarps as it will last twice as long as the silver tarps. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities / / MONITORING FOR WEEK BEGINNING. 09 14 08 Rainfall Date Amount Initials 09/16/08 JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCGO10000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 09/17/08 OK Device functioning properly. Sediment Basin 2 09/17/08 NO Spillway tar has rips and needs to be replaced. Sediment Basin 3 09/17/08 OK Device functioning properly. Sediment Basin 4 09/17/08 OK Device functioning properly. Sediment Basin 5 09/17/08 OK Device functioning properly. Sediment Basin 6 09/17/08 NO Spillway berm is starting to undermine (small hole in tarp). Riser Basin # 7 09/17/08 OK Device functioning properly. Diversions Ditches 09/17/08 OK Devices functioning properly. Slope drains 09/17/08 OK See comments below Silt Fence 09/17/08 NO See silt fence at toe of slope at Rec Center and south of street D on perimeter of property Fence Outlet Structures 09/17/08 NO See silt fence at toe of slope at Rec Center and south of street D on perimeter of property protection 09/17/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10) Floating Solids (1-10 Suspended Solids 1-10) Oil Sheen Other Pollution Visible Sediment Leaving Site If yes, see Comments SB # 1 09/17/08 2 1 2 N N FES # 23 09/17/08 1 1 1 N N SB # 2 09/17/08 2 1 2 N N FES # 26 09/17/08 1 1 1 N N SB # 3 09/17/08 2 1 2 N N FES # 34 09/17/08 1 1 1 N N SB # 4 09/17/08 2 1 2 N N FES # 20 09/17/08 1 1 1 N N SB # 5 09/17/08 2 1 2 N N SB # 6 09/17/08 3 2 3 N N FES # 19 09/17/08 1 1 1 N N RB # 7 09/17/08 5 2 6 N N FES # RB 7 09/17/08 1 1 1 N N 54" RCP FES X 09/17/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The Silt fence south of road D has been repaired. The fill slope above this is eroding and the ditch is starting to fill with sediment. Suggest reseeding the fill slope. The slope drains at the rec center are protecting the slope from erosion but sediment is being flushed down the pipes from lot erosion above. Suggest scour holes and a horseshoe filter berm at entrance of slope drain pipes. Make sure these are lower than berm at top of slope. The silt fence at the toe of slope need sediment removed as the sediment that flushed down the slope drains is filling the silt fence. (These slope drains prevented massive slope failure during this heavy rain event and even with the minor sediment were a huge benefit to preventing sediment discharge into the stream below. Suggest angling the slope drains at the bottom of the slope to slow the water velocity exiting the smooth pipe to a non erosive velocity. Basin # 6 is staring to have the spillway berm undermine from a small hole in the tarp. Multiple spillway tarps had been temporarily repaired weeks ago with tape over the small rips in the tarps. Several of these tarps now have additional rips. The tarps are aging out and will continue to deteriorate. Basin # 3 has huge rips now and will need replacing (it was repaired with tape several weeks ago). Highly recommend that "Dura Skrim " be used as the liner instead of the silver tarps as it will last twice as long as the silver tarps. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 09/21/08 Rainfall Date Amount Initials No rain event JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: W [past once npr seven calendar davs and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken I Field Notes Sediment Basin 1 09/24/08 OK Device functioning properly. Sediment Basin 2 09/24/08 NO Spillway tar has rips and needs to be replaced. Sediment Basin 3 09/24/08 OK Device functioning properly. Sediment Basin 4 09/24/08 OK Device functioning properly. Sediment Basin 5 09/24/08 OK Device functioning properly. Sediment Basin 6 09/24/08 NO Spillway berm is starting to undermine (small hole in tarp). Riser Basin # 7 09/24/08 OK Device functioning properly. Diversions Ditches 09/24/08 OK Devices functioning properly. Slope drains 09/24/08 OK See comments below Silt Fence 09/24/08 NO See silt fence at toe of slope at Rec Center Silt Fence Outlet Structures 09/24/08 NO See devices at toe of slope at Rec Center Inlet protection 09/24/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 09/24/08 1 1 1 N N FES # 23 09/24/08 1 1 1 N N SB # 2 09/24/08 1 1 1 N N FES # 26 09/24108 1 1 1 N N SB # 3 09/24/08 1 1 1 N N FES # 34 09/24/08 1 1 1 N N SB # 4 09/24/08 1 1 1 N N FES # 20 09/24/08 1 1 1 N N S13#5 09/24/08 1 1 1 N N SB # 6 09/24/08 1 1 1 N N FES # 19 09/24/08 1 1 1 N N RB # 7 09/24/08 1 1 1 N N FES # RB 7 09/24/08 1 1 1 N N 54" RCP FES X 09/24/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The Silt fence south of road D has been repaired. Fill slope has been reseeded. The slope drains at the rec center are protecting the slope from erosion but sediment is being flushed down the pipes from lot erosion above. Suggest scour holes and a horseshoe filter berm at entrance of slope drain pipes. Make sure these are lower than berm at top of slope. The silt fence at the toe of slope need sediment removed as the sediment that flushed down the slope drains is filling the silt fence. (These slope drains prevented massive slope failure during past heavy rain events and even with the minor sediment were a huge benefit to preventing sediment discharge into the stream below. Suggest angling the slope drains at the bottom of the slope to slow the water velocity exiting the smooth pipe to a non erosive velocity. Basin # 6 is staring to have the spillway berm undermine from a small hole in the tarp. Multiple spillway tarps had been temporarily repaired weeks ago with tape over the small rips in the tarps. Several of these tarps now have additional rips. The tarps are aging out and will continue to deteriorate. Basin # 3 has huge rips now and will need replacing (it was repaired with tape several weeks ago). Highly recommend that "Dura Skrim " be used as the liner instead of the silver tarps as it will last twice as long as the silver tarps. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING 09/21/08 Rainfall Date Amount Initials 09/25/08 .3" JT 09/26/08 2.0" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCGO10000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 09/27/08 OK Device functioning properly. Sediment Basin 2 09/27/08 NO Spillway tar has rips and needs to be replaced. Sediment Basin 3 09/27/08 OK Device functioning properly. Sediment Basin 4 09/27/08 OK Device functioning properly. Sediment Basin 5 09/27/08 OK Device functioning properly. Sediment Basin 6 09/27/08 NO Spillway berm is starting to undermine (small hole in tarp). Riser Basin # 7 09/27/08 OK Device functioning properly. Diversions Ditches 09/27/08 OK Devices functioning properly. Slope drains 09/27/08 OK See comments below Silt Fence 09/27/08 NO See silt fence at toe of slope at Rec Center Silt Fence Outlet Structures 09/27/08 NO See devices at toe of slope at Rec Center Inlet protection 09/27/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 09/27/08 2 1 2 N N FES # 23 09/27/08 1 1 1 N N SB # 2 09/27/08 2 1 2 N N FES # 26 09/27/08 1 1 1 N N S13#3 09/27/08 2 1 2 N N FES # 34 09/27/08 1 1 1 N N S13#4 09/27/08 2 1 2 N N FES # 20 09/27/08 1 1 1 N N S13#5 09/27/08 2 1 2 N N S13#6 09/27/08 3 2 3 N N FES # 19 09/27/08 1 1 1 N N RB # 7 09/27/08 5 2 6 N N FES # RB 7 09/27/08 1 1 1 N N 54" RCP FES X 09/27/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The Silt fence south of road D has been repaired. Fill slope has been reseeded. The slope drains at the rec center are protecting the slope from erosion but sediment is being flushed down the pipes from lot erosion above. Suggest scour holes and a horseshoe filter berm at entrance of slope drain pipes. Make sure these are lower than berm at top of slope. The silt fence at the toe of slope need sediment removed as the sediment that flushed down the slope drains is filling the silt fence. (These slope drains prevented massive slope failure during past heavy rain events and even with the minor sediment were a huge benefit to preventing sediment discharge into the stream below. Suggest angling the slope drains at the bottom of the slope to slow the water velocity exiting the smooth pipe to a non erosive velocity. Basin # 6 is staring to have the spillway berm undermine from a small hole in the tarp. Multiple spillway tarps had been temporarily repaired weeks ago with tape over the small rips in the tarps. Several of these tarps now have additional rips. The tarps are aging out and will continue to deteriorate. Basin # 3 has huge rips now and will need replacing (it was repaired with tape several weeks ago). Highly recommend that "Dura Skrim " be used as the liner instead of the silver tarps as it will last twice as long as the silver tarps. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING 09/28/08 Rainfall Date Amount Initials 09/27/08 .4" JT 10/01/08 .25" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 10/04/08 OK Device functioning properly. Sediment Basin 2 10/04/08 NO Spillway tar has rips and needs to be replaced. Sediment Basin 3 10/04/08 OK Device functioning properly. Sediment Basin 4 10/04/08 OK Device functioning properly. Sediment Basin 5 10/04/08 OK Device functioning properly. Sediment Basin 6 10/04/08 NO Spillway berm is undermining small hole in tarp). Riser Basin # 7 10/04/08 OK Device functioning properly. Diversions Ditches 10/04/08 NO Ditch near basin No. 2 has been compromised. Slope drains 10/04/08 OK See comments below Silt Fence 10/04/08 NO See silt fence at toe of slope at Rec Center Silt Fence Outlet Structures 10/04/08 NO See devices at toe of slope at Rec Center Inlet protection 10/04/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainage) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments) SB # 1 10/04/08 1 1 1 N N FES # 23 10/04/08 1 1 1 N N SB # 2 10/04/08 1 1 1 N N FES # 26 10/04/08 1 1 1 N N S13#3 10/04/08 1 1 1 N N FES # 34 10/04/08 1 1 1 N N SB # 4 10/04/08 1 1 1 N N FES # 20 10/04/08 1 1 1 N N SB # 5 10/04/08 1 1 1 N N SB # 6 10/04/08 1 1 1 N N FES # 19 10/04/08 1 1 1 N N RB # 7 10/04/08 1 1 1 N N FES # RB 7 10/04/08 1 1 1 N N 54" RCP FES X 10/04/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The back side of basin No. 6 has washed out due to rips in the tarp. The diversion ditch leading to this basin has washed out from water flow down the slope leading to the ditch. Recommend a deeper ditch with a flat bottom to slow the flow of water. The silt fence above the invert out of the cross drainage pipe adjacent to the rec center needs maintenance. Recommend filtered outlet structure at low point. The slope drains at the rec center are protecting the slope from erosion but sediment is being flushed down the pipes from lot erosion above. Suggest scour holes and a horseshoe filter berm at entrance of slope drain pipes. Make sure these are lower than berm at top of slope. The silt fence at the toe of slope need sediment removed as the sediment that flushed down the slope drains is filling the silt fence. (These slope drains prevented massive slope failure during past heavy rain events and even with the minor sediment were a huge benefit to preventing sediment discharge into the stream below. Suggest angling the slope drains at the bottom of the slope to slow the water velocity exiting the smooth pipe to a non erosive velocity. Basin # 6 is staring to have the spillway berm undermine from a small hole in the tarp. Multiple spillway tarps had been temporarily repaired weeks ago with tape over the small rips in the tarps. Several of these tarps now have additional rips. The tarps are aging out and will continue to deteriorate. Basin # 3 has huge rips now and will need replacing (it was repaired with tape several weeks ago). Highly recommend that "Dura Skrim " be used as the liner instead of the silver tarps as it will last twice as long as the silver tarps. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING 10/05/08 Rainfall Date Amount Initials 10/09108 Trace JT 10/10/08 .2" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 10/11/08 OK Device functioning properly. Sediment Basin 2 10/11/08 NO Spillway tar has rips and needs to be replaced. Sediment Basin 3 10/11/08 OK Device functioning properly. Sediment Basin 4 10/11/08 OK Device functioning properly. Sediment Basin 5 10/11/08 OK Device functioning properly. Sediment Basin 6 10/11/08 NO Spillway berm is undermining small hole in tarp). Riser Basin # 7 10/11/08 OK Device functioning properly. Diversions Ditches 10/11/08 NO Ditch near basin No. 2 has a small breach which allows some sediment to flush behind the adjacent basin. Slope drains 10/11/08 OK See comments below Silt Fence 10/11/08 NO See silt fence at toe of slope at Rec Center Silt Fence Outlet Structures 10/11/08 NO See devices at toe of slope at Rec Center Inlet protection 10/11/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floatin solids are listed as 1 if clear or there is no drain ge) Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 10/11/08 1 1 1 N N FES # 23 10/11/08 1 1 1 N N SB # 2 10/11/08 1 1 1 N N FES # 26 10/11/08 1 1 1 N N SB # 3 10/11/08 1 1 1 N N FES # 34 10/11/08 1 1 1 N N SB # 4 10/11/08 1 1 1 N N FES # 20 10/11/08 1 1 1 N N SB # 5 10/11/08 1 1 1 N N SB # 6 10111/08 1 1 1 N N FES # 19 10/11/08 1 1 1 N N RB # 7 10/11/08 1 1 1 N N FES # RB 7 10/11/08 1 1 1 N N 54" RCP FES X 10/11/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits COMMENTS: The back side of basin No. 6 has washed out due to rips in the tarp. The diversion ditch leading to this basin has a breach with a washed out which is flushing some sediment past the protected area. Recommend a deeper ditch in the area where the berm failed with a flat bottom to slow the flow of water. The silt fence above the invert out of the cross drainage pipe adjacent to the rec center needs maintenance. The water is flowing down the silt fence (acting like a diversion ditch) and is eroding the area around the headwall of the cross drainage pipe. Recommend adjusting the location of the silt fence so the stormwater does not flow to the steep slope or the headwall. A filtered outlet structure can then be added to the low point of the silt fence. The slope drains at the rec center are protecting the slope from erosion but sediment is being flushed down the pipes from lot erosion above. Suggest scour holes and a horseshoe filter berm at entrance of slope drain pipes. Make sure these are lower than berm at top of slope. The silt fence at the toe of slope need sediment removed as the sediment that flushed down the slope drains is filling the silt fence. (These slope drains prevented massive slope failure during past heavy rain events and even with the minor sediment were a huge benefit to preventing sediment discharge into the stream below. Suggest angling the slope drains at the bottom of the slope to slow the water velocity exiting the smooth pipe to a non erosive velocity. Basin # 6 is staring to have the spillway berm undermine from a small hole in the tarp. Multiple spillway tarps had been temporarily repaired weeks ago with tape over the small rips in the tarps. Several of these tarps now have additional rips. The tarps are aging out and will continue to deteriorate. Basin # 3 has huge rips now and will need replacing (it was repaired with tape several weeks ago). Highly recommend that "Dura Skrim " be used as the liner instead of the silver tarps as it will last twice as long as the silver tarps. STORMWATER INSPECTIONS FOR GENERAL PERMIT NCGO1000-LAND DISTURBING ACTIVITIES PROJECT: Panther Rock Phase 1 For: Terramor Communities MONITORING FOR WEEK BEGINNING: 10/19/08 Rainfall Date Amount Initials 10-24/08-10/25/08 .1" JT By this signature, I certify (in accordance with Part II Section B, 10 of the NCG010000 Permit) that this report is accurate and complete to the best of my knowledge: Jake Taylor CPESC # 3602 (Signature of permitted or designee) Pollution Monitoring Services Inc. EROSION AND SEDIMENT CONTROL OF FACILITIES INSPECTED: At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours Facility ID Date Operating Properly Corrective Actions Taken / Field Notes Sediment Basin 1 10/25/08 OK Device functioning properly. Sediment Basin 2 10/25/08 NO Spillway tar has rips and needs to be replaced. Sediment Basin 3 10/25/08 OK Device functioning properly. Sediment Basin 4 10/25/08 OK Device functioning properly. Sediment Basin 5 10/25/08 OK Device functioning properly. Sediment Basin 6 10/25/08 NO Spillway berm is undermining small hole in tarp). Riser Basin # 7 10/25/08 OK Device functioning properly. Diversions Ditches 10/25/08 NO Ditch near basin No. 2 has a small breach which allows some sediment to flush behind the adjacent basin. Slope drains 10/25/08 OK See comments below Silt Fence 10/25/08 OK See comments below Silt Fence Outlet Structures 10/25/08 NO See devices at toe of slope at Rec Center Inlet protection 10/25/08 OK Devices functioning properly. OBSERVATIONS OF RUNOFF AT STORMWATER DISCHARGE OUTFALLS: (At least once per seven calendar days and within 24 hours of rainfall event of .5" per 24 hours) (clarity, suspended and floating solids are listed as 1 if clear or there is no drainaael Stormwater Discharge Outfall ID Date Clarity 1-10 Floating Solids 1-10 Suspended Solids 1-10 Oil Sheen V Other Pollution Visible Sediment Leaving Site If es, see Comments SB # 1 10/25/08 1 1 1 N N FES # 23 10/25/08 1 1 1 N N S13#2 10/25/08 1 1 1 N N FES # 26 10/25/08 1 1 1 N N S13#3 10/25/08 1 1 1 N N FES # 34 10/25/08 1 1 1 N N S13#4 10/25/08 1 1 1 N N FES # 20 10/25/08 1 1 1 N N S13#5 10/25/08 1 1 1 N N SB # 6 10/25/08 1 1 1 N N FES # 19 10/25/08 1 1 1 N N RB # 7 10/25/08 1 1 1 N N FES # RB 7 10/25/08 1 1 1 N N 54" RCP FES X 10/25/08 1 1 1 N N Storm water Discharge Description of Actions to Prevent Future Description of Measurements taken to Clean Outfall ID Releases up Sediment Outside Disturbed Limits p COMMENTS: i ne bacK side of basin No. 6 has washed out due to rips in the tarp. The silt fence behind this is filling with silt. The diversion ditch leading to this basin has a breach with a washed out which is flushing some sediment past the protected area. Recommend a deeper ditch in the area where the berm failed with a flat bottom to slow the flow of water. The silt fence above the invert out of the cross drainage pipe adjacent to the rec center needs maintenance. Silt fence has been repaired around the headwall of the cross drainage pipe. Recommend a filtered outlet structure to be added to the low point of the silt fence above the invert out of the cross drainage pipe at the stream crossing. The slope drains at the rec center are protecting the slope from erosion but sediment is being flushed down the pipes from lot erosion above. Suggest scour holes and a horseshoe filter berm at entrance of slope drain pipes. Make sure these are lower than berm at top of slope. The silt fence at the toe of slope need sediment removed as the sediment that flushed down the slope drains is filling the silt fence. (These slope drains prevented massive slope failure during past heavy rain events and even with the minor sediment were a huge benefit to preventing sediment discharge into the stream below. Suggest angling the slope drains at the bottom of the slope to slow the water velocity exiting the smooth pipe to a non erosive velocity. Basin # 6 is staring to have the spillway berm undermine from a small hole in the tarp. Several of these tarps now have additional rips. The tarps are aging out and will continue to deteriorate. Basin # 3 has huge rips now and will need replacing (it was repaired with tape several weeks ago). Highly recommend that "Dura Skrim " be used as the liner instead of the silver tarps as it will last twice as long as the silver tarps.