Loading...
HomeMy WebLinkAbout20160191 Ver 1_R-2250 Silt loss_20170907Carpenter,Kristi From: Johnson, Jay B Sent: Thursday, September 07, 2017 11:01 AM To: Steffens, Thomas A SAW (Thomas.A.Steffens@usace.army.mil); Ward, Garcy Cr. Lentine, Sarah F; Blankenship, Andrew; Eatmon, Bryce Subject: FW: R-2250 Silt loss � From: Lentine, Sarah F Sent: Thursday, September 07, 2017 8:56 AM To: Johnson, Jay B Subject: R-2250 Silt loss Jay, Yesterday during heavy rains we had a slope drain blow out, which led to the silt fence being undermined at the location of the wattle. Approximate location is 9i+oo —L- LT at the jurisdictional stream, Site i. The contractor started working on it when the rains cleared yesterday and have �xed the silt fence, installed a 2nd line of silt fence, and �xed the slope drain. They are currently working on repairing the slopes and berm along the main line and at the bridge approach. They retrieved a little over 5— 5 gallon buckets of sediment from the permitted site. Thanks, Sarah E Lentine, PE Senior Assistant Resident Engineer Resident Engineer's Office - Pitt NC Department of Transportation 252 830 3495 office sflentine(a�ncdot.gov 1710 North Memorial Drive P. O. Box 1587 Greenville, NC 27835-1587 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� �:��,����,���� �� �������� �:s�����,�. I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,