HomeMy WebLinkAbout20160191 Ver 1_R-2250 Silt loss_20170907Carpenter,Kristi
From: Johnson, Jay B
Sent: Thursday, September 07, 2017 11:01 AM
To: Steffens, Thomas A SAW
(Thomas.A.Steffens@usace.army.mil); Ward, Garcy
Cr. Lentine, Sarah F; Blankenship, Andrew; Eatmon, Bryce
Subject: FW: R-2250 Silt loss
�
From: Lentine, Sarah F
Sent: Thursday, September 07, 2017 8:56 AM
To: Johnson, Jay B
Subject: R-2250 Silt loss
Jay,
Yesterday during heavy rains we had a slope drain blow out, which led to
the silt fence being undermined at the location of the wattle. Approximate
location is 9i+oo —L- LT at the jurisdictional stream, Site i. The
contractor started working on it when the rains cleared yesterday and have
�xed the silt fence, installed a 2nd line of silt fence, and �xed the slope
drain. They are currently working on repairing the slopes and berm along
the main line and at the bridge approach. They retrieved a little over 5— 5
gallon buckets of sediment from the permitted site.
Thanks,
Sarah E Lentine, PE
Senior Assistant Resident Engineer
Resident Engineer's Office - Pitt
NC Department of Transportation
252 830 3495 office
sflentine(a�ncdot.gov
1710 North Memorial Drive
P. O. Box 1587
Greenville, NC 27835-1587
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� �:��,����,���� �� �������� �:s�����,�.
I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl
I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a,
I�arti��,